Project_26-103_Belleview_Middle_School_HVAC_Upgrades_-_RFQ_Advertisement.pdf

PDF 1 MB Posted

Attached to
Design Services - Belleview Middle School HVAC Upgrades
Solicitation number
26-103 DS
Issued by
Marion County, Orlando City, Florida

About this file

This Request for Qualifications (RFQ) advertisement from the Marion County Public Schools (MCPS) in Florida solicits architectural and engineering services for the design and construction administration of HVAC system upgrades at Belleview Middle School. The project scope encompasses replacement of the existing water-to-air package heat pump system with a modern, energy-efficient chilled water system across the 40-acre campus located at 10500 SE 36th Avenue in Ocala, Florida. Design services must include a full study, design development, and construction administration, with deliverables including bid documents by October 2026 and permit documents by December 2026. A mandatory pre-bid meeting is scheduled for Thursday, February 12, 2026 at 9:00 AM at the Marion County Public Schools Purchasing Department Conference Room (2091 NE 35th Street, Ocala, Florida 34479), with failure to attend resulting in ineligibility. Qualifications submittals must be submitted through the VendorLink portal no later than 2:00 p.m. Eastern Standard Time on February 26, 2026, with bid opening on February 27, 2026. Construction will be conducted in two phases: Phase I from January 2027 through August 2027 for the Central Plant and Buildings #1, #5, #6, #7, and #8, and Phase II from June 2028 through August 2028 for Buildings #2, #3, and #4.

Submittals shall not exceed 20 pages and must include a letter of application, proof of Florida licensure and insurance, proof of minority business status if applicable, joint venture documentation if applicable, professional reference letters for at least three school projects, and responses to all criteria outlined in the 2026 Marion County Public Schools Design Services RFQ Manual. All applicants must be licensed to practice in Florida and registered to operate in the state at time of application. General Liability and Auto Insurance of a minimum of $1,000,000 each, along with statutory Workers' Compensation Insurance, will be required for each project. The construction budget is $6 million for Phase I (available September 2026) and $6 million for Phase II (available September 2027). The design professional must sign the District's Standard Design Professional Service Agreement and will provide all necessary consultants for design. Contract negotiations regarding the fee for services and construction document delivery timelines will occur after the highest-ranking firm is determined and Board approval is obtained.

View the file

Other files

File Type Posted
26103_5A_BMS_HVAC_Upgrades__Contract_Board_Approval.pdf PDF
26103_5A_BMS_HVAC_Upgrades__Selection_Recommendation_Board_Approval.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Shortlist_Interviews_Tabulation_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Shortlist_Interviews_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Shortlist_Interviews_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Shortlist_Interviews_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Submittal_Review_Final_Meeting_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Submittal_Review_Final_Meeting_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Minutes_Rev1.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Minutes_Rev1.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Minutes.pdf PDF
26-103_6A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Sign-In_Sheet.pdf PDF
26-103_6A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Sign-In_Sheet.pdf PDF
Project_26-103_Belleview_Middle_School_HVAC_Upgrades_-_RFQ_Advertisement.pdf PDF
Design_Services_2026_Request_for_Qualifications_RFQ_Manual_-_1.30.26.pdf PDF
Design_Services_2026_Request_for_Qualifications_RFQ_Manual_-_1.30.26.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARION COUNTY PUBLIC SCHOOLS REQUEST FOR QUALIFICATIONS

ARCHITECTURAL AND ENGINEERING SERVICES

The Marion County Public School System (MCPS) is requesting professional services from qualified firms from the State of Florida pursuant with Section 287.055, Florida Statutes, the “Consultant’s Competitive Negotiations Act” (CCNA), Section 287.057 (24) Florida Statues, for the following:

ARCHITECTURAL, CIVIL, STRUCTURAL, AND MECHANICAL/ELECTRICAL/

PLUMBING ENGINEERING AND OTHER APPROPRIATE CONSULTING SERVICES

POTENTIALLY INCLUDING A DESIGN STUDY, AND ALL PHASES OF DESIGN AND

CONSTRUCTION ADMINISTRATION AND ANY ADDITIONAL OR ASSOCIATED

WORK OR EXTENSIONS OF THE WORK ON THE SITE, AS MAY BE NECESSARY

FOR THE FOLLOWING PROJECT:

PROJECT 26-103 BELLEVIEW MIDDLE SCHOOL – HVAC UPGRADES

The proceeding pages are divided into the following sections:

• GENERAL INFORMATION

• INSTRUCTIONS

• PROJECT SCOPE OF WORK

GENERAL INFORMATION

The Marion County Public School District is seeking to replace the current HVAC system at the above referenced location campus wide with a modern, energy-efficient chilled water system. The following information is being made publicly available to all qualified design professionals for informational purposes, so that they may better understand the requirements necessary to be awarded this project.

• A mandatory pre-bid meeting will be held Thursday, February 12, 2026 at 9:00 AM.

The Mandatory Pre-Bid Meeting will be held in the Purchasing Department Conference Room, 2091 NE 35th Street, Ocala, Florida 34479. Failure of vendor to attend the mandatory pre-bid meeting will result in ineligibility to participate in this

RFQ.

• The selected design professional will be expected to provide all related design and contract administration services as well as all necessary consultants required for design.

~An Equal Opportunity School District~

• The selected design professional will be expected to sign the District’s Standard Design Professional Service Agreement, which is available on the Facilities Department Forms page of the Marion County Public Schools website. A direct link to this page can be found below:

o https://www.marionschools.net/departments/facilities/facilities_forms.

• Contract negotiations will take place after determination of the highest-ranking firm is finalized and the Board approves the District to proceed. These negotiations will consist of establishing a set fee for services as well as timelines for construction document delivery dates.

• The selection process for this RFQ will abide by the 2026 Design Services (RFQ) Selection Process Manual, which can be found on the Facilities Forms page of the Marion County Public Schools website. A direct link to this page can be found below:

o https://www.marionschools.net/departments/facilities/facilities_forms.

• The Marion County Public School District reserves the right to conduct or not conduct public presentations in accordance with the CCNA Section 287.055, Florida Statutes. These presentations are not open to the public and will be recorded in compliance with F.S. 286.0113

• Pursuant to Florida Statute Section 287.057(25), respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch (i.e., Marion County School District) concerning any aspect of this solicitation, except in writing to the purchasing specialist (Garrett.Mccallum@marion.k12.fl.us) or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.

INSTRUCTIONS

Firms desiring to provide professional services for the above-described project(s) shall submit a qualifications submittal through the VendorLink portal. This submittal shall include the following:

• A letter of application

• Proof of licensure and insurance

• Proof of Minority Business status (if applicable)

• Joint Venture documentation (if applicable)

~An Equal Opportunity School District~ https://Garrett.Mccallum@marion.k12.fl.us https://www.marionschools.net/departments/facilities/facilities_forms https://www.marionschools.net/departments/facilities/facilities_forms

• Professional reference letters for at least 3 school projects where design services by the firm were provided. There is no specific format these reference letters need to be.

• A response to all criteria listed in the 2026 Marion County Public Schools Design Services Request for Qualifications (RFQ) Manual, particularly the criteria listed under Step 1 on pages 4 – 6

Submittals must not exceed 20 pages, including the items listed above.

All applicants must be licensed to practice their profession in the State of Florida at the time of application, and the proposal shall include evidence of same. Corporations must be registered to operate in the State of Florida by the Department of State Division of Corporations at the time of application.

General Liability and Auto Insurance will be required for each contracted project in the minimal amount of $1,000,000 for each type of coverage, along with Worker’s Comp Insurance (statutory limits), and will be provided as a part of basic services.

The selection committee reserves the right to reject any and/or all submittals received pursuant to this request for qualifications as it is determined to be in the best interest of the Marion County Public School District. All materials submitted shall become the property of the Marion County Public School District and will not be returned. Costs for developing submittals in response to this request for qualifications are entirely the obligation of the applicant(s) and shall not be chargeable in any manner to the Marion County Public School District.

The Marion County Public School District reserves the right to use any and all information presented in any response to the request for proposal. Acceptance or rejection of your proposal does not affect this right.

The required submittal must be received through the VendorLink online portal, no later than 2:00 p.m. Eastern Standard Time on February 26, 2026. Late submittals, regardless of the reason, will not be accepted.

Further information may be obtained at the MCPS website or by contacting the purchasing specialist in writing via email at Garrett.Mccallum@marion.k12.fl.us. Note that in accordance with Florida Statutes Section 287.057 (25) and the provisions listed above in this solicitation, all correspondence must be in writing.

NOTE: The outline for the basic Project Scope of Work is as follows on the succeeding page:

https://Garrett.Mccallum@marion.k12.fl.us

FACILITIES DEPARTMENT

1105 SW Seventh Road ● Ocala, FL 34471

OFFICE: 352.671.6902 ● FAX: 352.671.6906

www.marionschools.net/departments/facilities FRS 800.955.8770 (voice) ● 800.955.8771 (TTY)

Facilities Department Design Project Scope

Project: Belleview Middle School HVAC Upgrades Project #26-103

Summary:

Belleview Middle School is located on a 40-acre campus located at 10500 SE 36th Avenue, Ocala, FL 34420. The HVAC system consists of water-to-air package heat pumps located above each classroom on a mezzanine. The units are connected to a closed loop condenser water loop with a cooling tower and boiler system connected to the loop as well. Water is circulated through a bank of circulation pumps. The entire system is controlled by an energy management system with remote controlling capabilities from the district's main computers in the Maintenance Department.

The system has outlived its projected life span and needs replacement as well as expansion due to the system struggling to sufficiently heat and cool the entire campus.

Marion County Public Schools seeks to replace the current system with a modern, energy-efficient chilled water system. The design scope includes a full study, design, and contract administration services. The following items define the project scope:

Proposed new CEP location.

Design https://www.marionschools.net/departments/facilities

FACILITIES DEPARTMENT

1105 SW Seventh Road ● Ocala, FL 34471

OFFICE: 352.671.6902 ● FAX: 352.671.6906

www.marionschools.net/departments/facilities FRS 800.955.8770 (voice) ● 800.955.8771 (TTY)

Scope of Work – Design Services

1. Performance Requirements:

• Design the system to handle maximum and minimum Marion County temperatures, ranging from 17°F to 95°F.

2. HVAC System Replacement:

• Replace the existing HVAC system with a new chilled water system.

• Include a new water-cooled chiller, cooling tower, pumps, air handlers, VAV boxes with electric heat, and new DDC controls.

3. Central Energy Plant (CEP) and Cooling Tower yard:

• Design and construction of a new Central Energy Plant (CEP) to support the chilled water system.

• Include construction of a new cooling tower yard, equipment pads, structural supports, enclosures, access, and associated site improvements.

• Coordinate CEP and cooling tower yard location, utilities, access, noise mitigation, and maintenance clearances with the owner and applicable codes.

4. Demolition/Removal:

• Remove existing boiler(s), pumps, and cooling tower(s).

5. Piping and Distribution:

• Install new welded Schedule 40 black iron piping with fittings.

• Pre-insulated steel pipe with PVC jackets is preferred; HDPE piping is an alternate.

• Abandon existing underground condenser water piping in place where feasible.

• Exterior piping to be enclosed with a painted 18-gauge galvanized steel shroud.

• Provide a main shut-off valve for each building.

6. Ventilation and Air Quality:

• Incorporate outside makeup air and ventilation to meet building codes and proper air exchange.

• Install UVC lighting in air handlers to improve indoor air quality.

7. Mezzanine Modifications:

• Modify existing mezzanines as required: close unneeded vents, add insulation, patch openings, and accommodate new HVAC components.

https://www.marionschools.net/departments/facilities

8. Special Spaces:

• Administration suite to have DX units independent of chilled water to allow operation when the main campus is off.

• Media center to include a heat pipe for humidity control.

9. Electrical Upgrades:

• Upgrade electrical systems as needed to support new HVAC equipment.

10. Fire Alarm System:

• Upgrade the Fire alarm system as needed to support the new HVAC units and building addition.

11. Controls System:

• Design a new DDC controls system compatible with the owner’s existing Alerton or Delta system, including remote access capabilities.

12. Construction Modifications:

• Address cosmetic repairs, patching of penetrations, and construction of equipment access areas.

13. Design Timeline:

• Bid documents – October 2026

• Permit documents – December 2026

14. Construction Timeline:

• This project will be conducted in two construction phases:

(Phase I) January 2027- August 2027

➢ Central Plant, Buildings #1, #5, #6, #7, #8.

(Phase II) June 2028- August 2028

➢ Buildings #2, #3, #4.

15. Construction Budget:

• Phase I - $6Mill. Available in September 2026

• Phase II - $6Mill. Available in September 2027

Design

~An Equal Opportunity School District~

FACILITIES DEPARTMENT

1105 SW Seventh Road ● Ocala, FL 34471

OFFICE: 352.671.6902 ● FAX: 352.671.6906

www.marionschools.net/departments/facilities FRS 800.955.8770 (voice) ● 800.955.8771 (TTY) http://www.marionschools.net/facilities

File details come from the government source that posted it. Updated .