Drawings - 626-18-202 Upgrade Surgical Suite Air Handling Units Bid drawings.pdf
PDF 14 MB Posted
- Solicitation number
- 36C24920R0049
About this file
This package includes construction drawings and specifications for the upgrade of surgical suite air handling units at the Nashville VA Medical Center. The project involves demolishing and replacing two air handling units, associated ductwork, and mechanical room modifications. Key scope items include installing new AC-17 and AC-16 air handlers, exhaust fans, ductwork, hydronic piping, controls, and mechanical room improvements. Construction will be phased to renovate operating rooms and maintain medical services throughout the project duration. The solicitation number is 36C24920R0049 and was issued by the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
B
IM
/1
N a s h v ill e V
A
A H
U U p g ra d e
/1
N a s h v ill e V
A
A H
U U p g ra d e s M
E P
.r v t
/2
/2
:3
:0
P
M
G001
COVER SHEET UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
1310 24th Avenue South, Nashville, TN 37212
626-18-202
01/28/2020 CJC SB
100% BID DOCUMENTS
UPGRADE SURGICAL SUITE
AIR HANDLING UNITS
PROJECT NO. 626-18-202
NASHVILLE VA MEDICAL CENTER
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212
VICINITY MAP
SITE
LOCATION MAP
SITE
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
G002 GENERAL CONTRACTOR AND BASIS-OF-DESIGN PROTOCOL NOTES
G003 GENERAL PROTECTION PROTOCOL, SCOPE OF WORK AND MISC. NOTES
G100 PHASING PLAN
G101 ICRA AND DUST BARRIER CONTROL
ASB-01 BASEMENT - ASBESTOS ABATEMENT
LEAD-1 BASEMENT - LEAD SHIELDING ABATEMENT
STRUCTURAL
S001 STRUCTURAL GENERAL NOTES
S100 OVERALL REFERENCE PLAN
S101 BASEMENT PLAN
S102 BATHROOM PLAN
S103 FAN ROOM #5 (AHU 16)
S200 DUCTWORK OPENING
S500 TYPICAL DETAILS
S501 FAN ROOM SECTION 1
S502 FAN ROOM SECTION 2
S503 FAN ROOM SECTION 3
S504 FAN ROOM SECTION 4
ARCHITECTURAL
A001 ARCHITECTURAL SYMBOLS, LEGENDS AND GENERAL NOTES
A100 PARTIAL BASEMENT DEMOLITION PLAN
A101 PARTIAL BASEMENT NEW WORK PLAN
A102 DEMOLITION AND NEW WORK PLAN - FAN ROOM 5
A201 ENLARGED FLOOR PLANS
A301 SECTIONS
MECHANICAL
M000 MECHANICAL TITLE SHEET
MD101 MECHANICAL ROOM B-B105 (AC-17) DEMO./TEMPORARY WORK PLAN
MD102 MECHANICAL ROOM B-G124 (AC-16) DEMO./TEMPORARY WORK PLAN
MD103 SUB-BASEMENT DUCTWORK DEMOLITION PLAN
MD104 BASEMENT DUCTWORK DEMOLITION PLAN
M101 ENLARGED MECHANICAL ROOM (AC-17) NEW DUCTWORK PLAN
M102 ENLARGED MECHANICAL ROOM (AC-16) NEW DUCTWORK PLAN
M103 SUB-BASEMENT PLAN - NEW DUCTWORK
M104 BASEMENT PLAN - NEW DUCTWORK
M105 MECHANICAL AIRFLOW/ PRESSURIZATION DIAGRAM
M201 ENLARGED MECHANICAL ROOM HYDRONICS PLANS
M202 BASEMENT PLAN - NEW PIPING
M401 ENLARGED OR NEW DUCTWORK
M402 ENLARGED OR NEW DUCTWORK
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M601 MECHANICAL CONTROL DIAGRAMS
M602 MECHANICAL CONTROL DIAGRAMS
M701 MECHANICAL SCHEDULES
ELECTRICAL
E000 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
ED101 ELECTRICAL DEMOLITION PLAN
E101 ELECTRICAL NEW WORK PLAN
E201 ELECTRICAL DETAILS
E301 ELECTRICAL SCHEDULES AND RISER DIAGRAMS
# Revisions Date
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
B
IM
/1
N a s h v ill e V
A
A H
U U p g ra d e
/1
N a s h v ill e V
A
A H
U U p g ra d e s M
E P
.r v t
/2
/2
:3
:0
P
M
G002
GENERAL CONTRACTOR AND
BASIS-OF-DESIGN PROTOCOL NOTES
UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
1310 24th Avenue South, Nashville, TN 37212
626-18-202
01/28/2020 CC SB
100% BID DOCUMENTS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
B
IM
/1
N a s h v ill e V
A
A H
U U p g ra d e
/1
N a s h v ill e V
A
A H
U U p g ra d e s M
E P
.r v t
/2
/2
:3
:1
P
M
G003
GENERAL PROTECTION PROTOCOL, SCOPE
OF WORK AND MISC. NOTES
UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
1310 24th Avenue South, Nashville, TN 37212
626-18-202
01/28/2020 CC SB
100% BID DOCUMENTS
# Revisions Date
NASHVILLE MEDICAL CENTER
THE CONTRACTOR SHALL IDENTIFY ALL EMPLOYEES THAT WILL BE WORKING UNDER THE
AWARDED CONTRACT. CONTRACTOR PERSONNEL SHALL INCLUDE EMPLOYEES, SUB-
CONTRACTORS, SUPPLIERS AND DELIVERY PERSONNEL ENTERING THE MEDICAL CENTER.
THOSE EMPLOYEES SHALL BRING 2 FORMS OF GOVERNMENT ISSUED ID TO OBTAIN A VA
CONTRACTOR FLASH IDENTIFICATION BADGE THAT SHALL BE WORN ABOVE THE BELT AT ALL
TIMES WHILE ON MEDICAL CENTER PROPERTY. IF ISSUED A TEMPORARY BADGE,
CONTRACTOR’S EMPLOYEES SHALL RETURN ALL TEMPORARY I.D. BADGES TO DESIGNATED
PERSONNEL AT THE END OF THE PERIOD OF PERFORMANCE OF THE CONTRACT. LOST
BADGES WILL RESULT IN A SURCHARGE.
5.
6. IT IS THE INTENT OF THE DEPARTMENT OF VETERANS AFFAIRS TO HAVE THE CONTRACTOR
FULLY MEASURE, SURVEY, INVESTIGATE, AND DOCUMENT THE EXISTING WINDOWS,
CONNECTIONS AND INTERIOR/EXTERIOR INTERFACES IN ORDER TO GAIN THE KNOWLEDGE
AND INSIGHT NECESSARY TO PERFORM THE CONSTRUCTION IN A PROFESSIONAL AND
COMPETENT MANNER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND
COR OF ANY DISCREPANCY BEFORE PERFORMING ANY WORK. THE CONTRACTOR SHALL BE
SPECIFICALLY RESPONSIBLE FOR THE COORDINATION AND PROPER RELATION OF HIS WORK
TO THE BUILDING, STRUCTURE, PHASING AND ENSURE THE SAFETY OF EMPLOYEES AND
WORKMEN.
FURNISH ALL LABOR, TOOLS, MATERIALS, AND EXPERTISE TO COMPLETE PROJECT
626-18-501, “USP 800 PHARMACY COMPLIANCE”, IN STRICT ACCORDANCE WITH THE
SPECIFICATIONS AND DRAWINGS AT THE TENNESSEE VALLEY HEALTHCARE SYSTEM,
VAMC, 1310 24TH AVENUE SOUTH, NASHVILLE, TN 37212.
T
T T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
J
J
REC & OR HEAD
NURSES
G-01
OFFICE
G-04
OFFICE
G-07
CHIEF
G-08
OFFICE
G-11
HAC
G-12
SEC
G-13
CONF ROOM
G-14
DRESSING &
HOLDING
G-15
TOILET
G-15A
TOILET
G-15B
SEC
G-16
HOLDING
G-17
FROZEN
SECTION
G-18
OPERATING
ROOM 2
G-19
OPERATING
ROOM 1
G-20
OPERATING
ROOM 3
G-21
ELEC CLO
G-22
STAFF LOUNGE
G-23
PHYSICIAN
LOUNGE
G-24
OPERATING
ROOM 4
G-25
OPERATING
ROOM 5
G-26
OPERATING
ROOM 6
G-27
OFFICE
G-28
SCRUB UP
ALCOVE
G-29
SCRUB-UP
ALCOVE
G-30
OFFICE
G-31
EXT RAD
CONTROL
G-32
SCRUB-UP
ALCOVE
G-33
OPERATING
ROOM 9
G-36
SUB STERILE
G-37
OPERATING
ROOM 8
G-38
OPERATING
ROOM 7
G-39
EQUIP STORAGE
G-40
PLASTER &
SPLINTS
G-41
SUB STERILE
G-42
HAC
G-43
EXT RAD
CONTROL RM
G-20a
STORAGE
G-20b
INST & STERILE
G-20c
SUB STERILE
G-19a
SUB STERILE
G-21a
SUB STERILE
G-26a
EQUIP
G-28a
DICTATING
G-23a
FEMALE
SHOWER
G-23b
FEMALE TOILET
G-23c
FEMALE
LOCKER RM
G-23d
MALE
TOILET/SHOWER
G-24a
MALE LOCKER
ROOM
G-24b
PHONE
G-01a
PUMP TECHS
PREP RM
G-36a
CLEAN CORE
SUPPORT
G-34
ON-CALL
G-48
ALCOVE
G-49
PACU
G-50
FEMALE STAFF
TOILET
G-51
RECOVERY
ISOLATON
BEDROOM
G-52
ALCOVE
G-53
RECOVERY
ISOLATON
BEDROOM
G-54
FEMALE STAFF
TOILET
G-55
SICU
G-56
BATH
G-48a
SIGNAL
G-49a
ELECTRICAL
CLO
G-49b
TELE
G-49c
SOILED UTILITY
G-56a
RECOVERY
STORAGE
G-56b
ANTE ROOM
G-56c
CLEAN LINEN
G-56d
RECOVERY
CLEAN UTILITY
G-56e
OFF LINE
MONITORING
G-47
STAIR
FAN ROOM 5
B-G124
ELECTRICAL
B-G124a
EM GENERATOR
B-G124b
FAN RM 4
B-B105
CORRIDOR
CB-6a
CORRIDOR
CB-2
CORRIDOR
CB-2b
CORRIDOR
CB-2c
CLO
B-G08a
CORRIDOR
CB-4
CORRIDOR
CB-3
CORRIDOR
CB-3a
CORRIDOR
CB-24
FEMALE
LOCKER ROOM
C-08a
FEMALE TOILET
C-08b
OFFICE
C-09
CORRIDOR
CB-22
ANEST WORK
RM
B-07
CORRIDOR
CB-21
VEST
B-01p
CLO
G-46
ANEST EQUIP
STOR
G-35
NURSE
MANAGER
G-45
VESTIBULE
V-01
7 8 9 10 11 12
13 14 15 16 17 18 19
C
D
E
F
G
H
I
21 22
1 2 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
KEYPLAN
B
IM
/1
N a s h v ill e V
A
A H
U U p g ra d e
/1
N a s h v ill e V
A
A H
U U p g ra d e s M
E P
.r v t
/2
/2
:3
:1
P
M
G100
PHASING PLAN UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
1310 24th Avenue South, Nashville, TN 37212
626-18-202
01/28/2020 CJC AA
100% BID DOCUMENTS
NORTH
TRUE
3/32" = 1'-0"
PHASING PLAN
NOTES FOR PHASING:
1. THE VA REQUIRES THE CONTRACTOR WORK SEVEN DAYS A WEEK DURING THE SHUTDOWN OF EACH PHASE TO LIMIT OVERALL DOWNTIME.
2. SUBMITTALS FOR LONG LEAD (8+ WEEKS) ITEMS OF THE OPERATING ROOM RENOVATIONS (SUCH AS OPERATING ROOM DIFFUSER ARRAY SYSTEM AND AHUS) MUST BE TO BE SUBMITTED, APPROVED, MATERIALS ORDERED AND MATERIALS STORED OFF-SITE PRIOR TO CONTRACTOR STARTING ANY SHUTDOWN ACTIVITIES. THIS IS INTENDED TO LIMIT THE POTENTIAL FOR DELAYS THAT COULD EXTEND THE SHUTDOWN.
3. CONTRACTOR MUST ACCOUNT FOR RELATED ACTIVITIES SUCH AS INFECTION CONTROL MEASURES, CLEANING, TESTING AND RE-CERTIFICATION OF
THE OPERATING ROOM SUITE.
4. THE WORK IN THE SUB-BASEMENT WOULD BE COMPLETED AS A PART OF PHASE 1.
THE FOLLOWING IS A PROPOSED PHASING STRATEGY PROPOSED BY THE DESIGN TEAM FOR THE CONTRACTOR TO IMPLEMENT DURING CONSTRUCTION.
PLEASE NOTE PER THE VA ONLY ONE (1) OF THE ORS 7, 8, AND 9 MAY BE OUT OF SERVICE AT ANY TIME DURING CONSTRUCTION.
PHASE 1:
PROVIDING TEMPORARY AHUS AND INSTALLING CONNECTIONS TO BACKFEED EXISTING DUCTWORK.
DEMOLITION OF AC-17 AND EF-74 AND ASSOCIATED DUCTWORK. TEMPORARILY REMOVE EXISTING EXHAUST FAN (EF-109) SERVING MECHANICAL ROOM.
DEMOLITION OF AC-16, RF-16, AND EF-82 AND ASSOCIATED DUCTWORK INCLUDING EXTENDING OUTDOOR AIR INTAKE DUCT.
INSTALL NEW DUCTWORK IN SUB-BASEMENT.
INSTALL NEW DUCTWORK IN CORRIDOR. (NOTE: THIS PORTION OF WORK WILL NEED TO OCCUR AT NIGHT/ON WEEKENDS AND INCLUDE NEW DUCTWORK AND PIPING FOR NEW VAV BOXES.)
INSTALLING NEW AC-17, RF-17 AND EF-74 INCLUDING ADJUSTING MECHANICAL ROOM LOUVER OPENINGS.
INSTALLING NEW AC-16, RF-16 AND EF-82 INCLUDING ADJUSTING MECHANICAL ROOM LOUVER OPENINGS.
PHASE 2:
RENOVATE OPERATING ROOMS 1, 2, AND 7. INCLUDES INSTALLING NEW CEILING TO SUPPORT DIFFUSER ARRAY ABOVE SURGICAL TABLE AND TWO ADDITIONAL NEW LOW RETURNS IN EACH OPERATING ROOM.
REPLACE VAV BOXES WITH DDC CONTROLLED VAV BOXES.
PHASE 3:
RENOVATE OPERATING ROOMS 3, 4, AND 8. INCLUDES INSTALLING NEW CEILING TO SUPPORT DIFFUSER ARRAY ABOVE SURGICAL TABLE AND TWO ADDITIONAL NEW LOW RETURNS IN EACH OPERATING ROOM.
REPLACE VAV BOXES WITH DDC CONTROLLED VAV BOXES.
PHASE 4:
RENOVATE OPERATING ROOMS 5, 6, AND 9. INCLUDES INSTALLING NEW CEILING TO SUPPORT DIFFUSER ARRAY ABOVE SURGICAL TABLE AND TWO ADDITIONAL NEW LOW RETURNS IN EACH OPERATING ROOM.
REPLACE VAV BOXES WITH DDC CONTROLLED VAV BOXES.
PHASE 1
PHASE 2
PHASE 3
PHASE 4
AREAWAY
STRETCHER ALCOVE
CB-24A
MALE
TOILET
C-08D
FEMALE TOILET
C-08B
FEMALE STAFF TOILET
G-51
FEMALE STAFF TOILET
G-55
CLOSET
G-46
CLOSET
G-08A
ELECTRICAL CLOSET
A-22A
FROZEN
SECTION
G-18 B-A118
CORRIDOR
CB-23
CORRIDOR
CB-4
AREAWAY
CORRIDOR
CB-3
SCRUB
UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
FAN RM - 4
B-B105
MECH
RM
AHU-26
FAN RM 11
STORAGE ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC POS RM
C-07V
EMERGENCY GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
B-02
CORRIDOR
CB-7
SCRUB
CB-3B
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
STAIR
NO 2
OFFICE
A-04B
FEMALE TOILET
A-10
FEMALE TOILET
A-11
MALE
TOILET
A-12
MALE
TOILET
A-13
SOILED UTILITY
G-56A
RECOVERY STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL CLOSET SIGNAL
G-49B
CLEAN LINEN
G-56D
SIGNAL
G-49A
RECOVERY CLEAN UTILITY
G-56E
RECOVERY NURSE STATION
RECOVERY ISOLATION BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY ISOLATION BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
STAIR
NO 10
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
GAS STORAGE NURSE MGR
OFFICE
B-01Q
ELEVATOR
P-8
FLOW CYTO
A-20A
IMMUN LAB
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST
EQUIP STOR
SCRUB-UP ALCOVE
G-33
EXT RAD
CONTROL
G-32
OPERATING RM 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
OPERATING RM 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
CORRIDOR
CB-2
CHIEF
G-08
OFFICE
G-11
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE
TOILET &
SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
STAIR
NO 1
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN LOUNGE
G-24
OPERATING RM 7
G-39
OFFICE
G-28
SCRUB
UP
ALCOVE
G-29
SCRUB-UP ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER
& SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING RM 6
G-27
SUB STERILE
G-26A
OPERATING RM 4
G-26
OPERATING RM 3
G-25
SUB
STERILE
G-21A
OPERATING RM 3
G-21
OPERATING RM 2
G-19
SCRUB
SUB
STERILE
G-19A
REC & OR
HEAD NURSES
G-01
ELECTRICAL CLOSET
G-22
PHONE/SGNL RM
EXT RAD
CNTROLRM
G-20A
STORAGE
G-20B
INSTRUMENT & STERILE
G-20C
OPERATING RM 1
G-20
HOLDING
G-17
OFFICE
G-02A
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
OFFICE
G-02B
CONTROL
G-03
DRESSING
& HOLDING
G-15
SEC
G-16
OFFICE
G-04
TOILET
G-15A
TOILET
G-15B
OFFICE
G-07
SEC
G-13
CONFERENCE RM
G-14
HAC
G-12
NUCLEAR
CARDIOLOGY
A-25Q
HAZ.
45 KVA
45 & 30 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER ALCOVE
WC
ALCOVE
STRETCHER ALCOVEWC
ALCOVE
MULTI-PURPOSE
B-G127S
TLT
B-B101G
ALCOVE
B-G127V
C
LE
A N
S U
P P
LY
B \-G
7R
PV CV LAB #1
B-B101I
EPS CV LAB #2
B-G127J
CONTROL #1
B-B101J
CV LAB #3 (BID
ITEM 5)
B-B101O
CONTROL #2 (BID
ITEM 5)
B-B101Q
CORRIDOR
B-G127F
VIEW
B-G127O
CV EQUIP #2
B-B101N
SOILED UTIL
B-B101E
PREP/HOLDING
B-G127T
H.A.C
B-B101H
CRASH CART
ALCOVE
B-B101R
TLT
1-G127W
CV EQUIP #3
B-B101P
ALCOVE
B-G127W
ALCOVE
B-G127X
CHANGE
B-G127Y
COR.
B-G127Z
CLEAN LINEN
B-G127AA
ALCOVE
B-G127BB
C V
E Q
U
IP
B -B
1N
DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT
PRIOR TO INITIATING WORK, CONTRACTOR AND COR WILL ACCESS THE SCOPE OF THE CONSTRUCTION
ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES
AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM
RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH
RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY
ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS
(CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT
SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA
AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION
PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION
CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH
RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH
ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED
ACCORDING TO SPECIFIC VAMC POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT
DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT
SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR
ACCESS TO ENTRY. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS
SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL
HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE
EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY
FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES, WET
CEILING TILE, ETC.
• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES;
AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE.
SIGNAGE SHOULD DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH
AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE
REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS
OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE
USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE
BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH PRIOR APPROVAL OF
THE VAMC.
• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT
EXCAVATION DEBRIS.
• CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS SHOULD BE
REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.
VENTILATION AND ENVIRONMENTAL CONTROLS
• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.
USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES
OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER
AND HEPA FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED
DAILY.
• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND
MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT
BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC
WILL MAKE DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING
AIR PRESSURE THROUGHOUT THE PROJECT.
• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE
OF THE PARTITION.
INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION
1. CLEAN WORK UPON COMPLETION OF TASK
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP &/OR VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY
SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
4. WET MOP WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS I - UPON COMPLETION OF PROJECTS
CLASS II - UPON COMPLETION OF PROJECTS
CLASS III - UPON COMPLETION OF PROJECTS
CLASS IV - UPON COMPLETION OF PROJECTS
(TO BE COMPLETED BY CONTRACTOR AND COR, THEN SIGNED BY INFECTION CONTROL NURSE)
CONTRACTOR'S SIGNATURE AND DATE
COR SIGNATURE AND DATE
LIGHT GRAY HATCH INDICATES
TYPES AND CLASSES SELECTED
FOR THIS RENOVATION
STEP #1: SELECT ACTIVITY TYPE BELOW:
CONSTRUCTION ACTIVITY TYPES:
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE
PER 50 SQUARE FEET.
• PAINTING (BUT NOT SANDING)
• WALL COVERING
• ELECTRICAL TRIM WORK
• MINOR PLUMBING
• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE B
SMALL SCALE, SHORT DURATION (less than 1 day) ACTIVITIES WHICH CREATE
MINIMAL DUST
INCLUDES, BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING
• ACCESS TO CHASE SPACES
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES
INCLUDES, BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
• REMOVAL OF FLOOR COVERING, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK
SHIFT
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT NOT LIMITED TO:
• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE HVAC
SYSTEM.
• NEW CONSTRUCTION
IS IT LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR INFECTION
WITH TUBERCULOSIS? YES / NO
IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER
SYSTEM/LINES DURING ACTIVITY? YES / NO
STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN
A) INFECTION CONTROL RISK GROUPS
GROUP 1 - LOW: OFFICE AREAS:
GROUP 2 - MEDIUM: CARDIOLOGY, ECHOCARDIOGRAPHY, ENDOSCOPY, NUCLEAR
MEDICINE, PHYSICAL THERAPY, RADIOLOGY/MRI, RESPIRATORY THERAPY
GROUP 3 - HIGH RISK: CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT
SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS
GROUP 4 - HIGHEST RISK: ANY AREA CARING FOR IMMUNOCOMPROMISED
PATIENTS, CARDIAC CATH LAB, CENTRAL SUPPLY, INTENSIVE CARE UNITS,
MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS
STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:
CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS
** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II,
III, IV PRECAUTIONS ARE REQUIRED.
RISK LEVEL TYPE 'A' TYPE 'B' TYPE 'C' TYPE 'D'
GROUP 1 I II II III / IV
GROUP 2 I II III IV
GROUP 3 I II III / IV IV
GROUP 4 II III / IV III / IV IV
CONSTRUCTION TYPE:
C
RISK GROUP:
LOW
RISK ASSESSMENT:
II
ELECTRICAL
YES
POTABLE WATER
NO
HVAC
YES
MEDICAL VACUUM
NO
SEWER
YES
PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL
STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:
1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED
CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR
THE CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY
SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT.
CLASS I - DURING CONSTRUCTION PROJECT
CLASS II - DURING CONSTRUCTION PROJECT
CLASS III - DURING CONSTRUCTION PROJECT
CLASS IV - DURING CONSTRUCTION PROJECT
INFECTION CONTROL NURSE'S SIGNATURE AND DATE
1 LAYER 5/8" TYPE-X G.W.B.
INSULATION - SEE SPECIFICATIONS
5/8" G.W.B.
METAL STUDS @16" O.C.
BASE - SEE FINISH
SCHEDULE FOR TYPE
TRACK RUNNER
FLOOR SLAB
S E
E S
C H
E D
U
LE
P A
R T
IT
IO
N W
ID
T
H
FIRESTOPPING SEALANT - SEE SPECIFICATIONS
DECK OR
STRUCTURE ABOVE
NOTE:
1. FOR EXISTING PARTITIONS USED AS ICRA BARRIERS, THE
CONTRACTOR SHALL COMPLETE THE FOLLOWING:
· MODIFY EXISTING PARTITION TO A ONE-HOUR RATED ICRA BARRIER
· EXTEND PARTITION TO FLOOR DECK WITH 5/8” G.W.B. ON EACH SIDE
· FINISH WALL PARTITION AS DIRECTED BY UL RATING REQUIREMENTS
· INFILL EXISTING OPENINGS WITH 5/8” G.W.B ON EACH SIDE
· PROVIDE FIRESTOPPING AT ALL EXISTING PENETRATIONS
2. PROVIDE 45 MINUTE RATED DOOR TO ACCESS CONSTRUCTION AREA
AT ALL NEW AND EXISTING ICRA BARRIERS
3. THE CONTRACTOR SHALL NOT BLOCK SPRINKLER PROTECTION ON
THE VA-OCCUPIED SIDE OF THE ICRA BARRIER.
7 8 9 10 11 12
13 14 15 16 17 18 19
C
D
E
F
G
H
I
21 22
1 2 3 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
KEYPLAN
B
IM
/1
N a s h v ill e V
A
A H
U U p g ra d e
/1
N a s h v ill e V
A
A H
U U p g ra d e s M
E P
.r v t
/2
/2
:3
:2
P
M
G101
ICRA AND DUST BARRIER CONTROL UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
1310 24th Avenue South, Nashville, TN 37212
626-18-202
01/28/2020 CJC SB
100% BID DOCUMENTS
NORTH
TRUE
NOT TO SCALEG101
2 ICRA BARRIER
1/16" = 1'-0"
ICRA AND DUST BARRIER CONTROL PLAN
# Revisions Date
NOTE:
DARK LINE ON PLAN INDICATES EXTENTS OF SCOPE OF WORK.
CONTRACTOR TO COORDINATE LOCATION AND EXTENTS OF ICRA
BARRIER WITH VA PRIOR TO CONSTRUCTION. PHASE OF
CONSTRUCTION MUST BE ENCLOSED AT ALL TIME TO KEEP ALL
DUST/CONSTRUCTION DEBRIS OUT OF THE REST OF THE VA FACILITY.
STRETCHER
ALCOVE
CB-24A
C-07DC-07C
MALE
TOILET
C-08D
FEMALE
TOILET
C-08B
FEMALE
STAFF
TOILET
G-51
FEMALE
STAFF
TOILET
G-55
CLOSET
G-46
CLOSET
G-08A
CLOSET
ELECTRICAL
A-22A
FROZEN
SECTION
G-18
B-A118
CORRIDOR
CB-23
CORRIDOR
CB-4
AREAWAY
CORRIDOR
CB-9C
CORRIDOR
CB-3
SCRUB UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
FAN RM - 4
B-B105
MECH RM
AHU-26
FAN RM 11
STORAGE
ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC
POS RM
C-07V
EMERGENCY
GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-16E
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
DECONTAMINATION RM
B-02
CORRIDOR
CB-7
CORRIDOR
CB-8
SCRUB
CB-3B
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
STAIR
NO 2
OFFICE
A-04B
BLOOD BANK
A-14
A-14A
PATH CHIEF
A-09
HEMA SUPER
A-17C
FEMALE
TOILET
A-10
FEMALE
TOILET
A-11
A-17B
MALE
TOILET
A-12
MALE
TOILET
A-13
SOILED
UTILITY
G-56A
RECOVERY
STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL
CLOSET
SIGNAL
G-49B
CLEAN
LINEN
G-56D
SIGNAL
G-49A
RECOVERY
CLEAN
UTILITY
G-56E
RECOVERY
NURSE
STATION
RECOVERY
ISOLATION
BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY
ISOLATION
BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
STAIR
NO 10
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
GAS STORAGE
NURSE
MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
ELEVATOR
P-8
TISSUE TYP
A-20
FLOW CYTO
A-20A
IMMUN LAB
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST EQUIP
STOR
SCRUB-UP
ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
CORRIDOR
CB-2
CHIEF
G-08
OFFICE
G-11
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE TOILET
& SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
STAIR
NO 1
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN
LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB UP
ALCOVE
G-29
SCRUB-UP
ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER &
SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING RM
GENERAL
G-27
SUB STERILE
G-26A
OPERATING RM
GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING RM
GENERAL
G-21
OPERATING RM
GENERAL
G-19
SCRUB
SUB
STERILE
G-19A
REC & OR
HEAD NURSES
G-01
ELECTRICAL
CLOSET
G-22
PHONE/SGNL RM
EXT RAD
CNTROLRM
G-20A
STORAGE
G-20B
INSTRUMENT
& STERILE
G-20C
CYSTOSCOPY RM
G-20
HOLDING
G-17
OFFICE
G-02A
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
OFFICE
G-02B
CONTROL
G-03
DRESSING
& HOLDING
G-15
SEC
G-16
OFFICE
G-04
TOILET
G-15A
TOILET
G-15B
OFFICE
G-07
SEC
G-13
CONFERENCE RM
G-14
HAC
G-12
NUCLEAR
CARDIOLOGY
A-25Q
HAZ.
45 KVA
45 & 30 KVA
45 KVA 45 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER
ALCOVE
WC
ALCOVE
STRETCHER
ALCOVE
WC
ALCOVE
MULTI-PURPOSE
B-G127S
TLT
B-B101G
ALCOVE
B-G127V
C L E
A N S
U P P L Y
B
G R
PV CV LAB #1
B-B101I
EPS CV LAB #2
B-G127J
CONTROL #1
B-B101J
CV LAB #3 (BID
ITEM 5)
B-B101O
CONTROL #2 (BID
ITEM 5)
B-B101Q
CORRIDOR
B-G127F
VIEW
B-G127O
CV EQUIP #2
B-B101N
SOILED UTIL
B-B101E
PREP/HOLDING
B-G127T
H.A.C
B-B101H
CRASH CART
ALCOVE
B-B101R
TLT
1-G127W
CV EQUIP #3
B-B101P
ALCOVE
B-G127W
ALCOVE
B-G127X
CHANGE
B-G127Y
COR.
B-G127Z
CLEAN LINEN
B-G127AA
ALCOVE
B-G127BB
C V E
Q U
IP
B -B
N
/5 /2
:3
:4
A
M
1310 24th Avenue South, Nashville, TN 37212
626-18-202
# Revisions Date
ASB-01
RCM NDB
www.skellyloy.com
412-828-1412
PITTSBURGH, PA 15238
3280 WILLIAM PITT WAY
SKELLY AND LOY, INC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street
Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
ASBESTOS CONTAINING MATERIALS
ACM NOTES
ASB-01
ASBESTOS ABATEMENT
NOT TO SCALE
LEGEND
KEY PLAN
NORTH
PROJECT
DRAWING AREA SHOWN
REQUIRED.
IS AREA WORK THE WITHIN CHAMBERS DECONTAMINATION THE OF
PLACEMENT SPECIFICATIONS. THE OF 1.9 SECTION WITH ACCORDANCE
IN CHAMBERS DECONTAMINATION WASTE AND PERSONNEL
SEPARATE DESIGN AND CONSTRUCT SHALL CONTRACTOR THE
- LOCATION ENCLOSURE DECONTAMINATION PERSONNEL/WASTE 3.
ASBESTOS WASTE.
NON-FRIABLE AS OF DISPOSED BE SHALL PIPE CEMENT AND MASTIC,
AND TILE FLOOR ASBESTOS-CONTAINING ACCUMULATED THE B.
APPROPRIATE NEGATIVE AIR PRESSURE IN THE WORK AREA.
THE RE-ESTABLISH TO REPAIRS NECESSARY THE MAKE AND WORK
STOP SHALL CONTRACTOR THE COLUMN, WATER OF INCHES -0.02”
BELOW FALLS AREA WORK THE WITHIN PRESSURE AIR NEGATIVE THE
TIME ANY AT IF REMOVAL. DURING TIMES ALL AT MAINTAINED BE SHALL
AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.
PRESENT IN THE WORK AREAS USING MANUAL WET METHODS.
MATERIALS ASBESTOS-CONTAINING ALL REMOVE SHALL CONTRACTOR
THE - REMOVAL PIPE ASBESTOS CEMENT MASTIC, AND TILE FLOOR 2.
TO PROCEED PRIOR TO THE START OF ABATEMENT.
APPROVAL RECEIVE AND VA THE NOTIFY SHALL CONTRACTOR THE
REGULATIONS AND THE SPECIFICATIONS.
ALL WITH ACCORDANCE IN PPE PROPER USE SHALL AND CERTIFIED,
AND TRAINED PROPERLY BE SHALL WORKERS ABATEMENT ALL
BUILDING MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
THE WITH COORDINATED BE SHALL SHUTDOWN REQUIRED SERVICE.
IN REMAIN SHALL SYSTEMS PROTECTION AND DETECTION FIRE
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
SHALL WORK AREA. WORK EACH IN EQUIPMENT/DEVICES ELECTRIFIED
AND EQUIPMENT HVAC ALL OF SHUTDOWN FOR CONTRACTOR
TRADE AND VA THE WITH COORDINATE SHALL CONTRACTOR THE
ACCORDANCE WITH THE SPECIFICATIONS.
IN MONITORING AIR PROVIDE SHALL CONTRACTOR THE
BY SECTIONS 3.1 AND 3.2 OF THE SPECIFICATIONS.
REQUIRED AS SHEETING POLYETHYLENE OF LAYERS 2 WITH SURFACES
WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE
AREA’S NEGATIVE AIR PRESSURE.
WORK THE MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETER
DIGITAL A MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED
MANOMETERS DIGITAL OF USE THE THROUGH CONTRACTOR THE BY
MONITORED CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE
AIR NEGATIVE AREAS. WORK THE INSIDE HOUR PER CHANGES AIR (4)
FOUR LEAST AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED
HEPA THESE BUILDING. THE OF EXTERIOR THE TO EXHAUSTED
HANDLERS AIR FILTERED HEPA USING AREA WORK THE IN CREATED
BE SHALL PRESSURE AIR NEGATIVE REMOVAL. ASBESTOS DURING
TIMES ALL AT PROVIDED BE SHALL LOCATION, PERIMETER AREA WORK
ANY AT MEASURED AS COLUMN, WATER OF INCHES -0.02 LEAST AT
OF PRESSURE AIR NEGATIVE A CONTAINMENTS. PRESSURE NEGATIVE
WITHIN CONDUCTED BE SHALL WORK REMOVAL ASBESTOS ALL
THE WORK AREA.
FROM MATERIALS NON-ASBESTOS AND ASBESTOS ALL OF REMOVAL THE
PERFORMING WHEN DUST OF RELEASE THE CONTROL TO CLEANERS
VACUUM AND HANDLERS AIR FILTERED HEPA AND METHODS WET
USE SHALL CONTRACTOR THE PIPE. ASBESTOS CEMENT AND MASTIC
AND TILE FLOOR ACM ACCESS TO AREAS WORK ASBESTOS DESIGNATED
THE WITHIN FROM CREATED MATERIALS CONTAINING NON-ASBESTOS
ALL OF DISPOSE AND REMOVE SHALL CONTRACTOR THE
SURGICAL SUITE RENOVATIONS, WHERE INDICATED ON THE DRAWINGS.
THE BY IMPACTED BE WILL THAT AREAS WORK FROM PIPE ASBESTOS
CEMENT AND MASTIC AND TILE FLOOR CONTAINING ASBESTOS
OF DISPOSE AND REMOVE SHALL CONTRACTOR THE 1200. CHAPTER
CONSERVATION ENVIRONMENTAL OF DEPARTMENT TENNESSEE WITH
ACCORDANCE STRICT IN DONE BE SHALL WORK ASBESTOS ALL 1.
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
ASBESTOS APPROVED PER ABATEMENT WITH PROCEED 4.
PROVIDE NEGATIVE AIR EXHAUST.3.
UNITS.
LOAD-OUT WASTE AND DECONTAMINATION CONSTRUCT 2.
ESTABLISH REGULATED ABATEMENT WORK AREA.1.
WORK SEQUENCE FOR ABATEMENT
SETUP AND PROJECT PHASING.
AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS CONTROL
DUST APPLICABLE THE REFERENCE SHALL CONTRACTOR THE 11.
1926.500-503.
CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO
ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET
(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED
WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.
(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926
AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE
CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS
APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.
TO PROCEED IN THE PROJECT WORK AREA.
PROJECT RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK
THE MAKE AND ACM SPECIFIED REMOVE TO IS WORK ABATEMENT THE
OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED
OR CONTAINING ASBESTOS ANY OF DISPOSAL THE INCLUDES
ALSO WORK THE FIBERS. ASBESTOS AIRBORNE WITH CONTACT
FROM ENVIRONMENT THE AND WORKERS PROTECT TO MATERIALS
CONTAINING ASBESTOS OF CONTROL AND HANDLING PROPER
THE INCLUDES COVERED WORK THE CONTAINMENT; UNDER WHILE 8.
REMOVED.
BE TO PIPE ASBESTOS CEMENT AND MASTIC AND TILE FLOOR ACM
ACCESS TO ETC. PARTITIONS, WALLS, CONTAINING NON-ASBESTOS ALL
REMOVE SHALL CONTRACTOR THE CONTAINMENT, UNDER WHILE 7.
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE
A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN
SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT IN 6.
THE DESIGNATED VA REPRESENTATIVE.
WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION
THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN
LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.
BE TO IS WORK WHERE FLOOR THE ON LOCATED PANELS DISTRIBUTION
POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS
GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR
THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS
WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR
OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.
SHEETING TO PROTECT THEM FROM DUST AND WATER CONTAMINATION.
PLASTIC WITH DETECTORS SMOKE THE COVER SHALL AND SYSTEM FIRE
MAIN THE FROM ISOLATED AREA WORK THE IN DETECTORS SMOKE ANY
HAVE TO ARRANGE SHALL CONTRACTOR THE SHEETING. PLASTIC 6-MIL
RETARDANT FIRE OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK
THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.
CONTAINMENT AREA
PROJECT AREA
ASBESTOS-CONTAINING TRANSITE PIPE
BLACK MASTIC UNDER NON-ACM FLOOR TILE
Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/23/2019 4:35:07 PM
Phase
100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
FULLY SPRINKLERED
01/28/2020
BASEMENT - ASBESTOS ABATEMENT
STRETCHER
ALCOVE
CB-24A
CLOSET
C-07D
CLOSET
C-07C
MALE
TOILET
C-08D
FEMALE
TOILET
C-08B
FEMALE
STAFF
TOILET
G-51
FEMALE
STAFF
TOILET
G-55
CLOSET
G-46
CLOSET
G-08A
CLOSET
ELECTRICAL
A-22A
FROZEN
SECTION
G-18
B-A118
CORRIDOR
CB-23
CORRIDOR
CB-4
AREAWAY
CORRIDOR
CB-9C
CORRIDOR
CB-3
SCRUB UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
FAN RM - 4
B-B105
MECH RM
AHU-26
FAN RM 11
STORAGE
ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC
POS RM
C-07V
EMERGENCY
GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-16E
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
DECONTAMINATION RM
B-02
CORRIDOR
CB-7
CORRIDOR
CB-8
SCRUB
CB-3B
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
STAIR
NO 2
OFFICE
A-04B
BLOOD BANK
A-14
OFFICE
A-14A
PATH CHIEF
A-09
HEMA SUPER
A-17C
FEMALE
TOILET
A-10
FEMALE
TOILET
A-11
A-17B
MALE
TOILET
A-12
MALE
TOILET
A-13
SOILED
UTILITY
G-56A
RECOVERY
STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL
CLOSET
SIGNAL
G-49B
CLEAN
LINEN
G-56D
SIGNAL
G-49A
RECOVERY
CLEAN
UTILITY
G-56E
RECOVERY
NURSE
STATION
RECOVERY
ISOLATION
BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY
ISOLATION
BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
STAIR
NO 10
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
GAS STORAGE
NURSE
MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
ELEVATOR
P-8
TISSUE TYP
A-20
FLOW CYTO
A-20A
IMMUN LAB
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST EQUIP
STOR
SCRUB-UP
ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
CORRIDOR
CB-2
CHIEF
G-08
OFFICE
G-11
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE TOILET
& SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
STAIR
NO 1
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN
LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB UP
ALCOVE
G-29
SCRUB-UP
ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER &
SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING RM
GENERAL
G-27
SUB STERILE
G-26A
OPERATING RM
GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING RM
GENERAL
G-21
OPERATING RM
GENERAL
G-19
SCRUB
SUB
STERILE
G-19A
REC & OR
HEAD NURSES
G-01
ELECTRICAL
CLOSET
G-22
PHONE/SGNL RM
EXT RAD
CNTROLRM
G-20A
STORAGE
G-20B
INSTRUMENT
& STERILE
G-20C
CYSTOSCOPY RM
G-20
HOLDING
G-17
OFFICE
G-02A
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
OFFICE
G-02B
CONTROL
G-03
DRESSING
& HOLDING
G-15
SEC
G-16
OFFICE
G-04
TOILET
G-15A
TOILET
G-15B
OFFICE
G-07
SEC
G-13
CONFERENCE RM
G-14
HAC
G-12
NUCLEAR
CARDIOLOGY
A-25Q
HAZ.
45 KVA
45 & 30 KVA
45 KVA 45 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER
ALCOVE
WC
ALCOVE
STRETCHER
ALCOVE
WC
ALCOVE
MULTI-PURPOSE
B-G127S
TLT
B-B101G
ALCOVE
B-G127V
C L E
A N S
U P P L Y
B
G R
PV CV LAB #1
B-B101I
EPS CV LAB #2
B-G127J
CONTROL #1
B-B101J
CV LAB #3 (BID
ITEM 5)
B-B101O
CONTROL #2 (BID
ITEM 5)
B-B101Q
CORRIDOR
B-G127F
VIEW
B-G127O
CV EQUIP #2
B-B101N
SOILED UTIL
B-B101E
PREP/HOLDING
B-G127T
H.A.C
B-B101H
CRASH CART
ALCOVE
B-B101R
TLT
1-G127W
CV EQUIP #3
B-B101P
ALCOVE
B-G127W
ALCOVE
B-G127X
CHANGE
B-G127Y
COR.
B-G127Z
CLEAN LINEN
B-G127AA
ALCOVE
B-G127BB
C V E
Q U
IP
B -B
N www.skellyloy.com
412-828-1412
PITTSBURGH, PA 15238
3280 WILLIAM PITT WAY
SKELLY AND LOY, INC.
626-18-202
Project Number
Building Number
Drawing Number
Drawing Title
Approved:
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Architect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
AE Works Ltd.
209 Sandusky Street
Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
# Revisions Date
LEAD NOTES
NOT TO SCALE
LEGEND
KEY PLAN
NORTH
PROJECT
DRAWING AREA SHOWN
CONTAINMENT AREA
PROJECT AREA
LEAD SHIELDING
LEAD SHIELDING ABATEMENT
LEAD-01
LEAD-01
LEAD CONTAINING MATERIALS
CONSTRUCTION/DEMOLITION WASTE.
CONSIDERED BE SHALL SHIELDING LEAD THE COVERING WALLS WASTE.
LEAD AS OF DISPOSED BE SHALL SHIELDING LEAD THE C.
REMOVAL OF THE EQUIPMENT FROM THE WORK AREA.
FOR SHEETING PLASTIC RETARDANT FLAME SIX-MIL OF LAYER A WITH
EQUIPMENT THE SEAL THEN SHALL CONTRACTOR THE COMPLETE. IS
EQUIPMENT THE OF USE THE ONCE EQUIPMENT REMOVAL ALL WET-WIPE
AND VACUUM HEPA THOROUGHLY SHALL CONTRACTOR THE B.
AIR PRESSURE IN THE WORK AREA.
NEGATIVE APPROPRIATE THE RE-ESTABLISH TO REPAIRS NECESSARY
THE MAKE AND WORK STOP SHALL CONTRACTOR THE COLUMN, WATER
OF INCHES -0.02” BELOW FALLS AREA WORK THE WITHIN PRESSURE
AIR NEGATIVE THE TIME ANY AT IF EQUIPMENT. SAW SHROUDED
THE OF USE THE DURING TIMES ALL AT MAINTAINED BE SHALL
AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.
CONTROLS/WORK PRACTICES WHEN REMOVING LEAD SHIELDING:
ENGINEERING FOLLOWING THE USE SHALL CONTRACTOR THE
DISPOSED OF AS CONSTRUCTION/DEMOLITION WASTE.
AND CONTAINING NON-LEAD CONSIDERED BE SHALL SHIELDING LEAD
THE COVERING WALLS ETC. HAMMER, BAR, PRY I.E. METHODS; MANUAL
USING AREA WORK THE IN PRESENT SHIELDING LEAD THE REMOVE
SHALL CONTRACTOR THE - METHOD REMOVAL SHIELDING LEAD 2.
SECTION 3.1 OF THE SPECIFICATIONS.
BY REQUIRED AS SHEETING PLASTIC OF LAYERS 2 WITH SURFACES
WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE
THE WORK AREA’S NEGATIVE AIR PRESSURE.
MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETERS DIGITAL (2)
TWO MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED MANOMETERS
DIGITAL OF USE THE THROUGH CONTRACTOR THE BY MONITORED
CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE AIR NEGATIVE
AREA. WORK THE INSIDE HOUR PER CHANGES AIR FOUR LEAST
AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED HEPA THESE
BUILDING. THE OF EXTERIOR THE TO EXHAUSTED AND HANDLERS
AIR FILTERED HEPA USING AREA WORK THE IN CREATED BE SHALL
PRESSURE AIR NEGATIVE REMOVAL. DURING TIMES ALL AT PROVIDED
BE SHALL LOCATION, PERIMETER AREA WORK ANY AT MEASURED
AS COLUMN, WATER OF INCHES -0.02 LEAST AT OF PRESSURE
AIR NEGATIVE A CONTAINMENT. PRESSURE NEGATIVE A WITHIN
CONDUCTED BE SHALL WORK REMOVAL SHIELDING LEAD ALL
THE WORK AREA.
FROM MATERIAL SHIELDING LEAD ALL OF REMOVAL THE PERFORMING
WHEN DUST OF RELEASE THE CONTROL TO VACUUM FILTERED
HEPA AND METHODS WET MANUAL USE SHALL CONTRACTOR THE
AREA, WHERE INDICATED ON THE DRAWING.
WORK DESIGNATED THE FROM SHIELDING LEAD ALL OF DISPOSE AND
REMOVE SHALL CONTRACTOR THE - REMOVAL SHIELDING 1. LEAD
PROJECT PHASING.
AND SETUP AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS
CONTROL DUST APPLICABLE REFERENCE SHALL CONTRACTOR THE 11.
1926.500-503.
CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO
ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET
(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED
WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.
(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926
AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE
CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS
APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.
PROJECT IN THIS WORK AREA.
RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK THE MAKE
AND SHIELDING LEAD SPECIFIED REMOVE TO IS WORK ABATEMENT THE
OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED
OR CONTAINING LEAD ANY OF DISPOSAL THE INCLUDES ALSO WORK
THE DUST. LEAD AIRBORNE WITH CONTACT FROM AREAS ADJACENT
AND ENVIRONMENT THE WORKERS, PROTECT TO MATERIAL SHIELDING
LEAD OF CONTROL AND HANDLING THE INCLUDES WORK THE 8.
CONSTRUCTION/DEMOLITION WASTE.
NON-LEAD AS TREATED BE SHALL WALLS REMOVED. BE TO SHIELDING
LEAD ACCESS TO WALLS ALL REMOVE SHALL CONTRACTOR THE 7.
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE
A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN
SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT FULL FOR 6.
THE DESIGNATED VA REPRESENTATIVE.
WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION
THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN
LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.
BE TO IS WORK WHERE FLOOR THE ON LOCATED PANEL DISTRIBUTION
POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS
GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR
THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS
WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR
OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.
PLASTIC SHEETING TO PROTECT THEM FROM DUST AND WATER.
WITH THEM COVER SHALL AND SYSTEM FIRE MAIN THE FROM ISOLATED
AREA WORK THE IN DETECTORS SMOKE ANY HAVE TO ARRANGE
SHALL CONTRACTOR THE PROJECT. THE THROUGHOUT FUNCTIONAL
REMAIN SHALL HEADS SPRINKLER HEADS. SPRINKLER COVER NOT
SHALL SHEETING PLASTIC THE SHEETING. PLASTIC 6-MIL RETARDANT
FLAME OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK
THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.
SHIELDING MATERIAL.
LEAD THE OF ABATEMENT THE CONDUCT TO NEEDED AS CHAMBER
DECONTAMINATION THE RELOCATE TO REQUIRED BE MAY CONTRACTOR
THEREFORE, REQUIRED. IS AREA WORK THE WITHIN CHAMBERS
DECONTAMINATION THE OF PLACEMENT SPECIFICATIONS. THE OF 3.1
SECTION WITH ACCORDANCE IN CHAMBERS DECONTAMINATION WASTE
AND PERSONNEL DESIGN AND CONSTRUCT SHALL CONTRACTOR THE
- LOCATION ENCLOSURE DECONTAMINATION PERSONAL/WASTE 3.
Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/25/2019 2:33:51 PM
1310 24th Avenue South, Nashville, TN 37212
RCM
Project Title
Location
Issue Date Checked Drawn
Phase
Sprinkler Status
Phase
100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
FULLY SPRINKLERED
01/28/2020 BSR
BASEMENT - LEAD SHIELDING ABATEMENT
MATERIAL SCHEDULE AND CONCRETE MIX DESIGN TABLE
MEMBER f'c W/C
F S W C 3/4" AGGREGATE 1" AGGREGATE
FOOTINGS 4500 PSI 0.45
EXPOSURE CATEGORY ENTRAINED AIR CONTENT
F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%
N/A N/A N/A N/A N/A N/A
SLABS-ON-GRADE (EXT)
4000 PSI 0.50
NOTES:
1. PROVIDE CONCRETE MIXES IN ACCORDANCE WITH ACI 301 FOR THE EXPOSURE CATEGORIES IDENTIFIED IN THE ABOVE TABLE.
2. MAXIMUM WATER-CEMENT (W/C) RATIOS INDICATED IN THE TABLE SHALL INCLUDE WATER FROM ADMIXTURES IN W/C CALCULATIONS.
3. DO NOT AIR-ENTRAIN CONCRETE DESIGNATED TO RECEIVE STEEL TROWEL FINISH.
SLABS-ON-GRADE (INT)
4500 PSI 0.45 F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%
PIERS 4500 PSI 0.45 F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%
WALLS 4500 PSI 0.45 F2 S0 W0 C1 6 +/-1.5% 6 +/- 1.5%
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 -
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 1
Sprinkler Status
AE Works Ltd.
209 Sandusky Street Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
KEYPLAN
161735
C U s e rs \l le s n ia k o w s k i\ D o c u m e n ts \1
A R
C H
S tr u c tu ra l W o rk in g F ile lle s n ia k o w s k i.
rv t
/2
/2
:5
:0
A
M
S001
STRUCTRUAL GENERAL NOTES
PVE, LLC
WATERFRONT CORPORATE PARK
III, SUITE 101
2000 GEORGETOWN DRIVE
SEWICKLEY, PA 15143-8992
(724) 444-1100
JEREMY URBAN
UPGRADE SURGICAL SUITE
AIR HANDLING UNITS
1310 24th Avenue South, Nashville, TN 37212
626-18-202
01/28/2020 JU LRL
CONSTRUCTION
DOCUMENTS CD-2
GENERAL NOTES - DIVISION 1
1. THESE GENERAL DESIGN AND CONSTRUCTION NOTES ARE INTENDED TO BE INTERPRETED IN COMBINATION WITH THE
PROJECT ARCHITECTURAL AND STRUCTURAL SPECIFICATIONS. IN THE EVENT OF ANY INCONSISTENCY, THE MORE STRINGENT
REQUIREMENT SHALL APPLY. IN THE EVENT OF ANY QUESTION OF INTERPRETATION, THE DECISION OF THE ENGINEER SHALL PREVAIL.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS THE LOCAL AGENCIES, DEPARTMENTS
AND LAWS HAVING JURISDICTION OVER ANY PORTION OR PHASE OF WORK.
3.THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES WITH REQUIREMENTS OF LOCAL AUTHORITIES AND BUILDING
MANAGEMENT.
4. ALL DETAILS, SECTIONS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO
SIMILAR SITUATIONS, UNO.
5. NO CHANGE IN SIZE, DIMENSION OR POSITION OF STRUCTURAL ELEMENTS SHALL BE MADE WITHOUT THE APPROVAL
OF THE STRUCTURAL ENGINEER OF RECORD.
6. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING CONSTRUCTION AND/OR SUBMITTING
SHOP DRAWINGS. ANY DISCREPANCIES SHALL BE REPORTED TO THE STRUCTURAL ENGINEER OF RECORD.
7. TAKE ALL MEASURES NECESSARY TO PROTECT EXISTING AND NEW UTILITIES AND BUILDINGS AND ASSUME FULL RESPONSIBILITY
FOR ANY DAMAGE DURING CONSTRUCTION. RESTORATION OF DAMAGED AREAS SHALL BE TO THE SATISFACTION OF THE OWNER, AT NO COST TO THE OWNER.
8. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR DETAILED INFORMATION REGARDING FINISHES, WATERPROOFING, LOCATIONS OF NON-LOAD BEARING PARTITIONS, EXTERIOR FACE OF BUILDING, ETC.
9. ALL NOTES, DIMENSIONS, DETAILS AND JOB CONDITIONS ARE TO BE CHECKED AND VERIFIED, AND ALL DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR ENGINEER PRIOR TO COMMENCEMENT OF WORK.
10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALL STAGES AND PHASES OF WORK.
11. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF THE
WORK SHALL BE INCLUDED.
12. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY
PRE…
This is the start of the file's text. The full file is on GovTribe.