Addendum 2 21086.pdf

PDF 78 KB Posted

Attached to
751/21086. JAN; Ludington SP - Replace Two T / S Buildings
Solicitation number
RFP-171-210000001568-4
Issued by
Macomb County, Livonia City, Michigan

About this file

This is Addendum No. 2 to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration, Design and Construction Division for the Michigan Department of Natural Resources. The project involves replacing two toilet shower buildings at the Ludington State Park Beechwood Campground, with file number 751/21086.JAN. Proposals are due Thursday, April 29, 2021, at 2:00 pm. The addendum's sole purpose is to provide an additional attachment containing the Middle Beechwood Toilet & Shower Building Plans record set dated 9/92.

No additional pricing terms, funding requirements, or other substantial modifications to the original RFP are included in this addendum. The document is approved by Project Director Jan Miller and dated April 22, 2021.

View the file

Other files

File Type Posted
Front Beechwood original plans 7-17-56.pdf PDF
Pre-proposal Meeting Agenda.docx DOCX document
Ludington sign-in sheet.msg MSG file
RFP 21086.pdf PDF
Campsite 3.ADARequirements.pdf PDF
Project Statement 21086.pdf PDF
Middle Beechwood original plans (s).pdf PDF
SAMPLE Billable Rate Contract (Rev 201214).pdf PDF
Addendum 1 21086.pdf PDF
Back Beechwood Survey.pdf PDF
Back Beechwood original plans 7-27-61.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 7/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 2

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

April 22, 2021

PROJECT NAME

Michigan Department of Natural Resources Ludington State Park Beechwood Campground Replace Two (2) Toilet Shower Buildings

FILE NUMBER

751/21086.JAN

PROJECT DIRECTOR

Jan Miller

PROPOSAL DUE DATE:

Thursday April 29, 2021 at 2:00 pm

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1. Additional attachment provided include:

• Middle Beechwood Toilet & Shower Building Plans, record set dated 9/92

APPROVED BY: Jan Miller PROJECT DIRECTOR DATE: April 22, 2021 http://www.buy4michigan.com/

File details come from the government source that posted it. Updated .