PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Attached to
- El Portal Vehicular Beach Access Ramp
- Solicitation number
- 26-B-59IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form template for Volusia County, Florida's reconstruction of the El Portal Vehicular Beach Access Ramp (Contract C-2014, ITB 25-B-##XX). The form requires bidders to identify all prime and subcontractor participation for the project, which involves demolition of storm-damaged infrastructure and reconstruction of a composite sheet pile seawall, concrete cap, reinforced concrete vehicular ramp, curbing, pedestrian sidewalk, and site restoration. The project scope includes installation of 64 linear feet of sheet-pile seawall and 104 linear feet of retaining walls with concrete caps, placement of 313 square yards of reinforced concrete ramp and 361 square yards of heavy-duty concrete, installation of 128 linear feet of FDOT Type D curbing and 104 square yards of sidewalk, and completion of pavement markings, signage, as-built survey certification, and site restoration within a 150-day period (120 days for substantial completion). The pre-bid meeting is scheduled for March 16, 2026, at 10:30 a.m. with a virtual option, questions must be submitted by March 26, 2026, at 11:59 p.m., and bids are due April 9, 2026, at 3:00 p.m. through the County's eProcurement Portal. Award will be determined by the lowest responsive and responsible bidder based on combined pricing for all line items.
The estimated construction cost is $1,464,420.00, and bidders must submit a bid bond equal to 5 percent of their total bid price, with Payment and Performance Bonds equal to 100 percent of contract price required upon award per Florida Statute 255.05. The form requires bidders to complete designated green cells showing dollar values and percentage of work allocation for the prime contractor and all identified subcontractor disciplines including demolition, excavation, sheet pile installation, concrete work, surveying, and testing, with the total work allocation equaling 100 percent. No local preference provisions apply due to FEMA funding restrictions, and no specific set-asides exist for disadvantaged or small businesses, although federal requirements mandate affirmative efforts to contract with small and minority businesses, women's business enterprises, and labor surplus area firms. The project is funded by FEMA and subject to federal compliance requirements including Davis-Bacon Act wage standards, Clean Air Act compliance, and domestic preference for materials. Liquidated damages are assessed at $1,000 per day for failure to meet completion deadlines, and payment will be made within 20 to 25 days of invoice receipt in accordance with Florida Statute 218.735. Prime contractors are responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes during project completion require prior approval from the County Project Manager.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .