This document is a Questions & Answers file for Project 765-23-101 EPS Warehouse HVAC Corrections at a VA facility. The project involves HVAC corrections, including the removal of 5 existing Roof Top Units (RTUs) and their replacement, with specific requirements for scheduling, security, and site logistics. Key details include a concrete roof deck, secured parking/landing zone for helicopter RTU replacement (scheduled for weekends), and specific vendor requirements for building automation and fire alarm systems. The facility requires VA Personal Identity Verification (PIV) badges for network access, with temporary badges provided for contractor leadership. Concrete specifications are detailed, including a 4000 PSI compressive strength for interior slab on grade, and the project involves multiple construction phases with varying Infection Control Risk Assessment (ICRA) levels from Class II to Class IV. Interior and exterior storage/laydown areas will be made available, and the existing RTUs will be disposed of by the VA.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
PROJECT: 765-23-101 EPS Warehouse HVAC Corrections
1.Can you confirm that the roof decking is concrete?
Answer: Yes.
2. Will there be secured parking/Landing zone for RTU replacement when helicopter is used?
Answer: Yes, parking lot space will be made available. However, the staging and helicopter use must be scheduled for weekend hours to provide a safe area and not disrupt building operations. In addition, a lift plan must be submitted in accordance with specification 01 35 26.
3. Is there a current low voltage/fire protection vendor for this facility that we are required to utilize?
Answer: For the building automation system, Building Automation Solutions is the current contractor providing maintenance with access to the system for integration. For fire alarm, the contractor must be certified to program on the existing Notifier Model NFS2-3030 main fire alarm control panel.
4.Regarding Division 3, there is concrete to be removed from the work area on the plans, but the spec section is not used to indicate a mix design or rebar/tie-in schedule. Can you provide this information?
Answer: See below.
https://bas-ddc.com/
5. Can you provide badging requirements?
Answer: VA Personal Identity Verification (PIV) badges are only required for contractors accessing the VA network. Temporary badges with door access will be provided to the contractor superintendent and leadership for escorting contractor staff. The facility is not open to the public and utilizes VA Police, access control, and video surveillance for security.
6. Storage/Laydown area for tools, materials, equipment?
Answer: Exterior space will be made available for dumpster(s). Interior space will be made available for storage and laydown.
7. Regarding the· existing 5 RTU's being removed, are these being kept by the VA for other areas/uses or are these to be disposed of?
Answer: VA does not want to keep the RTUs.
8. What is the level/class of ICRA needed for this project?
Answer: Refer to 01 00 00 General Requirements ICRA Assessment Form for description of level of Infection Control required. Per the scope of this project, the required level varies depending on the construction phase. Phase 1A, 2, and 3 are considered a Level/Class III or IV while Phase 4 is a Level/Class II.
9. Regarding the wall protection is this going to be on both sides of the walls indicated?
Answer: On the 1B wall, install wall protection on both sides. On the 1A wall, only install wall protection on the C1110 EPS Swing Space side that is open and not blocked by the C1097 Refrigeration Unit.