This file is a construction scope of work and design-build specifications document prepared by Volusia County, Florida for the reconstruction of a fishing dock facility located at 1652 John Anderson Drive in Ormond Beach, Florida. Volusia County is soliciting a State of Florida Certified General, Building, or Marine Contractor to provide comprehensive design-build services encompassing permitting, engineering, design, and construction. The existing timber dock structure, which extends into the intracoastal waterway with a main boardwalk section of 6 feet in width constructed over 8-inch round marine piles and a 12'x24' end section oriented north-south, was damaged during the 2017 hurricane season and is eligible for FEMA funding. The contractor is responsible for obtaining all necessary permits from the U.S. Army Corps of Engineers, Florida Department of Environmental Protection, and Volusia County, with an anticipated timeline of 150 days from Notice to Proceed. The engineering and design phase, running concurrently with permitting over 150 days, requires submission of plans at 30%, 60%, 90%, and final design stages, with all designs to be certified by a State of Florida FBPE Engineer and compliant with current Florida Building Codes. The construction phase is expected not to exceed 90 days following County approval of construction documents, with the contractor providing project closeout services, final as-built surveys, and a minimum one-year warranty from substantial completion.
The project budget is identified as $250,000.00 in the primary scope document, though alternative versions reference a $150,000.00 budget. Design specifications include an ADA-compliant dock system with PT SYP #1 grade decking and handrails, pressure-treated timber stringers and piles with specified CCA treatment levels, 316 stainless steel fasteners, PVC-T pile wrapping for all in-water piles, a concrete parking area with one ADA-compliant space, connecting concrete walkways and landing, and stone revetment coquina for erosion control. All construction must comply with Federal, State, and Local permitting and safety requirements. The County shall provide and pay for all required construction material testing and observation. As-built plans must be prepared by a Florida Licensed Surveyor and stamped for project closeout. Additional requirements include turbidity barriers and silt fencing as required by the authority having jurisdiction. The document includes multiple versions with request dates of March 5, 6, and 16, 2026, indicating possible revisions or addenda to the contract solicitation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public Works Engineering & Construction
Volusia County: Rivershore-Oceanshore Drive Fishing Dock Replacement
Scope:
Volusia County is seeking the services of a State of Florida Certified General, Building or Marine Contractor to provide DESIGN BUILD SERVICES including permitting, design and construction to reconstruct with new materials an existing County dock located at 1652 John Anderson Drive in Ormond Beach, Florida 32176. The dock was damaged during the 2017 hurricane season and is eligible for FEMA funding. The existing dock is a timber structure that extends into the inter-coastal waterway. Main boardwalk section is 6 feet in width constructed over 8-inch round marine piles with an approximate 12’x24’ end section running approximately north-south. The dock shall be rebuilt to match the existing dock footprint with pile spacing as determined by contractor’s engineer.
Design Build Team to field-verify dimensions. The selected contractor will provide the following services:
Project Budget: $250,000.00
Permitting:
Selected contractor will apply for and obtain all necessary permitting required to reconstruct the dock including, but not limited to ACOE, FDEP and Volusia County. It is assumed the timeline for this portion of the project is 150 days from Notice to Proceed and shall run concurrently with the Engineering and Design Phase.
Engineering and Design:
Selected contractor will provide all permitting, design and plans necessary to resurface the existing dock system in the same footprint as the original dock system. Original dock system is to be removed.
Contractor will submit plans for County review at 30%, 60% and 90% design stages. Once 90% design plans have been approved contractor will provide construction documents for final permitting. It is assumed the timeline for this portion of the project is 150 days from Notice to Proceed and shall run concurrently with the permitting phase. Design shall comply with all current Florida Building Codes and will be certified by a State of Florida FBPE Engineer.
The following design elements will be incorporated:
1) Dock system to be ADA compliant
2) Deck and rail boards shall be PT SYP #1 grade.
26-B-78JS EXHIBIT C-2078
3) Treatment of all other timber are as follows: Stringers/deck #2 SYP / .25pcf CCA.
Stringers/pile caps #2 SYP /.6CCA, timber piles 2.5 CCA.
4) All in water piles shall be wrapped with Pile Guard PVC-T or equivalent. Install 18” below sediment line to 15” above MHWL.
5) All fasteners and hardware on the project shall be 316 stainless steel
6) Construct 1 ADA compliant concrete parking area for one standard ADA parking space with striping and curb stop.
7) Concrete landing and walkway to and from ADA parking area.
8) ADA aluminum handrails to be provided per Florida Building Code.
9) Stone Revetment Coquina to reduce erosion.
Construction:
Contractor’s Florida licensed engineers shall design and Contractor shall construct the dock system in compliance with all Federal, State and Local permitting and safety requirements. Contractor shall provide a barrier preventing non-construction personnel from entering the construction site. The County shall provide and pay for all required construction material testing and or observation.
Contractor shall provide project closeout services including finalizing required permitting and final as-built survey services. Project shall be warranted for a minimum of 1 year from date of substantial completion. It is assumed the construction portion of the project will not exceed 90 days from County approval of Construction Documents.
Additional Construction requirements:
1) As-builds provided by a Florida Licensed surveyor plans submitted and stamped for final close out.
2) Turbidity Barrier and Silt Fence as required by authority having jurisdiction.
Rivershore_Oceanshore Fishing Dock Replacement 1652 John Anderson Drive, Ormond Beach, Florida 32176
Aerial Location Map
Volusia County Propery Appraiser Website
| Request date 3/6/26 |
| Request date 3/5/26 |
| Rivershore_Oceanshore Fishing Dock Replacment - Bid_Price_Sheet 3.10.26.pdf |
| Bid Tab |
| Rivershore_Oceanshore Fishing Dock Replacement - Scope of Work 3.10.26.pdf |
| Public Works Engineering & Construction |
| Scope: |
| Project Budget: $150,000.00 |
| Engineering and Design: |
| Construction: |
| Riv-Ocean Fishing Dock - Aerial Map 3.6.26.pdf |
| Aerial Map02 |
| Construction Bid Request Form - 3.16.26.pdf |
| Request date 3/16/26 |
| Request date 3/5/26 |
| Rivershore_Oceanshore Fishing Dock Replacement - Scope of Work 3.16.26.pdf |
| Public Works Engineering & Construction |
| Scope: |
| Project Budget: $150,000.00 |
| Engineering and Design: |
| Construction: |
| Riv-Ocean Fishing Dock - Aerial Map 3.16.26.pdf |
| Aerial Map02 |
| Construction Bid Request Form - 3.16.26.pdf |
| Request date 3/16/26 |
| Request date 3/5/26 |
File details come from the government source that posted it. Updated .