26-103_5A_BMS_HVAC_Upgrades_-__Submittal_Review_Final_Meeting_Tabulation.pdf

PDF 128 KB Posted

Attached to
Design Services - Belleview Middle School HVAC Upgrades
Solicitation number
26-103 DS
Issued by
Marion County, Orlando City, Florida

About this file

This document is a submittal review and final meeting tabulation for a Request for Qualifications (RFQ) issued by the School Board of Marion County, Florida for Design Services related to Belleview Middle School HVAC Upgrades (Project 26-103). The project seeks to replace the current HVAC system with a modern, energy-efficient chilled water system. A mandatory pre-bid meeting was held on February 12, 2026 at 9:00 AM at the Purchasing Department Conference Room in Ocala, Florida, with the bid opening occurring on February 27, 2026. The RFQ submission deadline has passed, and the tabulation meeting occurred on March 23, 2026, following a submittal review deadline of March 13, 2026 at 9:00 AM. Nine firms submitted qualifications for this design services contract.

The evaluation utilized a point-based scoring system across multiple criteria including Related Project Experience (30 points), Project Team qualifications (10 points), Professional/Technical Office Staff (20 points), Staff Adequacy (10 points), Florida Public School Systems experience (20 points), Other Project Experience (10 points), Office Location (5 points), and Minority/Woman-Owned Business/Small Business designation (5 points), for a total possible score of 105 points. The top three scoring firms—ThermaServe Mechanical, Inc. (90.17 points), Engineering Matrix, Inc. (88.67 points), and H2Engineering, Inc. (76.67 points)—were selected for interviews scheduled for April 1, 2026, with the final tabulation meeting at 2:00 PM on the same date. No pricing information, contract term, or funding details are included in this tabulation document.

View the file

Other files

File Type Posted
26103_5A_BMS_HVAC_Upgrades__Contract_Board_Approval.pdf PDF
26103_5A_BMS_HVAC_Upgrades__Selection_Recommendation_Board_Approval.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Shortlist_Interviews_Tabulation_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Shortlist_Interviews_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Shortlist_Interviews_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Shortlist_Interviews_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-__Submittal_Review_Final_Meeting_Tabulation.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Submittal_Review_Final_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Minutes_Rev1.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Minutes_Rev1.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Startup_Meeting_Sign-In_Sheet_R.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Minutes.pdf PDF
26-103_5A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Minutes.pdf PDF
26-103_6A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Sign-In_Sheet.pdf PDF
26-103_6A_BMS_HVAC_Upgrades_-_Pre-Bid_Meeting_Sign-In_Sheet.pdf PDF
Project_26-103_Belleview_Middle_School_HVAC_Upgrades_-_RFQ_Advertisement.pdf PDF
Project_26-103_Belleview_Middle_School_HVAC_Upgrades_-_RFQ_Advertisement.pdf PDF
Design_Services_2026_Request_for_Qualifications_RFQ_Manual_-_1.30.26.pdf PDF
Design_Services_2026_Request_for_Qualifications_RFQ_Manual_-_1.30.26.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHOOL BOARD OF MARION COUNTY FLORIDA, "AN EQUAL OPPORTUNITY SCHOOL DISTRICT "

Request for Qualifications Project Number: 26-103 Request for Qualifications Title: Belleview Middle School HVAC Upgrades - Design Services Date & Time: March 13, 2026 @ 9:00am Tabulation Posted: March 23, 2026

RFQ 26-103

A. Related Project Experience

SC 6.000 30.000 30.000 30.000 30.000 30.000 30.000 5.000 30.000

IB 20.000 30.000 30.000 20.000 22.000 26.000 25.000 5.000 24.000

AZ 30.000 30.000 30.000 30.000 30.000 30.000 30.000 20.000 28.000

SD 12.000 30.000 25.000 18.000 15.000 15.000 18.000 0.000 30.000

MC 22.000 30.000 28.000 30.000 24.000 30.000 30.000 4.000 25.000

AK 5.000 30.000 30.000 6.000 13.000 26.000 30.000 4.000 20.000

FB

15.833 30.000 28.833 22.333 22.333 26.167 27.167 6.333 26.167

SC 4.000 20.000 20.000 20.000 20.000 20.000 20.000 0.000 20.000

IB 10.000 16.000 10.000 10.000 16.000 18.000 18.000 3.000 14.000

AZ 20.000 20.000 19.000 20.000 20.000 20.000 20.000 20.000 18.000

SD 8.000 16.000 8.000 12.000 16.000 10.000 10.000 0.000 20.000

MC 15.000 20.000 17.000 18.000 15.000 20.000 20.000 8.000 15.000

AK 5.000 16.000 20.000 16.000 17.000 15.000 17.000 6.000 20.000

FB

10.333 18.000 15.667 16.000 17.333 17.167 17.500 6.167 17.833

SC 8.000 20.000 20.000 20.000 20.000 20.000 20.000 0.000 20.000

IB 12.000 20.000 20.000 20.000 10.000 18.000 20.000 0.000 8.000

AZ 18.000 20.000 19.000 20.000 20.000 20.000 20.000 16.000 18.000

SD 2.000 20.000 20.000 20.000 20.000 20.000 20.000 8.000 20.000

MC 16.000 16.000 20.000 20.000 16.000 18.000 20.000 4.000 20.000

AK 4.000 20.000 15.000 16.000 10.000 12.000 18.000 0.000 20.000

FB

10.000 19.333 19.000 19.333 16.000 18.000 19.667 4.667 17.667 B. Project Team

SC 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000

IB 6.000 9.000 9.000 10.000 10.000 10.000 7.000 4.000 5.000

AZ 8.000 10.000 9.000 10.000 8.000 10.000 9.000 9.000 8.000

SD 2.000 8.000 2.000 5.000 8.000 5.000 8.000 4.000 5.000

MC 10.000 8.000 10.000 8.000 10.000 10.000 10.000 8.000 10.000

AK 8.000 9.000 10.000 10.000 10.000 10.000 10.000 8.000 8.000

FB

7.333 9.000 8.333 8.833 9.333 9.167 9.000 7.167 7.667

SC 6.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000

IB 6.000 10.000 10.000 0.000 5.000 0.000 6.000 0.000 5.000

AZ 8.000 10.000 9.000 10.000 8.000 9.000 9.000 8.000 8.000

SD 0.000 8.000 4.000 0.000 6.000 5.000 10.000 0.000 5.000

MC 10.000 8.000 10.000 6.000 10.000 8.000 10.000 4.000 10.000

AK 5.000 7.000 10.000 5.000 5.000 5.000 8.000 0.000 5.000

FB

5.833 8.833 8.833 5.167 7.333 6.167 8.833 3.667 7.167

C. Office Location 3.000 3.000 3.000 5.000 3.000 5.000 3.000 3.000 3.000

D. Minority/Woman-Owned Business/Small Business 5.000 5.000 5.000 0.000 0.000 0.000 5.000 0.000 5.000

105 57.33 93.17 88.67 76.67 75.33 81.67 90.17 31.00 84.50

8 1 3 6 7 5 2 9 4

ThermaServe Mechanical, Inc

VoltAir Consulting Engineers Inc.

Engineering Matrix, Inc.

H2Engineering, Inc.

Matern Professional

Engineering, Inc.

Mitchell Gulledge Engineering, Inc.

SGM Engineering, Inc.

3. Continuing/Term Contract Experience

Average =

Average =

Average =

Alternate - Score Not Considered or Tabulated

Alternate - Score Not Considered or Tabulated

Alternate - Score Not Considered or Tabulated

Top three firms were selected for interviews by the committee. Those interviews will take place on April 1st. Tabulation Meeting will be at 2:00PM on the same day.

Average =

Average =

Average =

Average =

Design Services - Belleview Middle School HVAC Upgrades

Cape Design Engineering Co.

RANKING

TOTAL

Evaluation Criteria

E V A L U A T O R

1. Professional/Technical Office Staff

2. Staff Adequacy

1. Florida Public School Systems K-

2. Other Project Experience

P O I N T

V A L U E

DDC Engineering, Inc.

Alternate - Score Not Considered or Tabulated

Alternate - Score Not Considered or Tabulated

26-103 5A BMS HVAC Upgrades - Submittal Review Final Meeting Tabulation 1

File details come from the government source that posted it. Updated .