PWS_70LGLY25QGLB00028.pdf
PDF 120 KB Posted
- Solicitation number
- 70LGLY25QGLB00028
About this file
This Performance Work Statement (PWS) details an annual maintenance contract for bindery equipment at the Federal Law Enforcement Training Center's (FLETC) Digital Print Center in Glynco, Georgia. The contract requires a contractor to perform preventive maintenance on 11 specific pieces of bindery equipment, including punch machines, paper cutters, paper drills, stitchers, folders, tape binders, and a laminator, with four (4) quarterly service visits per year for each machine.
Key requirements include using trained and certified technicians who will perform maintenance according to manufacturer guidelines, submitting technician certifications prior to site visits, and completing a Quarterly Preventive Maintenance Checklist after each service. The contract period is one (1) base year with two (2) optional one-year extensions. The maintenance will be performed during business hours (7:30 AM to 4:30 PM EST), and technicians will need to obtain a FLETC Visitor Access Badge after completing a background check. The government will use periodic surveillance to ensure the contractor meets all performance standards without deviation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
1. PROJECT TITLE: Print Center Bindery Equipment/Machines Annual Maintenance
2. BACKGROUND: The Federal Law Enforcement Training Center's (FLETC) mission is to train and support the training of federal, state, local, and tribal law enforcement officers and international partners who are responsible for enforcing laws, treaties, and regulations within the United States and abroad. To carry out this mission, the FLETC serves as an interagency law enforcement training organization for 97 federal agencies or Participating Organizations.
The FLETC is headquartered in Glynco, Georgia, and operates other training centers in Artesia, New Mexico; Charleston, South Carolina; and Cheltenham, Maryland.
The Mission and Readiness Support Directorate (MRSD) supports the FLETC’s mission by providing administrative management support and services and oversight and program direction, one of the largest and most functionally diverse Directorates with the Federal Law Enforcement Training Centers’s Organization.
One such operational organization is the FLETC Glynco, Digital Print Center. Here are the training materials for the Enterprise reproduced.
This effort shall establish a preventative maintenance and services contract to maintain and service Bindery Equipment within the Digital Print Center.
3. SCOPE: Contractor performs preventive maintenance service on print center offline bindery equipment, the work described must be performed by trained, qualified/certified technicians in accordance with the manufacturer's recommendations. The preventive maintenance must consist of four (4) visits per service year for each piece of equipment/ machine annually. The business hours for these services will be from 7:30 AM to 4:30 PM EST.
3.1 EQUIPMENT
Description Serial # James Burn Automatic AlphaDoc MKIII Punch AL 4095 James Burns AlphaDoc PB 3000QS Coil Inserter 4427
James Burns AlphaDoc PB 3000QS Coil Inserter 4606
Challenge Paper Cutter 305XG Champion Paper 06X1261 Challenge EH-3A Paper Drill (Brown) 73025 Challenge EH-3A Paper Drill (Grey) 965276 Interlake S3A 7/8 Stitcher 5763 Baum 714 XLT Folder 014TF0187 POWIS Tape Binder/Fastrack 20 3134
POWIS Tape Binder/Fastrack 20 3859 POWIS Tape Binder/Fastrack 20 3861 FUJIPLA Auto Laminator Excel Package System Shrink Wrap Machine/Heat Tunnel ST200573
4. APPLICABLE DOCUMENTS: N/A
5. PERFORMANCE REQUIREMENTS AND STANDARDS: The Contractor must provide full preventive maintenance every three (3) months on the equipment listed in the PWS 3.1 by trained, qualified technicians in accordance with the manufacturer's recommended guidelines. The maintenance must consist of four (4) visits per service year for each piece of equipment/machine annually. The performance of the full preventive maintenance will be measured by the completion of the Quarterly Preventive Maintenance Checklist (Attachment A). The contractor must also provide proof of technician certifications (for any applicable equipment listed under 3.1) to the Project Manager prior to arriving on site. No adjustments and or modifications to the machines will be made that alter the original specifications of the machines. The contractor will be contacted by a member of the Publications Office when quarterly maintenance is scheduled. Per the terms of the contract.
All products and/or materials must conform to the requirements of this performance work statement and specification must be first quality, complying with all standards and applicable codes. All products and/or materials must be delivered in accordance with state and federal regulations and stored in an approved manner for the specific application. Contractor must field verify all conditions prior to beginning work or ordering materials.
The contractor must review conditions with the Project Manager, or Maintenance Supervisor prior to ordering materials and starting work.
6. NON-CONFORMANCE: The preventive maintenance inspections are to be accomplished in accordance with the performance standards, and if they do not conform to the standards, the government may retain partial payments until corrective action is taken.
7. DELIVERABLES AND DELIVERY SCHEDULE: These services must be performed per the established month(s) set forth in the agreement or only when requested by the Contracting Officer (CO) or Project Manager during the performance period.
Deliverable Frequency Submit To
Technician Certifications
Prior to arriving on site Project Manager
Quarterly Preventive Maintenance Checklist
After completion of preventive maintenance, prior to departing the site
Project Manager
8. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION: N/A
9. PLACE OF PERFORMANCE: The bindery equipment is located at
The Federal Law Enforcement Training Centers, 1131 Chapel Crossing Road Building 680 – Print Center, Glynco, GA 31524
10. PERIOD OF PERFORMANCE: The period of performance for this service will be a one (1) base year period (365 days) and two (2) one-year option periods.
11. SECURITY: The work will be unclassified; a background check will be required to obtain a frequent FLETC Visitor Access Badge to enter the facility for scheduled preventive maintenance appointments.
12. QUALITY ASSURANCE SURVEILLANCE PLAN: The services must be performed per the established month(s) set forth in the agreement or only when requested by the CO, or Project Manager during the performance period of this contract. Quality verification checks will be used to ensure that the qualifying standards of work have met the work requirement.
Required Service Performance Standard Acceptable Quality Level
(AQL)
Method of Surveillance
The contractor must provide proof of technician certifications and quarterly preventive maintenance (PWS paragraph 5)
The contractor provided technician certifications, performed quarterly preventive maintenance and submitted the Quarterly Preventive Maintenance Checklist
No deviation from Standard
Periodic Surveillance
File details come from the government source that posted it. Updated .