Attached to
Van Avenue Seawall Project
Solicitation number
25-B-104IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for the Van Avenue Seawall Project, a Volusia County, Florida infrastructure contract (Contract No. C-2014, ITB No. 25-B-##XX) that addresses hurricane damage sustained in 2022 at Van Avenue Beach Approach Park in Daytona Beach Shores. The project involves replacing the damaged concrete seawall with UC-95 composite seawall panels to protect the upland park and facilities from storm events. The scope includes demolition, disposal, surveying, sand/fill hauling, grading and compaction, concrete work, seawall panel installation, helical anchor installation, testing, aluminum fence and guardrail installation, and site restoration with sod placement. The existing concrete return wall at the southern end will be protected and capped to connect with new walls, while a new return wall will be installed on the northern property edge. Existing facilities must be preserved throughout construction activities.

The form requires bidders to submit a comprehensive Prime/Subcontractor breakdown allocating all work across the prime contractor and identified subcontractors, with dollar values and percentages of work for each discipline. The total bid amount must equal 100 percent of work allocation and match the total bid price on the official bid form. Prime contractors are responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes during project completion require prior written approval from the County Project Manager. The County reserves the right to request clarification on subcontractors but will not permit changes to the total submitted base bid pricing. This form also serves to determine local preference eligibility in accordance with the solicitation requirements.

View the file

Other files

File Type Posted
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave._-_Tech_Specs.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Tech_Specs.pdf PDF
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Demolition$ - 00.00%
Disposal$ - 00.00%
Surveyors$ - 00.00%
Sand/Fill Hauling$ - 00.00%
Grading and Compaction$ - 00.00%
Concrete$ - 00.00%
Seawall Panel Installation$ - 00.00%
Helical Anchor Installation$ - 00.00%
Testing$ - 00.00%
Aluminum Fence Installation$ - 00.00%
Alumin Guardrail Installation$ - 00.00%
Site Restoration & Sod Placement$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%