PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_.xls

XLS spreadsheet 38 KB Posted

Attached to
Daytona Beach International Airport Taxiway P3 and P4 Improvements
Solicitation number
26-B-77IF
Issued by
Volusia County, Florida

About this file

Prime/Subcontractor Form Summary

This is a Prime/Subcontractor declaration form (Contract No. C-2014, ITB No. 25-B-##XX) required for the Daytona Beach International Airport Taxiway P3 and P4 Improvements project issued by Volusia County, Florida. Bidders must complete and submit this form as part of their bid response, with failure to do so potentially resulting in a non-responsive bid designation. The form requires bidders to identify all proposed subcontractors by discipline and assign dollar values and percentage of work for both the prime contractor and each subcontractor across anticipated project disciplines including Airfield Electrical, Paving, Earthwork, Demolition, and Surveying. The total bid price must be allocated across all listed contractors and subcontractors, with the percentages totaling 100 percent. All cells shaded in green must be completed by bidders, while remaining cells are automatically calculated. The form serves dual purposes: documenting the contractor team structure and determining local preference eligibility in accordance with the solicitation requirements.

The Prime/Subcontractor Form requires bidders to allocate the total submitted base bid amount (inclusive of any required performance and payment bonds) across the prime contractor and all proposed subcontractors by discipline. The prime contractor bears responsibility for ensuring that all subcontractors maintain appropriate licenses and must obtain prior approval from the County Project Manager before making any subcontractor changes during project execution. The County reserves the right to request clarification on subcontractor qualifications but will not permit modifications to the total base bid pricing. This form directly supports the evaluation of local preference eligibility and ensures transparency regarding the proposed project team composition and work allocation prior to contract award.

View the file

Other files

File Type Posted
Exhibit_L_-_Sheet_G100_Reissued_04.13.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS_OF_SHEET_G100.pdf PDF
Exhibit_K_-_Geotechnical_Report.pdf PDF
Daytona_Beach_International_Airport_Taxiway_P3_and_P4_Improvements_(Addendum_#2_Revision).pdf PDF
Exhibit_C_-_Draft_Contract_26-B-77IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Exhibit_H_-_FAA_Contract_Provision_Guidelines_Issued_3_17_2026_-_REVISED_04.07.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Daytona_Beach_International_Airport_Taxiway_P3_and_P4_Improvements.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-77IF.xls XLS spreadsheet
Exhibit_J_-_Sales_Tax_Exemption_Procedures_26-B-77IF.pdf PDF
Exhibit_I_-_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-77IF.pdf PDF
Exhibit_H_-_FAA_Requirements_26-B-77IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-77IF.xlsx XLSX spreadsheet
Exhibit_F_-_Construction_Safety_and_Phasing_Plan.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-77IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-77IF.pdf PDF
DAB_TW_P3-P4_Plans.pdf PDF
DAB_TW_P3-P4_ProjectManual.pdf PDF
DAB_TW_P3-P4_CSPP.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_.xls XLS spreadsheet
DAB_TW_P3-P4_PriceSheet_(unlocked_for_Inga).xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Airfield Electrical$ - 00.00%
Paving$ - 00.00%
Earthwork$ - 00.00%
Demolition$ - 00.00%
Surveying$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .