Addendum 1 Drawings

937 KB Posted

Attached to
Pettigrew Boiler Replacement
Solicitation number
FVSU-2022-FM1-PHB2021
Issued by
Paulding County, Georgia

About this file

This is Addendum 1 Drawings for the Pettigrew Boiler Replacement project at Fort Valley State University (FVSU) in Georgia, prepared by NBP Engineers, Inc. The addendum contains 100% construction documents including electrical and mechanical system specifications for the boiler and chiller mechanical room. The project scope includes demolition of existing equipment (boiler, fluorescent light fixtures, and associated electrical connections) and installation of new equipment including a new boiler (BLR-1), variable frequency drives (VFDs), air compressor pump (ACP), and heating water pump (HP-1 and HP-2). The electrical work encompasses new conduit installation (EMT), copper THWN-2 conductors, panel board connections, emergency lighting with integral battery packs, and associated disconnect switches and circuit breakers. Sealed bids for the construction work were due by 2:00 PM Eastern Time on Tuesday, September 28, 2021, with bids to be opened publicly at FVSU's Pettigrew Ballroom in Fort Valley, Georgia. Bidding documents were available from NBP Engineers, Inc. through email request to moore@nbpengineers.com.

The construction documents require compliance with the 2017 National Electrical Code (NEC) and include specifications for heavy-duty fused disconnects, a 30-ampere/3-phase fused disconnect for the VFD, a 20-ampere/1-phase circuit for boiler control, and a 30-ampere/2-pole non-fused disconnect. The design professional's Certificate of Authorization (COA#PEF000774) expires June 30, 2022. No pricing information, funding sources, or contract award amounts are disclosed in this addendum document.

Text of this file

P:\20066\20066e00.dgn

DATE PLOTTED

DGN FILE

23-SEP-2021

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\20066\20066e00.dgn

AS SHOWN

08.18.2021

TWT

JCW

TWT

20066

F O

R T

V A

L L

E Y G

E O

R G

IA

S T

A

E

U N

IV

E R

S

IT

Y

D

COA Expiration: 6.30.2022

NBP Engineers, Inc. COA#PEF000774

P E

T T

IG

R

W

B O

IL

P L

A C

E M

E N

T F

O

L L

S

A

IV

E R

S

IT

Y

C

N S T

R U

C T

IO

C U

M E

N T S

F V

P

O J E o P

H B

E0.0

ELECTRICAL

NOTES, & DETAILS -

LEGEND, SCHEDULE,

EXISTING POWER RISER DIAGRAM

NOT TO SCALE

XFMR

PADMOUNT

750 KVA

EXISTING

T T

LDP

PANEL

XFMR

DRY

300 KVA

EXISTING XDP

MDP

PANEL

MCC

EXISTING

15KV, URD

3#4/0 ALUM,

4"-2W, SETS

MANHOLE #20

TO EXIST. PRIMARY 4#500MCM, 4"C

2 SETS:

MCM, 3•"C

3 SETS: 4#400

MDP-3

HA

PANEL

LDP-1

LA

PANEL

HA-9

MDP-1

(INVERTER)

A.C. PACKAGE

EMER.

"E"

LDP-2

LB

PANEL

MDP-5

HC

PANEL

LDP-5

LE

PANEL

PANEL

DIMMER

LIGHTING

STAGE

LDP-6

LF

PANEL

MDP-4

HB

PANEL

LDP-3

LC

PANEL

LDP-4

LD

PANEL

CT

TRACK LIGHTS: QUANTITY OF HEADS AS SHOWN EMERGENCY BATTERY PACK-CEILING

EMERGENCY BATTERY PACK-WALL

PANELBOARD-250 VAC OR LESS

SURFACE MOUNTED

PANELBOARD-250 VAC OR LESS

RECESSED

PANELBOARD-OVER 250 VAC

SURFACE MOUNTED

PANELBOARD-OVER 250 VAC

RECESSED

CABLE TRAY

BACKBOARD

CONNECTION TO EQUIPMENT

CAP

CONDUIT DOWN

CONDUIT UP

J

F

BT

C

C

BR

SLAB OR BELOW GRADE

GROUNDING CONDUCTOR- UNDER

U

SP

DP

PE

M

ICM

S

V

S

IC

MM

MC

GG

G

LIGHTING FIXTURES (SYMBOLS VARY BASED ON FIXTURES TYPE)

LIGHTING CONTROL

RECEPTACLES

CIRCUITS

GENERAL EQUIPMENT

FIRE PROTECTION EQUIPMENT

COMMUNICATIONS

LIGHTNING PROTECTION AND GROUNDING

T

JJ

I

UI

I

ELECTRICAL LEGEND

TV

C

G

B

K

LED ON "NORMAL" POWER

CEILING MOUNTED FIXTURE

WALL MOUNTED FIXTURE

EXIT LIGHT (ARROWS AS SHOWN)

LIFE SAFETY EGRESS FIXTURE

CEILING MOUNTED ULTRASONIC OCCUPANCY

SENSOR AND RELAY

CEILING/WALL MOUNTED INFRARED OCCUPANCY

SENSOR AND RELAY

CEILING MOUNTED COMBINATION INFRARED/

ULTRASONIC OCCUPANCY SENSOR AND RELAY -

SWITCHING PHOTOCELL (INTERIOR TYPE) F.C. NOTED

DIMMING PHOTOCELL (INTERIOR TYPE)

EXTERIOR TYPE PHOTO SWITCH

LOW VOLTAGE OVERRIDE SWITCH

INFRARED OCCUPANCY SENSOR

WALL MOUNTED SWITCH

"P" INDICATES PILOT LIGHT

KEYED SWITCH

DIMMER SWITCH

FOUR WAY SWITCH

THREE WAY SWITCH

SINGLE POLE SWITCH

DUPLEX RECEPTACLE - NORMAL

QUAD - NORMAL

GFCI DUPLEX RECEPTACLE - NORMAL

GFCI QUAD - NORMAL

FLOOR DUPLEX RECEPTACLE - NORMAL

FLOOR QUAD - NORMAL

CEILING DUPLEX RECEPTACLE - NORMAL CLOCK OUTLET

WALL/CEILING RACEWAY

CEILING SPECIAL - TYPE NOTED OR SHOWN

SPECIAL - TYPE NOTED OR SHOWN

HORIZONTALLY MOUNTED DUPLEX RECEPTACLE

WEATHER PROOF RECEPTACLE (GFCI)

ELECTRIC WATER COOLER RECEPTACLE(GFCI)

CONDUIT CONCEALED IN CEILING OR WALL

CONDUIT IN GROUND, SLAB, OR UNDER FLOOR

FLEXIBLE RACEWAY

RACEWAY EXPOSED

TRANSFORMER

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

ENCLOSED BREAKER-RECESSED IN WALL

ENCLOSED CIRCUIT BREAKER

EMERGENCY PUSHBUTTON

COMBINATION STARTER AND DISCONNECT

EXHAUST FAN

MANUAL STARTER AND MOTOR RATED SWITCH

MOTOR

JUNCTION BOX - WALL/CEILING/FLOOR

SURGE SUPPRESSOR

VOICE OUTLET, QUANTITY OF JACKS AS NOTED

DATA OUTLET, QUANTITY OF JACKS AS NOTED

COMBINATION VOICE/DATA OUTLET, QUANTITY OF

VOICE/DATA JACKS AS NOTED

FLOOR VOICE OUTLET, QUANTITY OF JACKS

AS NOTED

FLOOR DATA OUTLET, QUANTITY OF JACKS

AS NOTED

FLOOR COMBINATION VOICE/DATA OUTLET,

QUANTITY OF JACKS AS NOTED

MASTER CLOCK

INTERCOM MASTER STATION

INTERCOM CALL-IN STATION

WALL MOUNTED VOLUME CONTROL

BOX, STUB-UP, AND MODULAR PLATE W/ BLANKS

TELEVISION OUTLET

SPEAKER: CEILING/WALL

MICROPHONE: FLOOR/WALL

FIBER OUTLET

GROUND ROD - C IF CHEMICAL

GROUND CONNECTION (SCHEMATIC)

CONCEALED IN ROOF OR WALLS

GROUNDING CONDUCTOR-

GROUNDING CONDUCTOR- EXPOSED

AIR TERMINAL

GROUNDING PLATE

FACP

FAA

WF

VS

DH

SMOKE DETECTOR/SENSOR - BEAM RECEIVER

SMOKE DETECTOR/SENSOR - BEAM TRANSMITTER

SPEAKER/VISUAL ALARM: CEILING/WALL

VISUAL ALARM: CEILING/WALL

AUDIO/VISUAL ALARM: CEILING/WALL

MANUAL PULL STATION

FIRE ALARM ANNUNCIATOR

FIRE ALARM PANEL

DUCT MOUNTED SMOKE DETECTOR

SMOKE DETECTOR: CEILING / WALL

HEAT DETECTOR: CEILING / WALL

WATER FLOW SWITCH

WATER TAMPER SWITCH

DOOR HOLDER

FIREMAN'S PHONE OUTLET

EWC

WP

H

D

P

I

L

TWO ZONE LOW VOLTAGE SWITCHL2

VACANCY AUTO SHUT OFF

FOUR ZONE LOW VOLTAGE SWITCHL4

DUPLEX RECEPTACLE WITH INTEGRAL USBUSB

TV DUPLEX RECEPTACLETV

AC

ABOVE COUNTER DUPLEX RECEPTACLE (COORDINATE

HEIGHT WITH ARCHITECT)

J-HOOK

SECURITY

C CARD READER

P DOOR POSITION SENSOR

SECURITY CAMERA: CEILING/WALL MOUNTED

ES ELECTRIC STRIKE

C

CABLE TRAY

DUPLEX RECEPTACLE MOUNTED IN RACEWAYR

R DATA OUTLET MOUNTED IN RACEWAY

DUPLEX RECEPTACLE - TAMPER PROOFT

DUPLEX RECEPTACLE - GENERATOR CIRCUIT, RED IN COLOR

QUAD - GENERATOR CIRCUIT, RED IN COLOR

SINGLE ZONE LOW VOLTAGE SWITCHL1

HOMERUN - ONE ARROW PER CIRCUIT

DISCONNECT SWITCH: "F" IF FUSED

F

1 ADDDENDUM No. 1 09.23.21

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

E2.0

BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - SYSTEMS/HVAC POWER

LARGE SCALE -

BOILER/CHILLER MECHANICAL ROOM - NEW WORK - SYSTEMS/HVAC POWER

LARGE SCALE -

SYSTEMS/HVAC POWER

DEMOLITION & NEW WORK -

MECHANICAL ROOM -

BOILER/CHILLER

LARGE SCALE -

MDP

XDP

LDP

LB-18

MDP-7

MCC-9

LDP-14

LDP-18

MCC-8

MCC-1

MCC-2

MCC-9

MCC-3

T

45KVA

M

F

WP

J

EF-9

EX.

EF-8

EX.

F A

C P

M C

C

EXISTING HP

REMOVE

EXISTING BOILER

REMOVE

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

TO REMAIN

EXISTING AFTERCOOLER

CHEMICAL FEED TO REMAIN

EXISTING CHW BYPASS

EXISTING PUMP GAUGES TO REMAIN

TO REMAIN

EXISTING AIR COMPRESSOR

TO REMAIN

EXISTING CP

EXISTING WATER HEATER TO REMAIN

EXISTING ACP TO REMAIN

EXPANSION TANK TO REMAIN

EXISTING CHW

TO REMAIN

EX. UH

GENERAL NOTES:(THIS SHEET ONLY)

ALL NEW CONDUIT SHALL BE EMT.A

B ALL NEW CONDUCTORS SHALL BE COPPER, THWN-2.

C

NOTES:(THIS SHEET ONLY)

UNSWITCHED HOT TO THESE BATTERY PACKS FOR SENSING POWER LOSS.

TWO OF THE FIXTURES SHALL HAVE INTEGRAL EMERGENCY BATTERY PACKS. PROVIDE

REPLACE WITH FOUR ACUITY MODEL CLX-L96-6000LM-SEF-FDL-MVOLT-GZ10-40K-80CRI.

REMOVE FOUR EXISTING 8 FOOT FLUORESCENT LIGHT FIXTURES FROM THIS SPACE AND 1

1 1

F

F

3AND PROVIDE A NEW LABEL TO INDICATE "SPARE".

BOILER AND THE HEATING WATER PUMP CAN REMAIN IN PLACE. REMOVE EXISTING LABELS

CENTER. THE EXISTING MOTOR CONTROL CENTER BUCKETS THAT CURRENTLY SERVE THE

STARTERS, CONDUCTORS, AND CONDUIT BACK TO SERVING PANELBOARD OR MOTOR CONTROL

FOR ALL EXISTING EQUIPMENT SHOWN TO BE DEMOLISHED, REMOVE ALL DISCONNECTS,

PROVIDE LOCKABLE 30A/2P NON-FUSED DISCONNECT TO FEED THE BOILER.4

BREAKER MATCHING EXISTING PANEL AIC RATING. MAKE ALL FINAL CONNECTIONS.

#12 AWG, ƒ"C TO 1000A POWER STYLE PANELBOARD LDP. PROVIDE A NEW 20A/1P CIRCUIT

PROVIDE DEDICATED 20A, 120 VOLT CONTROL CIRCUIT TO THE NEW BOILER. ROUTE 5

COMPLY WITH THE 2017 NATIONAL ELECTRICAL CODE (NEC).D

NEW FUSED DISCONNECTS SHALL BE HEAVY DUTY (HD) TYPE.E

NEW WIREWAY TO BE MOUNTED ON WALL ABOVE EQUIPMENT. FOLLOW NEC TAP RULES.

PROVIDE 30A/3P FUSED DISCONNECT ON LINE SIDE OF NEW VFD. TAP CONDUCTORS FROM

ADJACENT TO MAIN SERVICE PANEL MDP. REFER TO NOTE 6 BELOW.

ROUTE 3#8 AWG, 1#10G, 1"C FROM NEW WIREWAY BACK TO NEW ENCLOSED CIRCUIT BREAKER

ABOVE HP-1 AND HP-2 VFDS.

1#10G. FOLLOW ALL NEC TAP RULES. LABEL CIRCUIT BREAKER AS "SERVES WIREWAY

CASE CIRCUIT BREAKER ADJACENT TO MDP. TAP CONDUCTORS SHALL BE 4#8 AWG,

TAP THE MAIN BUS IN MAIN SERVICE PANEL MDP AND SET A NEW 30A/3P ENCLOSED 6

1 ADDDENDUM No. 1 09.23.21

P:\20066\20066e20.dgn

DATE PLOTTED

DGN FILE

23-SEP-2021

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\20066\20066e20.dgn

AS SHOWN

08.18.2021

TWT

JCW

TWT

20066

F O

L L

E Y G

E O

R G

IA

S T

A

IV

E R

S

IT

COA Expiration: 6.30.2022

NBP Engineers, Inc. COA#PEF000774

P E

T T

IG

R

W

B

IL

P L

A C

E M

E N

T F

O

L L

A

IV

E R

S

IT

Y

N S T

R U

C T

IO

C U

M E

N T S

F V

P

O J E o P

H B

MDP

XDP

LDP

LB-18

MDP-7

MCC-9

LDP-14

LDP-18

MCC-8

MCC-1

MCC-2

MCC-9

MCC-3

T

45KVA

M

F

WP

J

EF-9

EX.

EF-8

EX.

F A

C P

M C

C

TO REMAIN

EXISTING AFTERCOOLER

CHEMICAL FEED TO REMAIN

EXISTING CHW BYPASS

EXISTING PUMP GAUGES TO REMAIN

TO REMAIN

EXISTING AIR COMPRESSOR

TO REMAIN

EXISTING CP

EXISTING WATER HEATER TO REMAIN

EXISTING ACP TO REMAIN

EXPANSION TANK TO REMAIN

EXISTING CHW

TO REMAIN

EX. UH

BLR-1

NEW

NEW VFD

NEW ACP

HP-1

NEW

HP-2

NEW

20066e00
References
tb, 20066tb.dgn
20066e20
References
tb, 20066tb.dgn
afp1, 20066aX1.dgn
afp2, 20066aX1.dgn
existing, 20066e20.dgn
new Hvac equip, 20066m20.dgn

Other files

File Type Posted
Cancelation Notice —
Pre-Bid Sign In Sheet —
Project Drawings —
Project Manual —
Addendum 1 —
Invitation to Bid —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .