PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-77IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form required by Volusia County, Florida for the Daytona Beach International Airport Taxiway P3 and P4 Improvements project (Contract No. C-2014, ITB No. 25-B-##XX). The form mandates that all bidders list every subcontractor proposed to perform work on the project, with failure to complete and return the form resulting in a non-responsive bid designation. Bidders must allocate the total bid price across the prime contractor and all subcontractors, with specific anticipated disciplines including Airfield Electrical, Paving, Earthwork, Demolition, and Surveying. The form requires completion of shaded green cells representing dollar values and work percentages assigned to each contractor, with all other cells automatically calculated. The total work allocation must equal 100 percent, and any changes to subcontractors during project completion require prior written approval from the County Project Manager. The County reserves the right to clarify subcontractor information but will not permit changes to the total submitted base bid pricing.
The form serves dual purposes: documenting subcontractor commitments and determining local preference eligibility pursuant to Section 2.8, D of the solicitation documents. Prime contractors performing self-work must note "self performing" in the appropriate box and submit $0.00 for that discipline to ensure accurate allocation calculations. Additional subcontractor disciplines beyond those listed may be added in blank rows as project needs dictate. The Prime Contractor bears responsibility for ensuring all subcontractors maintain appropriate licenses for their respective work disciplines. This form is a critical compliance document for bid responsiveness and will be evaluated as part of the overall procurement process for the estimated $4,851,000 airport construction project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Airfield Electrical | $ - 0 | 0.00% | |
| Paving | $ - 0 | 0.00% | |
| Earthwork | $ - 0 | 0.00% | |
| Demolition | $ - 0 | 0.00% | |
| Surveying | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .