Proposed Generator Parts Lists Ladd and Sycamore.pdf

PDF 148 KB Posted

Attached to
District 3 Ladd and Sycamore Maintenance Yard Generator and Installation
Solicitation number
26-494DOT-FINAD-B-49168
Issued by
Dekalb County, Illinois

About this file

This is a cost estimate document for proposed generator additions at two Illinois Department of Transportation (IDOT) District 3 maintenance yards, prepared as of May 1, 2025. The project encompasses electrical infrastructure upgrades at the Ladd Maintenance Yard and Sycamore Maintenance Yard, with the primary objective of installing standby generator systems and associated electrical distribution components. The Ladd project includes a 96kW/120kVA generator set with a 400A automatic transfer switch, service entrance upgrades, multiple panel installations (PP-1, D0222 MDP, D0223, and Tire Shed panels), and associated feeder conductors and ground fields. The Sycamore project features a 60kW/75kVA generator set with a 225A automatic transfer switch and four electrical panels (A, B, C, and D), along with concrete generator pads, gas service modifications, and comprehensive electrical distribution infrastructure. Both projects include miscellaneous items such as overcurrent studies, legend plates, and labels.

The document provides a detailed line-item breakdown of materials and quantities required for each location but does not specify unit pricing, total project costs, funding sources, or contract award information. No response dates, bid deadlines, site visit requirements, or bidders' conferences are identified in this preliminary cost estimate. The document serves as a planning tool for estimating the scope and scale of generator addition work at these two IDOT facilities, with quantities listed in units such as lump sum (LS), linear feet (LF), square feet (SF), and each (EA).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: DESIGNED: DATE: 5/1/2025

CLIENT: CHECKED: DATE: 5/1/2025

COMPS FOR: REVISED: DATE: -

PROJ. NO.:

Description Unit Quantity

Ladd Maintenance Yard Generator Addition

Generator Set

LS 1

SF 50

EA 1

LF 30

EA 1

LF 30

LF 35

LS 1

Service Entrance

LF 5

EA 1

LF 5

Panel "PP-1"

LF 35

EA 1

Panel D0222 MDP

EA 3

LF 360

EA 2

LS 1

LS 1

IDOT District 3

PE#101.2302.02

Cost Estimate

Proposed Generator Additions NDR

GWW

Ground field for existing meter

Existing gas service connection/modifications

Concrete generator pad w/ aggregate base

96kW/120kVA , 240/120V, 1ϕ, 3W standby engine generator

(GEN-1) w/ weatherproof enclosure

400A, 240/120V, 1ϕ, 3W, 3-Pole, NEMA 3R, automatic transfer switch (ATS-1), remote annuciator, stop switch

Generator control conductors/conduit from GEN-1 to ATS-1

400A, NEMA 3R, service rated main disconnect switch

Feeder conductors/conduit from GEN-1to ATS-1

200A, 2-pole breaker

Generator maintenance conductors/conduit from panel "PP-

1" to GEN-1

Ground field for generator

Feeder conductors/conduit from existing meter to main disconnect

Feeder conductors/conduit from main disconnect to ATS-1

Remove existing feeders

Remove existing service entrance

Feeder conductors/conduit from ATS-1 to panel "PP-1"

20A, single pole breaker

Ground field for existing panel D0222 MDP

Underground pullbox

Feeder conductors/conduit from panel "PP-1" to panel "D0222

MDP"

Ground bar and connections

COMPS FOR: REVISED: DATE: -

PROJ. NO.:

Description Unit Quantity

IDOT District 3

PE#101.2302.02

Cost Estimate

Proposed Generator Additions NDR

GWW

Panel D0222

LS 1

LF 10

Panel D0222 Bay #2

100-Amp 2-pole main breaker EA 1

LF 50

EA 1

LS 1

Panel D0223 5-Bay

LS 1

40-Amp 2P main breaker EA 1

LF 130

Panel Tire Shed

EA 1

LF 125

LS 1

Miscellaneous

LS 1Overcurrent study, legend plates and labels

Feeder conductors/conduit from panel "D0222 MDP" to panel

"D0222 Bay #2"

Ground bar and connections

Remove existing feeders

Feeder conductors/conduit from panel "D0222 MDP" to panel

"D0223 5-Bay"

Reconnect existing branch circuits

100-Amp, 120/240V, 1ϕ, 3W, 12 circuit panel, main breaker

100A, 2-pole breaker

Remove existing feeders

Feeder conductors/conduit from panel "D0222 MDP" to panel

"D0222"

Feeder conductors/conduit from panel "D0222 MDP" to panel

"D0223 5-Bay"

Ground bar and connections

Remove existing feeders

Ground bar and connections

Remove existing feeders

COMPS FOR: REVISED: DATE: -

PROJ. NO.:

Description Unit Quantity

Sycamore Maintenance Yard Generator Addition

Generator Set

LS 1

SF 45

EA 9

EA 1

LF 175

EA 1

LF 175

LF 275

Service Entrance

LF 20

EA 1

LF 20

LS 1

Panel "A"

LS 1

EA 1

LF 100

LS 1

Panel "B"

LS 1

EA 1

LF 120

LS 1

400A, NEMA 3R, service rated main disconnect switch

Feeder conductors/conduit from GEN-2 to ATS-2

Existing gas service connection/modifications

Proposed Generator Additions NDR

IDOT District 3 GWW

Cost Estimate -

PE#101.2302.02

Concrete generator pad w/ aggregate base

60kW/75kVA , 240/120V, 3ϕ, 4W standby engine generator

(GEN-2) w/ weatherproof enclosure

225A, 240/120V, 3ϕ, 4W, 4-Pole, NEMA 3R, automatic transfer switch (ATS-2), remote annuciator, stop switch

Generator control conductors/conduit from ATS-2 to GEN-2

Generator maintenance conductors/conduit from Panel "C" to

GEN-2

Ground field for generator

Feeder conductors/conduit from existing meter to main disconnect

Feeder conductors/conduit from main disconnect to ATS-2

Ground field for existing meter

Remove existing panel and feeders

Remove existing panel and feeders

100-Amp, 120/240V, 3ϕ, 4W, 20 circuit panel, main breaker

Feeder conductors/conduit from panel "A" to panel "B"

Concrete filled bollard

Feeder conductors/conduit from ATS-2 to panel "A"

225-Amp, 120/240V, 3ϕ, 4W, 30 circuit panel, main breaker

Reconnect existing branch circuits

Reconnect existing branch circuits

Panel "C"

EA 1

LF 120

LS 1

Panel "D"

LS 1

EA 1

LF 50

LF 60

Miscellaneous

Feeder conductors/conduit from panel "D" to existing compressor disconnect switch

Reconnect existing branch circuits

Remove existing feeders

Feeder conductors/conduit from panel "C" to panel "D"

100-Amp, 120/240V, 1ϕ, 3W, 20 circuit panel, NEMA 3R, main breaker

Overcurrent study, legend plates and labels

Feeder conductors/conduit from panel "A" to panel "C"

Reconnect existing branch circuits

Remove existing panel and feeders

100-Amp, 120/240V, 3ϕ, 4W, 42 circuit panel, main lug