This Performance Work Statement (PWS) details rotary airlift services for the North Warning System (NWS) across five zones in Canada from 1 October 2026 to 30 September 2031. The contractor must provide a minimum of one rotary aircraft per zone, capable of IFR flight and Night Vision Goggle (NVG) operations, with removable passenger seating for at least eight passengers. Each aircraft must transport a minimum payload of 1,850 pounds over 150 nautical miles nonstop, comply with Canadian safety requirements, and be equipped with cargo tie-down devices.
The five operational zones are Inuvik, Cambridge Bay, Hall Beach, Iqaluit, and Goose Bay, with flights authorized to Short Range Radar (SRR), Long Range Radar (LRR), and Logistic Support Site (LSS) locations. Flights between zones require prior authorization from HQ ACC AMIC Det 1, and failure to obtain authorization may result in mission reimbursement denial. The NWS O&M contractor can schedule flights or direct mission routing, with commercial airfields potentially used depending on mission requirements. NWS personnel will be considered passengers during these operations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH WARNING SYSTEM
Rotary Airlift Services Appendix 3
FA4890-26-C-XXXX
PERFORMANCE WORK STATEMENT
AS OF 02 Dec 2025
APPENDIX 3 MAIN ROTARY AIRLIFT REQUIREMENTS
1.0 REQUIREMENTS FOR AIRCRAFT AND SERVICES
1.1. The period of performance of this contract is from 1 October 2026 to 30 September 2031.
The Contractor shall provide a minimum of one rotary aircraft equipped with removable and/or foldable passenger seating which provides seating with seat belts for a minimum of eight passengers in each of the five zones at all times. The aircraft will have the capacity of transporting, on each flight, any combination of passenger(s) and/or cargo totaling a minimum payload of 1,850 pounds (for example: four passengers with personal gear weighing 1000 pounds and tools and equipment weighing 850 pounds). This payload will not include helicopter crew-members and Contractor equipment required for the performance of this contract. The aircraft shall be capable of transporting the total payload a range of 150 nautical miles nonstop.
1.2 All aircraft and crew shall be capable of IFR flight. The Contractor will provide a minimum of one NVG capable aircraft and associated crew in each zone. The aircraft shall be in compliance with established Canadian Safety requirements and be equipped with tie-down devices to restrain the movement of cargo. These requirements are a minimum.
1.3 The NWS O&M contractor may require the aircraft to be utilized to its maximum capability as determined by the Aircraft Commander. NWS personnel will be considered passengers and not identified as crew or other specialized category of personnel.
1.4 Zone 1 (Inuvik) flights may fly any combination of routes to Short Range Radar (SRR), Long Range Radar (LRR), or Logistic Support Site (LSS) locations as scheduled by the NWS O&M Contractor or as directed by HQ ACC AMIC Det 1. Sites are provided, but not limited to, the approximate locations in Appendix 1. Commercial airfields may also be employed depending on mission requirements. Cross zone flights will be authorized by HQ ACC AMIC Det 1 prior to mission. Failure by the airlift contractor to obtain cross zone flight authorization prior to the mission may result in a denial of reimbursement for the mission.
1.5 Zone 2 (Cambridge Bay) flights may fly any combination of routes to Short Range Radar (SRR), Long Range Radar (LRR), or Logistic Support Site (LSS) locations as scheduled by the NWS O&M Contractor or as directed by HQ ACC AMIC Det 1. Sites are provided, but not limited to, the approximate locations in Appendix 1. Commercial airfields may also be employed depending on mission requirements. Cross zone flights will be authorized by HQ ACC
AMIC
NORTH WARNING SYSTEM
Rotary Airlift Services Appendix 3 FA4890-26-C-XXXX
PERFORMANCE WORK STATEMENT AS OF XX Dec 2025
Det 1 prior to mission. Failure by the airlift contractor to obtain cross zone flight authorization prior to the mission may result in a denial of reimbursement for the mission.
1.6 Zone 3 (Hall Beach) flights may fly any combination of routes to Short Range Radar (SRR), Long Range Radar (LRR), or Logistic Support Site (LSS) locations as scheduled by the NWS O&M Contractor or as directed by HQ ACC AMIC Det 1. Sites are provided, but not limited to, the approximate locations in Appendix 1. Commercial airfields may also be employed depending on mission requirements. Cross zone flights will be authorized by HQ ACC AMIC Det 1 prior to mission. Failure by the airlift contractor to obtain cross zone flight authorization prior to the mission may result in a denial of reimbursement for the mission.
1.7 Zone 4 (Iqaluit) flights may fly any combination of routes to Short Range Radar (SRR), Long Range Radar (LRR), or Logistic Support Site (LSS) locations as scheduled by the NWS O&M Contractor or as directed by HQ ACC AMIC Det 1. Sites are provided, but not limited to, the approximate locations in Appendix 1. Commercial airfields may also be employed depending on mission requirements. Cross zone flights will be authorized by HQ ACC AMIC Det 1 prior to mission. Failure by the airlift contractor to obtain cross zone flight authorization prior to the mission may result in a denial of reimbursement for the mission.
1.8 Zone 5 (Goose Bay) flights may fly any combination of routes to Short Range Radar (SRR), Long Range Radar (LRR), or Logistic Support Site (LSS) locations as scheduled by the NWS O&M Contractor or as directed by HQ ACC AMIC Det 1. Sites are provided, but not limited to, the approximate locations in Appendix 1. Commercial airfields may also be employed depending on mission requirements. Cross zone flights will be authorized by HQ ACC AMIC Det 1 prior to mission. Failure by the airlift contractor to obtain cross zone flight authorization prior to the mission may result in a denial of reimbursement for the mission.