PRIME-SUB_FORM_for_Contractors.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 25-B-155LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for Volusia County, Florida's Invitation for Bid (IFB) #25-B-155LL, Contract No. C-2050, which pertains to the construction of a pre-engineered metal building (PEMB) canopy structure at the Tomoka Farms Landfill in Port Orange. The project requires bidders to submit a completed Prime/Subcontractor Form identifying all proposed subcontractors and the dollar value and percentage of work each contractor (prime and subcontractors) will perform. The anticipated subcontractor disciplines for this project include Electrical and Plumbing work, though additional disciplines may be added as needed. Bidders must ensure all subcontractors hold appropriate licenses, and any changes to subcontractors during project completion require prior written approval from the County Project Manager. The form serves to verify bid responsiveness and to determine local preference eligibility. A non-mandatory pre-bid meeting is scheduled for October 30, 2025, at 3:30 pm, with sealed bids due on November 20, 2025, at 3:01 pm.
The form requires bidders to complete green-shaded cells indicating dollar values for the prime contractor and each subcontractor, with all other cells automatically calculating percentages of work performed. The total bid amount must equal 100 percent across all contractors. The estimated project construction cost is $250,000.00, and performance and payment bonds are required due to the project value exceeding $200,000. Funding will be drawn from Volusia County account numbers 513-860-0300-6300 and 450-760-5000-6300. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. This form is mandatory for bid submission and failure to complete and return it may result in a non-responsive bid.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2050 | ITB No. 25-B-155LL | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Electrical | $ - 0 | 0.00% | |
| Plumbing | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .