Pricing_Schedule (4).xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Transition Power Supply Installation IDIQ with the Radar Operations Center
Solicitation number
1305M226Q0038
Issued by

About this file

This is a Pricing Schedule for a federal Indefinite Delivery Indefinite Quantity (IDIQ) contract opportunity. The solicitation (1305M226Q0038) is issued by the Department of Commerce National Oceanic and Atmospheric Administration (NOAA) for a 5-year Transition Power Supply (TPS) Installation program with the Radar Operations Center. The contract is structured as a single ordering period with a firm-fixed price (FFP) basis and requires offerors to provide unit pricing for each of five annual performance periods estimated from September 18, 2026 through September 17, 2031.

The pricing schedule identifies three line items requiring unit price quotations: (1) Eaton 93PM UPS with maintenance bypass module (MBM) and Battery cabinet with batteries installed at specified sites; (2) Eaton 93PM UPS with MBM sidecar and Battery cabinet with batteries installed at designated sites, with installation travel costs included in per-unit pricing; and (3) Eaton 93PM UPS with sidecar/MBM and Battery cabinet without batteries, shipped to the National Logistics Support Center without installation. Offerors must complete the pricing schedule in the provided format and may include quantity discounts with corresponding warranty information. The submission must include all required technical compliance documentation, installation plans, past performance data, and pricing information per Section L of the solicitation instructions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TPS Pricing Schedule

PRICING SCHEDULE - The offeror shall complete and return the pricing schedule below, or otherwise provide all the pricing elements in the format provided with their quote. Dates are estimates based on the date of this soliciation and are subject to change. The final dates for each ordering period will be included in the award contract.
Period of Performance - 1 Ordering Period for a Total of 5 Years (No Option years).
ROC TPS Installation
RFQ 1305M226Q0038 Firm-Fixed Price (FFP)
CLIN #Item DescriptionQuantityUnit Price for Year 1 EST: 9/18/26 - 9/17/27Unit Price for Year 2 EST: 9/18/27 - 9/17/28Unit Price for Year 3 EST: 9/18/28 - 9/17/29Unit Price for Year 4 EST: 9/18/29 - 9/17/30Unit Price for Year 5 EST: 9/18/30 - 9/17/31
1Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed1$0.00$0.00$0.00$0.00$0.00
2Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed1$0.00$0.00$0.00$0.00$0.00
3Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center1$0.00$0.00$0.00$0.00$0.00
TOTAL

Please provide any quantity discounts and corresponding warranty info.