PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 25-B-155LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime-Sub Contractor Form for Volusia County, Florida's Tomoka Farms Landfill Fleet Management Solid Waste Shop project, IFB #25-B-155LL. The project involves construction of a new open-air pre-engineered metal building (PEMB) canopy structure totaling 4,720 square feet, designed to provide covered workspace for fleet vehicle maintenance and repair operations adjacent to an existing maintenance facility in Port Orange. The structure will feature a rigid frame with a 21'-6" eave height, pre-finished metal roof panels, concrete slab, oil/water separator, compressed air system extension, and LED lighting, along with complete electrical and plumbing systems. A non-mandatory pre-bid meeting is scheduled for October 30, 2025, at 3:30 pm, with sealed bids due on November 20, 2025, at 3:01 pm. The project timeline includes 150 total days with 120 days designated for substantial completion, and liquidated damages of $225 per day apply for delays beyond the completion date. Subcontractors must be pre-approved by the County, and any changes to the contract require prior approval from the County Project Manager.
The estimated project construction cost is $250,000.00, awarded on a lump sum basis to a single responsive and responsible bidder. Bidders must hold a Florida Certified General or Building Contractor license and provide comprehensive insurance coverage including Workers' Compensation, Commercial General Liability, Auto Liability, and Builder's Risk insurance. Performance and payment bonds are required due to the project value exceeding $200,000. Local businesses with at least six months of operation may receive preference consideration, though no specific set-aside designations for disadvantaged business enterprises are identified. Contractors must comply with E-verify requirements and adhere to federal, state, and local regulations. Funding will be drawn from multiple county account numbers: 513-860-0300-6300 and 450-760-5000-6300. The County's Business Services/Facility Management department will oversee project execution.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .