About this file

This is a Prime/Subcontractor Form for Volusia County, Florida, related to Invitation to Bid (ITB) No. 25-B-##XX for Contract No. C-2014, concerning the Rivershore-Oceanshore Fishing Dock Replacement project. The project involves design-build services for the reconstruction of an existing County dock located at 1652 John Anderson Drive in Ormond Beach, Florida, which was damaged during the 2017 hurricane season. The dock replacement requires a State of Florida Certified General, Building, or Marine Contractor and includes permitting, design, and construction services. The existing timber dock structure extends into the intracoastal waterway with a main boardwalk section of 6 feet in width constructed over 8-inch round marine piles and an approximate 12-foot by 24-foot end section running north-south. The project is eligible for Echo funding, and the design-build team must field-verify dimensions and determine pile spacing according to the contractor's engineer's specifications.

Bidders are required to complete and return this form as a mandatory component of a responsive bid, with failure to do so resulting in bid rejection. Prime contractors must list all proposed subcontractors and their respective disciplines, dollar values, and percentages of work performed. The form establishes that the prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses and that any subcontractor changes during project completion require prior approval from the County Project Manager. The County reserves the right to seek clarification on subcontractors but will not permit changes to the total submitted base bid pricing. The form will also be used to determine local preference in accordance with Section 2.8, D of the solicitation. Bidders must complete green-shaded areas indicating dollar values and work percentages for both the prime contractor and all subcontractors, with the total percentage of work required to equal 100 percent.

View the file

Other files

File Type Posted
Rivershore_-_Oceanshore_Fishing_Dock_Replacement_(Addendum_#3_Revision).pdf PDF
Exhibit_G,_Bid_Price_Sheet,_26-B-78JS.xlsx XLSX spreadsheet
Rivershore_-_Oceanshore_Fishing_Dock_Replacement.pdf PDF
Exhibit_G,_Bid_Price_Sheet,_26-B-78JS.xlsx XLSX spreadsheet
Exhibit_D,Construction_Plans_Rivershore-Oceanshore_Fishing_Dock_Replacment,_26-B-78JS.pdf PDF
Exhibit_D,Construction_Plans_Rivershore-Oceanshore_Fishing_Dock_Replacment,_26-B-78JS.pdf PDF
Exhibit_C,_Draft_Construction_Contract_26-B-78JS_-_REVIEW.pdf PDF
Exhibit_C,_Draft_Construction_Contract_26-B-78JS_-_REVIEW.pdf PDF
Exhibit_F,_SPECIAL_CONDITIONS_AND_CONSTRUCTION_SIGN_ECHO-RIV-OCEAN.pdf PDF
Exhibit_E,_Manatee_and_Sea_Turtle_Construction_Conditions,_26-B-78JS.pdf PDF
Exhibit_F,_SPECIAL_CONDITIONS_AND_CONSTRUCTION_SIGN_ECHO-RIV-OCEAN.pdf PDF
Exhibit_E,_Manatee_and_Sea_Turtle_Construction_Conditions,_26-B-78JS.pdf PDF
Exhibit_A,_Insurance_Requirements_26-B-78JS_.pdf PDF
Exhibit_B,_Prime-Sub_Form_for_Contractors,_26-B-78JS.xls XLS spreadsheet
Exhibit_A,_Insurance_Requirements_26-B-78JS_.pdf PDF
Exhibit_B,_Prime-Sub_Form_for_Contractors,_26-B-78JS.xls XLS spreadsheet
EXHIBIT_A_-CONSTRUCTION_SIGN-ECHO-RIV-OCEAN.pdf PDF
Construction_Bid_Request_Package_-_Rivershore-Oceanshore_Fishing_Dock_Replacment_3.16.26_(Final).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Rivershore_Oceanshore_Fishing_Dock_Replacment_-_Bid_Price_Sheet_3.10.26.xlsx XLSX spreadsheet
EXHIBIT_A_-CONSTRUCTION_SIGN-ECHO-RIV-OCEAN.pdf PDF
Rivershore_Oceanshore_Fishing_Dock_Replacment_-_Bid_Price_Sheet_3.10.26.xlsx XLSX spreadsheet
Construction_Bid_Request_Package_-_Rivershore-Oceanshore_Fishing_Dock_Replacment_3.16.26_(Final).pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2