PRIME-SUB_FORM_for_Contractors_rev._01.15.2025.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 25-B-155LL
- Issued by
- Volusia County, Florida
About this file
The document is a Prime/Subcontractor Form for a construction project related to the Tomoka Farms Landfill Fleet Management Solid Waste Shop in Port Orange, Florida. The form is designed for a bid solicitation (ITB No. 25-B-##XX, Contract No. C-2014) involving the construction of a new open-air pre-engineered metal building (PEMB) canopy structure, which will include electrical and plumbing work. The form requires bidders to comprehensively list all proposed subcontractors and their specific disciplines, with a focus on electrical and plumbing subcontractors. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes require prior approval from the County Project Manager.
The form includes provisions for local bid preference and mandates that bidders complete green-shaded areas with dollar values for prime and subcontractors. The total subcontractor allocation must equal 100%, and the prime contractor must clearly indicate the percentage and dollar value of work they will perform. The document emphasizes that failure to complete and return this form may result in a non-responsive bid. While no specific bid due date or contract term is explicitly stated, the form is structured to capture detailed subcontractor information and ensure transparency in the bidding process for the Fleet Management Solid Waste Shop construction project.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Electrical | $ - 0 | 0.00% | |
| Plumbing | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .