Pricing_Table.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- Chester Byrd Park Improvements
- Solicitation number
- 26-023
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This is a Pricing Table document for the Santa Rosa County Gateway Logistics Center - County Earthwork Package in Milton, Florida. The bid item list is organized into three sections based on funding sources: Items 101 funded by Triumph Grant Funds, Items 102 funded by FDEP Grant Funds, and Items 201 as a Bid Alternate paid for with Other Grant Funds. The project scope includes mobilization, maintenance of traffic, as-built surveys, clearing and grubbing, erosion control, dewatering, excavation of unsuitable material, and embankment work utilizing stockpiled earthwork from Milton Interchange Park located approximately 7 miles from the project site. Additional work under Items 102 and 201 includes installation of FDOT drainage infrastructure such as inlets, manholes, pipes ranging from 18 to 54 inches in diameter, endwalls, and metal end sections, along with riprap, sodding, seeding and mulch work, and 6-foot chain link fencing with vinyl coating. Quantities vary significantly across funding sections, with excavation ranging from 14,820 to 32,960 cubic yards, embankment from 4,490 to 88,350 cubic yards, and embankment truck hauling from 6,290 to 123,690 cubic yards. The pre-bid meeting is scheduled for March 6, 2026 at 10:00 a.m., with questions due by March 13, 2026, and sealed proposals due by 10:00 a.m. on March 30, 2026, at which time bids will be publicly opened.
The pricing table provides detailed bid line items with unit measurements including lump sum (LS), acres (AC), cubic yards (CY), each (EA), linear feet (LF), tons (TN), and square yards (SY) quantities. The document indicates this is an Opinion of Probable Construction Cost, Revision 0, dated October 16, 2025. Contractors must provide pricing for each line item across the three funding categories, allowing Santa Rosa County to evaluate costs for the base project and alternates separately. The segregation of work by funding source enables the county to manage project delivery based on available grant funds from Triumph, FDEP, and other grant sources, with flexibility to execute the base project or include alternate items depending on funding availability and bid competitiveness.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Item List
| Item No. | Item Description | Quantity | Unit |
| Items 101 Paid For With Triumph Grant Funds | |||
| 101.01 | Mobilization | 1 | LS |
| 101.02 | Maintenance of Traffic | 1 | LS |
| 101.03 | As-Built Survey | 1 | LS |
| 101.04 | Clearing & Grubbing | 10.50 | AC |
| 101.05 | Erosion Control | 1 | LS |
| 101.06 | Dewatering | 1 | LS |
| 101.07 | Excavation (On Site) (Remove Unsuitable Material) | 32,960 | CY |
| 101.08 | Embankment (On Site) | 88,350 | CY |
| 101.09 | Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road. | 123,690 | CY |
| Items 102 Paid For With FDEP Grant Funds | |||
| 102.01 | Mobilization | 1 | LS |
| 102.02 | Maintenance of Traffic | 1 | LS |
| 102.03 | As-Built Survey | 1 | LS |
| 102.04 | Clearing & Grubbing | 3 | AC |
| 102.05 | Erosion Control | 1 | LS |
| 102.06 | Dewatering | 1 | LS |
| 102.07 | Excavation (On Site) (Remove Unsuitable Material) | 14,820 | CY |
| 102.08 | Embankment (On Site) | 4,490 | CY |
| 102.09 | Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road. | 6,290 | CY |
| 102.10 | FDOT Type D Inlet (Pond Control Structure) | 1 | EA |
| 102.11 | FDOT 8' Dia. J-Bottom Manhole | 1 | EA |
| 102.12 | FDOT 6'x6' J-Bottom Manhole | 1 | EA |
| 102.13 | 30" Pipe | 51 | LF |
| 102.14 | 48" Pipe | 53 | LF |
| 102.15 | 54" Pipe | 52 | LF |
| 102.16 | 30" U-Type Endwall w/ Baffles | 1 | EA |
| 102.17 | 48" MES with 4:1 Slope | 1 | EA |
| 102.18 | 54" MES with 4:1 Slope | 1 | EA |
| 102.19 | Riprap w/Filter Fabric | 22 | TN |
| 102.20 | Sodding | 6,840 | SY |
| 102.23 | Seed & Mulch | 49,650 | SY |
| 102.21 | 6' Chain Link Fence (Black Vinyl Coating) | 1,260 | LF |
| 102.22 | 6'X12' Chain Link Double Swing Gate | 1 | EA |
| Bid Alternate - Items 201 Paid For With Other Grant Funds | |||
| 201.01 | Mobilization | 1 | LS |
| 201.02 | Maintenance of Traffic | 1 | LS |
| 201.03 | As-Built Survey | 1 | LS |
| 201.04 | Clearing & Grubbing | 9 | AC |
| 201.05 | Erosion Control | 1 | LS |
| 201.06 | Dewatering | 1 | LS |
| 201.07 | Excavation (On Site) (Remove Unsuitable Material) | 28,650 | CY |
| 201.08 | Embankment (On Site) | 25,390 | CY |
| 201.09 | Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road. | 35,550 | CY |
| 201.10 | FDOT Type D Inlet (Pond Control Structure) | 1 | EA |
| 201.11 | FDOT 5' Dia. J-Bottom Manhole | 2 | EA |
| 201.12 | 18" Pipe | 38 | LF |
| 201.13 | 24" Pipe | 29 | LF |
| 201.14 | 30" Pipe | 33 | LF |
| 201.15 | 24" U-Type Endwall w/ Baffles | 1 | EA |
| 201.16 | 18" MES with 4:1 Slope | 1 | EA |
| 201.17 | 30" MES with 4:1 Slope | 1 | EA |
| 201.18 | Riprap w/Filter Fabric | 22 | TN |
| 201.19 | Sodding | 1,600 | SY |
| 201.20 | Seed & Mulch | 43,600 | SY |
| 201.21 | 6' Chain Link Fence (Black Vinyl Coating) | 700 | LF |
| 201.22 | 6'X12' Chain Link Double Swing Gate | 1 | EA |
&G
&"Arial,Regular"&9&K4298B5Opinion of Probable Construction Cost l Rev. 0 l 16 Oct. 2025 l Page &P of &N image1.jpeg