Pricing_Cost_Form_Lenel.pdf

PDF 257 KB Posted

Attached to
LENEL ACCESS CONTROL MODERNIZATION AND INFASTRUCTURE UPGRADE SERVICES State and local contract opportunity
Solicitation number
25-S-026
Issued by
District of Columbia

About this file

This is a Pricing/Cost Form for a firm-fixed-price Request for Proposal issued by Events DC (Washington Convention and Sports Authority) for Lenel Access Control Modernization and Infrastructure Upgrade Services at the Walter E. Washington Convention Center. The project encompasses six implementation phases: Phase 1 (Server and Network Infrastructure), Phase 2 (System Migration), Phase 3 (South Building Implementation), Phase 4 (Middle Building Implementation), Phase 5 (North Building Implementation), and Phase 6 (Project Closeout). The solicitation requires qualified contractors to provide complete replacement, upgrade, and modernization of the existing Lenel OnGuard Access Control System throughout the 2.3 million square foot facility, including migration from legacy 7.x components to Lenel OnGuard 8.3 or newer, deployment of intelligent controllers, network infrastructure, HID iClass SEOS credentialing systems, and CAD-based documentation. The pre-proposal conference and mandatory site visit occurred on February 9, 2026, at 12:00 PM EST, with written questions due February 12, 2026, at 5:00 PM EST, and proposals due February 26, 2026, at 5:00 PM EST. The base contract term extends from award through September 30, 2028, with four one-year renewal options available at Events DC's discretion.

The pricing structure requires bidders to submit firm fixed prices for each of the six project phases and fully loaded, fixed hourly rates for all personnel (Project Manager and Lead Technician) for the base year and all option years, with other direct costs submitted separately if applicable. All prices must exclude federal excise tax, transportation tax, and District of Columbia sales and use taxes, and must be as low as or lower than those charged to the contractor's most favored customer for comparable quantities, terms, and conditions. Quotes are valid for 90 calendar days from submission date. This procurement includes a 35 percent set-aside for Certified Business Enterprises (CBEs), restricting competition to qualified CBE firms. Contractors must possess Lenel OnGuard Value-Added Reseller certification with a minimum of ten years of enterprise-level experience and at least six years with Lenel OnGuard 7.x or higher. For contracts exceeding $300,000, First Source Employment requirements mandate that 51 percent of hired personnel be District of Columbia residents, and subcontracting plans must award at least 35 percent of annual contract value to small businesses or CBEs. The project requires compliance with D.C. prevailing wage determinations and comprehensive insurance coverage including $1 million general liability, $5 million umbrella liability, and $1 million cyber liability.

View the file

Other files for this state and local contract opportunity

Other files attached to LENEL ACCESS CONTROL MODERNIZATION AND INFASTRUCTURE UPGRADE SERVICES, newest first.
File Type Posted
Addenda_2_Lenel_Access_RFP.pdf PDF
Addenda_1_Lenel_Access_RFP.pdf PDF
Addenda_1_Lenel_Access_RFP.pdf PDF
RFP_Lenel_System_Final.pdf PDF
Pricing_Cost_Form_Lenel.pdf PDF
RFP_Lenel_System_Final.pdf PDF
Pricing_Cost_Form_Lenel.pdf PDF
RFP_Lenel_System_Final.pdf PDF
REPRESENTATIONS_AND_CERTIFICATIONS~2.pdf PDF
SBE_Subcontracting_Plan.pdf PDF
2020_ACH_FORM.pdf PDF
FIRST_SOURCE_EMPLOYMENT_AGREEMENT_-_Non-Construction_-_Final_02222016_0_(1).pdf PDF
OCPS_Disclosure_Statement_2025.pdf PDF
W9_Form_2.pdf PDF
2020_ACH_FORM.pdf PDF
Events_DC_SCTs_March_2025_FINAL_(no_construction_terms)_(1).pdf PDF
W9_Form_2.pdf PDF
Events_DC_SCTs_March_2025_FINAL_(no_construction_terms)_(1).pdf PDF
Final_Tax_Certification_Affidavit-NEW.pdf PDF
REPRESENTATIONS_AND_CERTIFICATIONS~2.pdf PDF
Rules_of_the_Jobsite_for_Contractors_Updated_October_2014_(1).pdf PDF
2020_ACH_FORM.pdf PDF
FIRST_SOURCE_EMPLOYMENT_AGREEMENT_-_Non-Construction_-_Final_02222016_0_(1).pdf PDF
OCPS_Disclosure_Statement_2025.pdf PDF
W9_Form_2.pdf PDF
Events_DC_SCTs_March_2025_FINAL_(no_construction_terms)_(1).pdf PDF
Rules_of_the_Jobsite_for_Contractors_Updated_October_2014_(1).pdf PDF
SBE_Subcontracting_Plan.pdf PDF
Final_Tax_Certification_Affidavit-NEW.pdf PDF
Rules_of_the_Jobsite_for_Contractors_Updated_October_2014_(1).pdf PDF
Final_Tax_Certification_Affidavit-NEW.pdf PDF
REPRESENTATIONS_AND_CERTIFICATIONS~2.pdf PDF
FIRST_SOURCE_EMPLOYMENT_AGREEMENT_-_Non-Construction_-_Final_02222016_0_(1).pdf PDF
OCPS_Disclosure_Statement_2025.pdf PDF
SBE_Subcontracting_Plan.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 PRICING/COST FORM RFP #25-X-XX

LENEL ACCESS CONTROL MODERNIZATION AND INFRASTRUCTURE UPGRADE SERVICES

Firm Fixed Prices

Please provide Firm Fixed Prices for each Phase of the Work outlined in Section C.1.2 through C.1.7.

FIRM FIXED PRICE BASE YEAR

PHASE 1 - SERVER AND NETWORK INFRASTRUCTURE $

PHASE 2 - SYSTEM MIGRATION $

PHASE 3 - SOUTH BUILDING IMPLEMENTATION $

PHASE 4 - MIDDLE BUILDING IMPLEMENTATION $

PHASE 5 - NORTH BUILDING IMPLEMENTATION $

PHASE 6 - PROJECT CLOSEOUT $

Fully Loaded, Fixed Hourly Rate

Please provide Fully Loaded, Fixed Hourly Rates for all personnel required to provide the Work outlined in Section C.1.1 through C.1.7 for the Base Year and all Option Years.

FIRM FIXED PRICE BASE

YEAR

BASE

YEAR 2

BASE

YEAR 3

OPTION

YEAR 1

OPTION

YEAR 2

OPTION

YEAR 3

OPTION

YEAR 4

Project Manager $ $ $ $ $ $ $

Lead Technician $ $ $ $ $ $ $

Other Direct Costs

On a separate sheet, if applicable, submit a list of, and total price for, anticipated ODC and proposed costs which may be paid on a cost-reimbursement basis.

(a) Events DC is exempt from Federal Excise Tax, Transportation Tax, and District of Columbia Sales and Use Taxes. All prices shall exclude all taxes.

(b) The prices offered shall be as low as or lower than those charged to the Contractor’s most favored customer for comparable quantities, terms and conditions.

By checking this box, I confirm that I have received Events DC’s Standard Contract Provisions (Attachment 9).

Signed by: Date: Title: Company:

Quotes are valid for a period of ninety (90) calendar days from date of quote.