Drawings - 626-18-202 Upgrade Surgical Suite Air Handling Units Bid drawings.pdf

PDF 14 MB Posted

Attached to
Y1DZ--Project# 626-18-202 - Upgrade Surgical Suite Air Handling Units
Solicitation number
36C24920R0049
Issued by

About this file

This package includes construction drawings and specifications for the upgrade of surgical suite air handling units at the Nashville VA Medical Center. The project involves demolishing and replacing two air handling units, associated ductwork, and mechanical room modifications. Key scope items include installing new AC-17 and AC-16 air handlers, exhaust fans, ductwork, hydronic piping, controls, and mechanical room improvements. Construction will be phased to renovate operating rooms and maintain medical services throughout the project duration. The solicitation number is 36C24920R0049 and was issued by the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works Ltd.

209 Sandusky Street Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

B

IM

/1

N a s h v ill e V

A

A H

U U p g ra d e

/1

N a s h v ill e V

A

A H

U U p g ra d e s M

E P

.r v t

/2

/2

:3

:0

P

M

G001

COVER SHEET UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

1310 24th Avenue South, Nashville, TN 37212

626-18-202

01/28/2020 CJC SB

100% BID DOCUMENTS

UPGRADE SURGICAL SUITE

AIR HANDLING UNITS

PROJECT NO. 626-18-202

NASHVILLE VA MEDICAL CENTER

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212

VICINITY MAP

SITE

LOCATION MAP

SITE

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

G001 COVER SHEET

G002 GENERAL CONTRACTOR AND BASIS-OF-DESIGN PROTOCOL NOTES

G003 GENERAL PROTECTION PROTOCOL, SCOPE OF WORK AND MISC. NOTES

G100 PHASING PLAN

G101 ICRA AND DUST BARRIER CONTROL

ASB-01 BASEMENT - ASBESTOS ABATEMENT

LEAD-1 BASEMENT - LEAD SHIELDING ABATEMENT

STRUCTURAL

S001 STRUCTURAL GENERAL NOTES

S100 OVERALL REFERENCE PLAN

S101 BASEMENT PLAN

S102 BATHROOM PLAN

S103 FAN ROOM #5 (AHU 16)

S200 DUCTWORK OPENING

S500 TYPICAL DETAILS

S501 FAN ROOM SECTION 1

S502 FAN ROOM SECTION 2

S503 FAN ROOM SECTION 3

S504 FAN ROOM SECTION 4

ARCHITECTURAL

A001 ARCHITECTURAL SYMBOLS, LEGENDS AND GENERAL NOTES

A100 PARTIAL BASEMENT DEMOLITION PLAN

A101 PARTIAL BASEMENT NEW WORK PLAN

A102 DEMOLITION AND NEW WORK PLAN - FAN ROOM 5

A201 ENLARGED FLOOR PLANS

A301 SECTIONS

MECHANICAL

M000 MECHANICAL TITLE SHEET

MD101 MECHANICAL ROOM B-B105 (AC-17) DEMO./TEMPORARY WORK PLAN

MD102 MECHANICAL ROOM B-G124 (AC-16) DEMO./TEMPORARY WORK PLAN

MD103 SUB-BASEMENT DUCTWORK DEMOLITION PLAN

MD104 BASEMENT DUCTWORK DEMOLITION PLAN

M101 ENLARGED MECHANICAL ROOM (AC-17) NEW DUCTWORK PLAN

M102 ENLARGED MECHANICAL ROOM (AC-16) NEW DUCTWORK PLAN

M103 SUB-BASEMENT PLAN - NEW DUCTWORK

M104 BASEMENT PLAN - NEW DUCTWORK

M105 MECHANICAL AIRFLOW/ PRESSURIZATION DIAGRAM

M201 ENLARGED MECHANICAL ROOM HYDRONICS PLANS

M202 BASEMENT PLAN - NEW PIPING

M401 ENLARGED OR NEW DUCTWORK

M402 ENLARGED OR NEW DUCTWORK

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M504 MECHANICAL DETAILS

M601 MECHANICAL CONTROL DIAGRAMS

M602 MECHANICAL CONTROL DIAGRAMS

M701 MECHANICAL SCHEDULES

ELECTRICAL

E000 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

ED101 ELECTRICAL DEMOLITION PLAN

E101 ELECTRICAL NEW WORK PLAN

E201 ELECTRICAL DETAILS

E301 ELECTRICAL SCHEDULES AND RISER DIAGRAMS

# Revisions Date

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works Ltd.

209 Sandusky Street Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

B

IM

/1

N a s h v ill e V

A

A H

U U p g ra d e

/1

N a s h v ill e V

A

A H

U U p g ra d e s M

E P

.r v t

/2

/2

:3

:0

P

M

G002

GENERAL CONTRACTOR AND

BASIS-OF-DESIGN PROTOCOL NOTES

UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

1310 24th Avenue South, Nashville, TN 37212

626-18-202

01/28/2020 CC SB

100% BID DOCUMENTS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works Ltd.

209 Sandusky Street Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

B

IM

/1

N a s h v ill e V

A

A H

U U p g ra d e

/1

N a s h v ill e V

A

A H

U U p g ra d e s M

E P

.r v t

/2

/2

:3

:1

P

M

G003

GENERAL PROTECTION PROTOCOL, SCOPE

OF WORK AND MISC. NOTES

UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

1310 24th Avenue South, Nashville, TN 37212

626-18-202

01/28/2020 CC SB

100% BID DOCUMENTS

# Revisions Date

NASHVILLE MEDICAL CENTER

THE CONTRACTOR SHALL IDENTIFY ALL EMPLOYEES THAT WILL BE WORKING UNDER THE

AWARDED CONTRACT. CONTRACTOR PERSONNEL SHALL INCLUDE EMPLOYEES, SUB-

CONTRACTORS, SUPPLIERS AND DELIVERY PERSONNEL ENTERING THE MEDICAL CENTER.

THOSE EMPLOYEES SHALL BRING 2 FORMS OF GOVERNMENT ISSUED ID TO OBTAIN A VA

CONTRACTOR FLASH IDENTIFICATION BADGE THAT SHALL BE WORN ABOVE THE BELT AT ALL

TIMES WHILE ON MEDICAL CENTER PROPERTY. IF ISSUED A TEMPORARY BADGE,

CONTRACTOR’S EMPLOYEES SHALL RETURN ALL TEMPORARY I.D. BADGES TO DESIGNATED

PERSONNEL AT THE END OF THE PERIOD OF PERFORMANCE OF THE CONTRACT. LOST

BADGES WILL RESULT IN A SURCHARGE.

5.

6. IT IS THE INTENT OF THE DEPARTMENT OF VETERANS AFFAIRS TO HAVE THE CONTRACTOR

FULLY MEASURE, SURVEY, INVESTIGATE, AND DOCUMENT THE EXISTING WINDOWS,

CONNECTIONS AND INTERIOR/EXTERIOR INTERFACES IN ORDER TO GAIN THE KNOWLEDGE

AND INSIGHT NECESSARY TO PERFORM THE CONSTRUCTION IN A PROFESSIONAL AND

COMPETENT MANNER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND

COR OF ANY DISCREPANCY BEFORE PERFORMING ANY WORK. THE CONTRACTOR SHALL BE

SPECIFICALLY RESPONSIBLE FOR THE COORDINATION AND PROPER RELATION OF HIS WORK

TO THE BUILDING, STRUCTURE, PHASING AND ENSURE THE SAFETY OF EMPLOYEES AND

WORKMEN.

FURNISH ALL LABOR, TOOLS, MATERIALS, AND EXPERTISE TO COMPLETE PROJECT

626-18-501, “USP 800 PHARMACY COMPLIANCE”, IN STRICT ACCORDANCE WITH THE

SPECIFICATIONS AND DRAWINGS AT THE TENNESSEE VALLEY HEALTHCARE SYSTEM,

VAMC, 1310 24TH AVENUE SOUTH, NASHVILLE, TN 37212.

T

T T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

J

J

REC & OR HEAD

NURSES

G-01

OFFICE

G-04

OFFICE

G-07

CHIEF

G-08

OFFICE

G-11

HAC

G-12

SEC

G-13

CONF ROOM

G-14

DRESSING &

HOLDING

G-15

TOILET

G-15A

TOILET

G-15B

SEC

G-16

HOLDING

G-17

FROZEN

SECTION

G-18

OPERATING

ROOM 2

G-19

OPERATING

ROOM 1

G-20

OPERATING

ROOM 3

G-21

ELEC CLO

G-22

STAFF LOUNGE

G-23

PHYSICIAN

LOUNGE

G-24

OPERATING

ROOM 4

G-25

OPERATING

ROOM 5

G-26

OPERATING

ROOM 6

G-27

OFFICE

G-28

SCRUB UP

ALCOVE

G-29

SCRUB-UP

ALCOVE

G-30

OFFICE

G-31

EXT RAD

CONTROL

G-32

SCRUB-UP

ALCOVE

G-33

OPERATING

ROOM 9

G-36

SUB STERILE

G-37

OPERATING

ROOM 8

G-38

OPERATING

ROOM 7

G-39

EQUIP STORAGE

G-40

PLASTER &

SPLINTS

G-41

SUB STERILE

G-42

HAC

G-43

EXT RAD

CONTROL RM

G-20a

STORAGE

G-20b

INST & STERILE

G-20c

SUB STERILE

G-19a

SUB STERILE

G-21a

SUB STERILE

G-26a

EQUIP

G-28a

DICTATING

G-23a

FEMALE

SHOWER

G-23b

FEMALE TOILET

G-23c

FEMALE

LOCKER RM

G-23d

MALE

TOILET/SHOWER

G-24a

MALE LOCKER

ROOM

G-24b

PHONE

G-01a

PUMP TECHS

PREP RM

G-36a

CLEAN CORE

SUPPORT

G-34

ON-CALL

G-48

ALCOVE

G-49

PACU

G-50

FEMALE STAFF

TOILET

G-51

RECOVERY

ISOLATON

BEDROOM

G-52

ALCOVE

G-53

RECOVERY

ISOLATON

BEDROOM

G-54

FEMALE STAFF

TOILET

G-55

SICU

G-56

BATH

G-48a

SIGNAL

G-49a

ELECTRICAL

CLO

G-49b

TELE

G-49c

SOILED UTILITY

G-56a

RECOVERY

STORAGE

G-56b

ANTE ROOM

G-56c

CLEAN LINEN

G-56d

RECOVERY

CLEAN UTILITY

G-56e

OFF LINE

MONITORING

G-47

STAIR

FAN ROOM 5

B-G124

ELECTRICAL

B-G124a

EM GENERATOR

B-G124b

FAN RM 4

B-B105

CORRIDOR

CB-6a

CORRIDOR

CB-2

CORRIDOR

CB-2b

CORRIDOR

CB-2c

CLO

B-G08a

CORRIDOR

CB-4

CORRIDOR

CB-3

CORRIDOR

CB-3a

CORRIDOR

CB-24

FEMALE

LOCKER ROOM

C-08a

FEMALE TOILET

C-08b

OFFICE

C-09

CORRIDOR

CB-22

ANEST WORK

RM

B-07

CORRIDOR

CB-21

VEST

B-01p

CLO

G-46

ANEST EQUIP

STOR

G-35

NURSE

MANAGER

G-45

VESTIBULE

V-01

7 8 9 10 11 12

13 14 15 16 17 18 19

C

D

E

F

G

H

I

21 22

1 2 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works Ltd.

209 Sandusky Street Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

KEYPLAN

B

IM

/1

N a s h v ill e V

A

A H

U U p g ra d e

/1

N a s h v ill e V

A

A H

U U p g ra d e s M

E P

.r v t

/2

/2

:3

:1

P

M

G100

PHASING PLAN UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

1310 24th Avenue South, Nashville, TN 37212

626-18-202

01/28/2020 CJC AA

100% BID DOCUMENTS

NORTH

TRUE

3/32" = 1'-0"

PHASING PLAN

NOTES FOR PHASING:

1. THE VA REQUIRES THE CONTRACTOR WORK SEVEN DAYS A WEEK DURING THE SHUTDOWN OF EACH PHASE TO LIMIT OVERALL DOWNTIME.

2. SUBMITTALS FOR LONG LEAD (8+ WEEKS) ITEMS OF THE OPERATING ROOM RENOVATIONS (SUCH AS OPERATING ROOM DIFFUSER ARRAY SYSTEM AND AHUS) MUST BE TO BE SUBMITTED, APPROVED, MATERIALS ORDERED AND MATERIALS STORED OFF-SITE PRIOR TO CONTRACTOR STARTING ANY SHUTDOWN ACTIVITIES. THIS IS INTENDED TO LIMIT THE POTENTIAL FOR DELAYS THAT COULD EXTEND THE SHUTDOWN.

3. CONTRACTOR MUST ACCOUNT FOR RELATED ACTIVITIES SUCH AS INFECTION CONTROL MEASURES, CLEANING, TESTING AND RE-CERTIFICATION OF

THE OPERATING ROOM SUITE.

4. THE WORK IN THE SUB-BASEMENT WOULD BE COMPLETED AS A PART OF PHASE 1.

THE FOLLOWING IS A PROPOSED PHASING STRATEGY PROPOSED BY THE DESIGN TEAM FOR THE CONTRACTOR TO IMPLEMENT DURING CONSTRUCTION.

PLEASE NOTE PER THE VA ONLY ONE (1) OF THE ORS 7, 8, AND 9 MAY BE OUT OF SERVICE AT ANY TIME DURING CONSTRUCTION.

PHASE 1:

PROVIDING TEMPORARY AHUS AND INSTALLING CONNECTIONS TO BACKFEED EXISTING DUCTWORK.

DEMOLITION OF AC-17 AND EF-74 AND ASSOCIATED DUCTWORK. TEMPORARILY REMOVE EXISTING EXHAUST FAN (EF-109) SERVING MECHANICAL ROOM.

DEMOLITION OF AC-16, RF-16, AND EF-82 AND ASSOCIATED DUCTWORK INCLUDING EXTENDING OUTDOOR AIR INTAKE DUCT.

INSTALL NEW DUCTWORK IN SUB-BASEMENT.

INSTALL NEW DUCTWORK IN CORRIDOR. (NOTE: THIS PORTION OF WORK WILL NEED TO OCCUR AT NIGHT/ON WEEKENDS AND INCLUDE NEW DUCTWORK AND PIPING FOR NEW VAV BOXES.)

INSTALLING NEW AC-17, RF-17 AND EF-74 INCLUDING ADJUSTING MECHANICAL ROOM LOUVER OPENINGS.

INSTALLING NEW AC-16, RF-16 AND EF-82 INCLUDING ADJUSTING MECHANICAL ROOM LOUVER OPENINGS.

PHASE 2:

RENOVATE OPERATING ROOMS 1, 2, AND 7. INCLUDES INSTALLING NEW CEILING TO SUPPORT DIFFUSER ARRAY ABOVE SURGICAL TABLE AND TWO ADDITIONAL NEW LOW RETURNS IN EACH OPERATING ROOM.

REPLACE VAV BOXES WITH DDC CONTROLLED VAV BOXES.

PHASE 3:

RENOVATE OPERATING ROOMS 3, 4, AND 8. INCLUDES INSTALLING NEW CEILING TO SUPPORT DIFFUSER ARRAY ABOVE SURGICAL TABLE AND TWO ADDITIONAL NEW LOW RETURNS IN EACH OPERATING ROOM.

REPLACE VAV BOXES WITH DDC CONTROLLED VAV BOXES.

PHASE 4:

RENOVATE OPERATING ROOMS 5, 6, AND 9. INCLUDES INSTALLING NEW CEILING TO SUPPORT DIFFUSER ARRAY ABOVE SURGICAL TABLE AND TWO ADDITIONAL NEW LOW RETURNS IN EACH OPERATING ROOM.

REPLACE VAV BOXES WITH DDC CONTROLLED VAV BOXES.

PHASE 1

PHASE 2

PHASE 3

PHASE 4

AREAWAY

STRETCHER ALCOVE

CB-24A

MALE

TOILET

C-08D

FEMALE TOILET

C-08B

FEMALE STAFF TOILET

G-51

FEMALE STAFF TOILET

G-55

CLOSET

G-46

CLOSET

G-08A

ELECTRICAL CLOSET

A-22A

FROZEN

SECTION

G-18 B-A118

CORRIDOR

CB-23

CORRIDOR

CB-4

AREAWAY

CORRIDOR

CB-3

SCRUB

UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

FAN RM - 4

B-B105

MECH

RM

AHU-26

FAN RM 11

STORAGE ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC POS RM

C-07V

EMERGENCY GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

B-02

CORRIDOR

CB-7

SCRUB

CB-3B

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

STAIR

NO 2

OFFICE

A-04B

FEMALE TOILET

A-10

FEMALE TOILET

A-11

MALE

TOILET

A-12

MALE

TOILET

A-13

SOILED UTILITY

G-56A

RECOVERY STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL CLOSET SIGNAL

G-49B

CLEAN LINEN

G-56D

SIGNAL

G-49A

RECOVERY CLEAN UTILITY

G-56E

RECOVERY NURSE STATION

RECOVERY ISOLATION BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY ISOLATION BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

STAIR

NO 10

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

GAS STORAGE NURSE MGR

OFFICE

B-01Q

ELEVATOR

P-8

FLOW CYTO

A-20A

IMMUN LAB

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST

EQUIP STOR

SCRUB-UP ALCOVE

G-33

EXT RAD

CONTROL

G-32

OPERATING RM 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

OPERATING RM 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

CORRIDOR

CB-2

CHIEF

G-08

OFFICE

G-11

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE

TOILET &

SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

STAIR

NO 1

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN LOUNGE

G-24

OPERATING RM 7

G-39

OFFICE

G-28

SCRUB

UP

ALCOVE

G-29

SCRUB-UP ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER

& SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING RM 6

G-27

SUB STERILE

G-26A

OPERATING RM 4

G-26

OPERATING RM 3

G-25

SUB

STERILE

G-21A

OPERATING RM 3

G-21

OPERATING RM 2

G-19

SCRUB

SUB

STERILE

G-19A

REC & OR

HEAD NURSES

G-01

ELECTRICAL CLOSET

G-22

PHONE/SGNL RM

EXT RAD

CNTROLRM

G-20A

STORAGE

G-20B

INSTRUMENT & STERILE

G-20C

OPERATING RM 1

G-20

HOLDING

G-17

OFFICE

G-02A

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

OFFICE

G-02B

CONTROL

G-03

DRESSING

& HOLDING

G-15

SEC

G-16

OFFICE

G-04

TOILET

G-15A

TOILET

G-15B

OFFICE

G-07

SEC

G-13

CONFERENCE RM

G-14

HAC

G-12

NUCLEAR

CARDIOLOGY

A-25Q

HAZ.

45 KVA

45 & 30 KVA

KVA

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER ALCOVE

WC

ALCOVE

STRETCHER ALCOVEWC

ALCOVE

MULTI-PURPOSE

B-G127S

TLT

B-B101G

ALCOVE

B-G127V

C

LE

A N

S U

P P

LY

B \-G

7R

PV CV LAB #1

B-B101I

EPS CV LAB #2

B-G127J

CONTROL #1

B-B101J

CV LAB #3 (BID

ITEM 5)

B-B101O

CONTROL #2 (BID

ITEM 5)

B-B101Q

CORRIDOR

B-G127F

VIEW

B-G127O

CV EQUIP #2

B-B101N

SOILED UTIL

B-B101E

PREP/HOLDING

B-G127T

H.A.C

B-B101H

CRASH CART

ALCOVE

B-B101R

TLT

1-G127W

CV EQUIP #3

B-B101P

ALCOVE

B-G127W

ALCOVE

B-G127X

CHANGE

B-G127Y

COR.

B-G127Z

CLEAN LINEN

B-G127AA

ALCOVE

B-G127BB

C V

E Q

U

IP

B -B

1N

DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT

PRIOR TO INITIATING WORK, CONTRACTOR AND COR WILL ACCESS THE SCOPE OF THE CONSTRUCTION

ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES

AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM

RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH

RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY

ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS

(CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT

SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA

AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION

PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION

CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH

RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH

ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED

ACCORDING TO SPECIFIC VAMC POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT

DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT

SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR

ACCESS TO ENTRY. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS

SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL

HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE

EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY

FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES, WET

CEILING TILE, ETC.

• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS

SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES;

AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE.

SIGNAGE SHOULD DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND

MATERIALS.

• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING

DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH

AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE

REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS

OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE

USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE

BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE

CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH PRIOR APPROVAL OF

THE VAMC.

• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT

EXCAVATION DEBRIS.

• CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS SHOULD BE

REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.

VENTILATION AND ENVIRONMENTAL CONTROLS

• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-

CIRCULATED AIR; FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER

MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH

RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.

USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD

PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES

OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF

APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER

AND HEPA FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED

DAILY.

• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND

MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT

BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC

WILL MAKE DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING

AIR PRESSURE THROUGHOUT THE PROJECT.

• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE

OF THE PARTITION.

INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION

1. CLEAN WORK UPON COMPLETION OF TASK

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP &/OR VACUUM BEFORE LEAVING WORK AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

4. WET MOP WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS I - UPON COMPLETION OF PROJECTS

CLASS II - UPON COMPLETION OF PROJECTS

CLASS III - UPON COMPLETION OF PROJECTS

CLASS IV - UPON COMPLETION OF PROJECTS

(TO BE COMPLETED BY CONTRACTOR AND COR, THEN SIGNED BY INFECTION CONTROL NURSE)

CONTRACTOR'S SIGNATURE AND DATE

COR SIGNATURE AND DATE

LIGHT GRAY HATCH INDICATES

TYPES AND CLASSES SELECTED

FOR THIS RENOVATION

STEP #1: SELECT ACTIVITY TYPE BELOW:

CONSTRUCTION ACTIVITY TYPES:

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE

PER 50 SQUARE FEET.

• PAINTING (BUT NOT SANDING)

• WALL COVERING

• ELECTRICAL TRIM WORK

• MINOR PLUMBING

• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

TYPE B

SMALL SCALE, SHORT DURATION (less than 1 day) ACTIVITIES WHICH CREATE

MINIMAL DUST

INCLUDES, BUT NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING

• ACCESS TO CHASE SPACES

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE

CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES

DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES

INCLUDES, BUT NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING

• REMOVAL OF FLOOR COVERING, CEILING TILES AND CASEWORK

• NEW WALL CONSTRUCTION

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

• MAJOR CABLING ACTIVITIES

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK

SHIFT

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT NOT LIMITED TO:

• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE HVAC

SYSTEM.

• NEW CONSTRUCTION

IS IT LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR INFECTION

WITH TUBERCULOSIS? YES / NO

IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER

SYSTEM/LINES DURING ACTIVITY? YES / NO

STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN

A) INFECTION CONTROL RISK GROUPS

GROUP 1 - LOW: OFFICE AREAS:

GROUP 2 - MEDIUM: CARDIOLOGY, ECHOCARDIOGRAPHY, ENDOSCOPY, NUCLEAR

MEDICINE, PHYSICAL THERAPY, RADIOLOGY/MRI, RESPIRATORY THERAPY

GROUP 3 - HIGH RISK: CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT

SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS

GROUP 4 - HIGHEST RISK: ANY AREA CARING FOR IMMUNOCOMPROMISED

PATIENTS, CARDIAC CATH LAB, CENTRAL SUPPLY, INTENSIVE CARE UNITS,

MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS

STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:

CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS

** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II,

III, IV PRECAUTIONS ARE REQUIRED.

RISK LEVEL TYPE 'A' TYPE 'B' TYPE 'C' TYPE 'D'

GROUP 1 I II II III / IV

GROUP 2 I II III IV

GROUP 3 I II III / IV IV

GROUP 4 II III / IV III / IV IV

CONSTRUCTION TYPE:

C

RISK GROUP:

LOW

RISK ASSESSMENT:

II

ELECTRICAL

YES

POTABLE WATER

NO

HVAC

YES

MEDICAL VACUUM

NO

SEWER

YES

PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL

STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:

1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING

3. SEAL UNUSED DOORS WITH DUCT TAPE

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR

FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED

CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR

FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR

THE CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE

THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT.

CLASS I - DURING CONSTRUCTION PROJECT

CLASS II - DURING CONSTRUCTION PROJECT

CLASS III - DURING CONSTRUCTION PROJECT

CLASS IV - DURING CONSTRUCTION PROJECT

INFECTION CONTROL NURSE'S SIGNATURE AND DATE

1 LAYER 5/8" TYPE-X G.W.B.

INSULATION - SEE SPECIFICATIONS

5/8" G.W.B.

METAL STUDS @16" O.C.

BASE - SEE FINISH

SCHEDULE FOR TYPE

TRACK RUNNER

FLOOR SLAB

S E

E S

C H

E D

U

LE

P A

R T

IT

IO

N W

ID

T

H

FIRESTOPPING SEALANT - SEE SPECIFICATIONS

DECK OR

STRUCTURE ABOVE

NOTE:

1. FOR EXISTING PARTITIONS USED AS ICRA BARRIERS, THE

CONTRACTOR SHALL COMPLETE THE FOLLOWING:

· MODIFY EXISTING PARTITION TO A ONE-HOUR RATED ICRA BARRIER

· EXTEND PARTITION TO FLOOR DECK WITH 5/8” G.W.B. ON EACH SIDE

· FINISH WALL PARTITION AS DIRECTED BY UL RATING REQUIREMENTS

· INFILL EXISTING OPENINGS WITH 5/8” G.W.B ON EACH SIDE

· PROVIDE FIRESTOPPING AT ALL EXISTING PENETRATIONS

2. PROVIDE 45 MINUTE RATED DOOR TO ACCESS CONSTRUCTION AREA

AT ALL NEW AND EXISTING ICRA BARRIERS

3. THE CONTRACTOR SHALL NOT BLOCK SPRINKLER PROTECTION ON

THE VA-OCCUPIED SIDE OF THE ICRA BARRIER.

7 8 9 10 11 12

13 14 15 16 17 18 19

C

D

E

F

G

H

I

21 22

1 2 3 5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works Ltd.

209 Sandusky Street Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

KEYPLAN

B

IM

/1

N a s h v ill e V

A

A H

U U p g ra d e

/1

N a s h v ill e V

A

A H

U U p g ra d e s M

E P

.r v t

/2

/2

:3

:2

P

M

G101

ICRA AND DUST BARRIER CONTROL UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

1310 24th Avenue South, Nashville, TN 37212

626-18-202

01/28/2020 CJC SB

100% BID DOCUMENTS

NORTH

TRUE

NOT TO SCALEG101

2 ICRA BARRIER

1/16" = 1'-0"

ICRA AND DUST BARRIER CONTROL PLAN

# Revisions Date

NOTE:

DARK LINE ON PLAN INDICATES EXTENTS OF SCOPE OF WORK.

CONTRACTOR TO COORDINATE LOCATION AND EXTENTS OF ICRA

BARRIER WITH VA PRIOR TO CONSTRUCTION. PHASE OF

CONSTRUCTION MUST BE ENCLOSED AT ALL TIME TO KEEP ALL

DUST/CONSTRUCTION DEBRIS OUT OF THE REST OF THE VA FACILITY.

STRETCHER

ALCOVE

CB-24A

C-07DC-07C

MALE

TOILET

C-08D

FEMALE

TOILET

C-08B

FEMALE

STAFF

TOILET

G-51

FEMALE

STAFF

TOILET

G-55

CLOSET

G-46

CLOSET

G-08A

CLOSET

ELECTRICAL

A-22A

FROZEN

SECTION

G-18

B-A118

CORRIDOR

CB-23

CORRIDOR

CB-4

AREAWAY

CORRIDOR

CB-9C

CORRIDOR

CB-3

SCRUB UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

FAN RM - 4

B-B105

MECH RM

AHU-26

FAN RM 11

STORAGE

ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC

POS RM

C-07V

EMERGENCY

GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

CORRIDOR

CB-16E

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

DECONTAMINATION RM

B-02

CORRIDOR

CB-7

CORRIDOR

CB-8

SCRUB

CB-3B

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

STAIR

NO 2

OFFICE

A-04B

BLOOD BANK

A-14

A-14A

PATH CHIEF

A-09

HEMA SUPER

A-17C

FEMALE

TOILET

A-10

FEMALE

TOILET

A-11

A-17B

MALE

TOILET

A-12

MALE

TOILET

A-13

SOILED

UTILITY

G-56A

RECOVERY

STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL

CLOSET

SIGNAL

G-49B

CLEAN

LINEN

G-56D

SIGNAL

G-49A

RECOVERY

CLEAN

UTILITY

G-56E

RECOVERY

NURSE

STATION

RECOVERY

ISOLATION

BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY

ISOLATION

BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

STAIR

NO 10

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

GAS STORAGE

NURSE

MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

ELEVATOR

P-8

TISSUE TYP

A-20

FLOW CYTO

A-20A

IMMUN LAB

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST EQUIP

STOR

SCRUB-UP

ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

CORRIDOR

CB-2

CHIEF

G-08

OFFICE

G-11

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE TOILET

& SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

STAIR

NO 1

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN

LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB UP

ALCOVE

G-29

SCRUB-UP

ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER &

SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING RM

GENERAL

G-27

SUB STERILE

G-26A

OPERATING RM

GENERAL

G-26

GENERAL

OPERATING RM

G-25

SUB

STERILE

G-21A

OPERATING RM

GENERAL

G-21

OPERATING RM

GENERAL

G-19

SCRUB

SUB

STERILE

G-19A

REC & OR

HEAD NURSES

G-01

ELECTRICAL

CLOSET

G-22

PHONE/SGNL RM

EXT RAD

CNTROLRM

G-20A

STORAGE

G-20B

INSTRUMENT

& STERILE

G-20C

CYSTOSCOPY RM

G-20

HOLDING

G-17

OFFICE

G-02A

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

OFFICE

G-02B

CONTROL

G-03

DRESSING

& HOLDING

G-15

SEC

G-16

OFFICE

G-04

TOILET

G-15A

TOILET

G-15B

OFFICE

G-07

SEC

G-13

CONFERENCE RM

G-14

HAC

G-12

NUCLEAR

CARDIOLOGY

A-25Q

HAZ.

45 KVA

45 & 30 KVA

45 KVA 45 KVA

KVA

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER

ALCOVE

WC

ALCOVE

STRETCHER

ALCOVE

WC

ALCOVE

MULTI-PURPOSE

B-G127S

TLT

B-B101G

ALCOVE

B-G127V

C L E

A N S

U P P L Y

B

G R

PV CV LAB #1

B-B101I

EPS CV LAB #2

B-G127J

CONTROL #1

B-B101J

CV LAB #3 (BID

ITEM 5)

B-B101O

CONTROL #2 (BID

ITEM 5)

B-B101Q

CORRIDOR

B-G127F

VIEW

B-G127O

CV EQUIP #2

B-B101N

SOILED UTIL

B-B101E

PREP/HOLDING

B-G127T

H.A.C

B-B101H

CRASH CART

ALCOVE

B-B101R

TLT

1-G127W

CV EQUIP #3

B-B101P

ALCOVE

B-G127W

ALCOVE

B-G127X

CHANGE

B-G127Y

COR.

B-G127Z

CLEAN LINEN

B-G127AA

ALCOVE

B-G127BB

C V E

Q U

IP

B -B

N

/5 /2

:3

:4

A

M

1310 24th Avenue South, Nashville, TN 37212

626-18-202

# Revisions Date

ASB-01

RCM NDB

www.skellyloy.com

412-828-1412

PITTSBURGH, PA 15238

3280 WILLIAM PITT WAY

SKELLY AND LOY, INC.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works Ltd.

209 Sandusky Street

Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

ASBESTOS CONTAINING MATERIALS

ACM NOTES

ASB-01

ASBESTOS ABATEMENT

NOT TO SCALE

LEGEND

KEY PLAN

NORTH

PROJECT

DRAWING AREA SHOWN

REQUIRED.

IS AREA WORK THE WITHIN CHAMBERS DECONTAMINATION THE OF

PLACEMENT SPECIFICATIONS. THE OF 1.9 SECTION WITH ACCORDANCE

IN CHAMBERS DECONTAMINATION WASTE AND PERSONNEL

SEPARATE DESIGN AND CONSTRUCT SHALL CONTRACTOR THE

- LOCATION ENCLOSURE DECONTAMINATION PERSONNEL/WASTE 3.

ASBESTOS WASTE.

NON-FRIABLE AS OF DISPOSED BE SHALL PIPE CEMENT AND MASTIC,

AND TILE FLOOR ASBESTOS-CONTAINING ACCUMULATED THE B.

APPROPRIATE NEGATIVE AIR PRESSURE IN THE WORK AREA.

THE RE-ESTABLISH TO REPAIRS NECESSARY THE MAKE AND WORK

STOP SHALL CONTRACTOR THE COLUMN, WATER OF INCHES -0.02”

BELOW FALLS AREA WORK THE WITHIN PRESSURE AIR NEGATIVE THE

TIME ANY AT IF REMOVAL. DURING TIMES ALL AT MAINTAINED BE SHALL

AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.

PRESENT IN THE WORK AREAS USING MANUAL WET METHODS.

MATERIALS ASBESTOS-CONTAINING ALL REMOVE SHALL CONTRACTOR

THE - REMOVAL PIPE ASBESTOS CEMENT MASTIC, AND TILE FLOOR 2.

TO PROCEED PRIOR TO THE START OF ABATEMENT.

APPROVAL RECEIVE AND VA THE NOTIFY SHALL CONTRACTOR THE

REGULATIONS AND THE SPECIFICATIONS.

ALL WITH ACCORDANCE IN PPE PROPER USE SHALL AND CERTIFIED,

AND TRAINED PROPERLY BE SHALL WORKERS ABATEMENT ALL

BUILDING MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.

THE WITH COORDINATED BE SHALL SHUTDOWN REQUIRED SERVICE.

IN REMAIN SHALL SYSTEMS PROTECTION AND DETECTION FIRE

BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.

SHALL WORK AREA. WORK EACH IN EQUIPMENT/DEVICES ELECTRIFIED

AND EQUIPMENT HVAC ALL OF SHUTDOWN FOR CONTRACTOR

TRADE AND VA THE WITH COORDINATE SHALL CONTRACTOR THE

ACCORDANCE WITH THE SPECIFICATIONS.

IN MONITORING AIR PROVIDE SHALL CONTRACTOR THE

BY SECTIONS 3.1 AND 3.2 OF THE SPECIFICATIONS.

REQUIRED AS SHEETING POLYETHYLENE OF LAYERS 2 WITH SURFACES

WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE

AREA’S NEGATIVE AIR PRESSURE.

WORK THE MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETER

DIGITAL A MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED

MANOMETERS DIGITAL OF USE THE THROUGH CONTRACTOR THE BY

MONITORED CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE

AIR NEGATIVE AREAS. WORK THE INSIDE HOUR PER CHANGES AIR (4)

FOUR LEAST AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED

HEPA THESE BUILDING. THE OF EXTERIOR THE TO EXHAUSTED

HANDLERS AIR FILTERED HEPA USING AREA WORK THE IN CREATED

BE SHALL PRESSURE AIR NEGATIVE REMOVAL. ASBESTOS DURING

TIMES ALL AT PROVIDED BE SHALL LOCATION, PERIMETER AREA WORK

ANY AT MEASURED AS COLUMN, WATER OF INCHES -0.02 LEAST AT

OF PRESSURE AIR NEGATIVE A CONTAINMENTS. PRESSURE NEGATIVE

WITHIN CONDUCTED BE SHALL WORK REMOVAL ASBESTOS ALL

THE WORK AREA.

FROM MATERIALS NON-ASBESTOS AND ASBESTOS ALL OF REMOVAL THE

PERFORMING WHEN DUST OF RELEASE THE CONTROL TO CLEANERS

VACUUM AND HANDLERS AIR FILTERED HEPA AND METHODS WET

USE SHALL CONTRACTOR THE PIPE. ASBESTOS CEMENT AND MASTIC

AND TILE FLOOR ACM ACCESS TO AREAS WORK ASBESTOS DESIGNATED

THE WITHIN FROM CREATED MATERIALS CONTAINING NON-ASBESTOS

ALL OF DISPOSE AND REMOVE SHALL CONTRACTOR THE

SURGICAL SUITE RENOVATIONS, WHERE INDICATED ON THE DRAWINGS.

THE BY IMPACTED BE WILL THAT AREAS WORK FROM PIPE ASBESTOS

CEMENT AND MASTIC AND TILE FLOOR CONTAINING ASBESTOS

OF DISPOSE AND REMOVE SHALL CONTRACTOR THE 1200. CHAPTER

CONSERVATION ENVIRONMENTAL OF DEPARTMENT TENNESSEE WITH

ACCORDANCE STRICT IN DONE BE SHALL WORK ASBESTOS ALL 1.

ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.

ASBESTOS APPROVED PER ABATEMENT WITH PROCEED 4.

PROVIDE NEGATIVE AIR EXHAUST.3.

UNITS.

LOAD-OUT WASTE AND DECONTAMINATION CONSTRUCT 2.

ESTABLISH REGULATED ABATEMENT WORK AREA.1.

WORK SEQUENCE FOR ABATEMENT

SETUP AND PROJECT PHASING.

AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS CONTROL

DUST APPLICABLE THE REFERENCE SHALL CONTRACTOR THE 11.

1926.500-503.

CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO

ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET

(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED

WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.

(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926

AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE

CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS

APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.

TO PROCEED IN THE PROJECT WORK AREA.

PROJECT RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK

THE MAKE AND ACM SPECIFIED REMOVE TO IS WORK ABATEMENT THE

OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED

OR CONTAINING ASBESTOS ANY OF DISPOSAL THE INCLUDES

ALSO WORK THE FIBERS. ASBESTOS AIRBORNE WITH CONTACT

FROM ENVIRONMENT THE AND WORKERS PROTECT TO MATERIALS

CONTAINING ASBESTOS OF CONTROL AND HANDLING PROPER

THE INCLUDES COVERED WORK THE CONTAINMENT; UNDER WHILE 8.

REMOVED.

BE TO PIPE ASBESTOS CEMENT AND MASTIC AND TILE FLOOR ACM

ACCESS TO ETC. PARTITIONS, WALLS, CONTAINING NON-ASBESTOS ALL

REMOVE SHALL CONTRACTOR THE CONTAINMENT, UNDER WHILE 7.

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE

A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN

SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT IN 6.

THE DESIGNATED VA REPRESENTATIVE.

WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION

THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN

LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.

BE TO IS WORK WHERE FLOOR THE ON LOCATED PANELS DISTRIBUTION

POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS

GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR

THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS

WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR

OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.

SHEETING TO PROTECT THEM FROM DUST AND WATER CONTAMINATION.

PLASTIC WITH DETECTORS SMOKE THE COVER SHALL AND SYSTEM FIRE

MAIN THE FROM ISOLATED AREA WORK THE IN DETECTORS SMOKE ANY

HAVE TO ARRANGE SHALL CONTRACTOR THE SHEETING. PLASTIC 6-MIL

RETARDANT FIRE OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK

THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.

CONTAINMENT AREA

PROJECT AREA

ASBESTOS-CONTAINING TRANSITE PIPE

BLACK MASTIC UNDER NON-ACM FLOOR TILE

Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/23/2019 4:35:07 PM

Phase

100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

FULLY SPRINKLERED

01/28/2020

BASEMENT - ASBESTOS ABATEMENT

STRETCHER

ALCOVE

CB-24A

CLOSET

C-07D

CLOSET

C-07C

MALE

TOILET

C-08D

FEMALE

TOILET

C-08B

FEMALE

STAFF

TOILET

G-51

FEMALE

STAFF

TOILET

G-55

CLOSET

G-46

CLOSET

G-08A

CLOSET

ELECTRICAL

A-22A

FROZEN

SECTION

G-18

B-A118

CORRIDOR

CB-23

CORRIDOR

CB-4

AREAWAY

CORRIDOR

CB-9C

CORRIDOR

CB-3

SCRUB UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

FAN RM - 4

B-B105

MECH RM

AHU-26

FAN RM 11

STORAGE

ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC

POS RM

C-07V

EMERGENCY

GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

CORRIDOR

CB-16E

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

DECONTAMINATION RM

B-02

CORRIDOR

CB-7

CORRIDOR

CB-8

SCRUB

CB-3B

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

STAIR

NO 2

OFFICE

A-04B

BLOOD BANK

A-14

OFFICE

A-14A

PATH CHIEF

A-09

HEMA SUPER

A-17C

FEMALE

TOILET

A-10

FEMALE

TOILET

A-11

A-17B

MALE

TOILET

A-12

MALE

TOILET

A-13

SOILED

UTILITY

G-56A

RECOVERY

STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL

CLOSET

SIGNAL

G-49B

CLEAN

LINEN

G-56D

SIGNAL

G-49A

RECOVERY

CLEAN

UTILITY

G-56E

RECOVERY

NURSE

STATION

RECOVERY

ISOLATION

BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY

ISOLATION

BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

STAIR

NO 10

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

GAS STORAGE

NURSE

MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

ELEVATOR

P-8

TISSUE TYP

A-20

FLOW CYTO

A-20A

IMMUN LAB

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST EQUIP

STOR

SCRUB-UP

ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

CORRIDOR

CB-2

CHIEF

G-08

OFFICE

G-11

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE TOILET

& SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

STAIR

NO 1

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN

LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB UP

ALCOVE

G-29

SCRUB-UP

ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER &

SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING RM

GENERAL

G-27

SUB STERILE

G-26A

OPERATING RM

GENERAL

G-26

GENERAL

OPERATING RM

G-25

SUB

STERILE

G-21A

OPERATING RM

GENERAL

G-21

OPERATING RM

GENERAL

G-19

SCRUB

SUB

STERILE

G-19A

REC & OR

HEAD NURSES

G-01

ELECTRICAL

CLOSET

G-22

PHONE/SGNL RM

EXT RAD

CNTROLRM

G-20A

STORAGE

G-20B

INSTRUMENT

& STERILE

G-20C

CYSTOSCOPY RM

G-20

HOLDING

G-17

OFFICE

G-02A

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

OFFICE

G-02B

CONTROL

G-03

DRESSING

& HOLDING

G-15

SEC

G-16

OFFICE

G-04

TOILET

G-15A

TOILET

G-15B

OFFICE

G-07

SEC

G-13

CONFERENCE RM

G-14

HAC

G-12

NUCLEAR

CARDIOLOGY

A-25Q

HAZ.

45 KVA

45 & 30 KVA

45 KVA 45 KVA

KVA

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER

ALCOVE

WC

ALCOVE

STRETCHER

ALCOVE

WC

ALCOVE

MULTI-PURPOSE

B-G127S

TLT

B-B101G

ALCOVE

B-G127V

C L E

A N S

U P P L Y

B

G R

PV CV LAB #1

B-B101I

EPS CV LAB #2

B-G127J

CONTROL #1

B-B101J

CV LAB #3 (BID

ITEM 5)

B-B101O

CONTROL #2 (BID

ITEM 5)

B-B101Q

CORRIDOR

B-G127F

VIEW

B-G127O

CV EQUIP #2

B-B101N

SOILED UTIL

B-B101E

PREP/HOLDING

B-G127T

H.A.C

B-B101H

CRASH CART

ALCOVE

B-B101R

TLT

1-G127W

CV EQUIP #3

B-B101P

ALCOVE

B-G127W

ALCOVE

B-G127X

CHANGE

B-G127Y

COR.

B-G127Z

CLEAN LINEN

B-G127AA

ALCOVE

B-G127BB

C V E

Q U

IP

B -B

N www.skellyloy.com

412-828-1412

PITTSBURGH, PA 15238

3280 WILLIAM PITT WAY

SKELLY AND LOY, INC.

626-18-202

Project Number

Building Number

Drawing Number

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Architect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

AE Works Ltd.

209 Sandusky Street

Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

# Revisions Date

LEAD NOTES

NOT TO SCALE

LEGEND

KEY PLAN

NORTH

PROJECT

DRAWING AREA SHOWN

CONTAINMENT AREA

PROJECT AREA

LEAD SHIELDING

LEAD SHIELDING ABATEMENT

LEAD-01

LEAD-01

LEAD CONTAINING MATERIALS

CONSTRUCTION/DEMOLITION WASTE.

CONSIDERED BE SHALL SHIELDING LEAD THE COVERING WALLS WASTE.

LEAD AS OF DISPOSED BE SHALL SHIELDING LEAD THE C.

REMOVAL OF THE EQUIPMENT FROM THE WORK AREA.

FOR SHEETING PLASTIC RETARDANT FLAME SIX-MIL OF LAYER A WITH

EQUIPMENT THE SEAL THEN SHALL CONTRACTOR THE COMPLETE. IS

EQUIPMENT THE OF USE THE ONCE EQUIPMENT REMOVAL ALL WET-WIPE

AND VACUUM HEPA THOROUGHLY SHALL CONTRACTOR THE B.

AIR PRESSURE IN THE WORK AREA.

NEGATIVE APPROPRIATE THE RE-ESTABLISH TO REPAIRS NECESSARY

THE MAKE AND WORK STOP SHALL CONTRACTOR THE COLUMN, WATER

OF INCHES -0.02” BELOW FALLS AREA WORK THE WITHIN PRESSURE

AIR NEGATIVE THE TIME ANY AT IF EQUIPMENT. SAW SHROUDED

THE OF USE THE DURING TIMES ALL AT MAINTAINED BE SHALL

AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.

CONTROLS/WORK PRACTICES WHEN REMOVING LEAD SHIELDING:

ENGINEERING FOLLOWING THE USE SHALL CONTRACTOR THE

DISPOSED OF AS CONSTRUCTION/DEMOLITION WASTE.

AND CONTAINING NON-LEAD CONSIDERED BE SHALL SHIELDING LEAD

THE COVERING WALLS ETC. HAMMER, BAR, PRY I.E. METHODS; MANUAL

USING AREA WORK THE IN PRESENT SHIELDING LEAD THE REMOVE

SHALL CONTRACTOR THE - METHOD REMOVAL SHIELDING LEAD 2.

SECTION 3.1 OF THE SPECIFICATIONS.

BY REQUIRED AS SHEETING PLASTIC OF LAYERS 2 WITH SURFACES

WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE

THE WORK AREA’S NEGATIVE AIR PRESSURE.

MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETERS DIGITAL (2)

TWO MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED MANOMETERS

DIGITAL OF USE THE THROUGH CONTRACTOR THE BY MONITORED

CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE AIR NEGATIVE

AREA. WORK THE INSIDE HOUR PER CHANGES AIR FOUR LEAST

AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED HEPA THESE

BUILDING. THE OF EXTERIOR THE TO EXHAUSTED AND HANDLERS

AIR FILTERED HEPA USING AREA WORK THE IN CREATED BE SHALL

PRESSURE AIR NEGATIVE REMOVAL. DURING TIMES ALL AT PROVIDED

BE SHALL LOCATION, PERIMETER AREA WORK ANY AT MEASURED

AS COLUMN, WATER OF INCHES -0.02 LEAST AT OF PRESSURE

AIR NEGATIVE A CONTAINMENT. PRESSURE NEGATIVE A WITHIN

CONDUCTED BE SHALL WORK REMOVAL SHIELDING LEAD ALL

THE WORK AREA.

FROM MATERIAL SHIELDING LEAD ALL OF REMOVAL THE PERFORMING

WHEN DUST OF RELEASE THE CONTROL TO VACUUM FILTERED

HEPA AND METHODS WET MANUAL USE SHALL CONTRACTOR THE

AREA, WHERE INDICATED ON THE DRAWING.

WORK DESIGNATED THE FROM SHIELDING LEAD ALL OF DISPOSE AND

REMOVE SHALL CONTRACTOR THE - REMOVAL SHIELDING 1. LEAD

PROJECT PHASING.

AND SETUP AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS

CONTROL DUST APPLICABLE REFERENCE SHALL CONTRACTOR THE 11.

1926.500-503.

CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO

ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET

(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED

WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.

(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926

AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE

CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS

APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.

PROJECT IN THIS WORK AREA.

RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK THE MAKE

AND SHIELDING LEAD SPECIFIED REMOVE TO IS WORK ABATEMENT THE

OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED

OR CONTAINING LEAD ANY OF DISPOSAL THE INCLUDES ALSO WORK

THE DUST. LEAD AIRBORNE WITH CONTACT FROM AREAS ADJACENT

AND ENVIRONMENT THE WORKERS, PROTECT TO MATERIAL SHIELDING

LEAD OF CONTROL AND HANDLING THE INCLUDES WORK THE 8.

CONSTRUCTION/DEMOLITION WASTE.

NON-LEAD AS TREATED BE SHALL WALLS REMOVED. BE TO SHIELDING

LEAD ACCESS TO WALLS ALL REMOVE SHALL CONTRACTOR THE 7.

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE

A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN

SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT FULL FOR 6.

THE DESIGNATED VA REPRESENTATIVE.

WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION

THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN

LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.

BE TO IS WORK WHERE FLOOR THE ON LOCATED PANEL DISTRIBUTION

POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS

GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR

THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS

WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR

OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.

PLASTIC SHEETING TO PROTECT THEM FROM DUST AND WATER.

WITH THEM COVER SHALL AND SYSTEM FIRE MAIN THE FROM ISOLATED

AREA WORK THE IN DETECTORS SMOKE ANY HAVE TO ARRANGE

SHALL CONTRACTOR THE PROJECT. THE THROUGHOUT FUNCTIONAL

REMAIN SHALL HEADS SPRINKLER HEADS. SPRINKLER COVER NOT

SHALL SHEETING PLASTIC THE SHEETING. PLASTIC 6-MIL RETARDANT

FLAME OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK

THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.

SHIELDING MATERIAL.

LEAD THE OF ABATEMENT THE CONDUCT TO NEEDED AS CHAMBER

DECONTAMINATION THE RELOCATE TO REQUIRED BE MAY CONTRACTOR

THEREFORE, REQUIRED. IS AREA WORK THE WITHIN CHAMBERS

DECONTAMINATION THE OF PLACEMENT SPECIFICATIONS. THE OF 3.1

SECTION WITH ACCORDANCE IN CHAMBERS DECONTAMINATION WASTE

AND PERSONNEL DESIGN AND CONSTRUCT SHALL CONTRACTOR THE

- LOCATION ENCLOSURE DECONTAMINATION PERSONAL/WASTE 3.

Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/25/2019 2:33:51 PM

1310 24th Avenue South, Nashville, TN 37212

RCM

Project Title

Location

Issue Date Checked Drawn

Phase

Sprinkler Status

Phase

100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

FULLY SPRINKLERED

01/28/2020 BSR

BASEMENT - LEAD SHIELDING ABATEMENT

MATERIAL SCHEDULE AND CONCRETE MIX DESIGN TABLE

MEMBER f'c W/C

F S W C 3/4" AGGREGATE 1" AGGREGATE

FOOTINGS 4500 PSI 0.45

EXPOSURE CATEGORY ENTRAINED AIR CONTENT

F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%

N/A N/A N/A N/A N/A N/A

SLABS-ON-GRADE (EXT)

4000 PSI 0.50

NOTES:

1. PROVIDE CONCRETE MIXES IN ACCORDANCE WITH ACI 301 FOR THE EXPOSURE CATEGORIES IDENTIFIED IN THE ABOVE TABLE.

2. MAXIMUM WATER-CEMENT (W/C) RATIOS INDICATED IN THE TABLE SHALL INCLUDE WATER FROM ADMIXTURES IN W/C CALCULATIONS.

3. DO NOT AIR-ENTRAIN CONCRETE DESIGNATED TO RECEIVE STEEL TROWEL FINISH.

SLABS-ON-GRADE (INT)

4500 PSI 0.45 F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%

PIERS 4500 PSI 0.45 F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%

WALLS 4500 PSI 0.45 F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 -

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 1

Sprinkler Status

AE Works Ltd.

209 Sandusky Street Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

KEYPLAN

161735

C U s e rs \l le s n ia k o w s k i\ D o c u m e n ts \1

A R

C H

S tr u c tu ra l W o rk in g F ile lle s n ia k o w s k i.

rv t

/2

/2

:5

:0

A

M

S001

STRUCTRUAL GENERAL NOTES

PVE, LLC

WATERFRONT CORPORATE PARK

III, SUITE 101

2000 GEORGETOWN DRIVE

SEWICKLEY, PA 15143-8992

(724) 444-1100

JEREMY URBAN

UPGRADE SURGICAL SUITE

AIR HANDLING UNITS

1310 24th Avenue South, Nashville, TN 37212

626-18-202

01/28/2020 JU LRL

CONSTRUCTION

DOCUMENTS CD-2

GENERAL NOTES - DIVISION 1

1. THESE GENERAL DESIGN AND CONSTRUCTION NOTES ARE INTENDED TO BE INTERPRETED IN COMBINATION WITH THE

PROJECT ARCHITECTURAL AND STRUCTURAL SPECIFICATIONS. IN THE EVENT OF ANY INCONSISTENCY, THE MORE STRINGENT

REQUIREMENT SHALL APPLY. IN THE EVENT OF ANY QUESTION OF INTERPRETATION, THE DECISION OF THE ENGINEER SHALL PREVAIL.

2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS THE LOCAL AGENCIES, DEPARTMENTS

AND LAWS HAVING JURISDICTION OVER ANY PORTION OR PHASE OF WORK.

3.THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES WITH REQUIREMENTS OF LOCAL AUTHORITIES AND BUILDING

MANAGEMENT.

4. ALL DETAILS, SECTIONS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO

SIMILAR SITUATIONS, UNO.

5. NO CHANGE IN SIZE, DIMENSION OR POSITION OF STRUCTURAL ELEMENTS SHALL BE MADE WITHOUT THE APPROVAL

OF THE STRUCTURAL ENGINEER OF RECORD.

6. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING CONSTRUCTION AND/OR SUBMITTING

SHOP DRAWINGS. ANY DISCREPANCIES SHALL BE REPORTED TO THE STRUCTURAL ENGINEER OF RECORD.

7. TAKE ALL MEASURES NECESSARY TO PROTECT EXISTING AND NEW UTILITIES AND BUILDINGS AND ASSUME FULL RESPONSIBILITY

FOR ANY DAMAGE DURING CONSTRUCTION. RESTORATION OF DAMAGED AREAS SHALL BE TO THE SATISFACTION OF THE OWNER, AT NO COST TO THE OWNER.

8. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR DETAILED INFORMATION REGARDING FINISHES, WATERPROOFING, LOCATIONS OF NON-LOAD BEARING PARTITIONS, EXTERIOR FACE OF BUILDING, ETC.

9. ALL NOTES, DIMENSIONS, DETAILS AND JOB CONDITIONS ARE TO BE CHECKED AND VERIFIED, AND ALL DISCREPANCIES SHALL

BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR ENGINEER PRIOR TO COMMENCEMENT OF WORK.

10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALL STAGES AND PHASES OF WORK.

11. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF THE

WORK SHALL BE INCLUDED.

12. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY

PRE…