Project Drawings
3 MB Posted
- Attached to
- Pettigrew Boiler Replacement
- Solicitation number
- FVSU-2022-FM1-PHB2021
- Issued by
- Paulding County, Georgia
About this file
This is a Project Drawings document prepared by NBP Engineers, Inc. for Fort Valley State University's Pettigrew Boiler Replacement project (PHB-2021) located at 1005 State University Drive, Fort Valley, Georgia 31030. The 100% construction documents include comprehensive mechanical, plumbing, and electrical drawings with detailed schedules, legends, and specifications for the boiler replacement work in the Pettigrew building. The project involves demolition of existing boiler equipment and installation of new heating systems, including a new condensing hot water boiler (BLR-1) rated at 120/1,250 MBH input/1,200 MBH output with 96% efficiency, new circulating pumps with variable frequency drives (HP-1 and HP-2), expansion tanks, chemical feed systems, and associated piping and controls. The sealed bid deadline is 2:00 PM on September 28, 2021, with bids to be publicly opened and announced at FVSU Pettigrew Ballroom. Bidding documents are available from NBP Engineers, Inc. via email request to moore@nbpengineers.com, with acquisition through the Georgia Procurement Registry or the Design Professional's office recommended to ensure complete and accurate information.
The construction documents specify that all new conduit shall be EMT and all new conductors shall be copper THWN-2, with compliance required to the 2017 National Electrical Code. The project includes electrical work such as providing a new 30-amp three-phase fused disconnect for the variable frequency drive, a new 20-amp single-phase circuit for boiler control, and replacement of four existing fluorescent light fixtures with new LED units equipped with emergency battery packs. Plumbing work involves new gas piping with a regulator set for 2 PSI delivery pressure, routing of gas exhaust, and connection of hot and cold water systems. The mechanical systems include new piping with trapeze hangers, air vents, drain valves, and a new make-up water station. The design documents were finalized on August 18, 2021, as 100% construction documents with a professional engineering seal valid through June 30, 2022 (COA#PEF000774).
Text of this file
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
M2.0
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
ABBREVIATIONS, LEGENDS, SCHEDULES, & DETAILS - HVACM0.0
E0.0 LEGEND, SCHEDULE, NOTES, & DETAILS - ELECTRICAL
FORT VALLEY, GEORGIA 31030
1005 STATE UNIVERSITY DR.
PETTIGREW BOILER REPLACEMENT
FORT VALLEY STATE UNIVERSITY
LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
P2.0
P0.0 LEGEND, SCHEDULE, NOTES, & DETAILS - PLUMBING
LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - PLUMBING
E2.0 LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL
M4.0
M5.0 DETAILS - HVAC
FLOW DIAGRAM - HVAC
08.18.2021 100% CONSTRUCTION DOCUMENTS
FVSU PROJECT No. PHB-2021
P:\20066\20066m00.dgn
DATE PLOTTED
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m00.dgn
AS SHOWN
08.18.2021
WSH
LTF
WSH
20066
F O
R T
V A
L L
E Y G
E O
R G
IA
S T
A
E
U N
IV
E R
S
IT
Y
D
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
W
B O
IL
P L
A C
E M
E N
T F
O
L L
S
A
IV
E R
S
IT
Y
C
N S T
R U
C T
IO
C U
M E
N T S
F V
P
O J E o P
H B
M0.0
CHS CHR
HWS HWR
CR
D
SPF
HTWS HTWR
DTS DTR
CHILLED WATER SUPPLY CHILLED WATER RETURN
HEATING WATER SUPPLY HEATING WATER RETURN
CONDENSER WATER SUPPLY CONDENSER WATER RETURN
CONDENSATE DRAIN
FIRE PROTECTION MAIN STANDPIPE
HIGH TEMP. SUPPLY HIGH TEMP. RETURN
DUAL TEMP. SUPPLY DUAL TEMP. RETURN
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID
CONDENSATE DRAIN
CS
RS REFRIGERANT SUCTION
RG REFRIGERANT HOT GAS
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
(15 PSIG. MAX)
CR CONDENSATE RETURN (LP)
PUMPED CONDENSATE
50#
STEAM
(PRESSURE INDICATED)
SOLENOID VALVE RELIEF VALVE
GATE VALVE WITH
3/4" HOSE END
NEEDLE VALVE
OS&Y GATE VALVE .
GAS COCK
AUTOMATIC AIR VENTAAV
GAUGE WITH COCK
BOILER DRAIN PIPE TEST PLUG
FLEX. PIPE CONN. BACKFLOW PREVENTER
MANUAL AIR VENT
STRAINER
ELBOW UP ELBOW DOWN
BRANCH OUT BOTTOM BRANCH OUT TOP
TEE OUT BOTTOM TEE OUT TOP
SCREWED UNION FLANGED UNION
PIPE CAP BLIND FLANGE
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
2-WAY CONTROL VALVE
CONTROL VALVE
PLAN VIEW
ECCENTRIC REDUCER
GAUGE COCK
3-WAY MIXING
VALVE IN VALVE BOX
CONTROL VALVE
HPS
THERMOMETER IN WELL
SEPARABLE SOCKET WELL
LPS
PLUG VALVE
PCR
CONNECT TO EXISTING
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
95 F DB / 78 F WB 25 F DB
72 F DB75 F DB / 55% RH
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
MARK REMARKS
SCHEDULES - HVAC
LEGEND, &
ABBREVIATIONS,
MARK SERVICE TYPE GPM
FT.H O
MAX. MIN.
EFF.%2
MANUFACTURERS
REMARKS
DYNAMIC
PUMP SCHEDULE
BELL & GOSSETT
RPM
HP
CONDENSING HOT WATER BOILER SCHEDULE
MBH
INPUT
BOILER
MBH
OUTPUT
EFFICIENCY
MIN.
PRESSURE
OPERATING
GPM VOLT/PHASE
BLR-1 120/11250 1200 96% 45
VIL 1750HP-1 BLDG HW
VIL 1750HP-2 BLDG HW
60135
5 61.6 2.5x2.5x9.5C 2x2x9.5 2x2x9.5
TACOPATTERSON
60 5 61.6 2.5x2.5x9.5C 2x2x9.5 2x2x9.5
BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - HVAC
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
BOILER/CHILLER MECHANICAL ROOM - NEW WORK - HVAC
LARGE SCALE -
M2.0
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
BOILER/CHILLER
LARGE SCALE -
32/12
8/
T
FD
1 ‚"
T
5"
1"
FM
1 ‚"
EXISTING BOILER
4"
3"
MDP
XDP
LDP
T
45KVA
M C
C
F
F A
C P
CHS
EXISTING RELIEF VALVE
EF-8
EX.
EF-9
EX.
4"
EXISTING PIPES UP TO 2nd
EXISTING ACP
DRAIN DN
SPRINKLER
EXISTING
F-1
EX. CP
EX. UH
4"
CONNECT TO POTABLE WATER
EXISTING 1 •"CW;
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
REMOVE
CONCRETE PAD
& CORRESPONDING
REMOVE EXISTING HW PUMP
FILLTROL PURGER
REMOVE EXISTING
TO CAP ON ROOF
EXISTING BOILER FLUE
REMOVE PORTION OF
CHEMICAL FEED ON WALL
REMOVE EXISTING BYPASS
GAL EXP TANK
REMOVE EXISTING 55
PUMP GAUGES
REMOVE EXISTING
EXISTING WATER HEATER TO REMAIN
REMOVE EXISTING 8"{ FLUE
EXISTING FILLTROL PURGER TO REMAIN
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
EXISTING UH THERMOSTAT TO REMAIN
TO REMAIN
EXISTING AFTERCOOLER
TO REMAIN
EXISTING AIR COMPRESSOR
WATER MAKE-UP TO REMAIN
EXISTING CHW
EXPANSION TANK TO REMAIN
EXISTING CHW
AIR SEPARATOR TO REMAIN
EXISTING CHW TANGENTIAL
MUW
NOTES:(THIS SHEET ONLY)
REFER TO SPECS FOR DRAFT FAN DF-1 REQUIREMENTS.
2 CONNECT NEW FLUE TO EXISTING WATER HEATER.
4" HWR
CONCRETE BASE
REMOVE EXISTING
CONCRETE BASE
EXISTING
H W
S
H W
S
4"
4"4"
4"
4" HWS
3 3
3 BUTTERFLY VALVE WITH BLIND FLANGE FOR TEMPORARY BOILER.
4 BUTTERFLY VALVE WITH BLIND FLANGE FOR FUTURE BYPASS VALVE.
EX. HP
NEW CONCRETE PAD
NEW HW EXPANSION TANK
NEW TANGENTIAL AIR SEPARATOR
CHEMICAL FEEDER TANK
NEW HW BYPASS
BLR-1
NEW
NEW VFD
NEW ACP
HP-1
NEW
HP-2
NEW
AND TILE WITH NEW TO MATCH EXISTING.
REMOVE EXISTING ACOUSTICAL CEILING AND REPLACE CEILING GRID
FLUE CAP ON ROOF
CHASE; REMOVE EXISTING
THRU EXISTING 2ND FLOOR
REMOVE EXISTING FLUE UP
5 5
BOILER FLUE
NEW 8"{
PROVIDE NEW FLUE CAP ON ROOF
UP THRU EXISTING CHASE;
NEW 8"{ BOILER FLUE
HEATER FLUE
NEW 8"{ WATER
CHASE; PROVIDE NEW FLUE CAP ON ROOF
UP THRU EXISTING 2ND FLOOR
NEW 8"{ WATER HEATER FLUE
P:\20066\20066m20.dgn
DATE PLOTTED
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m20.dgn
AS SHOWN
08.18.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
32/12
8/
T
FD
1 ‚"
T
5"
1"
FM
1 ‚"
4"
3"
MDP
XDP
LDP
T
45KVA
M C
C
F
F A
C P
CHS
EXISTING RELIEF VALVE
EF-8
EX.
EF-9
EX.
EXISTING PIPES UP TO 2nd
EXISTING ACP
DRAIN DN
SPRINKLER
EXISTING
F-1
EX. CP
EX. UH
CONNECT TO POTABLE WATER
EXISTING 1 •"CW;
EXISTING WATER HEATER TO REMAIN
EXISTING FILLTROL PURGER TO REMAIN
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
EXISTING UH THERMOSTAT TO REMAIN
TO REMAIN
EXISTING AFTERCOOLER
TO REMAIN
EXISTING AIR COMPRESSOR
WATER MAKE-UP TO REMAIN
EXISTING CHW
EXPANSION TANK TO REMAIN
EXISTING CHW
AIR SEPARATOR TO REMAIN
EXISTING CHW TANGENTIAL
CONCRETE BASE
EXISTING
P:\20066\20066m40.dgn
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m40.dgn
AS SHOWN
08.18.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
M4.0
HVAC
FLOW DIAGRAM -
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
F.M.
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
4"
4"
4"
4"
4"
4" 4"
4"
4"
4"
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BLR-1 BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
HEATING SYSTEM PUMP-VFD CONTROL
HEATING SYSTEM PUMP-VFD CONTROL
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
HP-1
HP-2
BOILER PLANT SYSTEM
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
M
A P
H
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
K E
U P
S E
T P
O
IN
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
L
IM
IT
R
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
H
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
IN
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
F
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
FLOW DIAGRAM - HVAC
L
O
O
DP-1 (FUTURE)
VLV-1 (FUTURE)
TEMPORARY BOILER
BLIND FLANGE FOR
4"
4"
4"4"4"
TEMPORARY BOILER
BLIND FLANGE FOR
4"
HWS
HWR HWR
HWS
BLR-1
NEW
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
INITIAL FILL PRESSURE. 18 GAL.
EXPANSION TANK, SET 25 PSIG
MIN. ACCEPTANCE VOLUME.
111 GAL. MIN. TANK VOLUME
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
NEW HP-2
NEW HP-1
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
FUTURE
BYPASS VALVE
CV= 15.0
FLANGE
BLIND
FLANGE
BLIND FUTURE
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
P:\20066\20066m50.dgn
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m50.dgn
AS SHOWN
08.18.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
M5.0 ƒ" CHAMFER
ALL SIDES UNLESS OTHERWISE NOTED
EQUIPMENT
4" MINIMUM ALL SIDES
6" X 6", 10\10 WELDED WIRE
FABRIC AT MID-DEPTH OF
PAD (UNLESS OTHERWISE NOTED)
SLAB, FLOOR, OR SUPPORTING STRUCTURE.
ROUGH UP WHERE CONCRETE DOES NOT HAVE
BROOM FINISH OR ROUGHER.
6" THICK CONCRETE
(INERTIA PAD IDENTICAL)
HOUSEKEEPING PAD DETAIL
NOT TO SCALE
REDUCER
‚" COPPER TUBING
•" GATE VALVE
•" 4" NIPPLE
CIRCULATING WATER PIPING
NOTES:
1.
2.
VENT ALL HIGH POINTS AS INDICATED ABOVE.
IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
ELEVATION TYPICAL AIR VENT
NOT TO SCALE
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
NOT TO SCALE
A
BC
E
BY-PASS CHEMICAL FEEDER
BC
TO HEATING
SYSTEM
TO COOLING
SYSTEM
B -ƒ" TO DISCHARGE OF PUMP.
C -ƒ" TO SUCTION OF PUMP.
E -‚" GAUGE COCK FOR VENT.
F - RISER CLAMP. WELD TO 2X3/4 " FLAT
OFFSET BRACKET TO WALL.
A - CHEMICAL FEEDER TANK.
D -ƒ" TO FLOOR DRAIN.
D
4"MIN.
WELD
F
NOT TO SCALE
SERVICE TEE
ECCENTRIC REDUCER
•" STREET ELL.
AUTOMATIC AIR VENT
MAINS
•"X2" NIPPLE
„"MPT X ‚" FLARE ELL.
‚" COPPER TO FLOOR
DRAIN OR OUTSIDE
AS SHOWN.
AUTOMATIC AIR VENT
NOT TO SCALE
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
NOT TO SCALE
TEST PLUG
GATE VALVE
STRAINER
BALANCE VALVE
CHECK VALVE
PIPES SUPPORT
PRESSURE GAUGE
GAUGE COCK
VERTICAL IN-LINE PUMP DETAIL
VERTICAL INLINE PUMP
NOT TO SCALE
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL) BACKFLOW PREVENTER
1"1"
MAKE - UP WATER STATION
GAUGE COCK
ƒ"
PRESSURE REDUCING
VALVE. SET AT
1"
AIR GAP DRAIN
FITTING
1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR
TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE
CLAMPS SAME MATERIAL AS PIPE.
PSI.
GAUGE
GATE VALVE
GATE VALVE
NOT TO SCALE
TO FILL POINT
OF SYSTEM
BALL VALVE
QUICK FILL
CONNECTION
TO DOMESTIC COLD
WATER SUPPLY
S
BRANCH CIRCUIT FROM
PANELBOARD,SWITCHGEAR,OR MCC
(1600)
VFD PACKAGE
(1500)
(1600)
NOTES:(THIS DETAIL ONLY)
SYSTEM SHOWN IN NORMAL (VFD NOT BYPASSED)
NUMBERS IN PARENTHESES INDICATE DIVISION
UNDER WHICH WORK OR EQUIPMENT IS SPECIFIED.
MOTOR
(1500)
VFD SINGLE LINE DIAGRAM
NOT TO SCALE
RECTIFIER
AND INVERTER
MODE, MOTOR RUNNING.
OVERLOAD
CIRCUIT
BREAKER
DETAILS - HVAC
P:\20066\20066p00.dgn
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066p00.dgn
AS SHOWN
08.18.2021
20066
JDL
WHD
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
DCS
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
P0.0
PLUMBING
NOTES, & DETAILS -
LEGEND, SCHEDULE,
FIXTURES.
SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL PLUMBING
ALL WATER PIPING SHALL BE RUN ABOVE CEILING UNLESS OTHERWISE
NOTED.
ALL VENTS THRU ROOF (VTR) SHALL BE OFFSET A MINIMUM OF 15'-0"
FROM ALL OUTSIDE INTAKES.
-5 PROVIDE HANGER ON ALL HORIZONTAL WATER PIPING INSIDE CHASES
COORDINATE PLUMBING PIPING WITH AIR CONDITIONING DUCTS, EQUIPMENT
AND ELECTRICAL CONDUIT.
GENERAL NOTES:
WITHIN 6" OF SPECIFIED WATER HAMMER ARRESTOR.
NOTE TO CONTRACTOR:
PROVIDE ACCESS TO THE CONCEALED UTILITY.
WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO
PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF
TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES
NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING
FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT
WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,
NOTES:
GAS REGULATOR SCHEDULE
NUMBER
REGULATOR
SERVED
EQUIPMENT
LOCATION
EQUIPMENT
INPUT DEMAND
MBH GAS
PRESSURES
INLET/OUTLET
BOILER 1,250 MBH MECH. ROOM 2psi/10"W.C.
GR-2
WATER HEATER
450 MBH MECH. ROOM 2psi/7"W.C.
LEGEND
SOIL , WASTE VENT
D CONDENSATE DRAIN COLD WATER
HOT WATER (140 ) HOT WATER RETURN
G GAS (LOW PRESSURE) HIGH PRESSURE GAS HPG
GATE VALVEBALL VALVE
CHECK VALVE
BALANCER (CIRCUIT SETTER)
FLOW INDICATOR
STRAINERPRESSURE REDUCING VALVE
GLOBE VALVE UNION
GAS COCK AQUASTAT
INCREASER FLOOR DRAIN (FD)
CLEANOUT (CO) CLEANOUT (CO)
HUB DRAIN BELOW FLOORBF
ABOVE CEILINGAC ABOVE FINISHED FLOORAFF
EXISTING VENT TO REMAIN
TO REMAIN
EXISTING SOIL, WASTE
WATER TO REMAIN
EXISTING COLD
BE REMOVED
EXISTING PIPING TO
WATER TO REMAIN
EXISTING HOT
RETURN TO REMAIN
EXISTING HOT WATER
LIMIT OF DEMOLITION
NEW TO EXISTING
POINT OF CONNECTION
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
UTILITY PIPING (C.W., H.W.,
H.W.R., GAS, AIR)
4"(TYPICAL)
TRAPEZE HANGER
SEE SPECIFICATIONS(SECTIONAL VIEW)
(SIDE VIEW)
NOT TO SCALE
& GAS RANGE
* PIPE RELIEF VENT FULL SIZE TO OUTSIDE. PIPE AWAY FROM INTAKE LOUVERS, ETC.
FIN
ISHED
GRADE
GAS METER & REGULATOR PIPING SCHEMATIC
NOT TO SCALE
GAS COCK
EXISTING
EXISTING GAS SERVICE
OUTLET PRESSURE OF 2PSI
NEW GAS REGULATOR SET FOR
GAS METER
DOWNSTREAM FROM METER
PROVIDE NEW GAS VALVE
1 ‚" GAS(2PSI)
THROUGH BUILDING WALL
SEAL NEW GAS PIPING
TO BUILDING EQUIPMENT
GR-3
GR-1
GR-3 BUILDING AT METER 1,700 MBH 30psi/2psi
GEXGAS REGULATOR GAS EXHAUST
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
P2.0
MDP
XDP
LDP
T
45KVA
F
HWH
BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - PLUMBING
LARGE SCALE -
BOILER/CHILLER MECHANICAL ROOM - NEW WORK - PLUMBING
LARGE SCALE -
PLUMBING
DEMOLITION & NEW WORK -
MECHANICAL ROOM -
BOILER/CHILLER
LARGE SCALE -
3"
3"V-UP
H P
G
4"CO
4"
4"V-BF
G
3"
4"V-UP
1 •"
4"CO
3"ƒ"2"
3" 3"
EXISTING 55 GAL EXP TANK
EXISTING PUMP GAUGES
CHEMICAL FEED ON WALL
EXISTING BYPASS
MOUNTED ON WALL
EXISTING AFTERCOOLER
EXISTING AIR COMPRESSOR
CHEMICAL FEED ON WALL
EXISTING BYPASS
EXISTING PUMP GAUGES
EX. UH
F A
C P
M C
C
EF-9
EX.
EF-8
EX.
EX. HP
EX. CP
DRAIN DN
SPRINKLER
EXISTING
EX. BOILER
1‚"
EX. ACP
1•" CW
4"W-DN
ƒ"
G
3"
3"V
1"
4"FD
3"FD
4"FD
4"FD
4"FD
G
4"
4"FD
ƒ"
G
EXPANSION TANK TO REMAIN
EXISTING CHW
HEATER IS TO REMAIN
EXISTING WATER
TO BE REMOVED
EX. GAS REGULATOR
TO BE REMOVED
EX. GAS METER
•"G
1‚"G
1•"G
GR-2
GR-1
2•"G
G(2PSI)
1‚"G(2PSI)
G (2
P S I)
1‚"G(2PSI)
1‚"G(2PSI)
1‚"G
NOTES:(THIS SHEET ONLY)
CONNECT NEW 1‚" GAS TO EXISTING PIPING SERVING WATER HEATER.
CONNECT NEW •" GAS TO EXISTING GAS PIPING SERVING GAS RANGE.
FROM GR-1 PRIOR TO CONNECTING TO BOILER.
MINIMUM OF 10 FEET OF 2•" GAS PIPING DOWNSTREAM
CONNECT 2•" GAS TO NEW CONDENSING BOILER. ROUTE A
REMOVE ALL LOW PRESSURE GAS PIPING TO POINT SHOWN .
HEATING, 400 MBH WATER HEATING, AND 50 MBH FOR GAS RANGE.
BE 2 PSI. TOTAL LOAD IS 1,700 MBH. LOAD BREAKDOWN; 1,250 MBH BUILDING
PROVIDE NEW GAS REGULATOR, AND NEW GAS METER. SET DELIVERY PRESSURE TO
G E
X
G E
X
6 ROUTE GAS EXHASUT FULL SIZE FROM REGULATOR TO EXTERIOR.
P:\20066\20066p20.dgn
DATE PLOTTED
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066p20.dgn
AS SHOWN
08.18.2021
20066
JDL
WHD
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
DCS
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
MDP
XDP
LDP
T
45KVA
F
HWH
3"
3"V-UP
H P
G
4"CO
4"
4"V-BF
4"V-UP
1 •"
4"CO
3"ƒ"2"
3" 3"
MOUNTED ON WALL
EXISTING AFTERCOOLER
EXISTING AIR COMPRESSOR
CHEMICAL FEED ON WALL
EXISTING BYPASS
EXISTING PUMP GAUGES
EX. UH
F A
C P
M C
C
EF-9
EX.
EF-8
EX.
EX. CP
DRAIN DN
SPRINKLER
EXISTING
1‚"
EX. ACP
1•" CW
4"W-DN
ƒ"
3"V
1"
4"FD
3"FD
4"FD
4"FD
4"FD
G
4"
4"FD
ƒ"
EXPANSION TANK TO REMAIN
EXISTING CHW
HEATER IS TO REMAIN
EXISTING WATER
BLR-1
NEW
NEW VFD
NEW ACP
HP-1
NEW
HP-2
NEW
P:\20066\20066e00.dgn
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066e00.dgn
AS SHOWN
08.18.2021
TWT
JCW
TWT
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
E0.0
ELECTRICAL
NOTES, & DETAILS -
LEGEND, SCHEDULE,
EXISTING POWER RISER DIAGRAM
NOT TO SCALE
XFMR
PADMOUNT
750 KVA
EXISTING
T T
LDP
PANEL
XFMR
DRY
300 KVA
EXISTING XDP
MDP
PANEL
MCC
EXISTING
15KV, URD
3#4/0 ALUM,
4"-2W, SETS
MANHOLE #20
TO EXIST. PRIMARY 4#500MCM, 4"C
2 SETS:
MCM, 3•"C
3 SETS: 4#400
MDP-3
HA
PANEL
LDP-1
LA
PANEL
HA-9
MDP-1
(INVERTER)
A.C. PACKAGE
EMER.
"E"
LDP-2
LB
PANEL
MDP-5
HC
PANEL
LDP-5
LE
PANEL
PANEL
DIMMER
LIGHTING
STAGE
LDP-6
LF
PANEL
MDP-4
HB
PANEL
LDP-3
LC
PANEL
LDP-4
LD
PANEL
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
E2.0
BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - SYSTEMS/HVAC POWER
LARGE SCALE -
BOILER/CHILLER MECHANICAL ROOM - NEW WORK - SYSTEMS/HVAC POWER
LARGE SCALE -
SYSTEMS/HVAC POWER
DEMOLITION & NEW WORK -
MECHANICAL ROOM -
BOILER/CHILLER
LARGE SCALE -
MDP
XDP
LDP
LB-18
MDP-7
MCC-9
LDP-14
LDP-18
MCC-8
MCC-1
MCC-2
MCC-9
MCC-3
T
45KVA
WP
J
EF-9
EX.
EF-8
EX.
F A
C P
M C
C
EXISTING HP
REMOVE
EXISTING BOILER
REMOVE
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
TO REMAIN
EXISTING AFTERCOOLER
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
TO REMAIN
EXISTING AIR COMPRESSOR
TO REMAIN
EXISTING CP
EXISTING WATER HEATER TO REMAIN
EXISTING ACP TO REMAIN
EXPANSION TANK TO REMAIN
EXISTING CHW
TO REMAIN
EX. UH
GENERAL NOTES:(THIS SHEET ONLY)
ALL NEW CONDUIT SHALL BE EMT.A
B ALL NEW CONDUCTORS SHALL BE COPPER, THWN-2.
C
NOTES:(THIS SHEET ONLY)
UNSWITCHED HOT TO THESE BATTERY PACKS FOR SENSING POWER LOSS.
TWO OF THE FIXTURES SHALL HAVE INTEGRAL EMERGENCY BATTERY PACKS. PROVIDE
REPLACE WITH FOUR ACUITY MODEL CLX-L96-6000LM-SEF-FDL-MVOLT-GZ10-40K-80CRI.
REMOVE FOUR EXISTING 8 FOOT FLUORESCENT LIGHT FIXTURES FROM THIS SPACE AND 1
1 1
F
F
PROVIDE 30A/3P FUSED DISCONNECT ON LINE SIDE OF NEW VFD.2
CIRCUIT BREAKER MATCHING EXISTING PANEL AIC RATING.
ROUTE 4#10, ƒ"C BACK TO EXISTING MAIN SERVICE PANEL MDP. PROVIDE NEW 15A/3P 3
AND PROVIDE A NEW LABEL TO INDICATE "SPARE".
BOILER AND THE HEATING WATER PUMP CAN REMAIN IN PLACE. REMOVE EXISTING LABELS
CENTER. THE EXISTING MOTOR CONTROL CENTER BUCKETS THAT CURRENTLY SERVE THE
STARTERS, CONDUCTORS, AND CONDUIT BACK TO SERVING PANELBOARD OR MOTOR CONTROL
FOR ALL EXISTING EQUIPMENT SHOWN TO BE DEMOLISHED, REMOVE ALL DISCONNECTS,
PROVIDE LOCKABLE 30A/2P NON-FUSED DISCONNECT TO FEED THE BOILER.4
BREAKER MATCHING EXISTING PANEL AIC RATING. MAKE ALL FINAL CONNECTIONS.
#12 AWG, ƒ"C TO 1000A POWER STYLE PANELBOARD LDP. PROVIDE A NEW 20A/1P CIRCUIT
PROVIDE DEDICATED 20A, 120 VOLT CONTROL CIRCUIT TO THE NEW BOILER. ROUTE 5
COMPLY WITH THE 2017 NATIONAL ELECTRICAL CODE (NEC).D
NEW FUSED DISCONNECTS SHALL BE HEAVY DUTY (HD) TYPE.E
P:\20066\20066e20.dgn
DATE PLOTTED
DGN FILE
18-AUG-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066e20.dgn
AS SHOWN
08.18.2021
TWT
JCW
TWT
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
MDP
XDP
LDP
LB-18
MDP-7
MCC-9
LDP-14
LDP-18
MCC-8
MCC-1
MCC-2
MCC-9
MCC-3
T
45KVA
WP
J
EF-9
EX.
EF-8
EX.
F A
C P
M C
C
TO REMAIN
EXISTING AFTERCOOLER
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
TO REMAIN
EXISTING AIR COMPRESSOR
TO REMAIN
EXISTING CP
EXISTING WATER HEATER TO REMAIN
EXISTING ACP TO REMAIN
EXPANSION TANK TO REMAIN
EXISTING CHW
TO REMAIN
EX. UH
BLR-1
NEW
NEW VFD
NEW ACP
HP-1
NEW
HP-2
NEW
| 20066aCov |
| 20066m00 |
| References |
| tb, 20066tb.dgn |
| 20066m20 |
| References |
| tb, 20066tb.dgn |
| afp1, 20066aX1.dgn |
| afp2, 20066aX1.dgn |
| existing, 20066m20.dgn |
| 20066m40 |
| References |
| tb, 20066tb.dgn |
| 20066m50 |
| References |
| tb, 20066tb.dgn |
| 20066p00 |
| References |
| tb, 20066tb.dgn |
| 20066p20 |
| References |
| tb, 20066tb.dgn |
| afp1, 20066aX1.dgn |
| afp2, 20066aX1.dgn |
| existing, 20066p20.dgn |
| 20066m20.dgn |
| 20066e00 |
| References |
| tb, 20066tb.dgn |
| 20066e20 |
| References |
| tb, 20066tb.dgn |
| afp1, 20066aX1.dgn |
| afp2, 20066aX1.dgn |
| existing, 20066e20.dgn |
| new Hvac equip, 20066m20.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| Cancelation Notice | — | |
| Pre-Bid Sign In Sheet | — | |
| Addendum 1 Drawings | — | |
| Project Manual | — | |
| Addendum 1 | — | |
| Invitation to Bid | — |
On GovTribe
Work with this file