About this file

This is a Pricing Table and Bid Item List for the Gateway Logistics Center - County Earthwork Package project issued by Santa Rosa County, Florida. The project encompasses three main bid sections: Items 101-102 paid for with Triumph Grant and FDEP Grant Funds, and Items 201 as a bid alternate paid for with Other Grant Funds. The work involves substantial earthwork activities including mobilization, maintenance of traffic, clearing and grubbing (ranging from 3 to 10.5 acres depending on the section), erosion control, dewatering, and excavation of unsuitable material (14,820 to 32,960 cubic yards). Significant embankment work is required both on-site and via truck hauling from Milton Interchange Park, located approximately 7 miles from the project site off Highway 87 South and south of I-10 off Ray Helms Road. The FDEP-funded section (Items 102) additionally includes drainage infrastructure such as FDOT inlets, manholes, pipes ranging from 30 to 54 inches in diameter, and associated endwalls and slope protection. Landscaping elements include sodding, seed and mulch (totaling between 1,600 and 56,490 square yards), chain link fencing, and gates. A pre-bid meeting was scheduled for March 6, 2026 at 10:00 a.m. at the Santa Rosa County Economic Development Office, with questions due by 12:00 p.m. on March 13, 2026, and sealed bid submissions required by 10:00 a.m. on March 30, 2026.

The project is funded through multiple grant sources including Triumph Grant Funds, FDEP Grant Funds, and Other Grant Funds. Bidders are required to provide unit pricing for each line item across the three bid sections to allow for evaluation of the base bid and alternate pricing. Santa Rosa County encourages participation from small businesses, minority-owned businesses, women-owned businesses, and disadvantaged business enterprises. The County reserves the right to waive irregularities in bids, reject any or all bids for documented reasons, and award the contract based on what it determines to be in the best interest of Santa Rosa County. No incumbent contractor information, renewal options, or specific contract term duration are identified in this pricing table document.

View the file

Other files

File Type Posted
Chester_Byrd_Park_Improvements_(Addendum_#6_Revision).pdf PDF
Chester_Byrd_Park_Improvements_(Addendum_#3_Revision).pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
AGREEMENT_-_CHESTER_BYRD_PARK_IMPROVEMENTS.pdf PDF
FDEP_Grant_Agreement_Chester_Byrd_Park_Project_P25011.pdf PDF
Bid_Form_Notes.pdf PDF
CHESTER_BYRD_PARK_IMPROVEMENTS_BID_PLANS.pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package_(Addendum_#2_Revision).pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package_(Addendum_#2_Revision).pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package_(Addendum_#1_Revision).pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Project_Manual.pdf PDF
2026-02-12_Project_Manual.pdf PDF
2026-02-12_Project_Manual.pdf PDF
2026-02-12_Project_Manual.pdf PDF
Pricing_Table.xlsx XLSX spreadsheet
Pricing_Table.xlsx XLSX spreadsheet
Pricing_Table.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Item List

Item No.Item DescriptionQuantityUnit
Items 101 Paid For With Triumph Grant Funds
101.01Mobilization1LS
101.02Maintenance of Traffic1LS
101.03As-Built Survey1LS
101.04Clearing & Grubbing10.50AC
101.05Erosion Control1LS
101.06Dewatering1LS
101.07Excavation (On Site) (Remove Unsuitable Material)32,960CY
101.08Embankment (On Site)88,350CY
101.09Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road.123,690CY
Items 102 Paid For With FDEP Grant Funds
102.01Mobilization1LS
102.02Maintenance of Traffic1LS
102.03As-Built Survey1LS
102.04Clearing & Grubbing3AC
102.05Erosion Control1LS
102.06Dewatering1LS
102.07Excavation (On Site) (Remove Unsuitable Material)14,820CY
102.08Embankment (On Site)4,490CY
102.09Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road.6,290CY
102.10FDOT Type D Inlet (Pond Control Structure)1EA
102.11FDOT 8' Dia. J-Bottom Manhole1EA
102.12FDOT 6'x6' J-Bottom Manhole1EA
102.1330" Pipe51LF
102.1448" Pipe53LF
102.1554" Pipe52LF
102.1630" U-Type Endwall w/ Baffles1EA
102.1748" MES with 4:1 Slope1EA
102.1854" MES with 4:1 Slope1EA
102.19Riprap w/Filter Fabric22TN
102.20Sodding6,840SY
102.23Seed & Mulch49,650SY
102.216' Chain Link Fence (Black Vinyl Coating)1,260LF
102.226'X12' Chain Link Double Swing Gate1EA
Bid Alternate - Items 201 Paid For With Other Grant Funds
201.01Mobilization1LS
201.02Maintenance of Traffic1LS
201.03As-Built Survey1LS
201.04Clearing & Grubbing9AC
201.05Erosion Control1LS
201.06Dewatering1LS
201.07Excavation (On Site) (Remove Unsuitable Material)28,650CY
201.08Embankment (On Site)25,390CY
201.09Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road.35,550CY
201.10FDOT Type D Inlet (Pond Control Structure)1EA
201.11FDOT 5' Dia. J-Bottom Manhole2EA
201.1218" Pipe38LF
201.1324" Pipe29LF
201.1430" Pipe33LF
201.1524" U-Type Endwall w/ Baffles1EA
201.1618" MES with 4:1 Slope1EA
201.1730" MES with 4:1 Slope1EA
201.18Riprap w/Filter Fabric22TN
201.19Sodding1,600SY
201.20Seed & Mulch43,600SY
201.216' Chain Link Fence (Black Vinyl Coating)700LF
201.226'X12' Chain Link Double Swing Gate1EA

&G

&"Arial,Regular"&9&K4298B5Opinion of Probable Construction Cost l Rev. 0 l 16 Oct. 2025 l Page &P of &N image1.jpeg