This pricing sheet outlines costs for a federal contract opportunity to replace chillers and cooling towers at a federal building in Carbondale, Illinois. The contractor provides a total base price of $XXX,XXX including general conditions, abatement work, concrete, metals work, HVAC equipment, ductwork, electrical work, and fire alarm modifications. Additional costs include overhead at XX% of the subtotal, profit at XX% of the subtotal, and bonding. The total proposed project cost is $XXX,XXX.

The related federal contract opportunity posted on the General Services Administration website seeks to replace existing water-cooled chillers, an associated cooling tower, pumps, piping, controls, and motor control center at the location indicated. Minor site work such as regrading, concrete foundations and slabs are also within the project scope. The solicitation number for the replacement project is 47PF0024R0022.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Sheet

PROJECT TITLE: Chiller & Cooling Tower Replacement RFP# 47PF0024R0022

PROJECT COST

DIVISION COST SUBCONTRACTOR / NOTES

0001 - General Conditions

0002 - Site Work (Asbestos and Lead Abatement)

0003 - Concrete

0004 - Masonry

0005 - Metals

0006 - Wood and Plastics

0007 - Thermal and Moisture Protection

0008 - Doors and Windows

0009 - Finishes

0010 - Specialties

0021 – Fire Suppression

0022 - Plumbing

0023 - HVAC

0023 – HVAC Ductwork

0023 –HVAC Equipment

0026 - Electrical

0028 – Electronic Safety & Security (Fire Alarm System Modifications)

The Contractor having examined the scope of work, plans, specifications and site conditions of the proposed work, hereby proposes to furnish all materials, labor, supplies and supervision to complete the proposed project per contract documents for the total sum stated.

SUB-TOTAL $

O/H % $

Profit % $

Total Base Bid $

BONDING $

Total Project Cost