Pricing Schedule-Attachment 5.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36S79725R0003
About this file
The document is a Pricing Schedule (Attachment C) for the VA National Acquisition Center's solicitation 36S79725R0003 concerning EPS Warehouse HVAC Corrections. The pricing template provides a detailed breakdown of potential costs across multiple construction division categories, including general requirements, existing conditions, concrete, masonry, metals, thermal and moisture protection, electrical, plumbing, and HVAC systems. The spreadsheet allows for line-by-line itemization of material, labor, and equipment costs, with columns for quantity, unit pricing, labor hours, and average rates. The document appears to be dated 4/14/20 and includes provisions for calculating subtotal costs, general liability/insurance, overhead, profit, and bonding, with a final section for determining the total project cost.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE
| ATTACHMENT C - PRICING SCHEDULE | ||
| CONTRACT NUMBER AND TITLE | ||
| EPS HVAC CORRECTIONS | ||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | DATE |
| 4/14/20 |
| DIVISION | UNIT OF MEASURE | MATERIAL COST | LABOR COSTS | EQUIPMENT | |||||||
| COSTS | LINE TOTAL | ||||||||||
| QTY | UNIT | TOTAL | LABOR-HRS PER UNIT | MANHOURS | AVERAGE RATE | TOTAL | |||||
| 01 | General Requirements | ||||||||||
| 02 | Existing Conditions | ||||||||||
| 03 | Concrete | ||||||||||
| 04 | Masonry | ||||||||||
| 05 | Metals | ||||||||||
| 06 | Wood, Plastics, and Composites | ||||||||||
| 07 | Thermal & Moisture Protection | ||||||||||
| 08 | Openings- Doors and Windows | ||||||||||
| 09 | Finishes | ||||||||||
| 10 | Specialties | ||||||||||
| 11 | Equipment | ||||||||||
| 12 | Furnishings | ||||||||||
| 13 | Special Construction | ||||||||||
| 14 | Conveying Equipment | ||||||||||
| 21 | Fire Suppression | ||||||||||
| 22 | plumbing | ||||||||||
| 23 | Heating, Ventilation, and Air Conditioning | ||||||||||
| 25 | Integrated Automation | ||||||||||
| 26 | Electrical | ||||||||||
| 27 | Communications | ||||||||||
| 28 | Electronic Safety and Security | ||||||||||
| 31 | Earthwork | ||||||||||
| 32 | Exterior Improvements | ||||||||||
| 33 | Utilities |
| SUBTOTAL COST: | |
| GENERAL LIABILITY / INSURANCE: | |
| OVERHEAD: | |
| PROFIT: | |
| BOND: | |
| PROJECT TOTAL COST: |
Front &P of &N
File details come from the government source that posted it. Updated .