About this file
This is a Pricing Table document for the Santa Rosa County Gateway Logistics Center – County Earthwork Package, a construction project managed by the Santa Rosa County Procurement Office in Milton, Florida. The project encompasses three separate bid item groups funded through different sources: Triumph Grant Funds (Items 101), FDEP Grant Funds (Items 102), and Other Grant Funds as a bid alternate (Items 201). The work includes mobilization, maintenance of traffic, clearing and grubbing, excavation, embankment work with stockpiled materials from Milton Interchange Park (approximately 7 miles away), erosion control, dewatering, and utility infrastructure installation such as inlets, manholes, and various pipe sizes. The bid alternate additionally includes sodding, seed and mulch, chain link fencing, and gates. A pre-bid meeting is scheduled for March 6, 2026 at 10:00 a.m. at the Santa Rosa County Economic Development Office in Milton, Florida. Questions must be submitted through the procurement portal by 12:00 p.m. on Friday, March 13, 2026. Sealed bids are due by 10:00 a.m. on Monday, March 30, 2026, and will be publicly opened via Teams. The contract is funded through three distinct grant sources: Triumph Grant Funds cover the base earthwork package (Items 101) including 123,690 cubic yards of truck-hauled embankment; FDEP Grant Funds support utility and drainage infrastructure (Items 102) with 6,290 cubic yards of truck-hauled embankment and associated drainage structures; and the bid alternate (Items 201) includes additional earthwork and improvements funded through other grant sources. Santa Rosa County Board of County Commissioners encourages participation from small businesses, minority/women-owned businesses, and disadvantaged business enterprises, and reserves the right to waive bid irregularities or reject any or all bids.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Item List
| Item No. | Item Description | Quantity | Unit |
| Items 101 Paid For With Triumph Grant Funds | |||
| 101.01 | Mobilization | 1 | LS |
| 101.02 | Maintenance of Traffic | 1 | LS |
| 101.03 | As-Built Survey | 1 | LS |
| 101.04 | Clearing & Grubbing | 10.50 | AC |
| 101.05 | Erosion Control | 1 | LS |
| 101.06 | Dewatering | 1 | LS |
| 101.07 | Excavation (On Site) (Remove Unsuitable Material) | 32,960 | CY |
| 101.08 | Embankment (On Site) | 88,350 | CY |
| 101.09 | Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road. | 123,690 | CY |
| Items 102 Paid For With FDEP Grant Funds | |||
| 102.01 | Mobilization | 1 | LS |
| 102.02 | Maintenance of Traffic | 1 | LS |
| 102.03 | As-Built Survey | 1 | LS |
| 102.04 | Clearing & Grubbing | 3 | AC |
| 102.05 | Erosion Control | 1 | LS |
| 102.06 | Dewatering | 1 | LS |
| 102.07 | Excavation (On Site) (Remove Unsuitable Material) | 14,820 | CY |
| 102.08 | Embankment (On Site) | 4,490 | CY |
| 102.09 | Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road. | 6,290 | CY |
| 102.10 | FDOT Type D Inlet (Pond Control Structure) | 1 | EA |
| 102.11 | FDOT 8' Dia. J-Bottom Manhole | 1 | EA |
| 102.12 | FDOT 6'x6' J-Bottom Manhole | 1 | EA |
| 102.13 | 30" Pipe | 51 | LF |
| 102.14 | 48" Pipe | 53 | LF |
| 102.15 | 54" Pipe | 52 | LF |
| 102.16 | 30" U-Type Endwall w/ Baffles | 1 | EA |
| 102.17 | 48" MES with 4:1 Slope | 1 | EA |
| 102.18 | 54" MES with 4:1 Slope | 1 | EA |
| 102.19 | Riprap w/Filter Fabric | 22 | TN |
| 102.20 | Sodding | 6,840 | SY |
| 102.23 | Seed & Mulch | 49,650 | SY |
| 102.21 | 6' Chain Link Fence (Black Vinyl Coating) | 1,260 | LF |
| 102.22 | 6'X12' Chain Link Double Swing Gate | 1 | EA |
| Bid Alternate - Items 201 Paid For With Other Grant Funds | |||
| 201.01 | Mobilization | 1 | LS |
| 201.02 | Maintenance of Traffic | 1 | LS |
| 201.03 | As-Built Survey | 1 | LS |
| 201.04 | Clearing & Grubbing | 9 | AC |
| 201.05 | Erosion Control | 1 | LS |
| 201.06 | Dewatering | 1 | LS |
| 201.07 | Excavation (On Site) (Remove Unsuitable Material) | 28,650 | CY |
| 201.08 | Embankment (On Site) | 25,390 | CY |
| 201.09 | Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road. | 35,550 | CY |
| 201.10 | FDOT Type D Inlet (Pond Control Structure) | 1 | EA |
| 201.11 | FDOT 5' Dia. J-Bottom Manhole | 2 | EA |
| 201.12 | 18" Pipe | 38 | LF |
| 201.13 | 24" Pipe | 29 | LF |
| 201.14 | 30" Pipe | 33 | LF |
| 201.15 | 24" U-Type Endwall w/ Baffles | 1 | EA |
| 201.16 | 18" MES with 4:1 Slope | 1 | EA |
| 201.17 | 30" MES with 4:1 Slope | 1 | EA |
| 201.18 | Riprap w/Filter Fabric | 22 | TN |
| 201.19 | Sodding | 1,600 | SY |
| 201.20 | Seed & Mulch | 43,600 | SY |
| 201.21 | 6' Chain Link Fence (Black Vinyl Coating) | 700 | LF |
| 201.22 | 6'X12' Chain Link Double Swing Gate | 1 | EA |
&G
&"Arial,Regular"&9&K4298B5Opinion of Probable Construction Cost l Rev. 0 l 16 Oct. 2025 l Page &P of &N image1.jpeg
File details come from the government source that posted it. Updated .