Drawings-Camp Dawson Billeting and RTI HW - Addendum#1 - 30Jul26.pdf
PDF 6 MB Posted
- Solicitation number
- CRFQ 0603 ADJ2700000002 2
- Issued by
- Kanawha County, West Virginia
About this file
This addendum to the construction drawings for Camp Dawson Billeting and Domestic Hot Water (RTI HW) project in West Virginia modifies the technical specifications and design requirements for the billeting facility and related hot water systems. The addendum clarifies construction details, updates drawing specifications, and addresses modifications to the original project scope to ensure proper installation and compliance with project requirements. The document provides revised architectural and mechanical drawings that supersede previous versions, establishing precise construction standards for the billeting infrastructure and hot water distribution systems at Camp Dawson.
The addendum includes detailed technical modifications necessary for contractor compliance during the construction phase, with emphasis on ensuring the drawings accurately reflect the intended design and construction methodology. All contractors must incorporate these addendum changes into their bid proposals and construction plans, with the addendum dated July 30, 2026, serving as the official modification to the original contract documents. Contractors are required to acknowledge receipt and understanding of the addendum requirements prior to contract execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNDN
WING 1
WING 2
WING 3
WING 4
WING 5
WING 6WING 8
WING 7
"ø
D T
W
1"ø DTWR
3"ø DTW
/4
"ø D
T W
R
3" DTW UP
3" DTW UP
"ø
D T
W
1 1
P403
RTI BILLETING
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. NEW WING ISOLATION VALVE. REFER TO P501 DETAIL 4
FOR MORE INFORMATION ON LAYOUT.
2. INSTALL NEW THERMOMETER WITH CIRCUIT SOLVER
ASSEMBLY IN THIS LOCATION. REFER TO P501
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P101
FIRST FLOOR
DOMESTIC PLUMBING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1" = 30'-0"
FIRST FLOOR DOMESTIC PLAN - OVERALL
N O
D
E S
C R
IP
T
IO
N
D A
T E
A
D D
E N
D U
M
/2
/2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
WING 5
WING 6
EXTEND ALTERNATE
DFAC PIPING UP TO
SECOND FLOOR
/4
"ø D
T W
R
NEW DTWR CONNECT. VALVE OFF WHEN ALT FEED NOT IN USE
INSTALL VALVES FOR THE INTERCONNECT & EACH BRANCH
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW
CIRCUIT SOLVER. VERIFY LOCATION IN FIELD. (TYP)
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P101B
FIRST FLOOR
DOMESTIC PLUMBING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/16" = 1'-0"
FIRST FLOOR DOMESTIC PLAN - AREA B
N O
D
E S
C R
IP
T
IO
N
D A
T E
A
D D
E N
D U
M
/2
/2
DNDN
INTERCONNECT
TAP TO BILLETING
FROM RTI
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW
CIRCUT SOLVER. VERIFY LOCATION IN FIELD. (TYP)
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P101C
FIRST FLOOR
DOMESTIC PLUMBING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
1/16" = 1'-0"
FIRST FLOOR DOMESTIC PLAN - AREA C
N O
D
E S
C R
IP
T
IO
N
D A
T E
A
D D
E N
D U
M
/2
/2
PHASE 1. SHUT OFF WATER AND INSTALL CIRCUIT SOLVER. REFER TO
DETAIL 1 ON P501. FOR RTI, IT WILL CONSIST OF 1 CIRCUIT SOLVER PER TAP
(1 WILL COVER 6 ROOMS ACROSS 3 FLOORS). REFER TO DETAIL 1 ON P502
FOR GENERAL LAYOUT OF DHW PIPING.
PHASE 2, SHUT OFF WATER AND INSTALL CIRCUIT SOLVER. REFER TO
DETAIL 1 ON P501. FOR RTI, IT WILL CONSIST OF 1 CIRCUIT SOLVER PER
TAP (1 WILL COVER 6 ROOMS ACROSS 3 FLOORS FOR RTI). REFER TO
DETAIL 1 ON P502 FOR GENERAL LAYOUT OF DHW PIPING. (TYP)
P101D
TIE IN VALVE OFF INITIAL CUT OFF
LOCATION FOR NEW 3" DHW TAP
FOR PHASE 2
1 1
ALTERNATE FEED TO DFAC AND TO BILLETING,
SEE SHEETS P101, P101B, P101C, P102
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED
ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.
14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
19. ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
PIPING OCCURS IN THE CEILING ON
THE FIRST FLOOR. CIRCUIT SOLVER
TO BE CONNECTED ON 1F. SEE P502
FOR MORE INFORMATION. (TYP)
1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW
CIRCUT SOLVER. VERIFY LOCATION IN FIELD. (TYP)
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P101D
FIRST FLOOR
DOMESTIC PLUMBING
PLAN
17 APR 2026
TRT
BCM
25007
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
N O
D
E S
C R
IP
T
IO
N
D A
T E
A
D D
E N
D U
M
/2
/2
1/16" = 1'-0"
FIRST FLOOR DOMESTIC PLAN - AREA D
3/8" = 1'-0"
RTI GENERAL PIPING SECTION
DEMO SECTION OF PIPE
FOR INSTALLATION OF
NEW TAP
DEMO
DEMO
DEMO
DEMO FOR INSTALLATION OF NEW SHUTOFF VALVE
DEMO
EXISTING BOILER PIPING TO REMAIN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED.
ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
DOMESTIC WATER PIPING TO BE TYPE "L" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
1. SELECTIVELY DEMO TANKS AND PIPING TO REPLACE
THE TANKS WHILE KEEPING THE HW SYSTEM IN
OPERATION, COORDINATE W/ ENGINEER AND OWNER.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P401
ENLARGED
PLUMBING DEMO
PLAN - OPS
17 APR 2026
TRT
BCM
21014
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
N O
D
ES
C
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
/2 9/
1/2" = 1'-0"1
OPS BOILER ROOM PLUMBING DEMO PLAN - ENLARGED
NOTE: ORIGINAL DOCUMENT IN COLOR
WATTS LF709 OR EQUAL
INSTALL SHUTOFF VALVE AFTER
CHILLER LOCATION SUCH THAT
IT IS NOT OVER THE CHILLER.
4"ø DHW
4"ø DHW
EXISTING WILL NOW BECOME
WATER SOFTENER BYPASS
EXISTING DOMESTIC COLD
WATER CONTROL CORP HF-300-TWIN 4"
WATER SOFTENER OR EQUIVALENT
3" ø
SA
N
TIE IN NEW TAP TO EXISTING SANITARY LINE OVERHEAD ON 1ST FLOOR BELOW
INSTALL 4" BUTTERFLY VALVES
INSTALL 4" BUTTERFLY VALVES
4"ø DHW
4" ø
D H
W
RECONNECT TO EXISTING 4"
CONNECT TO EXISTING TAP FOR BACKUP MAKE-UP WATER CONNECTION. ALT FEED DURING CONSTRUCTION
CONNECT TO EXISTING TAP
4" ø
H H
W R
4"ø DCW
4"ø DHW
ET-1
ET-1
3/4"ø HHWR
3/4"ø HHWR
3" ø
H H
W S
3"ø HHWS
3" ø
H H
W R 3" ø D
H W
RECONNECT TO EXISTING
3"ø HHWS
3"ø HHWR
4" ø
D H
W
3/4"ø DHW
3/ 4" ø D
H W
PROVIDE BALL ISOLATION
VALVES AT ALL TANK PIPING
CONNECTIONS
3/4"ø HHWR
3/4"ø HHWR
3/4"ø HHWR
1.
2.
3.
4.
5.
INSTALL DRAIN, UNION, AND AIR VENT FOR NEW
EXPANSION TANKS.
INSTALL TACO CAF600-125P OR EQUIVALENT BLADDER
TYPE EXPANSION TANK. INSTALL PER MFR'S
REQUIREMENTS.
INSTALL HTP-JS-48-108 HOT WATER STORAGE TANK.
INSTALL PER MFR'S REQUIREMENTS.
INSTALL NEW TANKS SEQUENTIALLY TO ENSURE THE
HOT WATER REMAINS IN SERVICE, COORDINATE WITH
ENGINEER AND OWNER. INSTALL REMOTE TANK DRAIN
BALL VALVE AT BOTTOM EDGE OF TANK AND EXTEND
TO FLOOR DRAIN, MINIMIZING TRIPPING HAZARDS.
NEW EXPANSION TANK RECIRCULATION PUMP, TACO
0015E 3 SPEED CIRCULATOR. STAINLESS STEEL, 12GPM,
WITH ISOLATION VALVES AND DISCHARGE CHECK
VALVE AND UNION. PROVIDE BALL ISOLATION VALVES
AT EACH TAP AND EQUIPMENT LOCATION IN EXPANSION
TANK RECIRCULATING LOOP PIPING. MOUNT PUMP ON
WALL BRACKET 4' AFF, EXTEND LOOP PIPING DOWN AND
BACK UP VERTICALLY TO PUMP ALONG WALL.
SHEET NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS
SPECIFIED, AND REQUIRED BY CODE.
PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING
SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH
PIPING SERVES TWO OR MORE FIXTURES.
UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT
WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.
UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.
INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,
TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A
PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE
USED TO THE LAST FIXTURE.
ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE
OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS
(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR
ALTERATIONS AND REPAIRS.
ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY
OPERATION.
PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/
ACCESSIBLE STOPS.
ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE
PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE
STOP (MEMORY STOPS).
ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS
IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE
OF VALVE IS REMOVED.
ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES
INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL
BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS
CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL
BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
DOMESTIC WATER PIPING TO BE TYPE "L" COPPER w/ SOLDERED
OR MECHANICALLY PRESSED FITTINGS.
PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR
TESTING IS NOT PERMITTED.
FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,
FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND
MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL
OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL
PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.
ALL WORK TO MEET REQUIREMENTS OF CURRENT
INTERVENTIONAL PLUMBING CODE, INTERNATIONAL
MECHANICAL CODE, STATE AND LOCAL CODES AND
REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.
PLUMBING NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
P402
ENLARGED
PLUMBING PLAN -
OPS
17 APR 2026
TRT
BCM
21014
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
N O
D
ES
C
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
/2 9/
1/2" = 1'-0"1
OPS BOILER ROOM PLUMBING PLAN - ENLARGED
NEW ET-1 TIE IN
NOTE: ORIGINAL DOCUMENT IN COLOR
G
FC
I G
FC
I
GFCI
HOT WATER PLANT
MECHANICAL PENTHOUSE
CORR
ELEC
COMM
PANEL LB1
1.
2.
3.
4.
5.
6.
7.
WIRING AND CONDUIT SHALL BE REQUIRED FOR ALL OUTLETS
AND DEVICES. FOLLOW INDICATED CIRCUITS NUMBERS AND
PANEL DESIGNATION. OBTAIN PRIOR APPROVAL OF ENGINEER
FOR DEVIATIONS.
ALTHOUGH ALL BRANCH CIRCUIT WIRING IS NOT SHOWN, IT IS
THE INTENT OF THESE DOCUMENTS THAT A COMPLETE
BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED. ALL
NEUTRALS SHALL BE FULL CAPACITY. THE USE OF SHARED OR
COMMON NEUTRALS IS PROHIBITED ON ALL ELECTRIC WIRING.
PROVIDE CONTROL AND FIRE ALARM WIRE AS NECESSARY TO
INSTALL ALL SYSTEMS DEVICES AND PANELS FOR COMPLETE
SYSTEMS. FINAL CONNECTION TO PERMANTLY MOUNTED
EQUIPMENT IS PART OF THE ELECTRICAL SCOPE OF THIS
PROJECT.
ALL INTERIOR WIRING SHALL BE THHN/THWN IN METAL
CONDUIT. MAX OF 3'-0" OF FLEXIBLE CONDUIT MAY BE USED
FOR FINAL EQUIPMENT TERMINATIONS.
VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO
BIDDING. COORDINATE ALL WORK WITH OTHER TRADES.
COORDINATE ALL CEILING MOUNTED DEVICES WITH ALL OTHER
TRADES PRIOR TO INSTALLATION.
PERFORM ALL WORK IN ACCORDANCE WITH 2020 NEC.
FINAL COORDINATION OF SCOPE OF WORK , DIMENSIONS,
FIXTURE PLACEMENT, ROUTINGS, ETC IS THE RESPONSIBILITY
OF THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS
PRIOR TO BIDDING.
ELECTRICAL NOTES
1.
2.
INSTALL NEW GFCI RECEPTACLE. RECEPTACLE WILL
RECEIVE A HOME-RUN FEED FROM PANEL LB1 FOR
WATER SOFTNER SYSTEM. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS.
POWER TO NEW TACO 0013 120V CIRCULATOR FROM
PANEL LB1, 15A BREAKER #12 CONDUCTOR, NEW 3/4
EMT CONDUIT. INSTALL FUSED DISCONNECT ON WALL
AT PUMP LOCATION, COORDINATE WITH ENGINEER.
SHEET NOTES
PA OFFICE:
429 LAUREL RUN ROAD
CARMICHAELS, PA 15320
PH: (724) 966-5655
WV OFFICE:
54 WEST RUN RD.
MORGANTOWN, WV 26508
PH: (304) 291-2234
SHEET NAME:
MILLER ENGINEERING INC.
COPY RIGHT:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
BCM
SEAL:
CONSULTANT:
PROJECT NAME:
PROJECT OWNER:
PROJECT STATUS:
PROJECT NUMBER:
ORIGINAL PAGE SIZE: 22x34
E401
ENLARGED
ELECTRICAL PLAN -
OPS
17 APR 2026
TRT
BCM
21014
BIDDING
DOCUMENTS
WV ARMY NATIONAL
GUARD
WVANG - DAWSON
BILLETING AND RTI
DOMESTIC HOT
WATER REPAIRS
N O
D
ES
C
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
/2 9/
1/8" = 1'-0"1
OPS MECHANICAL ROOM ELECTRICAL PLAN - ENLARGED
120 Braley Road, East Freetown, MA 02717 • TEL: 508-763-8071 • www.htproducts.com
HTP-CD1066-A Last Revision: 11/2014
WATER STORAGE VESSELS
JACKETED & INSULATED TANKS
• Glass Lined Steel Tank – Glass lining is applied to the interior surface of the steel providing a tough wear resistant lining which minimizes the effects of high temperature hot water.
• Designed for 180° F.
• Sturdy Steel Jacket – Heavy gauge steel jacket.
• 2” High Density Foam Insulation – Minimizes heat loss with an R value of 12.5.
•Magnesium Anode Rod – for protection and longer service life.
• Two ¾” Aquastat NPT Fittings – Located in the lower and upper part of the tank.
• All Tanks are constructed and Certified – In accordance with ASME IV, Part HLW for 125 PSI (862 kPa).
• Five Year Limited Warranty on Steel Tank – Provide warranty protection against tank failure resulting from defects in materials and workmanship.
• Ten Year Limited Warranty on Steel Tank (with double glass lining) – Provide superior warranty protection against tank failure. Double glass lining is not an inventory item, built upon request.
5-Year Limited Tank Warranties/5-Year Limited Warranty on Component Parts
For products installed in USA, Canada and Puerto Rico; some states do not allow limitations on warranties. See complete copy of the warranty included with the heater
Water Storage Vessels – Jacketed & Insulated Tanks www.htproducts.com • 272 Duchaine Blvd, New Bedford, MA • © Ariston Thermo USA LLC. 07/31/2020 • MKTLIT-109
Large Volume Commercial Storage Tanks Jacketed & Insulated Tanks
HTP MODEL ACTUAL
GALLONS
NOMINAL
GALLONS DIA. HEIGHT APPROX.
WEIGHT
HTP-JS-32-200 200 N/A 32" 77" 541 LBS.
*** NO MODIFICATIONS CAN BE MADE TO THE ABOVE LISTED TANK. IT IS AVAILABLE IN GLASS LINED ONLY.
HTP-JS-30-075 210 229 34" 83" 613 LBS.
HTP-JS-30-085 240 260 34" 93" 700 LBS.
HTP-JS-30-099 280 303 34" 107" 673 LBS.
HTP-JS-30-111 320 340 34" 119" 703 LBS.
HTP-JS-36-072 285 318 40" 80" 714 LBS.
HTP-JS-36-078 310 344 40" 86" 782 LBS.
HTP-JS-36-085 340 375 40" 93" 845 LBS.
HTP-JS-36-090 360 397 40" 98" 894 LBS.
HTP-JS-36-102 415 449 40" 110" 982 LBS.
HTP-JS-36-114 465 502 40" 122" 1106 LBS.
HTP-JS-36-126 515 555 40" 134" 1194 LBS.
HTP-JS-42-081 435 486 46" 89" 1024 LBS.
HTP-JS-42-084 453 504 46" 92" 1074 LBS.
HTP-JS-42-093 505 558 46" 101" 1168 LBS.
HTP-JS-42-105 575 630 46" 113" 1292 LBS.
HTP-JS-42-117 645 702 46" 125" 1392 LBS.
HTP-JS-42-129 720 774 46" 137" 1498 LBS.
HTP-JS-42-139 790 846 46" 147" 1587 LBS.
HTP-JS-48-073 500 572 48" 77" 1038 LBS.
HTP-JS-48-084 580 658 48" 88" 1161 LBS.
HTP-JS-48-096 675 752 48" 100" 1298 LBS.
HTP-JS-48-108 765 846 48" 112" 1433 LBS.
HTP-JS-48-120 840 940 48" 124" 1567 LBS.
HTP-JS-48-141 1040 1105 48" 145" 1805 LBS.
HTP-JS-54-113 1000 1119 58" 123" 2300 LBS.
HTP-JS-60-114 1245 1395 64" 124" 2500 LBS.
HTP-JS-60-138 1530 1689 64" 148" 2500 LBS.
* HTP Offers Epoxy Lined Tanks For The Same Price As Glass Lined Tanks.
A Manway Is Included With All Epoxy Lined Tanks – All Models are ASME Rated ***Horizontal Configurations Are Available At An Additional Cost ***For Extra Fittings, Please Refer To Pricing On The Options Page
W-H-196 Test = 7.0 - 8.0 mg/in2 The W-H-196 Test is required for water heaters sold to the U.S. Government. The test consists of exposing the enamel to a boiling (212 F) 4/10% solution of Sodium Bicarbonate for eight (8), eighteen (18) hour cycles. Maximum weight loss after eight cycles is not to exceed 15 mg/in2.
PEI T-21 Spot Acid Test = Class A PEI T-21 Spot Acid Test is used to determine enamel resistance to acids. The test area is examined for visible effects on the enamel and is graded from Class AA (no sign of etching) to Class D (etched surface).
Impact resistance = Class 4 to 5 The Impact Resistance Test is used to determine the adhesive qualities of enamel to the substrate.
The enamel is graded from Class 1 (worst) to Class 5 (best), fractured glass adhering solidly to the impact area. Class 3 is acceptable.
Hi-Pot Test Less than 20 The HYPO Test is a measurement of the continuity of the glass
All tanks are ASME Certified
Heat Exchanger Bears the ASME
“HLW” Stamp
1 2 0 B r a l e y R o a d , E a s t F r e e t o w n , M A 0 2 7 1 7 • w w w. h t p r o d u c t s . c o m • 1 1 / 2 0 1 4 © H T P www.htproducts.com • 272 Duchaine Blvd, New Bedford, MA • © Ariston Thermo USA LLC. 07/31/2020 • MKTLIT-109
Submittal
© 2025 Taco, Inc. | tacoinc.com 1160 Cranston Street, Cranston, RI | 401–942–8000
Literature No. 401-216 Effective: 11/17/25 | Supersedes: 06/13/22
CAF FLOW THROUGH
EXPANSION TANKS
Submittal
© 2025 Taco, Inc. | tacoinc.com 1160 Cranston Street, Cranston, RI | 401–942–8000
Literature No. 401-216 Effective: 11/17/25 | Supersedes: 06/13/22
CAF FLOW THROUGH
EXPANSION TANKS
PRODUCT DATA
ITEM NO. LOCATION
MODEL NO.
PRE-CHARGE* WORKING PRESSURE
QUANTITY
JOB:
ENGINEER:
REPRESENTATIVE:
CONTRACTOR:
CAF Flow Through Expansion Tanks Submittal Data
Submittal No: 401-216 | Effective: June 13, 2022 | Supersedes: NEW (Certified by NSF to NSF/ANSI 61-G for Potable Water Applications)
* Unless otherwise specified, standard pre-charge of 40 psi (276 kPa).
OPTIONAL DESIGN PRESSURES
AND TEMPERATURES
□ 150 psi @ 240°F (1034 kPa @ 116°C)
□ 175 psi @ 240°F (1207 kPa @ 116°C)
□ 250 psi @ 240°F (1724 kPa @ 116°C)
□ 300 psi @ 240°F (2069 kPa @ 116°C)
SPECIFICATIONS
• Designed and constructed per ASME Code Section VIII, Div. 1.
• Construction: Carbon Steel with exterior red oxide primer finish
• Standard Design Pressure and Temperature: 125 psi @ 240°F
(862 kPa @ 116°C) Max.
• Registered with the National Board of Pressure Vessel Manufacturers
• U-1A Data Report
• Bladder type for permanent separation of air and water.
• 2 connection design permitting flow through tank.
• Water expands into bladder, air pre-charge on shell side.
• Bladder – Heavy Duty Butyl, removable for inspection.
• System Connection Materials 304 Stainless Steel
• Suitable for Vertical Installation
• Models certified to NSF 372 are required to be installed on the cold water side of the hot water heater.
ADDITIONAL OPTIONS
□ [ A ] Anchor Clips
□ [ B ] Bulls Eye Sight Glass
H1
B
D
H2
R
CHARGING VALVE
LIFTING LUG
1/2" NPT (12.7mm)
(FACTORY USE ONLY)
ASME NAMEPLATE
OPTIONAL
SIGHT GLASS
(ADD SUFFIX 'B')
LIFTING LUG
CAF600 THRU CAF2500
OPTIONAL
ANCHOR CLIPS
(ADD SUFFIX 'A')
SYSTEM
CONNECTIONS
1/2" NPT.(12.7mm)
CAF600 THRU CAF2500
(FACTORY USE ONLY)
1/2" NPT (12.7mm) DRAIN
(CAF90 THRU CAF2500)
DO NOT PIPE THE DRAIN
COMMENTS
Taco, Inc., 1160 Cranston Street, Cranston, RI 02920 | Tel: (401) 942-8000 | Taco (Canada), Ltd., 8450 Lawson Road, Suite #3, Milton, Ontario L9T 0J8 | Tel: (905) 564-9422 Visit our website: www.TacoComfort.com | ©2022 Taco, Inc.
Model Number Tank Volume H1’ HEIGHT H2’ HEIGHT B’ DIAMETER D’ DIAMETER R’ RADIUS SHIPPING
WEIGHT **
SYSTEM
CONNECTION SIZE
Max Flow in Tank Rate
GAL. liter INCH mm INCH mm INCH mm INCH mm INCH mm LBS kg Imperial metric GPM
CAF90-125P 23 90 34 863.6 31 1/8 790.6 16 406 20 508 5.49 139 129 58.5 1 1/2” NPT 38.1mm 55
CAF140-125P 37 140 45 1143 42 1/8 1070 16 406 20 508 5.49 139 204 92.5 1 1/2” NPT 38.1mm 55
CAF215-125P 57 215 63 3/4 1619.3 60 7/8 1546.2 16 406 20 508 5.49 139 299 135.6 1 1/2” NPT 38.1mm 55
CAF300-125P 79 300 62 5/8 1590.7 59 1/8 1501.8 20 508 24 610 5.50 140 333 151.0 2” NPT 50.8mm 80
CAF450-125P 119 450 82 1/4 2089.2 78 3/4 2000.3 20 508 24 610 5.50 140 413 187.3 2” NPT 50.8mm 80
CAF500-125P 132 500 90 5/8 2301.9 87 1/8 2212.34 20 508 24 610 5.50 140 433 196.4 2” NPT 50.8mm 80
CAF600-125P 158 600 76 3/8 1940 73 1854.2 24 610 30 762 7.05 179 473 214.5 2” NPT 50.8mm 80
CAF700-125P 185 700 85 1/8 2162.2 81 5/8 2073.3 24 610 30 762 7.05 179 538 244 2” NPT 50.8mm 80
CAF800-125P 211 800 94 3/8 2397.2 90 7/8 2308.2 24 610 30 762 7.05 179 603 273.5 2” NPT 50.8mm 80
CAF900-125P 238 900 79 7/8 2028.8 75 1/4 1911.35 30 762 36 914 8.48 215 719 326 3” NPT 76.2mm 200
CAF1000-125P 264 1000 85 3/4 2178.1 82 1/8 2085.9 30 762 36 914 8.48 215 819 371.5 3” NPT 76.2mm 200
CAF1100-125P 291 1100 92 2336.8 87 3/8 2219.3 30 762 36 914 8.48 215 894 405.5 3” NPT 76.2mm 200
CAF1200-125P 317 1200 97 3/4 2482.9 93 1/8 2365.4 30 762 36 914 8.48 215 969 439.5 3” NPT 76.2mm 200
CAF1300-125P 344 1300 103 3/4 2635.3 99 1/8 2517.65 30 762 36 914 8.48 215 1009 457.8 3” NPT 76.2mm 200
CAF1400-125P 370 1400 109 3/4 2787.7 105 1/8 2670.2 30 762 36 914 8.48 215 1049 475.8 3” NPT 76.2mm 200
CAF1500-125P 396 1500 81 5/8 2073.3 76 3/8 1939.9 40 1016 48 1219 12.77 324 1251 567.4 3” NPT 76.2mm 200
CAF1600-125P 422 1600 84 3/4 2152.7 79 1/2 2019.3 40 1016 48 1219 12.77 324 1431 649 3” NPT 76.2mm 200
CAF1800-125P 475 1800 91 5/8 2327.3 86 3/8 2193.9 40 1016 48 1219 12.77 324 1567 710.8 3” NPT 76.2mm 200
CAF2000-125P 528 2000 98 5/8 2505.1 93 3/8 2371.7 40 1016 48 1219 12.77 324 1701 771.6 3” NPT 76.2mm 200
CAF2500-125P 660 2500 115 3/8 2930.5 110 1/8 2797.2 40 1016 48 1219 12.77 324 1881 853.2 3” NPT 76.2mm 200
Certified to
NSF/ANSI/CAN 61-G
Features
| • | 3-Speed Switch | |
| • | Fine tune to system requirements | |
| • | Highest performance & starting torque in class | |
| • | Heavy-Duty construction for longer life | |
| • | Removable high-flow Integral Flow Check (IFC®) | |
| - Prevents gravity flow | ||
| - Reduces installation costs | ||
| - Improves pump performance | ||
| • | Replaceable cartridge design | |
| • | Quiet, efficient operation | |
| • | Self lubricating, no mechanical seal | |
| • | Wide range of applications | |
| • | Cast Iron or St. Steel, flanged construction |
Materials of Construction
| Casing:...................................Cast Iron or St. Steel |
| Integral Flow Check .... |
| (IFC®): ....................................Acetal & Stainless Steel |
| Stator Housing:................Aluminum |
| Cartridge:.............................Stainless Steel |
| Impeller:...............................Non-Metallic |
| Shaft:.......................................Ceramic |
| Bearings:...............................Ceramic |
| O-Ring & Gaskets:...........EPDM |
Performance Data
| 0012 | 0013 | |
| Max. Flow (GPM): | 42 | 32 |
| Max. Head (FT): | 14 | 33 |
| Min. Fluid Temperature: | 40˚F (4˚C) | |
| Max. Fluid Temperature: | 210°F (98˚C) | |
| Max. Working Pressure: | 125 psi | |
| Flanged Connection Sizes: | ||
| 3/4”, 1”, 1-1/4”, 1-1/2” |
Electrical Data
Pump Dimensions & Weights
Models Type Flange Code
A B C D F G Ship Wt.
in. mm in. mm in. mm in. mm in. mm in. mm lbs. Kg
0012-MSF2-IFC CI S
8-7/16 214 6-15/64 158 4-1/4 107 4-3/64 103 6-9/64 156 8-1/2 216
12 5.5
0012-MSSF2-IFC SS S 15.2 6.9
0013-MSF2-IFC CI R
7-9/16 192 6-5/32 156 3-1/2 89 4-3/64 103 6-9/64 156 6-1/2 165 11 5
0013-MSSF2-IFC SS R
Model Volts Hz Ph Amps Watts RPM
(Speed 3) HP Speed 1 Speed 2 Speed 3
0012 115 60 1 1.65 130 170 195 3250 1/8
0013 115 60 1 1.95 140 200 235 3250 1/8
Motor Type Permanent Split Capacitor Thermally Protected
Low-Lead Compliant
Certifications & Listings
FOR INDOOR
USE ONLY
Flange Orientation
Standard (S) Rotated (R)
A D
F B
C
G
Submittal Data Information
Job: Engineer: Contractor: Rep:
ITEM NO. MODEL NO.
101-166
Effective: July 19, 2021 Supersedes: June 26, 2015
0012 & 0013 3-Speed Cartridge Circulators
Dimensions and weights are approximate.
LIMITED WARRANTY STATEMENT
Taco, Inc. will repair or replace without charge (at the company’s option) any Taco product which is proven defective under normal use within three (3) years from the date code.
In order to obtain service under this warranty, it is the responsibility of the purchaser to promptly notify the local Taco stocking distributor or Taco in writing and promptly deliver the subject product or part, delivery prepaid, to the stocking distribu-tor. For assistance on warranty returns, the pur-chaser may either contact the local Taco stock-ing distributor or Taco. If the subject product or part contains no defect as covered in this war-ranty, the purchaser will be billed for parts and labor charges in effect at time of factory exami-nation and repair.
Any Taco product or part not installed or operated in conformity with Taco instructions or which has been subject to misuse, misapplication, the addi-tion of petroleum-based fluids or certain chemical additives to the systems, or other abuse, will not be covered by this warranty.
If in doubt as to whether a particular substance is suitable for use with a Taco product or part, or for any application restrictions, consult the applicable Taco instruction sheets or contact Taco at (401-942-8000).
Taco reserves the right to provide replacement products and parts which are substantially similar in design and functionally equivalent to the defective product or part. Taco reserves the right to make changes in details of design, construc-tion, or arrangement of materials of its products without notification.
TACO OFFERS THIS WARRANTY IN LIEU OF
ALL OTHER EXPRESS WARRANTIES. ANY
WARRANTY IMPLIED BY LAW INCLUDING
WARRANTIES OF MERCHANTABILITY OR
FITNESS IS IN EFFECT ONLY FOR THE DURA-
TION OF THE EXPRESS WARRANTY SET
FORTH IN THE FIRST PARAGRAPH ABOVE.
THE ABOVE WARRANTIES ARE IN LIEU OF
ALL OTHER WARRANTIES, EXPRESS OR
STATUTORY, OR ANY OTHER WARRANTY
OBLIGATION ON THE PART OF TACO.
TACO WILL NOT BE LIABLE FOR ANY SPECIAL
INCIDENTAL, INDIRECT OR CONSEQUENTIAL
DAMAGES RESULTING FROM THE USE OF
ITS PRODUCTS OR ANY INCIDENTAL COSTS
OF REMOVING OR REPLACING DEFECTIVE
PRODUCTS.
This warranty gives the purchaser specific rights, and the purchaser may have other rights which vary from state to state. Some states do not allow limitations on how long an implied warranty lasts or on the exclusion of incidental or conse-quential damages, so these limitations or exclu-sions may not apply to you.
Applications The 0012 is designed for high flow/ low head, closed loop, hydronic systems. The 0013 is designed for high flow/ high head, closed loop hydronic systems. The Stainless Steel models can be used for open systems and potable water applications.
H
EA
D (F
T)
H
EA
D (F
T)H
EA
D (M
H
EA
D (M
0012 Performance Curves 0013 Performance Curves
7.5 10.5
7.5
4.5
1.5
4.5
1.5
1.1 2.3 3.4 4.5 5.7 6.8 7.9 9.1 10.2
50 10 15 20 25 30 35 40 45
FLOW (GPM)
FLOW (m3h)
FLOW (GPM)
FLOW (m3h)
1.1 2.3 3.4 4.5 5.7 6.8 7.9
50 10 15 20 25 30 35
L M H L M
H
| BILLETING ADDENDUM 7.28 |
| P101 - FIRST FLOOR DOMESTIC PLUMBING PLAN |
| P101B - FIRST FLOOR DOMESTIC PLUMBING PLAN |
| P101C - FIRST FLOOR DOMESTIC PLUMBING PLAN |
| P101D - FIRST FLOOR DOMESTIC PLUMBING PLAN |
| Op Building_24 revision 1 |
| JS-48-108.1 |
| CAF_Flow_Through_ Expansion_Tanks_Submittal_401-216 replacement for cbx600 |
| 0012-0013_3-Speed_Circulators_Submittal_101-166 |
| CD Domestic Hot Water PreBid Docs |
| htp js48-108 |
File details come from the government source that posted it. Updated .