This document is an amendment (Amendment 02) to a Request for Quote (RFQ) for annual preventative maintenance of Print Center Bindery Equipment/Machines at the Federal Law Enforcement Training Center (FLETC). The solicitation (70LGLY25QGLB00028) requires a contractor to perform four preventive maintenance visits per year for specific bindery equipment, with the previous contractor being Electronic Imaging LLC. The contract will be awarded based on the Lowest Price Technically Acceptable evaluation method, and requires a background check for technicians to obtain a FLETC Visitor Access Badge.
Key details include a closing date of March 28, 2025, at 4:30 PM EST, with no site visits or pre-bid conference planned. Potential bidders must apply their quote on page 2 of the RFQ SF 1449, providing unit prices for the four visits. Common bid rejection reasons include incomplete information, missing signatures, and late submissions. Only the prime contractor needs to be registered in SAM.gov, no bid bond or performance bond is required, and the previous purchase order contract has been attached to the RFQ notice for reference.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREGORY HODGSON
Digitally signed by GREGORY
HODGSON
Date: 2025.03.24 17:06:34 -04'00'
Amendment 02 for RFQ 70LGLY25Q00028 – Print Center Bindery Equipment/Machines Annual Maintenance RFI Inquiries and Responses
1. Question: Who is the current contractor?
Answer: The previous contract already expired. The previous contractor was Electronic Imaging LLC.
2. Question: What is the current contractor's bill rate for each line item on the price sheet?
Answer: The previous purchase order contract has been posted as an attachment on the RFQ notice, which will show the contractor’s lump sum price for the service year.
3. Question: What is the contract budget?
Answer: The contract budget cannot be given.
4. Question: May I obtain a copy of the current contract?
Answer: The copy of the previous purchase order contract has been attached to the RFQ notice.
5. Question: May I have access to the bid tabulation?
Answer: Bid tabulation will not be given.
6. Question: Are there any access restrictions or security protocols at these sites that the contractor should be aware of?
Answer: In accordance with the PWS Paragraph 11 – Security, a background check will be required for the technician attending the site so he/she can obtain a frequent FLETC Visitor Access Badge to enter the facility for scheduled preventive maintenance appointments.
7. Question: Will there be site visits or a pre-bid conference to assess the requirements more accurately?
Answer: There will be no site visits. The Performance Work Statement describes the work that needs to be done along with the list of the equipment that requires the preventive maintenance. The PWS Attachment A displays a list of what needs to be done for each equipment.
8. Question: What are the key evaluation factors for awarding this contract (e.g., price, past performance, technical approach)?
Answer: In accordance with the RFQ page 22, under Provision 52.212-2 Evaluation – Commercial Products and Commercial Services, the evaluation factor will be based on the Lowest Price Technically Acceptable.
9. Question: How are contract modifications or amendments handled if requirements change over time?
Answer: If requirements change over time, the Government will either issue a bilateral or unilateral modification; it depends on the type of change (e.g., time extension, additional equipment, descope of equipment, and exercise of option year).
10. Question: Is there a specific format or template that should be followed when submitting the quote?
Answer: Apply your quote amount on page 2 of the RFQ SF 1449 with the unit price for each of the four
(4) visits and the total amount for that service year.
11. Question: Are there any common mistakes that have led to previous bid rejections?
Answer: Incomplete fill-in information in the required RFQ Provisions, no signatures, missing price amount, and late submissions.
12. Questions: Is a bid bond required for this contract?
Answer: No
13. Question: If a payment and performance bond is required, can it be renewed annually at the contract amount?
Answer: N/A; no bonds are required.
14. Question: Does a subcontractor need to be a registered entity in SAM.gov to participate in the contract?
Answer: No. Only the prime contractor requires to be registered in SAM.gov.