Price Schedule - Proj 626-18-202.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Y1DZ--Project# 626-18-202 - Upgrade Surgical Suite Air Handling Units
Solicitation number
36C24920R0049
Issued by

About this file

This price schedule template is for the federal contract opportunity Solicitation Number 36C24920R0049 to upgrade surgical suite air handling units at the Nashville VA Medical Center. The contractor must provide a detailed price breakdown by division and specification for all labor, materials, equipment, taxes, overhead, profit, bonds and permits required. The base work includes demolition, new construction, mechanical, electrical and medical equipment installation. An alternate deduct removes operating room scope. The period of performance for the base work and alternate is 365 calendar days from notice to proceed. The solicitation is for the Department of Veterans Affairs VISN 9 for Project 626-18-202 to replace air handling units at the Nashville VA campus to improve surgical suites.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
01 00 00General Requirements$0.00$0.00$0.00$0.00
01 32 16.15Project Schedules (Small Projects – Design/Bid/Build)$0.00$0.00$0.00$0.00
01 33 23Shop Drawings, Product Data, and Samples$0.00$0.00$0.00$0.00
01 33 23.01Electronic Submittal Procedures$0.00$0.00$0.00$0.00
01 35 26Safety Requirements$0.00$0.00$0.00$0.00
01 42 19Reference Standards$0.00$0.00$0.00$0.00
01 45 00Quality Control$0.00$0.00$0.00$0.00
01 45 35Special Inspections$0.00$0.00$0.00$0.00
01 57 19Temporary Environmental Controls$0.00$0.00$0.00$0.00
01 58 16Temporary Interior Signage$0.00$0.00$0.00$0.00
01 74 19Construction Waste Management$0.00$0.00$0.00$0.00
01 81 13Sustainable Construction Requirements$0.00$0.00$0.00$0.00
01 91 00General Commissioning Requirements$0.00$0.00$0.00$0.00
DIVISION 2EXISTING CONDITIONS$0.00
02 41 00Demolition$0.00
02 82 11Traditional Asbestos Abatement$0.00
02 82 13.19Asbestos Floor Tile and Mastic Abatement$0.00
02 83 33.13Lead Shielding Abatement$0.00
DIVISION 3CONCRETE$0.00
03 30 53Cast-in-Place Concrete$0.00$0.00$ - 0$0.00
DIVISION 4MASONRY$0.00
04 01 00Maintenance of Masonry
04 20 00Unit Masonry
DIVISION 5METALS$0.00
05 31 00Steel Decking$0.00$0.00$0.00$0.00
05 40 00Cold-Formed Metal Framing$0.00$0.00$0.00$0.00
05 50 00Metal Fabrications$0.00$0.00$0.00$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 10 00Rough Carpentry$0.00$0.000.00$0.00
$0.00$0.000.00$0.00
DIVISION 07THERMAL AND MOISTURE PROTECTION$0.00
07 21 13Thermal Insulation$0.00$0.00$0.00$0.00
07 22 00Roof and Deck Insulation$0.00$0.00$0.00$0.00
07 27 27Fluid-Applied Membrane Air Barrier, Vapor Retarding$0.00$0.00$0.00$0.00
07 42 13.23Metal Composite Material Wall Panel$0.00$0.00$0.00$0.00
07 52 23Ethylene-Propylene-Diene-Monomer Roofing$0.00$0.00$0.00$0.00
07 71 00Roof Specialties$0.00$0.00$0.00$0.00
07 84 00Firestopping$0.00$0.00$0.00$0.00
07 92 00Joint Sealants$0.00$0.00$0.00$0.00
Division 8OPENINGS$0.00
08 90 00Louvers and Vents$0.00$0.00$0.00$0.00
DIVISION 9FINISHERS$0.00
09 22 16Non-Structural Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 13SPECIAL CONSTRUCTION$0.00
13 05 41Seismic Restraint Requirements for Non-Structural$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12Noise and Vibration Control for HVAC Piping and Equipment$0.00$0.00$0.00$0.00
23 05 41General Motor Requirements for HVAC Equipment$0.00$0.00$0.00$0.00
23 05 93Testing, Adjusting, and Balancing for HVAC$0.00$0.00$0.00$0.00
23 07 11HVAC Insulation$0.00$0.00$0.00$0.00
23 08 00Commissioning of HVAC Systems$0.00$0.00$0.00$0.00
23 09 23Direct-Digital Control System for HVAC$0.00$0.00$0.00$0.00
23 21 13Hydronic Piping$0.00$0.00$0.00$0.00
23 22 13Steam and Condensate Heating Piping$0.00$0.00$0.00$0.00
23 31 00HVAC Ducts and Casings$0.00$0.00$0.00$0.00
23 34 00HVAC Fans$0.00$0.00$0.00$0.00
23 36 00Air Terminal Units$0.00$0.00$0.00$0.00
23 37 00Air Outlets and Inlets$0.00$0.00$0.00$0.00
23 40 00HVAC Air Cleaning Devices$0.00$0.00$0.00$0.00
23 73 00Indoor Central-Station Air-Handling Units$0.00$0.00$0.00$0.00
23 82 16Air Coils$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 01 00Basic Electrical Requirements$0.00$0.00$0.00$0.00
26 02 00Quality Requirements$0.00$0.00$0.00$0.00
26 05 00Common Work Results for Electrical$0.00$0.00$0.00$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceway and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 05 73Overcurrent Protective Device Coordination Study$0.00$0.00$0.00$0.00
26 08 00Commissioning of Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 11Motor Controllers$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
26 36 23Automatic Transfer Switches$0.00$0.00$0.00$0.00
26 43 13Surge Protective Devices$0.00$0.00$0.00$0.00
26 55 71Medical and Surgical Lighting Fixtures$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
This project will prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the upgrade of surgical suite air handling units. The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation, and expert supervision necessary for Project 626-18-202, Upgrade Surgical Suite AHUs at the TVHS, VAMC, 1310 24th Avenue South, Nashville, TN 37212 in accordance to the state of work, project specifications, and drawings. Work includes construction, demolition, reconstruction of the interior walls within the project boundaries. The project will include new construction, including, but is not limited to: general construction, structural, mechanical, plumbing, electrical, fire alarm, low voltage controls, programming, infection control measures, and necessary removal of existing structures and construction and certain other items.

The Period of Performance (POP) for the work in the base offer 365 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"FY19 PLUS-UP PROJECT 626-18-202 &"-,Bold"UPGRADE SURGICAL SUITES AIR HANDLING UNITS &"-,Bold"NASHVILLE CAMP VA MEDICAL CENTER

Alternate Deduct 1

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
01 00 00General Requirements$0.00$0.00$0.00$0.00
01 32 16.15Project Schedules (Small Projects – Design/Bid/Build)$0.00$0.00$0.00$0.00
01 33 23Shop Drawings, Product Data, and Samples$0.00$0.00$0.00$0.00
01 33 23.01Electronic Submittal Procedures$0.00$0.00$0.00$0.00
01 35 26Safety Requirements$0.00$0.00$0.00$0.00
01 42 19Reference Standards$0.00$0.00$0.00$0.00
01 45 00Quality Control$0.00$0.00$0.00$0.00
01 45 35Special Inspections$0.00$0.00$0.00$0.00
01 57 19Temporary Environmental Controls$0.00$0.00$0.00$0.00
01 58 16Temporary Interior Signage$0.00$0.00$0.00$0.00
01 74 19Construction Waste Management$0.00$0.00$0.00$0.00
01 81 13Sustainable Construction Requirements$0.00$0.00$0.00$0.00
01 91 00General Commissioning Requirements$0.00$0.00$0.00$0.00
DIVISION 2EXISTING CONDITIONS$0.00
02 41 00Demolition$0.00
02 82 11Traditional Asbestos Abatement$0.00
02 82 13.19Asbestos Floor Tile and Mastic Abatement$0.00
02 83 33.13Lead Shielding Abatement$0.00
DIVISION 3CONCRETE$0.00
03 30 53Cast-in-Place Concrete$0.00$0.00$ - 0$0.00
DIVISION 4MASONRY$0.00
04 01 00Maintenance of Masonry
04 20 00Unit Masonry
DIVISION 5METALS$0.00
05 31 00Steel Decking$0.00$0.00$0.00$0.00
05 40 00Cold-Formed Metal Framing$0.00$0.00$0.00$0.00
05 50 00Metal Fabrications$0.00$0.00$0.00$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 10 00Rough Carpentry$0.00$0.000.00$0.00
$0.00$0.000.00$0.00
DIVISION 07THERMAL AND MOISTURE PROTECTION$0.00
07 21 13Thermal Insulation$0.00$0.00$0.00$0.00
07 22 00Roof and Deck Insulation$0.00$0.00$0.00$0.00
07 27 27Fluid-Applied Membrane Air Barrier, Vapor Retarding$0.00$0.00$0.00$0.00
07 42 13.23Metal Composite Material Wall Panel$0.00$0.00$0.00$0.00
07 52 23Ethylene-Propylene-Diene-Monomer Roofing$0.00$0.00$0.00$0.00
07 71 00Roof Specialties$0.00$0.00$0.00$0.00
07 84 00Firestopping$0.00$0.00$0.00$0.00
07 92 00Joint Sealants$0.00$0.00$0.00$0.00
Division 8OPENINGS$0.00
08 90 00Louvers and Vents$0.00$0.00$0.00$0.00
DIVISION 9FINISHERS$0.00
09 22 16Non-Structural Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 13SPECIAL CONSTRUCTION$0.00
13 05 41Seismic Restraint Requirements for Non-Structural$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12Noise and Vibration Control for HVAC Piping and Equipment$0.00$0.00$0.00$0.00
23 05 41General Motor Requirements for HVAC Equipment$0.00$0.00$0.00$0.00
23 05 93Testing, Adjusting, and Balancing for HVAC$0.00$0.00$0.00$0.00
23 07 11HVAC Insulation$0.00$0.00$0.00$0.00
23 08 00Commissioning of HVAC Systems$0.00$0.00$0.00$0.00
23 09 23Direct-Digital Control System for HVAC$0.00$0.00$0.00$0.00
23 21 13Hydronic Piping$0.00$0.00$0.00$0.00
23 22 13Steam and Condensate Heating Piping$0.00$0.00$0.00$0.00
23 31 00HVAC Ducts and Casings$0.00$0.00$0.00$0.00
23 34 00HVAC Fans$0.00$0.00$0.00$0.00
23 36 00Air Terminal Units$0.00$0.00$0.00$0.00
23 37 00Air Outlets and Inlets$0.00$0.00$0.00$0.00
23 40 00HVAC Air Cleaning Devices$0.00$0.00$0.00$0.00
23 73 00Indoor Central-Station Air-Handling Units$0.00$0.00$0.00$0.00
23 82 16Air Coils$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 01 00Basic Electrical Requirements$0.00$0.00$0.00$0.00
26 02 00Quality Requirements$0.00$0.00$0.00$0.00
26 05 00Common Work Results for Electrical$0.00$0.00$0.00$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceway and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 05 73Overcurrent Protective Device Coordination Study$0.00$0.00$0.00$0.00
26 08 00Commissioning of Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 11Motor Controllers$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
26 36 23Automatic Transfer Switches$0.00$0.00$0.00$0.00
26 43 13Surge Protective Devices$0.00$0.00$0.00$0.00
26 55 71Medical and Surgical Lighting Fixtures$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Alternate Deduct 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
A. Deduct Alternate No. 1: Remove Scope of Work (SOW) related to operating rooms in its entirety (Drawings M401 and M402), beginning downstream of new Variable Air Volume (VAV) boxes. The VAV boxes serving these rooms will still be replaced.

The Period of Performance (POP) for the work in Alternate Deduct #1 is 365 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"FY19 PLUS-UP PROJECT 626-18-202 &"-,Bold"UPGRADE SURGICAL SUITES AIR HANDLING UNITS &"-,Bold"NASHVILLE CAMP VA MEDICAL CENTER

File details come from the government source that posted it. Updated .