Project Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DA--FY26: NRM (PROJ:673-CSI-131) D/B Install CT Scanner (LDCT)
Solicitation number
36C24826R0085
Issued by

About this file

This is a pricing template for a design-build construction project to install a new GE Revolution Ascend CT Scanner (LDCT) system at the James A. Haley Veteran's Hospital in Tampa, Florida. The template is structured according to the MasterFormat 2016 classification system and requires offerors to provide detailed cost breakdowns organized by 27 construction divisions, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, Fire Suppression, and other trade categories. Each division requires separate line items for labor costs and material costs, with automatic calculation of total division costs.

The pricing template incorporates overhead, profit, and bond percentages that are applied sequentially to the division subtotals to arrive at the total base offer cost. Offerors must complete all applicable division cost entries and are required to provide granular pricing rather than lump-sum amounts to enable government price analysis. The template is associated with Solicitation Number 36C24826R0085, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8, with Phase 1 proposals due March 23, 2026, at 10:00 AM and a 281-day period of performance for the design-build installation project.

View the file

Other files

File Type Posted
Plumbing - Bldg 1 first.pdf PDF
Mechanical - basement-Floor - Arch E1 wit hmark up.pdf PDF
1-S3.pdf PDF
1-S9.pdf PDF
1-2.pdf PDF
1-12.pdf PDF
1-1.pdf PDF
Architectural - Bldg 1 second.pdf PDF
Electrical - Bldg 1 Basement.pdf PDF
Life Safety.pdf PDF
Mechanical - 1stfloor-Wing C - Ansi C.pdf PDF
1-S4.pdf PDF
1-S4A.pdf PDF
1-9.pdf PDF
1-7.pdf PDF
36C24826R0085 0004.pdf PDF
Electrical - Bldg 1 Ground.pdf PDF
Fire Protection - Bldg 1 ground.pdf PDF
Electrical - Bldg 1 Third.pdf PDF
Architectural - Bldg 1 ground.pdf PDF
Plumbing - Bldg 1 ground.pdf PDF
Busway D Wing - Ansi C ATS drawing.pdf PDF
Busway B Wing - Ansi C bust way 3th.pdf PDF
1-S16.pdf PDF
1-S5.pdf PDF
1-S2.pdf PDF
1-S6.pdf PDF
1-8.pdf PDF
1-15.pdf PDF
1-4.pdf PDF
1-14.pdf PDF
36C24826R0085 0001.pdf PDF
Specialized Experience Form 3 Pages.pdf PDF
Drawing-Arch Bldg 1 Project Location 1 Page.pdf PDF
Drawing-Equipment Layout 1 Page.pdf PDF
Site Map 1 Page.pdf PDF
Spec 013216.17 25 Pages.pdf PDF
Spec 000110 11 Pages.pdf PDF
Pre-Installation Manual 186 Pages.pdf PDF
36C24826R0085.pdf PDF
Spec 010000 52 Pages.pdf PDF
Spec 013216.16 23 Pages.pdf PDF
A.3 PRICE COST Schedule.pdf PDF
SOW 673-CSI-131 24 Pages.pdf PDF
WD FL20260208 01.02.2026 Hillsborough 8 Pages.pdf PDF
Spec 014219 7 Pages.pdf PDF
PPQ 4 Pages.pdf PDF
LOS 2 Pages.pdf PDF
EMR 1 Page.pdf PDF
Contractor Work Plan and Peer Review 8 Pages.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis