TRANS #1
CONTRACTOR'S SUBMITTAL TRANSMITTAL CONTRACT NO. TRANSMITTAL NO. DATE
FROM CONTRACTOR PROJECT TITLE & LOCATION
TO
| CONTRACTOR USE ONLY | | | | REVIEWER USE ONLY | |
| List only one specification division per form. | | | | ** ACTION CODES | |
| | | | A - Approved | |
| List only one of the following categories on each transmittal form, | | | | D - Disapproved | |
| and indicate which is being submitted | | | | AN - Approved as noted | |
| Contractor Approval | | OICC Approval Deviation / Sub | | RA - Receipt acknowledged | |
| | For OICC Approval | | C - Comments | |
| | | | R - Resubmit | |
| ITEM NO. | PROJ. SPEC. SECT. | ITEM IDENTIFICATION | NO. OF COPIES | ACTION CODES | REVIEWER'S |
| & PARA. AND/OR | (TYPE, SIZE, MODEL NO., MFG. NAME, DWG. OR | | ** | INITIALS |
| PROJ. DWG. NO. | BROCHURE NUMBER) | | | CODE & DATE |
CONTRACTOR'S COMMENTS :
COPY OF TRANSMITTAL AND SUBMITTALS TO ROICC CONTRACTOR REPRESENTATIVE (Signature)
DATE RECEIVED BY REVIEWER FROM (REVIEWER) TO
| Submittals are returned with action indicated. Approval of an item does not include approval of any deviation from the contract |
| requirements unless the contractor calls attention to and supports the deviation. |
| Submittals are forwarded to LANTDIV with A & E recommendations indicated in REVIEWER USE ONLY Section and in |
| comments below on ONE COPY of the transmittal form. |
| REVIEWER'S COMMENTS | |
COPIES TO: DATE SIGNATURE
Register
| SUBMITTAL REGISTER | | | | | | | | | | | | | CONTRACT NO. | | | | | |
| TITLE AND LOCATION | | | | | | | CONTRACTOR | | | | | | | | | | | |
| EPS WAREHOUSE HVAC CORRECTIONS, GREAT LAKES CMOP HINES IL | | | | | | | | | | | | | | | | | | |
| ACTIVITY NO | TRANSMITTAL NO | | | | | CLASSIFICATION GOVT OR A/E REVWR | CONTRACTOR : SCHEDULE DATES | | | CONTRACTOR ACTION | | | APPROVING AUTHORITY | | | | | |
| | SPEC SECT | REVISION DATE | DESCRIPTION ITEM SUBMITTED | PARAGRAPH # | | SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | ACTION CODE | DATE OF ACTION | MAILED TO CONTR/ DATE RCD FRM APPR AUTH | REMARKS |
| (a) | (b) | (c) | | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| | | | OSHA 30 & OSHA 10 | | | | | | | | | | | | | | |
| | | | Suptintendent Appointment Letter | | | | | | | | | | | | | | |
| | | | List of Subcontractors | | | | | | | | | | | | | | |
| | | | Schedule of Values | | | | | | | | | | | | | | |
| | | | Construction Schedule | | | | | | | | | | | | | | |
| 010000 | 11-21 | GENERAL REQUIREMENTS | |
| 010000 | 11-21 | electronic security memorandum | 1.3.E |
| 010000 | 11-21 | Vehicle authorization request | 1.5.F |
| 010000 | 11-21 | Phasing/Work Plan/Scheduling Plan | 1.6.I |
| 010000 | 11-21 | Utility Services Plan | 1.6.M.2 |
| 010000 | 11-21 | PreWork Survey | 1.7.A |
| 010000 | 11-21 | ReSurvey (30 days prior to turn over) | 1.7.C |
| 010000 | 11-21 | Civil Engineer's certifcation of work | 1.13.B |
| 010000 | 11-21 | As-Built Drawings | 1.19 |
| 010000 | 11-21 | Warranty Management Plan | 1.13 |
| 010000 | 11-21 | Tests | 1.24 |
| 010000 | 11-21 | Maintenance/Operating Manuals | 1.25 |
| 013323 | 11-23 | SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES | |
| 013323 | 11-23 | Submittal Register monthly updates | 1.3.E |
| 013323 | 11-23 | Transmittal Form | 1.5.E |
| 013526 | 05-24 | SAFETY REQUIREMENTS | |
| 013526 | 05-24 | Preconstruction Submittals | 1.3.B |
| 013526 | 05-24 | Reports | 1.3.C |
| 013526 | 05-24 | Work Plans | 1.3.D |
| 0132526 | 05-24 | Certificates | 1.3.E |
| 013526 | 05-24 | Interpretation of Standards | 1.4 |
| 013526 | 05-24 | APP (Accident Prevention Plan) | 1.5 |
| 013526 | 05-24 | AHAS (Activity Hazard Analysis) | 1.6 |
| 013526 | 05-24 | Training Records | 1.10.F |
| 013526 | 05-24 | Weekly Safety Inspections | 1.11 |
| 013526 | 05-24 | Accident Notification | 1.12 |
| 013526 | 05-24 | Infection Control AHA | 1.14.B |
| 013526 | 05-24 | Dust control program | 1.15 |
| 013526 | 05-24 | Tuberculosis Screening | 1.16 |
| 013526 | 05-24 | Fire Safety Plan | 1.17.A |
| 013526 | 05-24 | Egress Route Inspections | 1.17.G |
| 013526 | 05-24 | Hot Work Permits | 1.17.N |
| 013526 | 05-24 | Lift permit | 1.22 |
| 013526 | 05-24 | Confined Space Entry Plan | 1.24 |
| 014500 | 02-21 | QUALITY CONTROL | |
| 014500 | 02-21 | Preconstruction Submittals | 1.3.1 |
| 014500 | 02-21 | Design Data | 1.3.2 |
| 014500 | 02-21 | Test Reports | 1.3.3 |
| 014500 | 02-21 | CQC Plan after receipt of NTP | 3.2.A |
| 014500 | 02-21 | DQC Plan | 3.2.C.1 |
| 014500 | 02-21 | design schedule | 3.2.C.2 |
| 014500 | 02-21 | CQC Plan after Preconstruction Post-award Conference | 3.3.A |
| 014500 | 02-21 | QC meeting minutes | 3.3.B |
| 014500 | 02-21 | Testing Procedure Data | 3.7.A |
| 014500 | 02-21 | Punch-Out Inspection | 3.8.A |
| 014500 | 02-21 | Design quality control activities | 3.9.A.10 |
| 014500 | 02-21 | Weekly Verification Statement | 3.9.B |
| 051200 | 11-18 | STRUCTURAL STEEL FRAMING | |
| 051200 | 11-18 | Shop Drawings | 1.4C |
| 072113 | 01-21 | THERMAL INSULATION | |
| 072113 | 01-21 | Submittal Drawings | 1.4.B |
| 072113 | 01-21 | Manufacturer's Literature and Data | 1.4.C |
| 079200 | 10-17 | JOINT SEALANTS | |
| 079200 | 10-17 | Certification | 1.4.A |
| 079200 | 10-17 | Installer Qualifications | 1.5.B |
| 079200 | 10-17 | Contractor Certification | 1.5.C |
| 079200 | 10-17 | Manufacturer's Installation Instructions for each product | 1.5.D |
| 079200 | 10-17 | Samples | 1.5.E |
| 079200 | 10-17 | Manufacturer's Literature and Data | 1.5.F |
| 083300 | 01-21 | COILING DOORS AND GRILLES | |
| 083300 | 01-21 | Submittal Drawings | 1.3.B |
| 083300 | 01-21 | Installer Qualifications | 1.3.D |
| 083300 | 01-21 | Certificates | 1.3.E |
| 083300 | 01-21 | Operation and Maintenance Data | 1.3.F |
| 092216 | 06-18 | NON-STRUCTURAL METAL FRAMING | |
| 092216 | 06-18 | Manufacturer's Literature and Data | 1.4.B |
| 092216 | 06-18 | Shop Drawings | 1.4.C |
| 092216 | 06-18 | Test results - Fire Rating | 1.4.D |
| 092900 | 04-20 | GYPSUM BOARD | |
| 092900 | 04-20 | Manufacturer's Literature and Data | 1.4.B |
| 092900 | 04-20 | Shop Drawings | 1.4.C |
| 092900 | 04-20 | Samples | 1.4.D |
| 092900 | 04-20 | Test Results - fire/sound | 1.4.E |
| 092900 | 04-20 | Certificates | 1.4.F |
| 221400 | 09-15 | Facility Storm Drainage | |
| 221400 | 09-15 | Shop Drawings | 1.4C |
| 230512 | 03-23 | General Motor Requirements for HVAC and Steam Generation Equipment | |
| 230512 | 03-23 | Shop Drawings | 1.4D |
| 230593 | 03-23 | Testing, Adjusting and Balancing for HVAC | |
| 230593 | 03-23 | Qualifications and Sample Report | 1.4C |
| 230593 | 03-23 | Test and Balance Report | 1.4E |
| 230800 | 03-23 | Commissioning of HVAC Systems | |
| 230800 | 03-23 | Pre-Funtional Checklist | 3.2 |
| 230800 | 03-23 | Contractor Tests | 3.3 |
| 230923 | 03-23 | Direct Digital Control System for HVAC | |
| 230923 | 03-23 | Shop Drawings | 1.7A |
| 230923 | 03-23 | Product Data | 1.7C |
| 232213 | 03-23 | Steam and Condesate Heating Piping | |
| 232213 | 03-23 | Shop Drawings | 1.4D |
| 233100 | 03-23 | HVAC Ducts and Casings | |
| 233100 | 03-23 | Shop Drawings | 1.4C |
| 233700 | 03-23 | Air Inlets and Outlets | |
| 233700 | 03-23 | Shop Drawings | 1.4C |
| 237413 | 03-23 | Packaged, Outdoor, Central Station Air Handling Units | |
| 237413 | 03-23 | Shop Drawings | 1.4C |
| 260519 | 11-22 | Low Voltage Electrical Power | |
| 260519 | 11-22 | Shop Drawings | 1.4C |
| 260526 | 11-22 | Grounding and Bonding for Electrical Systems | |
| 260526 | 11-22 | Shop Drawings | 1.4C |
| 260533 | 11-22 | Raceway and Boxes for Electrical Systems | |
| 260533 | 11-22 | Shop Drawings | 1.4C |
| 262921 | 11-22 | Enclosed Switches and Circuit Breakers | |
| 262921 | 11-22 | Shop Drawings | 1.4C |
| 283100 | 10-11 | Fire Detection and Alarm | |
| 283100 | 10-11 | Shop Drawings | 1.4C |