This combined synopsis/solicitation seeks quotes for preventative maintenance services for air handling units at the East Orange and Lyons VA medical campuses. The contractor shall provide all parts, labor, and materials identified in the performance work statement to perform quarterly, semi-annual, and annual preventative maintenance in accordance with the defined schedules. Pricing shall be provided for a base year and four option years. Quotes are due by August 31, 2020. Award will be made to the vendor with the lowest priced technically acceptable quote and acceptable past performance. The solicitation is a small business set-aside and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.

View the file

Other files

File Type Posted
36C24220Q0894 0004.docx DOCX document
36C24220Q0894 0003.docx DOCX document
36C24220Q0894 0002.docx DOCX document
36C24220Q0894 0001_1.docx DOCX document
P09-QASP- Air handling units.docx DOCX document
WD essex.docx DOCX document
36C24220Q0894.docx DOCX document
WD Somerset.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.3 PERORMANCE WORK STATEMENT (PWS)

A) This firm fixed requirement for quarterly, semi-annual and annual preventative maintenance services on the air handling units, air conditioners and filtered exhaust systems (non-filtered exhaust systems are not included in this scope of work) located at the Orange Campus of the New Jersey VA Healthcare System 385 Tremont Avenue, East Orange NJ 07018 and the Lyons Campus of the New Jersey VA Healthcare System 151 Knollcroft Rd, Lyons, NJ 07939 from 10/01/2020 through 09/30/2021 to include four option years.

B) Contractor shall possess a license to service HVAC equipment in the State of New Jersey and shall only use qualified technicians as defined by the State of New Jersey to service equipment at either location.

C) All technicians shall at the minimum have completed the OSHA 10hr safety course.

D) Contractor shall submit SDS documents for all chemicals to be used in this service agreement to the Contracting Officer’s Representative before the commencement of any work.

A.3.1 PREVENTATIVE MAINTENANCE SERVICES FOR AIR HANDLING UNITS LOCATED AT THE EAST ORANGE CAMPUS OF THE NEW JERSEY VA HEALTHCARE SYSTEM A.3.1.1 General

A) The contractor shall provide all labor, personnel, supervision, equipment, tools, and all materials (filters and belts) necessary to perform preventative maintenance on the air handling units, air conditioners and filtered exhaust systems (non-filtered exhaust systems are not included in this scope of work) as defined in this Performance Work Statement (PWS).

B) All work shall be performed during the hours of 7:00 AM to 3:30 PM, Monday thru Saturday excluding Federal Holidays (defined as: New Year's Day, Birthday of Martin Luther King, Jr., Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day) unless noted within PM procedures below.

C) Preventative maintenance services shall follow the following schedule:

1. Quarterly services shall occur in the months of October, January, April and July

2. Semi-Annual services shall occur in the months of October and April

3. Annual services shall occur in the month of October.

D) Upon arrival to the East Orange VA Medical Campus, HVAC Technicians shall report to Air Conditioning Equipment Mechanic Supervisor in Bldg. 1, B-level, Room 128, Ext. 2099 .the Boiler Plant Foreman in Bldg. 8, 973-676-1000 Ext. 1882.

E) Upon completion of tasks described under section A.3.1 PREVENTATIVE MAINTENANCE SERVICES FOR AIR HANDLING UNITS LOCATED AT THE EAST ORANGE CAMPUS OF THE NEW JERSEY VA HEALTHCARE SYSTEM the contractor shall provide a copy of service report to the COR. Service reports shall be signed by both the contractor and COR at completion of work. An electronic version of same shall be sent to the COR. Service reports shall include tasks completed to include areas worked on, number of workers involved and hours worked.

F) Equipment to be serviced under this contract are listed in Table 1. Below.

Table 1

Building
Level
Location
Equipment identification
Filter Size
Quantity
Building 1:
C-Level:
C-132
AHU-10A
20X25X2
2
AHU-11
24X24X2
8
AHU-11A
18X24X2
6
AHU-12
24X24X2
16
AHU-13
24X24X2
16
AHU-33
24x24x2
10
AHU-33
24X24X22 CORket
4
AHU-34
24X24X4
4
AHU-34
24X24X11½ HEPA
4
AHU-35
24X24X4
4
AHU-35
24X24X11½ HEPA
4
S-4
24X24X2
6
S-4
12X24X2
2
S-40
24X24X2
8
C-101
MAS package Unit
31½X 22X1 (polyester media)
2
C-102
EMS Storage Unit
12X18X2
1
C-121
EMS Supply Unit
20X20X1
1
C-111
Mechanical Room AC Unit
16x25x1
2
C-112
Mechanical Room AC Unit
16x25x1
2
B-Level:
B-110B
Dish washing room AC Unit
16X20X2
8
B-177
Mail Room Package Unit
16X20X1
4
B-158C
MSDS Package Unit
13X18X2
2
B-109
Retherm area AC-1
16X25X1
2
B-109
Retherm area AC-2
16X25X1
2
B-155
Electric Shop AC Unit
16X24X2
4
B-154D
Bio-Med AC Unit
16X25X1
4
B-136
Pharmacy AC Unit
16X25X1
4
B-134D
Linen Room AHU
24X25X2
2
B-140B
Receiving AC Unit
20X22-1/4X1
1
On roof over B-115
AHU-9
24X24X2
16
A-Level:
A-146
A-Level Lab AHU
24X24X4
8
On roof over A-215
Check-In AC Unit
16X20X2
4
On Roof over A-236
AHU-1D
24X24X12
4
On Roof over A-236
AHU-1D
12X24X12
4
On Roof over A-236
AHU-1D
16X16X2
5
On Roof over A-236
AHU-1D
16X25X2
15
A-236Y
AC-1
20X24X2
1
A-314
AC-2
20X24X2
1
A-244
Cat scan Unit
20X20X2
1
A-216A
Lobby Split Unit 1
Washable Filters
N/A
A-216B
Lobby Split Unit 2
Washable Filters
N/A
A-216C
Lobby Split Unit 3
Washable Filters
N/A
A-106 On roof above B-Level kitchen
Pharmacy Unit
16X20X2
6
A-128D
File Room AHU
16X25X2
3
A-102H
Prosthetics Office Unit
16X20X1
1
A-103E
Orthotics AHU
16X20X2
4
A-103E
Orthotics AHU
16X20X4
4
A-160
Clinic Waiting Room Unit
25X25X1
2
1st Floor
1-115
IRM Unit 1
20X24X4
4
1-115
IRM Unit 2
20X25X4
3
1-103A
IRM Unit 3
24X24X2
3
1-103
IRM Unit 4…
24X24X2
3
On roof over Chiller Plant
AHU-17
24X24X2
24
1-259
Angio Room Unit
16X20X2
4
1-259
Angio Room Unit
16X20X4...90%
4
1-261A
Angio Equipment Room Unit
16X24X4
1
1-241
Cat scan Unit 1
16X25X1
3
1-243
Cat scan unit 2
20X20X1
1
1-262B
IRM Classroom Unit
18X25X1
3
1-262
Medical Records Unit
20X22¼X1
1
1-E-301
Directors AHU
16X25X2
3
1-218D
MRI large AC Unit
24x24X1
2
1-218I
MRI Small Ac Unit
20x20X1
1
2nd Floor
2-102
Museum AHU
20X24X4
6
2-102
Museum AHU
24X24X2
6
2-192H
Endoscopy AHU
16X18X2
6
2-181
SPS AHU
20X25X2
6
2-181
SPS AHU
20X25X4
6
2-181
SPS AHU
16X20X2
8
2-181
SPS AHU
23⅜X19⅜X11½
6
2D AHU
On roof outside of room 2-437
18X25X2
10
2D AHU
On roof outside of room 2-437
24X24X11½ HEPA
6
3rd Floor
Auditorium Unit
roof outside of room 4-102
Washable Filters
N/A
3-222
Chaplin AHU
16X20X2
6
3-339
Dental Unit
12X24X2
3
3-339
Dental Unit
20X25X2
3
3-327
Dental Hood #1
16X20X1
1
3-327
Dental Hood #2
16X20X1
1
3-327
Dental Hood #3
16X20X1
1
3-327
Dental Lab after filter
12X18X1
4
3-171A
AHU-10
24X24X2
6
3-165A
Canteen Store AC
16x25X1
4
3-175B
Dining Room AC-1
16X25X2
4
3-181B
Dining Room AC-2
16X25X2
4
On roof outside of 3-214
2D HEPA exhaust
24X24X4
2
On roof outside of 3-214
2D HEPA exhaust
24X24X11½ HEPA
2
4th Floor
2-246
Audiology AHU
16X20X2
3
6th Floor
6C Roof
5C-AHU
20X15X2
24
6C Roof
5C-AHU
24X24X2
6
6C Roof
5C-AHU
24X12X2
2
6C Roof
5C-AHU
24X24X6
6
6C Roof
5C-AHU
Airguard Variflow Model# X0901035-10 24x12x6
2
6C Roof
5C-AHU
Airguard Variflow Model# X0901035-06 24x12x6
2
6C Roof
5C-HEPA Exhaust 1
24X24X4
4
6C Roof
5C-HEPA Exhaust 1
24X24X11½ HEPA
4
6C Roof
5C-HEPA Exhaust 2
24X24X4
4
6C Roof
5C-HEPA Exhaust 2
24X24X11½ HEPA
4
6C Roof
TBEF-6 HEPA Exhaust
24X24X2
2
6C Roof
TBEF-6 HEPA Exhaust
24X24X11½HEPA
2
6D Roof
Echo-Lab AHU
24X24X2
4
6D Roof
Echo-Lab AHU
12X24X2
4
7th Floor
7-200
Infection Control AC unit
12X20X2
2
7-200
Infection Control AC unit
12X20X4
2
8th Floor
8-188A
Podiatry AC Unit
28X21½X1
1
8-204C
New Chemo-lab unit
12X24X2
1
8-204C
New Chemo-lab unit
24X24X2
1
8-204C
New Chemo-lab unit
12X24x4…90%
1
8-204C
New Chemo-lab unit
4x24X4…90%
1
8-204C
New Chemo-lab unit
30X30X11½ HEPA
1
8-204A
Old Chemo-lab unit
16X25X2
4
8-204A
Old Chemo-lab unit
24X24X2
1
8-204A
Old Chemo-lab unit
24X24X11½ HEPA
1
9th Floor
9-163
Cath Lab Unit
18X24X2
2
9-163
Cath Lab Unit
12X24X2
1
9-163
Cath Lab Unit
24X24X2
2
9-163
Cath Lab Unit
24X24X11½ HEPA
2
Penthouse-A Core
PHA-1
AHU-7
24X24X2
20
PHA-1
AHU-8
24X24X2
16
PHA-1
TBEF-2 HEPA Exhaust
24X24X2
2
PHA-1
TBEF-2 HEPA Exhaust
24X24X11½ HEPA
2
PHA-1
TBEF-5 HEPA Exhaust
24X24X2
1
PHA-1
TBEF-5 HEPA Exhaust
24X24X11½ HEPA
1
PHA-1
TBEF-7 HEPA Exhaust…
24X24X2
4
PHA-1
TBEF-7 HEPA Exhaust…
24X24X11½ HEPA
4
Penthouse-A East Side
PHA-3
AHU-2
16X20X2
6
PHA-3
AHU-2
16X20X4
6
PHA-3
AHU-2
12X24X2
2
PHA-3
AHU-2
20X20X2
3
PHA-3
AHU-2
12X24X12 merv-11
2
PHA-3
AHU-2
20X20X12 merv-11
3
PHA-3
AHU-5
12X24X2
3
PHA-3
AHU-5
20X20X2
8
PHA-3
AHU-5
12X24X4
3
PHA-3
AHU-5
20X20X4
8
PHA-3
AHU-5
12X24X2
3
PHA-3
AHU-5
20X20X4
8
PHA-3
AHU-5
12X24X2
3
PHA-3
AHU-5
20X24X2
6
PHA-3
AHU-5
12X24X12 merv-11
3
PHA-3
AHU-5
20X24X12 merv-11
6
Penthouse-A West Side
PHA-4
AHU-3
12X24X2
5
PHA-4
AHU-3
20X20X2
24
PHA-4
AHU-3
16X20X2
4
PHA-4
AHU-3
12X24X4
5
PHA-4
AHU-3
20X20X4
24
PHA-4
AHU-3
16X20X4
4
PHA-4
AHU-3
12X24X2
4
PHA-4
AHU-3
24X24X2
20
PHA-4
AHU-3
12X24X11.5 merv-11
4
PHA-4
AHU-3
24X24X11.5 merv-11
20
PHA-4
HR-4
12X24X2
3
PHA-4
HR-4
16X20X2
2
PHA-4
HR-4
20X24X2
6
Penthouse-B Core
PHA-2B
AC Unit 5
18X24X2
3
PHA-2B
AC Unit 6
18X24X2
3
PHB-9
AC Unit 1
18X24X1
4
PHB-9
AC Unit 1
24X24X2
2
PHB-9
AC Unit 2
18X24X1
4
PHB-9
AC Unit 2
24X24X2
2
Penthouse-B East Side
PHB-2
AC Unit 3
18X24X1
4
PHB-2
AC Unit 3
24X24X2
2
PHB-3
AHU-4
20X20X2
6
PHB-3
AHU-4
20X20X4
6
PHB-3
AHU-4
20X24X2
4
PHB-3
AHU-4
20X20X2
2
PHB-3
AHU-4
20X24X12 merv-11
4
PHB-3
AHU-4
20X20X12 merv-11
2
PHB-3
HR-6
16X24X2
4
PHB-3
HR-6
20X25X2
3
PHB-3
AHU-2
24X24X2
8
Penthouse-B West Side
PHB-6
AC Unit 4
18X24X1
4
PHB-6
AC Unit 4
24X24X2
2
PHB-4
AHU-6
20X20X2
10
PHB-4
AHU-6
20X20X2
4
PHB-4
AHU-6
20X20X4
10
PHB-4
AHU-6
16X25X4
4
PHB-4
AHU-6
24X24X2
12
PHB-4
AHU-6
24X24X11.5 merv-11
12

Penthouse Roof East Side

AHU-1
24X24X2
15
AHU-1
12X24X2
8
AHU-1
24X24X4
15
AHU-1
12X24X4
8
AHU-1
12X24X2
14
AHU-1
24X24X2
12
AHU-1
12X24X12 MERV-11
14
AHU-1
24X24X12 MERV-11
12
HR-1
16X20X2
24

Penthouse Roof West Side

HR-2/3
16X20X2
6
HR-2/3
20X20X2
36

Building 5A:

Bard Unit #1
14X25X1
1
Bard Unit #2
14X25X1
1
Bard Unit #3
14X25X1
1
Bard Unit #4
14X25X1
1
Bard Unit #5
14X25X1
1
Bard Unit #6
14X25X1
1
Bard Unit #7
14X25X1
1
Bard Unit #8
14X25X1
1

Building 6:

6-01C
Paint Shop AHU
18X22X2
2
Building 7:
B-level
B-138
AHU-E-Preheat
20X20X2
4
B-135
AHU-E
24x24X2
2
B-135
AHU-E
24X16X2
1
B-135
AHU-E
12X24X2
2
B-135
AHU-E
12X16X2
1

Lower Roof

AHU-B
24X24X2
4
AHU-B
12X24X2
4
AHU-C
24X24X2
4
AHU-C
12X24X2
4
AHU-X
20X20X2
2
HR – B
24X24X2
4
HR – C
24X24X2
4

Upper Roof

AHU-A
24X24X2
4
AHU-A
12X24X2
4
AHU-D
24X24X2
2
AHU-D
12X24X2
1
HR - A
24X24X2
4
HR – D
No filters. Wash coil as needed
N/A
HR - E
No filters. Wash coil as needed
N/A

Penthouse

AHU-1
24X24X4
15
AHU-1
24X24X12
15
AHU-2
24X12X4
3
AHU-2
24X24X12
1
AHU-2
24X12X12
1
EF-1
20X24X4
12

Building 11:

B-104A
AHU-1
12X24X2
2
B-104A
AHU-1
24X24X2
1
B-104A
AHU-1
12X24X12…85%.
2
B-104A
AHU-1
24X24X12…85%
1
B-103A
AHU-2
24x24X2
4
B-103A
AHU-2
24X24X12…85%
4

Building 15:

15-131
AHU-1
29X29X2
2
15-131
AHU-2
18¼X21½X2
2

Building 15A:

Bard Unit #1
14X25X1
1
Bard Unit #2
14X25X1
1
Bard Unit #3
14X25X1
1

Building 15B:

Bard Unit #1
14X25X1
1
Bard Unit #2
14X25X1
1
Bard Unit #3
14X25X1
1

Building 18:

18-112
AHU-1
18¼X21½X2
2
18-112
Air Purifier 1
20X24X4
1
18-112
Air Purifier 1
20X24X11½ HEPA
1
18-132
AHU-2
18¼X21½X2
2
18-132
Air Purifier 2
20X24X4
1
18-132
Air Purifier 2
20X24X11½ HEPA
1
18-154B
132AHU-3
29X29X2
2
18-101 corridor
AHU-4
12X30X1
1
18-138A corridor
AHU-5
12X30X1
1

Building 24:

24-100
AC Unit
20X20X1
1

Most air handlers will use UL Class 2 standard capacity merv-7 or 8 pleated air filters. Air handlers 33, 34, 35, SPS, Endoscopy and Dental will use High capacity Merv-11 pleated air filters. Rigid cell box filters will be UL class 2 merv-11 air filters. HEPA filters will be UL class 1, hospital grade air filters.

COR-kept air filters will be UL class 2, merv-13 air filters.

A.3.1.2 QUARTERLY PREVENTATIVE MAINTENANCE SERVICES

A) The contractor shall provide the facility with a schedule detailing which pieces of equipment shall be serviced on what days at least one week before commencing quarterly preventative maintenance services. Changes to the schedules shall coordinated with the facility at least one business day in advance.

B) Before commencing work on a given day, VA personnel shall turn of the power to units being serviced using proper lock-out and tag-out procedures of the power supply will apply for V.A. and contractor personnel in accordance with NFPA 70E Standard for Electrical Safety in the Workplace.

C) The contractor shall perform the following tasks on the equipment listed in Table 1

1. Remove and dispose of all pre-filters on all Air Handling Units, Package Units, Air conditioning units and HEPA exhaust units.

2. Remove, wash, air dry and re-install washable air filters when applicable.

3. Remove and dispose of after-filters where applicable excluding HEPA Filters.

4. Inspect coils for cleanliness.

5. Wash or vacuum coils as needed.

6. Install new pre filters.

7. Install new after filters.

8. Lubricate bearings on motors and squirrel cage shaft bearings.

9. Clean grease fittings.

10. Inspect condition of belts and replace or adjust belts as necessary.

11. Install drain pan treatment and conditioner (Anti clog ATC or equivalent, Anti clog FTC or equivalent, Neutronic deodorant or equivalent and Slime Buster or equivalent)

12. Coordinate with VA personnel to remove lock-out tag-out and turn equipment back on.

D) The following Air Handlers (AHU-34, 35, SPS and AHU-1D) cannot be serviced during normal working hours. Special arrangements through the COR/Utility Shop Foreman shall be made to service these units after normal working hours or on weekends.

A.3.1.2 SEMI-ANNUAL PREVENTATIVE MAINTENANCE SERVICES

A) The Contractor shall replace belts on AHU #34, 35, SPS and Endoscopy Units – Regardless of condition.

A.3.1.3 ANNUAL PREVENTATIVE MAINTENANCE SERVICES

A) Provide all services listed in section A.3.1.2 QUARTERLY PREVENTATIVE MAINTENANCE SERVICES in addition to the following tasks:

1. Remove and dispose of all HEPA filters on the third quarter of the government fiscal year.

2. Install new HEPA filters.

3. Winterize all water filled chill water coils. The COR will determine the timing for the winterization based on the weather forecast and also which coils will be exempt from winterizing. To winterize coils, the following guideline will generally apply:

a. Close chilled water supply and return valves to the coil.

b. Open drain line and vent and drain the water to the nearest drain.

c. Connect hoses to drain line, vent, container of glycol and a pump in order to circulate Propylene Glycol throughout the coil. Freeze protection of glycol must be at least -20° F. Circulate the glycol through the coil for at least ten minutes to ensure all areas of the coil are saturated.

d. When circulation of the glycol is completed, drain the coil by reclaiming the glycol for use on the next coil.

e. Leave drain and vent valves in the open position.

f. Test the reclaimed glycol before using on the next coil to ensure protection against freezing to at least -40 F. Adjust concentration of glycol as necessary.

g. Clean up any spill that occurred during winterization.

h. Report to COR/Utility Shop Foreman if any valve does not positively stop the flow of chilled water to the coil being winterized.

1) Utility shop personnel shall reactivate the coil if and when needed and re-winterize if necessary

i. Replace all belts, regardless of condition.

B) The air handling units to be winterized shall be listed below in Table 2.

Table 2.

Units to be Serviced

AHU-1

AHU-2

AHU-3

AHU-4

AHU-5

AHU-6

AHU-7

AHU-8

AHU-9

AHU-10

AHU-10A

AHU-11

AHU-11A

AHU-12

AHU-13

AHU-Linen Room

AHU-A-level Lab

AHU-17

AHU-33

AHU-34

AHU-35

AHU-Director

AHU-2D

AHU-Museum

AHU-Endoscopy

AHU-Audiology

AHU-5C

AHU-Echo-Lab

AHU-SPS

AHU-Chaplin

AHU-Dental

C) In the month of July, unless instructed otherwise by COR, the contractor shall drain all glycol heating systems into containers for reuse. Inspect glycol for reusability and replace if necessary. Chemically clean each system following manufactures recommendations. Drain chemically treated water and refill using saved or new propylene glycol. Add glycol as necessary to maintain a 30% glycol and 70% water mix. Strainers that are affected on the air handlers of each glycol heating system shall be removed, cleaned and reinstalled.

D) The Glycol systems and their related air handler that shall be cleaned are listed in Table 3. below.

Table 3

Building
System
Sub-units
Building 1:
O.R. system…C-level
AHU-17
O.R. system…C-level
AHU-33
O.R. system…C-level
AHU-34
O.R. system…C-level
AHU-35
P13 & 14 system…C-level
AHU-9
P13 & 14 system…C-level
AHU-10
P13 & 14 system…C-level
AHU-10A
P13 & 14 system…C-level
AHU-11
5C system…C-level (two systems)
AHU-5C
Radiology system…A-236E
AHU-1D
Echo lab system…6-208B
AHU Echo lab
Penthouse system…Penthouse A core
AHU-1
Penthouse system…Penthouse A core
AHU-2 above.
Penthouse system…Penthouse A core
AHU-3
Penthouse system…Penthouse A core
AHU-4
Penthouse system…Penthouse A core
AHU-5
Penthouse system…Penthouse A core
AHU-6
Chemo Lab system…Penthouse A core
New chemo lab AHU

Building 15:

AHU-1…bldg. 15 machine room

AHU-2…bldg. 15 machine room

Building 18:

AHU-1…bldg. 18 ceiling

AHU-2…bldg. 18 ceiling

AHU-3…bldg. 18 ceiling

AHU-4…bldg. 18 ceiling

AHU-5…bldg. 18 ceiling

E) Building 15 and 18 glycol cooling systems shall to be done in January. These units are co-located with the air handling units listed in table 3 above.

A.3.2 PREVENTATIVE MAINTENANCE SERVICES FOR AIR HANDLING UNITS LOCATED AT Lyons CAMPUS OF THE NEW JERSEY VA HEALTHCARE SYSTEM A.3.2.1 General A) The contractor shall provide all labor, personnel, supervision, equipment, tools, and all materials (filters and belts) necessary to perform preventative maintenance on the air handling units, air conditioners and filtered exhaust systems (non-filtered exhaust systems are not included in this scope of work) as defined in this Performance Work Statement (PWS).

B) All work shall be performed during the hours of 8:00 AM to 4:00 PM, Monday thru Saturday excluding Federal Holidays (defined as: New Year's Day, Birthday of Martin Luther King, Jr., Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day) unless noted within PM procedures below.

C) Preventative maintenance services shall follow the following schedule:

1. Quarterly services shall occur in the months of November, February, May and August

2. Annual services shall occur in the month of May.

D) Upon arrival to the Lyons VA Medical Campus, HVAC Technicians shall report to HVAC Shop Foreman, Bldg. 136, Ext. 4845.

E) Upon completion of tasks described under section A.3.2 PREVENTATIVE MAINTENANCE SERVICES FOR AIR HANDLING UNITS LOCATED AT THE LYONS CAMPUS OF THE NEW JERSEY VA HEALTHCARE SYSTEM the contractor shall provide a copy of service report to the COR. Service reports shall be signed by both the contractor and COR at completion of work. An electronic version of same shall be sent to the COR. Service reports shall include tasks completed to include areas worked on, number of workers involved and hours worked.

F) Equipment to be serviced under this contract are listed in Table 4. Below.

Table 4.

Building
Location
Equipment identification
Filter Size/ type
Quantity
Bldg. #3
Mech. Rm S230
AHU-1
24 x 24 x 4/4" Perfect Pleat
6
Mech. Rm S230
AHU-1
12 x 24 x 4/4" Perfect Pleat
2
Mech. Rm S230
AHU-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
6
Mech. Rm S230
AHU-1
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
2
Mech. Rm S207
AHU-2
24 x 24 x 4/4" Perfect Pleat
6
Mech. Rm S207
AHU-2
12 x 24 x 4/4" Perfect Pleat
2
Mech. Rm S207
AHU-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
6
Mech. Rm S207
AHU-2
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
2
AHU-3
24 x 24 x 4/4" Perfect Pleat
9
AHU-3
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
9
AHU-4
24 x 24 x 4/4" Perfect Pleat
9
AHU-4
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
9
AHU-5
24 x 24 x 4/4" Perfect Pleat
9
AHU-5
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
9
AHU-6
24 x 24 x 4/4" Perfect Pleat
2
AHU-6
24 x 24 x 4/4" Perfect Pleat
2
AHU-6
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
2
AHU-6
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
2
FCU-1
16 x 25 x 2/2" Perfect Pleat
4
FCU-1
20 x 25 x 2/2" Perfect Pleat
2
FCU-2
16 x 25 x 2/2" Perfect Pleat
4
FCU-2
20 x 25 x 2/2" Perfect Pleat
2
Bldg. #4
Roof
AC-1
16 x 25 x 4/4" Perfect Pleat
2
Roof
AC-1
20 x 25 x 4/4" Perfect Pleat
7
Roof
AC-1
20 x20 x 4/4" Perfect Pleat
2
Roof
AC-1
20 x 24 x 15 - 6P/DriPak2000 - 90-95%
4
Roof
AC-1
20 x 20 x 15 - 6P/DriPak2000 - 90-95%
6
Roof
AC-2
16 x 20 x 4/4" Perfect Pleat
5
Roof
AC-2
20 x 25 x 4/4" Perfect Pleat
1
Roof
AC-2
20 x 24 x 15 - 6P/DriPak2000 - 90-95%
2
Roof
AC-2
12 x 24 x 15 - 4P/DriPak2000 - 90-95%
2
Attic
AC-3
16 x 20 x 4/4" Perfect Pleat
7
Attic
AC-3
16 x 25 x 4/4" Perfect Pleat
7
Bldg. #7
Attic
EF-1
24 x 24 x 4/4" Perfect Pleat
8
Attic
AH-1
20 x 24 x 4/4" Perfect Pleat
2
Attic
AH-1
24 x 24 x 2/2" Perfect Pleat
8
Attic
AH-1
20 x 24 x 2/2" Perfect Pleat
2
Basement
SF-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
Basement
SF-1
12 x 24 x 15 - 4P/DriPak2000 - 90-95%
2
Basement
SF-1
24 x 24 x 2/2" Perfect Pleat
8
Basement
SF-1
12 x 24 x 2/2" Perfect Pleat
2
Basement
AH-2
12 x 24 x 4/4" Perfect Pleat
4
Basement
AH-2
24 x 24 x 4/4" Perfect Pleat
8
Basement
AH-2
20 x 24 x 4/4" Perfect Pleat
2
Basement
AH-2
12 x 24 x 2/2" Perfect Pleat
4
Basement
AH-2
24 x 24 x 2/2" Perfect Pleat
8
Basement
AH-2
20 x 24 x 2/2" Perfect Pleat
2
MER
SF-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
MER
SF-2
12 x 24 x 15 - 4P/DriPak2000 - 90-95%
7
Building #53
MER 11 Basement
AHU-1
16 x 20 x4/4" Perfect Pleat
2
MER 11 Basement
AHU-1
16 x 25 x 4/4" Perfect Pleat
3
MER 11 Basement
AHU-1
20 x 20 x 4/4" Perfect Pleat
6
MER 11 Basement
AHU-1
20 x 25 x 4/4" Perfect Pleat
4
MER 11 Basement
AHU-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
MER 11 Basement
AHU-1
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
2
Left - Attic
AHU-2
16 x 25 x 4/4" Perfect Pleat
14
Left - Attic
AHU-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
Left - Attic
AHU-2
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
2
Attic
EF-2 & EF-3
16 x 25 x 4/4" Perfect Pleat
28
Right - Attic
AH-3
16 x20 x 4/4" Perfect Pleat
3
Right - Attic
AH-3
20 x 20 x 4/4" Perfect Pleat
15
Right - Attic
AH-3
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Right - Attic
AH-3
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
2
Building #54
Mech Rm 8
AC -1
16 x 20 x 2/2" Perfect Pleat
1
Mech Rm 8
AC -1
20 x 25 x 2/2" Perfect Pleat
4
Mech Rm 8
AC -1
20 x 20 x 2/2" Perfect Pleat
1
Mech Rm 8
AC -1
16 x 25 x 2/2" Perfect Pleat
6
Mech Rm 8
AC-2
16 x 25 x 2/2" Perfect Pleat
1
Mech Rm 8
AC-2
16 x 20 x 2/2" Perfect Pleat
1
Mech Rm 8
AC-3
20 x 25 x 2/2" Perfect Pleat
2
Mech Rm 8
AC-3
16 x 25 x 2/2" Perfect Pleat
2
Mech Rm 8
AC-3
16 x 20 x 2/2" Perfect Pleat
1
Building #57
Basement MER9
SF-1
24 x 24 x 2/2" Perfect Pleat
8
Basement MER9
SF-1
18 x 24 x 2/2" Perfect Pleat
2
Basement MER9
SF-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
Basement MER9
SF-1
12 x 24 x 15 - 4P/DriPak2000 - 90-95%
2
AH-2
18 x 24 x 4/4" Perfect Pleat
2
AH-2
24 x 25 x 4/4" Perfect Pleat
12
Basement MER9
SF-2
24 x 24 x 2/2" Perfect Pleat
8
Basement MER9
SF-2
12 x 24 x 2/2" Perfect Pleat
6
Basement MER9
SF-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
Basement MER9
SF-2
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
6
Attic
EF-1, EF-2 & EF-3
24 x 24 x 4/4" Perfect Pleat
18
Building #143
Mech Rm E104
SF-2
20 x 25 x 4/4" Perfect Pleat
16
Mech Rm E104
SF-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Mech Rm E104
SF-2
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
5
Mech Rm W105
SF-1
20 x 25 x 4/4" Perfect Pleat
18
Mech Rm W105
SF-1
20 x 20 x 4/4" Perfect Pleat
2
Mech Rm W105
SF-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Mech Rm W105
SF-1
20 x 24 x 15 - 5P/DriPak2000 - 90-95%
7
Mech Rm W105
SF-7
20 x 25 x 4/4" Perfect Pleat
2
3rd Flr. MER
SF -5
16 x 20 x 4/4" Perfect Pleat
3
3rd Flr. MER
SF -5
16 x 25 x 4/4" Perfect Pleat
4
3rd Flr. MER
SF -5
20 x 20 x 4/4" Perfect Pleat
6
3rd Flr. MER
SF -5
20 x 25 x 4/4" Perfect Pleat
4
3rd Flr. MER
SF -5
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
3rd Flr. MER
SF -5
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
6
3rd Flr. MER
SF-6
20 x 25 x 4/4" Perfect Pleat
18
3rd Flr. MER
SF-6
20 x 20 x 4/4" Perfect Pleat
2
3rd Flr. MER
SF-6
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
3rd Flr. MER
SF-6
20 x 20 x 15 - 5P/DriPak2000 - 90-95%
7
3rd Flr. MER
SF-6
20 x 24 x 15 - 3P/DriPak2000 - 90-95%
2
Mech Rm N107
SF-3
20 x 24 x 4/4" Perfect Pleat
6
Mech Rm N107
SF-3
20 x 20 x 4/4" Perfect Pleat
4
Mech Rm N107
SF-3
16 x 20 x 4/4" Perfect Pleat
3
Mech Rm N107
SF-3
16 x 25 x 4/4" Perfect Pleat
2
Mech Rm N107
SF-3
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
Mech Rm N107
SF-3
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
6
Mech Rm N107
SF-4
20 x 20 x 4/4" Perfect Pleat
4
Mech Rm N107
SF-4
20 x 24 x 4/4" Perfect Pleat
6
Mech Rm N107
SF-4
16 x 20 x 4/4" Perfect Pleat
3
Mech Rm N107
SF-4
16 x 25 x 4/4" Perfect Pleat
2
Mech Rm N107
SF-4
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
8
Mech Rm N107
SF-4
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
6
Building 135
Main Tower A
SF-4 & RF-4
12 x 24 x 2/2" Perfect Pleat
10
Main Tower A
SF-4 & RF-4
24 x 24 x 2/2" Perfect Pleat
20
Main Tower A
SF-4
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
5
Main Tower A
SF-4
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Main Tower A
SF-4
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
5
Main Tower A
SF-4
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Main Tower A
SF-3 & RF-1
24 x 24 x 2/2" Perfect Pleat
36
Main Tower A
SF-3
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
36
Main Tower B
SF-1
12 x 24 x 2/2" Perfect Pleat
5
Main Tower B
SF-1
24 x 24 x 2/2" Perfect Pleat
10
Main Tower B
SF-1
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
5
Main Tower B
SF-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Main Tower B
RF-1
24 x 24 x 2/2" Perfect Pleat
9
Main Tower B
RF-1
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
9
Main Tower C
SF-2
12 x 24 x 2/2" Perfect Pleat
5
Main Tower C
SF-2
24 x 24 x 2/2" Perfect Pleat
10
Main Tower C
SF-2
12 x 24 x 15 - 3P/DriPak2000 - 90-95%
5
Main Tower C
SF-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
10
Main Tower C
RF-2
24 x 24 x 2/2" Perfect Pleat
9
Main Tower C
RF-2
24 x 24 x 15 - 6P/DriPak2000 - 90-95%
9
Building 9
police station
AHU-1
16 x 24 x 2/2" Perfect Pleat
4
police station
AHU-1
24 x 24 x 2/2" Perfect Pleat
2
police station
AHU-1
12 x 24 x 2/2" Perfect Pleat
2
Building 1
SPD
AHU -1
16 x 25 x 2/2" Perfect Pleat
2
SPD
AHU -1
20 x 25 x 2/2" Perfect Pleat
4
SPD
AHU -1
20 x 24 x 15 - 6P/DriPak2000 - 90-95%
3
SPD
AHU -2
16 x 25 x 2/2" Perfect Pleat
6
SPD
AHU -2
20 x 25 x 2/2" Perfect Pleat
4

Blood Bank Package Unit

20 x 20 x 2/2" Perfect Pleat
4
Employee Health AC 1
AHU-1 above ceiling
16 x 25 x 2/2" Perfect Pleat
4
Building 6
Dental
AHU -1
16 x 20 x 2/2" Perfect Pleat
9
Dental
AHU- 2
16 x 20 x 1/1" Perfect Pleat
6
Building 2
Morgue
AHU-1
16 x 20 x 4/4" Perfect Pleat
1
Morgue
AHU-1
16 x 16 x 4/4" Perfect Pleat
1
Record Room
AHU-1
16 x 25 x 1/1" Perfect Pleat
2
Record Room
AHU-1
20 x 25 x 1/1" Perfect Pleat
1
Building 5
Gym
AHU -1
16 x 20 x 1/1" Perfect Pleat
6
Gym
AHU -2
16 x 20 x 1/1" Perfect Pleat
6
Building 1
Xray
AHU - 1
16 x 16 x 1/1" Perfect Pleat
6
Xray
AHU - 2
20 x 25 x 1/1" Perfect Pleat
1

A.3.2.2 QUARTERLY PREVENTATIVE MAINTENANCE SERVICES

A) The contractor shall provide the facility with a schedule detailing which pieces of equipment shall be serviced on what days at least one week before commencing quarterly preventative maintenance services. Changes to the schedules shall coordinated with the facility at least one business day in advance.

B) Before commencing work on a given day, VA personnel shall turn of the power to units being serviced using proper lock-out and tag-out procedures of the power supply will apply for V.A. and contractor personnel in accordance with NFPA 70E Standard for Electrical Safety in the Workplace.

C) The contractor shall perform the following tasks on the equipment listed in Table 4.

1. Remove and dispose of all pre-filters on all Air Handling Units, Package Units, Air conditioning units and HEPA exhaust units.

2. Remove, wash, air dry and re-install washable air filters when applicable.

3. Remove and dispose of after-filters where applicable excluding HEPA Filters.

4. Inspect coils for cleanliness.

5. Wash or vacuum coils as needed.

6. Install new pre filters.

7. Install new after filters.

8. Lubricate bearings on motors and squirrel cage shaft bearings.

9. Clean grease fittings.

10. Inspect condition of belts and replace or adjust belts as necessary.

11. Install drain pan treatment and conditioner (Anti clog ATC or equivalent, Anti clog FTC or equivalent, Neutronic deodorant or equivalent and Slime Buster or equivalent)

12. Coordinate with VA personnel to remove lock-out tag-out and turn equipment back on.

D) The following Air Handlers (AHU-34, 35, SPS and AHU-1D) cannot be serviced during normal working hours. Special arrangements through the COR/Utility Shop Foreman shall be made to service these units after normal working hours or on weekends.

A.3.2.2 ANNUAL PREVENTATIVE MAINTENANCE SERVICES

A) Provide all services listed in section A.3.1.2 QUARTERLY PREVENTATIVE MAINTENANCE SERVICES in addition to the following tasks:

1. Remove and dispose of all HEPA filters on the third quarter of the government fiscal year.

2. Install new HEPA filters.

3. Winterize all water filled chill water coils. The COR will determine the timing for the winterization based on the weather forecast and also which coils will be exempt from winterizing. To winterize coils, the following guideline will generally apply:

a. Close chilled water supply and return valves to the coil.

b. Open drain line and vent and drain the water to the nearest drain.

c. Connect hoses to drain line, vent, container of glycol and a pump in order to circulate Propylene Glycol throughout the coil. Freeze protection of glycol must be at least -20° F. Circulate the glycol through the coil for at least ten minutes to ensure all areas of the coil are saturated.

d. When circulation of the glycol is completed, drain the coil by reclaiming the glycol for use on the next coil.

e. Leave drain and vent valves in the open position.

f. Test the reclaimed glycol before using on the next coil to ensure protection against freezing to at least -40 F. Adjust concentration of glycol as necessary.

g. Clean up any spill that occurred during winterization.

h. Report to COR/Utility Shop Foreman if any valve does not positively stop the flow of chilled water to the coil being winterized.

1) Utility shop personnel shall reactivate the coil if and when needed and re-winterize if necessary

i. Replace all belts, regardless of condition.