Pricing Schedule-Attachment 5.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1AZ--765-23-101 EPS Warehouse HVAC Corrections (VA-25-00091960)
Solicitation number
36S79725R0003
Issued by

About this file

The document is a Pricing Schedule (Attachment C) for the VA National Acquisition Center's solicitation 36S79725R0003 concerning EPS Warehouse HVAC Corrections. The pricing template provides a detailed breakdown of potential costs across multiple construction division categories, including general requirements, existing conditions, concrete, masonry, metals, thermal and moisture protection, electrical, plumbing, and HVAC systems. The spreadsheet allows for line-by-line itemization of material, labor, and equipment costs, with columns for quantity, unit pricing, labor hours, and average rates. The document appears to be dated 4/14/20 and includes provisions for calculating subtotal costs, general liability/insurance, overhead, profit, and bonding, with a final section for determining the total project cost.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SCHEDULE

ATTACHMENT C - PRICING SCHEDULE
CONTRACT NUMBER AND TITLE
EPS HVAC CORRECTIONS
PURCHASE REQUEST NUMBERPROJECT NUMBERDATE
4/14/20
DIVISIONUNIT OF MEASUREMATERIAL COSTLABOR COSTSEQUIPMENT
COSTSLINE TOTAL
QTYUNITTOTALLABOR-HRS PER UNITMANHOURSAVERAGE RATETOTAL
01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics, and Composites
07Thermal & Moisture Protection
08Openings- Doors and Windows
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22plumbing
23Heating, Ventilation, and Air Conditioning
25Integrated Automation
26Electrical
27Communications
28Electronic Safety and Security
31Earthwork
32Exterior Improvements
33Utilities
SUBTOTAL COST:
GENERAL LIABILITY / INSURANCE:
OVERHEAD:
PROFIT:
BOND:
PROJECT TOTAL COST:

Front &P of &N

File details come from the government source that posted it. Updated .