PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls

XLS spreadsheet 38 KB Posted

Attached to
Rivershore - Oceanshore Fishing Dock Replacement
Solicitation number
26-B-78JS
Issued by
Volusia County, Orlando City, Florida

About this file

This is a Prime-Subcontractor Form template for Volusia County, Florida's Invitation to Bid No. 25-B-##XX (referenced as ITB No. 26-B-78JS in the associated solicitation) for design-build services to reconstruct the Rivershore-Oceanshore Fishing Dock in Ormond Beach, Florida. The project involves comprehensive reconstruction of an existing timber dock structure damaged during the 2017 hurricane season, including design, permitting, engineering, and construction services. The scope encompasses 20 line items including demolition, pier superstructure, decking, ADA-compliant accessibility features, concrete work, and as-built surveys. The engineering and design phase is expected to take 150 days concurrent with permitting, with construction anticipated not to exceed 90 days following approval of construction documents, for a total project duration of 240 days from issuance of the Notice to Proceed. A pre-bid conference is scheduled for April 14, 2026 at the project site, with a question submission deadline of April 23, 2026 at 11:59 p.m., and bid responses due by May 7, 2026 at 3:00 p.m. through the County's eProcurement Portal.

The Prime-Subcontractor Form requires bidders to identify all proposed subcontractors and assign dollar values and work percentages to each contractor entity, with the form also determining local bid preference eligibility. A bid bond equal to five percent of the total bid price, valid for at least 120 days, is required, along with performance and payment bonds mandated by Florida Statute due to the project exceeding $200,000. The engineer's estimate is $250,000, though alternative documentation references a $150,000 budget. The contractor must maintain comprehensive insurance including Workers Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability, Contractors Pollution Liability, Professional Liability, and Marine Protection & Indemnity coverage, with Volusia County named as additional insured. Liquidated damages are assessed at $250 per day for delays beyond substantial completion, with the county retaining five percent of monthly payments per Florida Statute 255.078 and remitting undisputed invoices within 20 business days. The project is eligible for HMGP (Hazard Mitigation Grant Program) federal disaster assistance funding related to 2017 hurricane damage. The form requires only prime contractor and subcontractor information to be completed in designated green-shaded cells, with all other calculations automated.

View the file

Other files

File Type Posted
Rivershore_-_Oceanshore_Fishing_Dock_Replacement_(Addendum_#3_Revision).pdf PDF
Exhibit_G,_Bid_Price_Sheet,_26-B-78JS.xlsx XLSX spreadsheet
Rivershore_-_Oceanshore_Fishing_Dock_Replacement.pdf PDF
Exhibit_C,_Draft_Construction_Contract_26-B-78JS_-_REVIEW.pdf PDF
Exhibit_C,_Draft_Construction_Contract_26-B-78JS_-_REVIEW.pdf PDF
Exhibit_G,_Bid_Price_Sheet,_26-B-78JS.xlsx XLSX spreadsheet
Exhibit_D,Construction_Plans_Rivershore-Oceanshore_Fishing_Dock_Replacment,_26-B-78JS.pdf PDF
Exhibit_D,Construction_Plans_Rivershore-Oceanshore_Fishing_Dock_Replacment,_26-B-78JS.pdf PDF
Exhibit_E,_Manatee_and_Sea_Turtle_Construction_Conditions,_26-B-78JS.pdf PDF
Exhibit_F,_SPECIAL_CONDITIONS_AND_CONSTRUCTION_SIGN_ECHO-RIV-OCEAN.pdf PDF
Exhibit_E,_Manatee_and_Sea_Turtle_Construction_Conditions,_26-B-78JS.pdf PDF
Exhibit_F,_SPECIAL_CONDITIONS_AND_CONSTRUCTION_SIGN_ECHO-RIV-OCEAN.pdf PDF
Exhibit_A,_Insurance_Requirements_26-B-78JS_.pdf PDF
Exhibit_B,_Prime-Sub_Form_for_Contractors,_26-B-78JS.xls XLS spreadsheet
Exhibit_A,_Insurance_Requirements_26-B-78JS_.pdf PDF
Exhibit_B,_Prime-Sub_Form_for_Contractors,_26-B-78JS.xls XLS spreadsheet
Construction_Bid_Request_Package_-_Rivershore-Oceanshore_Fishing_Dock_Replacment_3.16.26_(Final).pdf PDF
EXHIBIT_A_-CONSTRUCTION_SIGN-ECHO-RIV-OCEAN.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Construction_Bid_Request_Package_-_Rivershore-Oceanshore_Fishing_Dock_Replacment_3.16.26_(Final).pdf PDF
Rivershore_Oceanshore_Fishing_Dock_Replacment_-_Bid_Price_Sheet_3.10.26.xlsx XLSX spreadsheet
EXHIBIT_A_-CONSTRUCTION_SIGN-ECHO-RIV-OCEAN.pdf PDF
Rivershore_Oceanshore_Fishing_Dock_Replacment_-_Bid_Price_Sheet_3.10.26.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%