PRICING_PROPOSAL-23-1128(reference_only).pdf

PDF 194 KB Posted

Attached to
STAR Center Chiller 2 Replacement
Solicitation number
23-1128-ITB-C
Issued by
Pinellas County, Florida

About this file

This document is a Pricing Proposal for Invitation to Bid - Construction (ITB-C) #23-1128-ITB-C for the STAR Center Chiller 2 Replacement project in Florida. The project involves a turn-key installation of one new water-cooled chiller for the Central Energy plant, including all associated equipment such as pumps, piping, isolation valves, and supports. The proposal includes a 10-year warranty covering parts, refrigerant, and labor, along with 10 years of preventative maintenance service. The scope also includes new Trane direct digital controls to integrate with existing systems.

The pricing proposal is structured in two tables, with Line Item 1 covering the complete chiller replacement at a lump sum of $0.00, Line Item 2 for new digital controls at $0.00, an estimated building permit at $1,000.00, and a contingency of $50,000.00. Table 2 includes an unspecified hourly labor rate for unforeseen conditions. The project aims to replace a failed chiller that is beyond its operational life, with the goal of maintaining critical air conditioning services for the STAR Center and its tenants, ensuring reliable utility services and operational continuity.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid - Construction (ITB-C) #23-1128-ITB-C Title: STAR Center Chiller 2 Replacement

9. PRICING PROPOSAL

TABLE 1

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Provide all equipment, materials, labor, and permitting to complete the turn-key addition of one (1) new water cooled chiller and all associated pump, piping, isolation valves, supports, etc. along with year 10 warranty including parts, refrigerant, & Labor. Provide 10 year preventative maintenance service. List Direct

Digital Controls cost below which will be included in the total bid.

1 Lump sum $0.00

2 Provide new Trane direct digital controls to tie into the existing Trane controls.

1 Lump sum $0.00

3 Estimated Building Permit 1 Lump sum $1,000.00

4 Contingency 1 Lump Sum $50,000.00

TOTAL

TABLE 2

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Unspecified Hourly Labor Rate for unforseen conditions 1 $/hr

TOTAL

File details come from the government source that posted it. Updated .