Price Schedule - Proj 626-18-202.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- 36C24920R0049
About this file
This price schedule template is for the federal contract opportunity Solicitation Number 36C24920R0049 to upgrade surgical suite air handling units at the Nashville VA Medical Center. The contractor must provide a detailed price breakdown by division and specification for all labor, materials, equipment, taxes, overhead, profit, bonds and permits required. The base work includes demolition, new construction, mechanical, electrical and medical equipment installation. An alternate deduct removes operating room scope. The period of performance for the base work and alternate is 365 calendar days from notice to proceed. The solicitation is for the Department of Veterans Affairs VISN 9 for Project 626-18-202 to replace air handling units at the Nashville VA campus to improve surgical suites.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer-Breakdown
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| 01 00 00 | General Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 32 16.15 | Project Schedules (Small Projects – Design/Bid/Build) | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 33 23.01 | Electronic Submittal Procedures | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 35 26 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 42 19 | Reference Standards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 45 00 | Quality Control | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 45 35 | Special Inspections | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 57 19 | Temporary Environmental Controls | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 58 16 | Temporary Interior Signage | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 74 19 | Construction Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 81 13 | Sustainable Construction Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 91 00 | General Commissioning Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| 02 82 11 | Traditional Asbestos Abatement | $0.00 | ||||
| 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | $0.00 | ||||
| 02 83 33.13 | Lead Shielding Abatement | $0.00 | ||||
| DIVISION 3 | CONCRETE | $0.00 | ||||
| 03 30 53 | Cast-in-Place Concrete | $0.00 | $0.00 | $ - 0 | $0.00 | |
| DIVISION 4 | MASONRY | $0.00 | ||||
| 04 01 00 | Maintenance of Masonry | |||||
| 04 20 00 | Unit Masonry | |||||
| DIVISION 5 | METALS | $0.00 | ||||
| 05 31 00 | Steel Decking | $0.00 | $0.00 | $0.00 | $0.00 | |
| 05 40 00 | Cold-Formed Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 05 50 00 | Metal Fabrications | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 10 00 | Rough Carpentry | $0.00 | $0.00 | 0.00 | $0.00 | |
| $0.00 | $0.00 | 0.00 | $0.00 | |||
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 21 13 | Thermal Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 22 00 | Roof and Deck Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 27 27 | Fluid-Applied Membrane Air Barrier, Vapor Retarding | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 42 13.23 | Metal Composite Material Wall Panel | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 52 23 | Ethylene-Propylene-Diene-Monomer Roofing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 71 00 | Roof Specialties | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 84 00 | Firestopping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 92 00 | Joint Sealants | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 8 | OPENINGS | $0.00 | ||||
| 08 90 00 | Louvers and Vents | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 9 | FINISHERS | $0.00 | ||||
| 09 22 16 | Non-Structural Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 13 | SPECIAL CONSTRUCTION | $0.00 | ||||
| 13 05 41 | Seismic Restraint Requirements for Non-Structural | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $0.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 12 | Noise and Vibration Control for HVAC Piping and Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 41 | General Motor Requirements for HVAC Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 08 00 | Commissioning of HVAC Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 09 23 | Direct-Digital Control System for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 21 13 | Hydronic Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 22 13 | Steam and Condensate Heating Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 31 00 | HVAC Ducts and Casings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 34 00 | HVAC Fans | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 36 00 | Air Terminal Units | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 37 00 | Air Outlets and Inlets | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 40 00 | HVAC Air Cleaning Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 73 00 | Indoor Central-Station Air-Handling Units | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 82 16 | Air Coils | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 01 00 | Basic Electrical Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 02 00 | Quality Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 00 | Common Work Results for Electrical | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 73 | Overcurrent Protective Device Coordination Study | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 08 00 | Commissioning of Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 11 | Motor Controllers | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 36 23 | Automatic Transfer Switches | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 43 13 | Surge Protective Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 55 71 | Medical and Surgical Lighting Fixtures | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $0.00
TOTAL MATERIALS $0.00
TAX FOR MATERIALS 6% $0.00
| TOTAL EQUIPMENT | $0.00 | |
| $0.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $0 |
| TAX FOR MATERIALS | $0 |
SUBTOTAL $0
| OVERHEAD | 0% | $0 |
| PROFIT | 0% | $0 |
SUBTOTAL $0
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $0
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| This project will prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the upgrade of surgical suite air handling units. The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation, and expert supervision necessary for Project 626-18-202, Upgrade Surgical Suite AHUs at the TVHS, VAMC, 1310 24th Avenue South, Nashville, TN 37212 in accordance to the state of work, project specifications, and drawings. Work includes construction, demolition, reconstruction of the interior walls within the project boundaries. The project will include new construction, including, but is not limited to: general construction, structural, mechanical, plumbing, electrical, fire alarm, low voltage controls, programming, infection control measures, and necessary removal of existing structures and construction and certain other items. |
The Period of Performance (POP) for the work in the base offer 365 calendar days from receipt of notice to proceed.
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"FY19 PLUS-UP PROJECT 626-18-202 &"-,Bold"UPGRADE SURGICAL SUITES AIR HANDLING UNITS &"-,Bold"NASHVILLE CAMP VA MEDICAL CENTER
Alternate Deduct 1
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| 01 00 00 | General Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 32 16.15 | Project Schedules (Small Projects – Design/Bid/Build) | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 33 23.01 | Electronic Submittal Procedures | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 35 26 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 42 19 | Reference Standards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 45 00 | Quality Control | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 45 35 | Special Inspections | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 57 19 | Temporary Environmental Controls | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 58 16 | Temporary Interior Signage | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 74 19 | Construction Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 81 13 | Sustainable Construction Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 91 00 | General Commissioning Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| 02 82 11 | Traditional Asbestos Abatement | $0.00 | ||||
| 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | $0.00 | ||||
| 02 83 33.13 | Lead Shielding Abatement | $0.00 | ||||
| DIVISION 3 | CONCRETE | $0.00 | ||||
| 03 30 53 | Cast-in-Place Concrete | $0.00 | $0.00 | $ - 0 | $0.00 | |
| DIVISION 4 | MASONRY | $0.00 | ||||
| 04 01 00 | Maintenance of Masonry | |||||
| 04 20 00 | Unit Masonry | |||||
| DIVISION 5 | METALS | $0.00 | ||||
| 05 31 00 | Steel Decking | $0.00 | $0.00 | $0.00 | $0.00 | |
| 05 40 00 | Cold-Formed Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 05 50 00 | Metal Fabrications | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 10 00 | Rough Carpentry | $0.00 | $0.00 | 0.00 | $0.00 | |
| $0.00 | $0.00 | 0.00 | $0.00 | |||
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 21 13 | Thermal Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 22 00 | Roof and Deck Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 27 27 | Fluid-Applied Membrane Air Barrier, Vapor Retarding | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 42 13.23 | Metal Composite Material Wall Panel | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 52 23 | Ethylene-Propylene-Diene-Monomer Roofing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 71 00 | Roof Specialties | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 84 00 | Firestopping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 07 92 00 | Joint Sealants | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 8 | OPENINGS | $0.00 | ||||
| 08 90 00 | Louvers and Vents | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 9 | FINISHERS | $0.00 | ||||
| 09 22 16 | Non-Structural Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 13 | SPECIAL CONSTRUCTION | $0.00 | ||||
| 13 05 41 | Seismic Restraint Requirements for Non-Structural | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $0.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 12 | Noise and Vibration Control for HVAC Piping and Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 41 | General Motor Requirements for HVAC Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 08 00 | Commissioning of HVAC Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 09 23 | Direct-Digital Control System for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 21 13 | Hydronic Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 22 13 | Steam and Condensate Heating Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 31 00 | HVAC Ducts and Casings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 34 00 | HVAC Fans | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 36 00 | Air Terminal Units | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 37 00 | Air Outlets and Inlets | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 40 00 | HVAC Air Cleaning Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 73 00 | Indoor Central-Station Air-Handling Units | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 82 16 | Air Coils | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 01 00 | Basic Electrical Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 02 00 | Quality Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 00 | Common Work Results for Electrical | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 73 | Overcurrent Protective Device Coordination Study | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 08 00 | Commissioning of Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 11 | Motor Controllers | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 36 23 | Automatic Transfer Switches | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 43 13 | Surge Protective Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 55 71 | Medical and Surgical Lighting Fixtures | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $0.00
TOTAL MATERIALS $0.00
TAX FOR MATERIALS 6% $0.00
| TOTAL EQUIPMENT | $0.00 | |
| $0.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $0 |
| TAX FOR MATERIALS | $0 |
SUBTOTAL $0
| OVERHEAD | 0% | $0 |
| PROFIT | 0% | $0 |
SUBTOTAL $0
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $0
| Alternate Deduct 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| A. Deduct Alternate No. 1: Remove Scope of Work (SOW) related to operating rooms in its entirety (Drawings M401 and M402), beginning downstream of new Variable Air Volume (VAV) boxes. The VAV boxes serving these rooms will still be replaced. |
The Period of Performance (POP) for the work in Alternate Deduct #1 is 365 calendar days from receipt of notice to proceed.
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"FY19 PLUS-UP PROJECT 626-18-202 &"-,Bold"UPGRADE SURGICAL SUITES AIR HANDLING UNITS &"-,Bold"NASHVILLE CAMP VA MEDICAL CENTER
File details come from the government source that posted it. Updated .