Pricing_Table.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Chester Byrd Park Improvements
Solicitation number
26-023
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This is a Pricing Table document for the Santa Rosa County Gateway Logistics Center - County Earthwork Package in Milton, Florida. The bid item list is organized into three sections based on funding sources: Items 101 funded by Triumph Grant Funds, Items 102 funded by FDEP Grant Funds, and Items 201 as a Bid Alternate paid for with Other Grant Funds. The project scope includes mobilization, maintenance of traffic, as-built surveys, clearing and grubbing, erosion control, dewatering, excavation of unsuitable material, and embankment work utilizing stockpiled earthwork from Milton Interchange Park located approximately 7 miles from the project site. Additional work under Items 102 and 201 includes installation of FDOT drainage infrastructure such as inlets, manholes, pipes ranging from 18 to 54 inches in diameter, endwalls, and metal end sections, along with riprap, sodding, seeding and mulch work, and 6-foot chain link fencing with vinyl coating. Quantities vary significantly across funding sections, with excavation ranging from 14,820 to 32,960 cubic yards, embankment from 4,490 to 88,350 cubic yards, and embankment truck hauling from 6,290 to 123,690 cubic yards. The pre-bid meeting is scheduled for March 6, 2026 at 10:00 a.m., with questions due by March 13, 2026, and sealed proposals due by 10:00 a.m. on March 30, 2026, at which time bids will be publicly opened.

The pricing table provides detailed bid line items with unit measurements including lump sum (LS), acres (AC), cubic yards (CY), each (EA), linear feet (LF), tons (TN), and square yards (SY) quantities. The document indicates this is an Opinion of Probable Construction Cost, Revision 0, dated October 16, 2025. Contractors must provide pricing for each line item across the three funding categories, allowing Santa Rosa County to evaluate costs for the base project and alternates separately. The segregation of work by funding source enables the county to manage project delivery based on available grant funds from Triumph, FDEP, and other grant sources, with flexibility to execute the base project or include alternate items depending on funding availability and bid competitiveness.

View the file

Other files

File Type Posted
Chester_Byrd_Park_Improvements_(Addendum_#6_Revision).pdf PDF
Chester_Byrd_Park_Improvements_(Addendum_#3_Revision).pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
AGREEMENT_-_CHESTER_BYRD_PARK_IMPROVEMENTS.pdf PDF
FDEP_Grant_Agreement_Chester_Byrd_Park_Project_P25011.pdf PDF
Bid_Form_Notes.pdf PDF
CHESTER_BYRD_PARK_IMPROVEMENTS_BID_PLANS.pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package_(Addendum_#2_Revision).pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package_(Addendum_#2_Revision).pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package_(Addendum_#1_Revision).pdf PDF
Gateway_Logistics_Center_-_County_Earthwork_Package.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
26-023_Standard_Construction_Contract_with_Engineer.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
Triumph_Amendment_1_Signed.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
331_-_Fully_Executed_-_SR_Bagdad_Grant_Award_.pdf PDF
331_-_Fully_executed_-_SR_Bagdad_-_Partially_Executed_Second_Amendment_law7.pdf PDF
L0334_Original_Agreement_-_Executed.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Gateway_Logistics_Center_Earthwork_IFB_Plans.pdf PDF
2026-02-12_Project_Manual.pdf PDF
2026-02-12_Project_Manual.pdf PDF
2026-02-12_Project_Manual.pdf PDF
2026-02-12_Project_Manual.pdf PDF
Pricing_Table.xlsx XLSX spreadsheet
Pricing_Table.xlsx XLSX spreadsheet
Pricing_Table.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Item List

Item No.Item DescriptionQuantityUnit
Items 101 Paid For With Triumph Grant Funds
101.01Mobilization1LS
101.02Maintenance of Traffic1LS
101.03As-Built Survey1LS
101.04Clearing & Grubbing10.50AC
101.05Erosion Control1LS
101.06Dewatering1LS
101.07Excavation (On Site) (Remove Unsuitable Material)32,960CY
101.08Embankment (On Site)88,350CY
101.09Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road.123,690CY
Items 102 Paid For With FDEP Grant Funds
102.01Mobilization1LS
102.02Maintenance of Traffic1LS
102.03As-Built Survey1LS
102.04Clearing & Grubbing3AC
102.05Erosion Control1LS
102.06Dewatering1LS
102.07Excavation (On Site) (Remove Unsuitable Material)14,820CY
102.08Embankment (On Site)4,490CY
102.09Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road.6,290CY
102.10FDOT Type D Inlet (Pond Control Structure)1EA
102.11FDOT 8' Dia. J-Bottom Manhole1EA
102.12FDOT 6'x6' J-Bottom Manhole1EA
102.1330" Pipe51LF
102.1448" Pipe53LF
102.1554" Pipe52LF
102.1630" U-Type Endwall w/ Baffles1EA
102.1748" MES with 4:1 Slope1EA
102.1854" MES with 4:1 Slope1EA
102.19Riprap w/Filter Fabric22TN
102.20Sodding6,840SY
102.23Seed & Mulch49,650SY
102.216' Chain Link Fence (Black Vinyl Coating)1,260LF
102.226'X12' Chain Link Double Swing Gate1EA
Bid Alternate - Items 201 Paid For With Other Grant Funds
201.01Mobilization1LS
201.02Maintenance of Traffic1LS
201.03As-Built Survey1LS
201.04Clearing & Grubbing9AC
201.05Erosion Control1LS
201.06Dewatering1LS
201.07Excavation (On Site) (Remove Unsuitable Material)28,650CY
201.08Embankment (On Site)25,390CY
201.09Embankment (Truck) - The item shall include all labor and equipment for the loading and hauling of stockpiled earthwork from the Milton Interchange Park (approximately 7 miles one-way). Milton Interchange Park is located off Hwy 87 S and South of I-10 off of Ray Helms Road.35,550CY
201.10FDOT Type D Inlet (Pond Control Structure)1EA
201.11FDOT 5' Dia. J-Bottom Manhole2EA
201.1218" Pipe38LF
201.1324" Pipe29LF
201.1430" Pipe33LF
201.1524" U-Type Endwall w/ Baffles1EA
201.1618" MES with 4:1 Slope1EA
201.1730" MES with 4:1 Slope1EA
201.18Riprap w/Filter Fabric22TN
201.19Sodding1,600SY
201.20Seed & Mulch43,600SY
201.216' Chain Link Fence (Black Vinyl Coating)700LF
201.226'X12' Chain Link Double Swing Gate1EA

&G

&"Arial,Regular"&9&K4298B5Opinion of Probable Construction Cost l Rev. 0 l 16 Oct. 2025 l Page &P of &N image1.jpeg