This is a project drawings document for the West Virginia Army National Guard (WVANG) detailing plumbing and electrical work for the Dawson Billeting and RTI Domestic Hot Water Repairs project, with drawings prepared by Miller Engineering Inc. The project encompasses comprehensive domestic water piping system installation and repairs across eight wings of a billeting facility and an RTI (Readiness Training Installation) building. The scope includes installation of new circuit solver assemblies to replace existing circuit setters, provision of shutoff valves at all service points and branch locations, installation of Type K copper piping with soldered or mechanically pressed fittings, and implementation of a phased construction approach across ten phases to maintain operational continuity. The work involves both first and second floor domestic plumbing plans, with detailed demolition plans identifying existing infrastructure to be removed and new systems to be installed. Electrical work includes installation of a new GFCI receptacle for a water softener system in the mechanical room of the operations building, with all wiring to be run in metal conduit in accordance with the 2020 National Electrical Code.
The project specifications require all materials and equipment to be provided with complete and operable plumbing systems meeting current International Plumbing Code, International Mechanical Code, and state and local code requirements. Domestic cold and hot water piping shall be a minimum of one-half inch in size unless otherwise noted, with all piping installed overhead and tight to the underside of steel with provisions for insulation. All domestic water piping must be pressure tested with water, with air testing prohibited. The drawing set includes detailed schedules, isometric views, and enlarged plan views showing specific fixture connections, circuit solver assemblies, thermostatic mixing valves, isolation valves, and expansion tank installations. The contract requires final coordination of scope, dimensions, fixture placement, and routing to be the responsibility of the general contractor and all subcontractors prior to bidding, with verification of all field conditions and measurements mandatory before submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PENNSYLVANIA OFFICE
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PHONE: (724) 966 - 5655
WEST VIRGINIA OFFICE
54 WEST RUN RD
MORGANTOWN, WV 26508
PHONE: (304) 291 - 2234
WVANG - DAWSON BILLETING AND RTI DOMESTIC
HOT WATER REPAIRS
MEI PROJECT #
DWG TITLE
GENERAL
G000 COVER PAGE
G001 OVERALL SITE PLAN
G002 OVERALL PHASING PLAN
PLUMBING
P000 PLUMBING ABBREVIATIONS
P001 FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO
P001A FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO
P001B FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO
P001C FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO
P001D FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO
P002 SECOND FLOOR DOMESTIC PLUMBING PLAN - DEMO
P101 FIRST FLOOR DOMESTIC PLUMBING PLAN
P101A FIRST FLOOR DOMESTIC PLUMBING PLAN
P101B FIRST FLOOR DOMESTIC PLUMBING PLAN
P101C FIRST FLOOR DOMESTIC PLUMBING PLAN
P101D FIRST FLOOR DOMESTIC PLUMBING PLAN
P102 SECOND FLOOR DOMESTIC PLUMBING PLAN
P401 ENLARGED PLUMBING DEMO PLAN - OPS
P402 ENLARGED PLUMBING PLAN - OPS
P403 ENLARGED DOMESTIC PLUMBING PLAN
P501 PLUMBING DETAILS & SCHEDULES
P502 PLUMBING DETAILS & SCHEDULES
ELECTRICAL
E401 ENLARGED ELECTRICAL PLAN - OPS
NOTE: ORIGINAL DOCUMENTS ARE IN COLOR
DNDN
WING 1
WING 2
WING 3
WING 4
WING 5
WING 6
WING 7
WING 8
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
G001
OVERALL SITE PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/32" = 1'-0"
FIRST FLOOR DOMESTIC PLAN - OVERALL
N O
D
E S
C R
IP
T
IO
N
D A
T E
WING 1, PHASE 2 FOR INSTALLATION OF NEW
CIRCUIT SOLVERS.
WING 2, PHASE 3 WILL INVOLVE THE INSTALLATION OF A 3"
ALTERNATE DFAC FEED TO BILLETING. SEE P101D.
WING 3, PHASE 10
WING 4, PHASE 9
WING 5, PHASE 7
WING 6, PHASE 8
PHASE 4 WILL CONNECT RTI PIPING WITH BILLETING. SEE P102C FOR
CONTINUATION. SEE P101.
WING 7, PHASE 6 WILL BEGIN ONCE PHASE 5 IS
COMPLETED. PHASE 6 WILL BE SPLIT INTO 2 PARTS
WING 8, PHASE 5 WILL BEGIN WHEN THE PHASE
4 ALTERNATE DFAC FEED IS COMPLETED.
VERIFY SHUTOFF VAVE AT THE BEGINNING OF
THE WING BRANCH (TYP)
1. PHASE 1 WILL BE THE INSTALLAITON OF ISOLATION
VALVES TO EACH WING AS SHOWN ON P001, P002, P101,
AND P102.
2. REMOVE CEILING TILES AND SUPPORT GRID AS
REQUIRED TO PERFORM WORK. REPLACE OR
REINSTALL TILE AND GRID WHERE NECESSARY.
SHEET NOTES
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
G002
OVERALL PHASING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
N O
D
E S
C R
IP
T
IO
N
D A
T E
1/32" = 1'-0"
FIRST FLOOR DOMESTIC DEMO PLAN - OVERALL
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
L
--------------------A------------------------------------------------------------------------------------
AAV AUTOMATIC AIR VENT
ABV ABOVE
AD ACCESS DOOR
ADA AMERICANS WITH DISABLITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATELY
ASSOC ASSOCIATED
ASSY ASSEMBLY
ATC AUTOMATIC TEMPERATURE CONTROL
AUTO AUTOMATIC
AUX AUXILIARY
AV AIR VENT
AVG AVERAGE
AWT AVERAGE WATER TEMPERATURE
---------------B----------------------------------------------------------------------------------------
BB BASEBOARD
BC BALANCING COCK
BD BLOW DOWN
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BHP BRAKE HORESPOWER
BLDG BUILDING
BLR BOILER
BLW BELOW
BO BLOW OFF
BTM BOTTOM
BOP BOTTOM OF PIPE
BTUH BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
---------------C---------------------------------------------------------------------------------------
CA COMPRESSED AIR
CAP CAPACITY
CCW COUNTER CLOCKWISE
CDL CONDENSATE DRAIN LINE
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CHKV CHECK VALVE
CHWR CHILLED & HOT WATER RETURN
CHWS CHILLED & HOT WATER SUPPLY
CHWS&R CHILLED & HOT WATER SUPPLY AND RETURN
CIRC CIRCULATING
CI CAST IRON
CIRC CIRCULATING
CKT CIRCUIT
CLG CEILING
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
C/O CLEAN OUT
COL COLUMN
COMB COMBINATION
COMP COMPRESSOR
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CONST CONSTRUCTION
COP COEFFICIENT OF PERFORMANCE
CORR CORRIDOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
Cv COEFFICIENT, VALVE FLOW
CW COLD WATER/CLOCKWISE
CWFT CONDENSER WATER FROM TOWER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CWS&R CHILLED WATER SUPPLY AND RETURN
CWTT CONDENSER WATER TO TOWER
---------------D----------------------------------------------------------------------
D DEEP
Db DRY BULB TEMPERATURE(ºF)
DCO DOUBLE CLEAN OUT
DEMO DEMOLISH
DEPT DEPARTMENT
DIA DIAMETER
DIAG DIAGRAM
DISCH DISCHARGE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DN DOWN
DP DIFFERENTIAL PRESSURE
DPT DEW POINT TEMPERATURE(ºF)
DR DRAIN
DWG DRAWING
DWH DOMESTIC WATER HEATER
DX DIRECT EXPANSION
----------------E----------------------------------------------------------------------
EA EACH
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
ENCL ENCLOSURE
ENT ENTERING
EP END PANEL/EXPLOSION PROOF
EQUIP EQUIPMENT
ER ECCENTRIC REDUCER(BOTTOMS FLAT)
ESP EXTERNAL STATIC PRESSURE
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATUR(ºF)
----------------F----------------------------------------------------------------------
ºF FAHRENHEIT
FA FREE AREA
FB FREE BLOW
F&T FLOAT AND THERMOSTATIC TRAP
FC FLEXIBLE CONNECTION
FCD FLOW CONTROL DEVICE
FCO FLOOR CLEAN OUT
FCU FAN COIL UNIT
FD FIRE DAMPER/FLOOR DRAIN
FDN FOUNDATION
FF FOULING FACTOR
FIN FINISHED
FLA FULL LOAD AMPS
FLG FLANGE
FLR FLOOR
FNL FUNNEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOS&R FUEL OIL SUPPLY AND RETURN
FOV FUEL OIL VENT
FPB FAN POWERED BOX
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FIN-TUBE/FEET
FTG FITTING
FURN FURNISH
FV FACE VELOCITY
FW FEED WATER
----------------G----------------------------------------------------------------------
G GAS
GALV GALVANIZED
GA GAUGE, GAGE
GC GENERAL CONTRACTOR
GCWR GLYCOL CHILLED WATER RETURN
GCWS GLYCOL CHILLED WATER SUPPLY
GHWR GLYCOL HOT WATER RETURN
GHWS GLYCOL HOT WATER SUPPLY
GLV GLOBE VALVE
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRAV GRAVITY
GRV GRAVITY ROOF VENTILATOR
GV GATE VALVE
----------------H----------------------------------------------------------------------
H HEIGHT
HB HOSE BIBB
HC HEATING CONTRACTOR;
HANICAPPED
HD HEAD/HUB DRAIN
HG MERCURY
HGR HANGER
HP HORSEPOWER/HEAT PUMP
HORIZ HORIZONTAL
HPD HIGH PRESSURE DRIP
HPR HIGH PRESSURE RETURN
HPS HIGH PRESSURE STEAM
HR HOUR
HTG HEATING
HTR HEATER
HUH HORIZONTAL UNIT HEATER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HW HOT WATER
HWBG HOT WATER BELOW GRADE
HWOH HOT WATER OVER HEAD
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND
RETURN
----------------I----------------------------------------------------------------------
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
INV INVERT
IN-WG INCHES-WATER GAGE
INSUL INSULATION
IPS IRON PIPE SIZE
IVS ISOLATION VALVE STATION
IW INDIRECT WASTE
----------------J----------------------------------------------------------------------
JT JOINT
----------------K ---------------------------------------------------------------------
KS KITCHEN SINK
----------------L----------------------------------------------------------------------
L LENGTH
LAV LAVATORY
LBS POUNDS
LBS/HR POUNDS PER HOUR
LF LINEAR FEET
LP LOW PRESSURE
LPD LOW PRESSURE DRIP
LPR LOW PRESSURE RETURN
LPG LOW PETROLEUM GAS
LPS LOW PRESSURE STEAM
LV LOW VELOCITY
LVG LEAVING
LWCO LOW WATER CUTOFF
LWT LEAVING WATER
TEMPERATURE(ºF)
----------------M----------------------------------------------------------------------
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSAND BTUH
MC MECHANICAL CONTRACTOR
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MFG MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MPD MEDIUM PRESSURE DRIP
MPR MEDIUM PRESSURE RETURN
MPS MEDIUM PRESSURE STEAM
MS MINI-SPLIT SYSTEM
MTD MOUNTED
MTG MOUNTING
MTL METAL
MTR MOTOR
MWT MEAN WATER TEMPERATURE(ºF)
----------------N----------------------------------------------------------------------
N NORTH
N/A NOT APPLICABLE
NC NORMALLY CLOSED; NOISE CRITERIA
NEG NEGATIVE
NIC NOT IN CONTRACT
NM NONMETALLIC
NMAG NONMAGNETIC
NO NORMALLY OPEN
No NUMBER
NOM NOMINAL
NORM NORMAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
NWL NORMAL WATER LEVEL
----------------O----------------------------------------------------------------------
OA OVERALL; OUTSIDE AIR
OC ON CENTER
OCC OCCUPANCY
OCPD OVERCURRENT PROTECTION DEVICE
OD OUTSIDE DIAMETER; OUTSIDE DIMENSION
ODS OXYGEN DEPRIVATION SENSOR
OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED / OWNER INSTALLED
OFD OVER FLOW DRAIN
OH OVERHEAD
OPER OPERATED
OPP OPPOSITE
OPT OPTIONAL; OPTIMUM
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OSV OIL SAFETY VALVE
OUT OUTLET
OVC OVERCURRENT
OVF OVERFLOW
OZ OUNCE
----------------P----------------------------------------------------------------------
P PUMP
PC PLUMBING CONTRACTOR
PD PRESSURE DROP/PUMP
PE PNEUMATIC - ELECTRIC
PG PRESSURE DROP/PUMP DISCHARGE
PH PHASE
PLBG PLUMBING
PNL PANEL
PR PANEL RADIATOR
PRESS PRESSURE
PRV POWER ROOF VENTILATOR/PRESSURE REDUCING
VALVE
PS PIPE SUPPORT
PSI POUND PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAGE
PT PRESSURE/TEMPERATURE TAP
PTAC PACKAGED TERMINAL AIR CONDITIONER
PVC POLYVINYL CHLORIDE
----------------Q----------------------------------------------------------------------
QTY QUANTITY
----------------R----------------------------------------------------------------------
RA RELIEF/RETURN AIR
RAD RADIATOR
RAF RETURN AIR FIXTURES
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED/RECEIVED
REFRIG REFRIGERANT
REG REGISTER
REINF REINFORCED
REQD REQUIRED
RET RETURN
REV REVISION
RF RETURN/RELIEF FAN
RH REHEAT COIL
RHG REFRIGERANT HOT
RL REFRIGERANT LIQUID
RM ROOM
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
----------------S----------------------------------------------------------------------
SA SUPPLY AIR
SCH SCHEDULE
SDPR SMOKE DAMPER
SENS SENSIBLE
SEP SEPARATOR
SF SUPPLY FAN
SHT SHEET
SK SINK
SP STATIC PRESSURE (INCHES OF WATER)
SPEC SPECIFICATION
SPGR SPECIFIC GRAVITY
SQ SQUARE
SQFT SQUARE FOOT
SS STAINLESS STEEL UNIT
STAT STATIC
STD STANDARD
STL STEEL
STR STRAINER
SUP SUPPLY
SV SAFETY VALVE
SW SWITCH
----------------T----------------------------------------------------------------------
TA THROW AWAY
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TDV TRIPLE DUTY VALVE
TEMP TEMPERATURE
TH THERMOMETER
THK THICK
TK TANK
TMV THRTMOSTATIC MIXING VALVE
TOT TOTAL
TP TRAP PRIMER/TRAP PRIMER SUPPLY
TRANS TRANSITION
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TYP TYPICAL
----------------U----------------------------------------------------------------------
UC UNDERCUT
UF UNDER FLOOR
UG UNDERGROUND
UH UNIT HEATER
UR URINAL
----------------V----------------------------------------------------------------------
V VOLTAGE/VALVE/VENT
VAC VACUUM
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VFS VENTURI FLOW STATION
VOL VOLUME
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THROUGH ROOF
----------------W----------------------------------------------------------------------
W WIDTH
W/ WITH
W/O WITHOUT
WA WATER HAMMER ARRESTER
Wb WET BULB TEMPERATURE(ºF)
WC WATER COLUMN/WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WALL HEATER
WL WATER LEVEL
WP WEATHERPROOF
WT WEIGHT
----------------Y----------------------------------------------------------------------
YCO YARD CLEANOUT
----------------Z----------------------------------------------------------------------
Z ZONE
ZCV ZONE CONTROL VALVE
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P000
PLUMBING
ABBREVIATIONS
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
PLUMBING ABBREVIATIONS
Plumbing Piping System Legend
ABBREVIATION SYSTEM TYPE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DTW DOMESTIC TEMPERED WATER
DTWR DOMESTIC TEMPERED WATER RETURN
N O
D
E S
C R
IP
T
IO
N
D A
T
WING 1
WING 2
WING 3
WING 4
WING 5
WING 6
WING 7
WING 8
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. PHASE 1: SELECTIVELY DEMO PIPING IN WINGS FOR THE
INSTALLATION OF NEW WING ISOLATION VALVES ON THE DHWR.
REFER TO P501 FOR MORE INFORMATION.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P001
FIRST FLOOR
DOMESTIC PLUMBING
PLAN - DEMO
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/32" = 1'-0"
FIRST FLOOR DOMESTIC DEMO PLAN - OVERALL
N O
D
E S
C R
IP
T
IO
N
D A
T
P101A
1 1
1 1
WING 8
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. DEMOLISH EXISTING CIRCUIT SETTER FOR
REPLACEMENT WITH NEW CIRCUIT SOLVER.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P001A
FIRST FLOOR
DOMESTIC PLUMBING
PLAN - DEMO
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/16" = 1'-0"
FIRST FLOOR DOMESTIC DEMO PLAN - AREA A
N O
D
E S
C R
IP
T
IO
N
D A
T
WING 5
WING 6
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. DEMOLISH EXISTING CIRCUIT SETTER FOR
REPLACEMENT WITH NEW CIRCUIT SOLVER.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P001B
FIRST FLOOR
DOMESTIC PLUMBING
PLAN - DEMO
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/16" = 1'-0"
FIRST FLOOR DOMESTIC DEMO PLAN - AREA B
N O
D
E S
C R
IP
T
IO
N
D A
T
4 TAPS THIS SMALL SEGMENT. DEMOLISH EXISTING CIRCUIT
SETTING DEVICES. REPEAT FOR ALL TAPS IN BRANCH. FOR
BILLETING, 1 TAP SERVES 3 ROOMS. SEE ISO ON SHEET P501
(TYP)
WING 4
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. DEMOLISH EXISTING CIRCUIT SETTER FOR
REPLACEMENT WITH NEW CIRCUIT SOLVER.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P001C
FIRST FLOOR
DOMESTIC PLUMBING
PLAN - DEMO
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/16" = 1'-0"
FIRST FLOOR DOMESTIC DEMO PLAN - AREA C
N O
D
E S
C R
IP
T
IO
N
D A
T
NEW TAP LOCATION FOR NEW 3"
DHW DFAC ALT FEED AND FOR
PHASE 2. SEE P101D FOR MORE
DETAIL.
P101D
WING 1
WING 2
1 1
1 1
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P001D
FIRST FLOOR
DOMESTIC PLUMBING
PLAN - DEMO
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
N O
D
E S
C R
IP
T
IO
N
D A
T E
1/16" = 1'-0"
FIRST FLOOR DOMESTIC DEMO PLAN - AREA D
WING 2
WING 3
WING 4
WING 5
WING 6
DINING FACILITY REGION
USE ISOLATION VALVES IN MAIN LOOP
TO CREATE BACKFEEDS TO ONLY
REMOVE ONE SECTION AT A TIME
FROM SERVICE. (TYP)
1 1
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. PHASE 1: SELECTIVELY DEMO PIPING IN WINGS FOR
THE INSTALLATION OF NEW WING ISOLATION
VALVES ON THE DHW+DHWR.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P002
SECOND FLOOR
DOMESTIC PLUMBING
PLAN - DEMO
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/32" = 1'-0"
SECOND FLOOR DOMESTIC DEMO PLAN - OVERALL
N O
D
E S
C R
IP
T
IO
N
D A
T E
WING 8
WING 7
WING 2
WING 3
WING 4
WING 5
WING 6WING 8
WING 7
"ø
D T
W
1"ø DTWR
3"ø DTW
/4
"ø D
T W
R
3" DTW UP
3" DTW UP
"ø
D T
W
1 1
P403
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. NEW WING ISOLATION VALVE. REFER TO P501 DETAIL 4
FOR MORE INFORMATION ON LAYOUT.
2. INSTALL NEW THERMOMETER WITH CIRCUIT SOLVER
ASSEMBLY IN THIS LOCATION. REFER TO P501
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P101
FIRST FLOOR
DOMESTIC PLUMBING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1" = 30'-0"
FIRST FLOOR DOMESTIC PLAN - OVERALL
N O
D
E S
C R
IP
T
IO
N
D A
T
P101A
1 1
1 1
1 1
1 1
1 1
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1/2"ø DTW
/2
"ø D
T W
/4
"ø D
T W
/2
"ø D
T W
1/2"ø DTW 1/2"ø DTW
1/2"ø DTW
/2
"ø D
T W
R
/2
"ø D
T W
R
/2
"ø D
T W
R
LOCATE WHERE DHWR CIRCUIT SETTER EXISTS
AND REPLACE WITH CIRCUIT SOLVER (TYP).
DHWR OCCURS IN THE CEILING SPACE ON THE
FIRST FLOOR. SEE P501. (TYP)
1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW
CIRCUT SOLVER. VERIFY LOCATION IN FIELD. (TYP)
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P101A
FIRST FLOOR
DOMESTIC PLUMBING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/16" = 1'-0"
FIRST FLOOR DOMESTIC PLAN - AREA A
N O
D
E S
C R
IP
T
IO
N
D A
T E
3/8" = 1'-0"
BILLETING GENERAL PIPING SECTION
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
WING 5
WING 6
EXTEND ALTERNATE
DFAC PIPING UP TO
SECOND FLOOR
/4
"ø D
T W
R
NEW DTWR CONNECT. VALVE OFF WHEN ALT FEED NOT IN USE
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .