This Project Statement is from the Michigan Department of Technology, Management and Budget (DTMB) requesting professional architectural and engineering services to replace two toilet shower buildings at Ludington State Park Beechwood Campground. The project involves replacing the front and back buildings (excluding the middle building) and upgrading seven campsites to meet ADA requirements. A mandatory walk-through inspection is scheduled for April 16, 2021 at 1:00 pm at the State Park Hamlin Lake Day Use Area pavilion. Proposals are due April 29, 2021 at 2:00 pm local time. The project schedule indicates PSC contract award in May 2021, design from June-August 2021, bidding in September 2021, and construction from October 11, 2021 to May 2022.
The Department of Natural Resources (DNR) has standardized toilet shower fixtures and a prototype building design that must be modified for site conditions. The buildings require heating per LARA requirements despite being seasonal. Existing utilities include well water, drain fields, and propane. The project will coordinate with an ongoing electrical service upgrade to approximately 100 campsites. Geotechnical and topographic information is available for the back site with limited information for the front site. Additional surveys will be needed and included as reimbursable expenses along with LARA plan review fees. The project will use a traditional design/bid/build delivery method with 50% and 90% design submittals required at each phase, including cost estimates at 90% submittals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Front Beechwood original plans 7-17-56.pdf | ||
| Pre-proposal Meeting Agenda.docx | DOCX document | |
| Ludington sign-in sheet.msg | MSG file | |
| RFP 21086.pdf | ||
| Campsite 3.ADARequirements.pdf | ||
| Middle Beechwood original plans (s).pdf | ||
| SAMPLE Billable Rate Contract (Rev 201214).pdf | ||
| Addendum 1 21086.pdf | ||
| Back Beechwood Survey.pdf | ||
| Back Beechwood original plans 7-27-61.pdf | ||
| Addendum 2 21086.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1DTMB-0427 (R 01/21)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
751/21086.JAN
ACCOUNTING TEMPLATE
PROPOSAL DUE DATE
Thursday, April 29, 2021 @ 2:00 pm local time
CLIENT AGENCY
Department of Natural Resources / Parks & Recreation Division
PROJECT NAME AND LOCATION
Replace Two (2) Toilet Shower Buildings Ludington State Park Beechwood Campground PROJECT ADDRESS (if applicable) 8800 W. M-116, Ludington MI 49431
CLIENT AGENCY CONTACT
Annamarie Bauer, Regional Planner
TELEPHONE NUMBER
231-468-8616
DTMB - DCD PROJECT DIRECTOR
Jan Miller, RA
TELEPHONE NUMBER
517-388-6406
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Friday April 16, 2021 at 1:00 pm local time Ludington State Park 8800 W. M-116 Ludington, MI 49431 Meet at the State Park Hamlin Lake Day Use Area under the pavilion
MANDATORY (Check box if Mandatory)
LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov . The email “Subject” must include (facility name, project name, date and time of Pre- Proposal Walk Through Meeting).
COVID 19 Precautions: DTMB – DCD requires that masks be worn by attendees at ALL in person meetings, including Pre-Proposal meetings. Attendees must also observe social distancing protocols. Any individual refusing to comply with the mask requirement will be asked to leave the premises and are expected to do so peacefully. Said individual will not be qualified for attendance and the firm that the individual represents will be ineligible to submit a proposal for the project.
If a firm has staff who cannot medically tolerate a mask, please do not send those individuals, and have other staff attend the meeting that can mask up. Also, please do not attend if you have a fever, show any COVID 19 symptoms, have had any contact with a known COVID 19 patient or of have traveled outside the United States within two weeks of the Pre-Proposal Meeting, in the above instances, please send an alternative representative.
PROJECT DESCRIPTION/SERVICES REQUESTED
The Department of Technology, Management and Budget (DTMB) is requesting professional architectural and engineering services for the design and construction administration to replace two (2) existing toilet shower buildings and upgrade seven (7) campsites to meet ADA requirements in the Beechwood Campground at Ludington State Park in Ludington, Michigan. There are three (3) existing toilet shower buildings within the Beechwood Campground. This project is to replace the front and back buildings. The middle building is not part of this project. The buildings were constructed in the 1960’s, does not meet current building codes and requires frequent maintenance.
mailto:smithD76@michigan.gov
The Department of Natural Resources (DNR), Parks & Recreation Division (PRD), has standardized toilet shower fixtures and developed a standard prototype toilet shower building design. The design is to be modified as needed to meet site-specific conditions. Although these are seasonal buildings, LARA is requiring that they be heated and meet applicable codes. DNR had a Phase 100 Heating Study report completed which provides heating and ventilation options to consider during design. DEQ Campground Guidelines are to be adhered to at a minimum for fixture count. The utilities at the park include well water, drain fields, propane, which appear to be adequate. An electrical service upgrade to approximately 100 campsites at back Beechwood Campground will be underway during this project, coordination will be required.
DNR PRD has geotechnical and topographic information for the back Beechwood site and limited information for the front Beechwood site. Assume there will be additional surveys needed. Surveys, along with LARA plan review fees are to be included as reimbursable expenses. DTMB will retain a professional to test for hazardous materials that may need to be abated and to perform material testing during construction to meet quality control requirements. The standard prototype design, existing building plans, and the Phase 100 Heating Study are available and will be provided to the successful firm.
This request is to provide Phase 300 Schematic Design, Phase 500 Final Design, and Phase 600 & 700 Construction Administration for the two (2) new toilet shower buildings, the demolition of the existing buildings, and to upgrade seven (7) campsites to meet ADA codes. We anticipate 50% and 90% design submittals at both design phases, including a cost estimate at the 90% submittal of each phase. The traditional design / bid / build delivery method will be utilized for this project.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as bid amount.
• Please remember that individual attachments can be no larger than 6mb.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance. They can be reached by telephone at 888.734.9749 or by email at sigma-procurement-helpdesk@michigan.gov or sigma-vendor@michigan.gov
• Vendors are reminded to keep our office apprised of SIGMA VSS issues and to include your SIGMA ticket number when communicating with our office. Emailed submissions will need prior DCD approval and will be handled on a case by case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
NIGP CODES
90607,90610, 90638, 90672
DESIRED SCHEDULE OF WORK
PSC contract award: May 2021 Design: June 2021 – August 2021 Bid: September 2021 Construction: Oct. 11, 2021 – May 2022
ACCEPTING RFP QUESTIONS UNTIL: Wednesday April 21, 2021 @ 12:00 pm Please do not submit online questions through SIGMA VSS. ALL questions should be emailed to Jan Miller at millerj1@michigan.gov
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-vendor@michigan.gov