36C24220Q0894 0001_1.docx

DOCX document 25 KB Posted

Attached to
J041--Service Contract Air Handling Units Federal contract opportunity
Solicitation number
36C24220Q0894
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This combined synopsis and solicitation requests quotes for preventative maintenance services for air handling units at two Department of Veterans Affairs medical campuses. The contractor shall provide all parts, labor, and maintenance identified in the attached performance work statement to service air handling units at the East Orange and Lyons VA Medical Centers in New Jersey. The base period of performance is from October 1, 2020 to September 30, 2021 with four optional one-year extensions. Quotes are due by August 31, 2020 and award will be made to the vendor with the lowest priced technically acceptable quote and acceptable past performance. The requirement is set aside for small businesses under NAICS code 238220 with a size standard of $16.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to J041--Service Contract Air Handling Units, newest first.
File Type Posted
36C24220Q0894 0004.docx DOCX document
36C24220Q0894 0003.docx DOCX document
36C24220Q0894 0002.docx DOCX document
WD Somerset.docx DOCX document
PWS Air Handling Unit Services.docx DOCX document
P09-QASP- Air handling units.docx DOCX document
WD essex.docx DOCX document
36C24220Q0894.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Amendment to a Previous Combined Solicitation

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation J041 Service Contract Air Handling Units 14227 36C24220Q0894 09-11-2020 12:00

EASTERN TIME, NEW YORK, USA

N

SBA

238220 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Spivack, Michael Michael.Spivack@va.gov East Orange VAMC 385 Tremont Avenue East Orange NJ 07018

USA

Michael.Spivack@va.gov Contracting Officer This amendment answers the following contractor questions submitted during the walkthrough:

1. How are filters that are considered biohazardous to be disposed of at either location?

A. They are to be left in appropriate container at a location to be designated by the facility after award and the facility shall dispose of them. The COR shall provide the contractor specifics on the designated location after award.

2. For East Orange semi-annual services, please provide the sizes of the belts to be replaced. Are there any belts to be replaced on air handling units located at the Lyons VAMC?

A. Sizes for East Orange ranges from A19 to A90 and BX25 to BX96 Still waiting on response from Lyons.

3. Are there any air handling units to be serviced outside of regular business hours?

A. Yes, se A.3.1.2 D)

4. For A.3.1.3 C) Give specifics as to what components need to be cleaned under this requirement and provide a list of chemicals that can be used.

A. Chemicals to be used for cleaning are to meet EPA requirements for exposure limits

5. If there is a loss of glycol due to reasons other than contractor negligence that can be proved, who is responsible for the additional glycol and labor to top it off?

A. The VA will be responsible for the additional glycol and labor.

6. Are there any coils that are not to be drained during annual PMS? If so, provide list and details as to how they will be tested.

A. All chilled water coils are to be drained.

7. Are there any units at Lyons that need to be serviced outside of regular business hours?

A. Still waiting response from facility

8. How are repairs to be addressed under this service agreement?

A. All repairs shall be considered out of scope for this procurement and will require a modification to the contract issued by the Contracting Officer. If the repair is critical then the contractor shall inform the COR immediately. The COR shall request a modification to the contract from the Contracting Officer and the Contracting Officer shall issue a modification to the contractor. If the repair is not critical then the contractor shall forward a list of needed repairs to the COR on a quarterly basis for review and the COR shall forward a list of repairs to be included in a modification of the purchase order.

9. Can filters be stored on site before installation?

A. Yes

10. Can contractors use VA dumpsters onsite to dispose of non-biohazard filters?

A. Yes

11. Can Glycol be stored on location at both facilities? If so where?

A. For East Orange Glycol can be stored in mechanical room C-132 Still waiting for a response from Lyons

12. Please specify the locations of the VA facility dumpsters to discard regular pleated air filters.

A. This information shall be provided after award.

13. Please provide a quantity of glycol to complete this project.

A. Roughly 8,525 gallons

14. In situations of defective water valves / VA operator failure after the P/M, please confirm the contractor is not responsible of coil damage.

A. Contractor is not responsible for coil damage in situations of defective water valves/VA operator failure.

15. Regarding the Lyons facility, Bldg. 135 appears to have difficult access to the rooftop. Is the contractor permitted to rope up & down the air filters from the rooftop?

A. Still waiting for a response from the facilities.

16. Does the contractor have to allow money for unscheduled maintenance in the proposal? Please advise.

A. No, unscheduled repairs shall be dealt with through modifications to the contract.

17. If any existing problem is found upon the service being performed, whom is the point of contact to address these issues with? Is the COR the only POC? Please advise.

A. The main point of contact for this procurement shall be the COR, however the COR can provide alternative POC if they are not available. Further details shall be provided after award.

This is an incomplete response to contractor questions submitted, the remaining responses shall be provided in a future amendment. This solicitation is extended until 09/11/2020.

All other terms and conditions shall remain the same.

File details come from the government source that posted it. Updated .