PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls

XLS spreadsheet 38 KB Posted

Attached to
El Portal Vehicular Beach Access Ramp
Solicitation number
26-B-59IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form template for Volusia County, Florida's reconstruction of the El Portal Vehicular Beach Access Ramp (Contract C-2014, ITB 25-B-##XX). The form requires bidders to identify all prime and subcontractor participation for the project, which involves demolition of storm-damaged infrastructure and reconstruction of a composite sheet pile seawall, concrete cap, reinforced concrete vehicular ramp, curbing, pedestrian sidewalk, and site restoration. The project scope includes installation of 64 linear feet of sheet-pile seawall and 104 linear feet of retaining walls with concrete caps, placement of 313 square yards of reinforced concrete ramp and 361 square yards of heavy-duty concrete, installation of 128 linear feet of FDOT Type D curbing and 104 square yards of sidewalk, and completion of pavement markings, signage, as-built survey certification, and site restoration within a 150-day period (120 days for substantial completion). The pre-bid meeting is scheduled for March 16, 2026, at 10:30 a.m. with a virtual option, questions must be submitted by March 26, 2026, at 11:59 p.m., and bids are due April 9, 2026, at 3:00 p.m. through the County's eProcurement Portal. Award will be determined by the lowest responsive and responsible bidder based on combined pricing for all line items.

The estimated construction cost is $1,464,420.00, and bidders must submit a bid bond equal to 5 percent of their total bid price, with Payment and Performance Bonds equal to 100 percent of contract price required upon award per Florida Statute 255.05. The form requires bidders to complete designated green cells showing dollar values and percentage of work allocation for the prime contractor and all identified subcontractor disciplines including demolition, excavation, sheet pile installation, concrete work, surveying, and testing, with the total work allocation equaling 100 percent. No local preference provisions apply due to FEMA funding restrictions, and no specific set-asides exist for disadvantaged or small businesses, although federal requirements mandate affirmative efforts to contract with small and minority businesses, women's business enterprises, and labor surplus area firms. The project is funded by FEMA and subject to federal compliance requirements including Davis-Bacon Act wage standards, Clean Air Act compliance, and domestic preference for materials. Liquidated damages are assessed at $1,000 per day for failure to meet completion deadlines, and payment will be made within 20 to 25 days of invoice receipt in accordance with Florida Statute 218.735. Prime contractors are responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes during project completion require prior approval from the County Project Manager.

View the file

Other files

File Type Posted
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#2_Revision).pdf PDF
Exhibit_D_-_Construction_Plans_26-B-59IF_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-59IF_-_REVISED_03.10.2026.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-59IF.pdf PDF
Exhibit_H_-_Geotechnical_Report_26-B-59IF.pdf PDF
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-59IF.pdf PDF
Exhibit_F_-_Sales_Tax_Exemption_Procedures_26-B-59IF.pdf PDF
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF.xlsx XLSX spreadsheet
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_K_-_Federal_Contract_Provisions_26-B-59IF.pdf PDF
Exhibit_I_-_Survey_26-B-59IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-59IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF.xlsx XLSX spreadsheet
Exhibit_E_-_Technical_Specifications_26-B-59IF.pdf PDF
Exhibit_H_-_Geotechnical_Report_26-B-59IF.pdf PDF
Exhibit_I_-_Survey_26-B-59IF.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-59IF.pdf PDF
Exhibit_H_-_Geotechnical_Report_26-B-59IF.pdf PDF
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_K_-_Federal_Contract_Provisions_26-B-59IF.pdf PDF
Exhibit_L_-_Installation_Floater_Affidavit_26-B-59IF.docx DOCX document
Exhibit_I_-_Survey_26-B-59IF.pdf PDF
Exhibit_K_-_Federal_Contract_Provisions_26-B-59IF.pdf PDF
Exhibit_L_-_Installation_Floater_Affidavit_26-B-59IF.docx DOCX document
Exhibit_D_-_Construction_Plans_26-B-59IF.pdf PDF
1_-_FDEP_CCCL_VO002489_AR_FO.pdf PDF
2026-02-03_Final_Design_Tech_Specs.pdf PDF
4_-_Geotechnical_Report.pdf PDF
Drawings_-_EL_PORTAL.pdf PDF
2026-02-03_Final_Design_Tech_Specs.pdf PDF
3_-_Survey.pdf PDF
1_-_FDEP_CCCL_VO002489_AR_FO.pdf PDF
2026-02-03_Final_Design_Tech_Specs.pdf PDF
3_-_Survey.pdf PDF
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx XLSX spreadsheet
4_-_Geotechnical_Report.pdf PDF
2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx XLSX spreadsheet
3_-_Survey.pdf PDF
4_-_Geotechnical_Report.pdf PDF
Drawings_-_EL_PORTAL.pdf PDF
3_-_Survey.pdf PDF
2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx XLSX spreadsheet
1_-_FDEP_CCCL_VO002489_AR_FO.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%