2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
El Portal Vehicular Beach Access Ramp
Solicitation number
26-B-59IF
Issued by
Volusia County, Florida

About this file

This is a Bid Schedule document for Volusia County, Florida's El Portal Vehicular Beach Access Ramp reconstruction project (Invitation for Bid 26-B-59IF, Contract C-2075). The project scope includes demolition of storm-damaged infrastructure and reconstruction of safe pedestrian and vehicle access to the beach through 14 line items: mobilization/demobilization, demolition, excavation/grading/compaction, 64 linear feet of sheet-pile seawall, 104 linear feet of sheet-pile retaining walls, concrete plugs and chemical grout, 313 square yards of reinforced concrete ramp, 361 square yards of heavy-duty concrete, 128 linear feet of FDOT Type D curbing, 104 square yards of sidewalk and transition area, pavement markings and signage, as-built survey, site restoration, and flood insurance. The non-mandatory pre-bid meeting is scheduled for March 16, 2026, at 10:30 a.m. with a virtual Microsoft Teams option. The deadline for submitting questions is March 26, 2026, at 11:59 p.m., and sealed bids must be submitted electronically through the County's eProcurement Portal by April 9, 2026, at 3:00 p.m. The contract period is 150 days total, with substantial completion required within 120 days, and award will be determined by lowest responsive and responsible bidder.

The estimated construction cost is $1,464,420.00, with contractors required to submit a bid bond equal to 5 percent of total bid price and Payment and Performance Bonds equal to 100 percent of contract price upon award. The project is funded through FEMA due to Hurricane Nicole damage in 2022 and is subject to federal compliance requirements including Davis-Bacon Act wage standards, Clean Air Act compliance, and domestic preference for U.S.-produced iron and steel per Florida Statute 255.0993. No local preference provisions apply due to FEMA funding restrictions. Federal requirements mandate affirmative efforts to contract with small and minority businesses, women's business enterprises, and labor surplus area firms, though no specific set-asides are designated. The project requires compliance with Florida Department of Environmental Protection permits, U.S. Army Corps of Engineers authorizations, U.S. Fish and Wildlife Service Take Permits, and Volusia County's Habitat Conservation Plan, which prohibits construction activity during marine turtle nesting season (May 1 through October 31). Liquidated damages of $1,000 per day apply for failure to meet completion deadlines, and payment will be made within 20 to 25 days of invoice receipt per Florida Statute 218.735.

View the file

Other files

File Type Posted
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS_-_USE_THIS_FORM_ONLY.xlsx XLSX spreadsheet
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#2_Revision).pdf PDF
Exhibit_E_-_Technical_Specifications_03.23.2026_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.docx DOCX document
Exhibit_D_-_Construction_Plans_26-B-59IF_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-59IF_-_REVISED_03.10.2026.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp.pdf PDF
Exhibit_L_-_Installation_Floater_Affidavit_26-B-59IF.docx DOCX document
Exhibit_K_-_Federal_Contract_Provisions_26-B-59IF.pdf PDF
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_I_-_Survey_26-B-59IF.pdf PDF
Exhibit_H_-_Geotechnical_Report_26-B-59IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures_26-B-59IF.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-59IF.pdf PDF
Exhibit_D_-_Construction_Plans_26-B-59IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-59IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-59IF.xls XLS spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-59IF.pdf PDF
Drawings_-_EL_PORTAL.pdf PDF
2026-02-03_Final_Design_Tech_Specs.pdf PDF
4_-_Geotechnical_Report.pdf PDF
3_-_Survey.pdf PDF
1_-_FDEP_CCCL_VO002489_AR_FO.pdf PDF
2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Volusia County
El Portal Drive
Vehicular Beach Access Ramp
February 3, 2026
Bid Schedule
ItemDescriptionQuantity0Unit Price0Cost
1Mobilization/Demobilization1LSLS$0
2Demolition1LSLS$0
3Excavation, Grading, and Compaction1LSLS$0
4Sheet-Pile Seawall64LFLF$0
5Sheet-Pile Retaining Wall104LFLF$0
6Concrete Plugs & Chemical Grout1LSLS$0
7Reinforced Concrete Ramp313SYSY$0
8Heavy Duty Concrete361SYSY$0
9FDOT Type D Curb128LFLF$0
10Sidewalk & Transition Area104SYSY$0
11Pavement Markings & Signage1LSLS$0
12As-Built Survey1LSLS$0
13Site Restoration1LSLS$0
14Flood Insurance1LSLS$0
Total Cost:$0
Contract Time:150 Days

File details come from the government source that posted it. Updated .