626-18-202 Upgrade Surgical Suir Handling Units Bid drawings 7.pdf
PDF 1 MB Posted
- Solicitation number
- 36C24920R0049
About this file
This document contains bid drawings for the Upgrade Surgical Suite Air Handler Units project at the Nashville VA Medical Center. The project involves removing lead shielding from designated work areas in the basement and properly disposing of the material. Strict protocols must be followed to contain lead dust and maintain negative air pressure within containment areas. Personal protective equipment, decontamination chambers, and regulated power within work areas are required. The related federal contract opportunity is solicitation number 36C24920R0049 for project number 626-18-202 to upgrade the surgical suite air handler units at the Nashville VAMC. Bids are due on or before the specified date.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREAWAY
STRETCHER
ALCOVE
CB-24A
CLOSET
C-07D
CLOSET
C-07C
MALE
TOILET
C-08D
FEMALE
TOILET
C-08B
FEMALE
STAFF
TOILET
G-51
FEMALE
STAFF
TOILET
G-55
CLOSET
G-46
CLOSET
G-08A
CLOSET
ELECTRICAL
A-22A
FROZEN
SECTION
G-18
B-A118
CORRIDOR
CB-23
CORRIDOR
CB-4
AREAWAY
CORRIDOR
CB-9C
CORRIDOR
CB-3
SCRUB UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
FAN RM - 4
B-B105
MECH RM
AHU-26
FAN RM 11
STORAGE
ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC
POS RM
C-07V
EMERGENCY
GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-16E
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
DECONTAMINATION RM
B-02
CORRIDOR
CB-7
CORRIDOR
CB-8
SCRUB
CB-3B
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
STAIR
NO 2
OFFICE
A-04B
BLOOD BANK
A-14
OFFICE
A-14A
PATH CHIEF
A-09
HEMA SUPER
A-17C
FEMALE
TOILET
A-10
FEMALE
TOILET
A-11
A-17B
MALE
TOILET
A-12
MALE
TOILET
A-13
SOILED
UTILITY
G-56A
RECOVERY
STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL
CLOSET
SIGNAL
G-49B
CLEAN
LINEN
G-56D
SIGNAL
G-49A
RECOVERY
CLEAN
UTILITY
G-56E
RECOVERY
NURSE
STATION
RECOVERY
ISOLATION
BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY
ISOLATION
BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
STAIR
NO 10
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
GAS STORAGE
NURSE
MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
ELEVATOR
P-8
TISSUE TYP
A-20
FLOW CYTO
A-20A
IMMUN LAB
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST EQUIP
STOR
SCRUB-UP
ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
CORRIDOR
CB-2
CHIEF
G-08
OFFICE
G-11
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE TOILET
& SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
STAIR
NO 1
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN
LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB UP
ALCOVE
G-29
SCRUB-UP
ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER &
SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING RM
GENERAL
G-27
SUB STERILE
G-26A
OPERATING RM
GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING RM
GENERAL
G-21
OPERATING RM
GENERAL
G-19
SCRUB
SUB
STERILE
G-19A
REC & OR
HEAD NURSES
G-01
ELECTRICAL
CLOSET
G-22
PHONE/SGNL RM
EXT RAD
CNTROLRM
G-20A
STORAGE
G-20B
INSTRUMENT
& STERILE
G-20C
CYSTOSCOPY RM
G-20
HOLDING
G-17
OFFICE
G-02A
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
OFFICE
G-02B
CONTROL
G-03
DRESSING
& HOLDING
G-15
SEC
G-16
OFFICE
G-04
TOILET
G-15A
TOILET
G-15B
OFFICE
G-07
SEC
G-13
CONFERENCE RM
G-14
HAC
G-12
NUCLEAR
CARDIOLOGY
A-25Q
HAZ.
45 KVA
45 & 30 KVA
45 KVA 45 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER
ALCOVE
WC
ALCOVE
STRETCHER
ALCOVE
WC
ALCOVE
MULTI-PURPOSE
B-G127S
TLT
B-B101G
ALCOVE
B-G127V
C L E
A N S
U P P L Y
B
G R
PV CV LAB #1
B-B101I
EPS CV LAB #2
B-G127J
CONTROL #1
B-B101J
CV LAB #3 (BID
ITEM 5)
B-B101O
CONTROL #2 (BID
ITEM 5)
B-B101Q
CORRIDOR
B-G127F
VIEW
B-G127O
CV EQUIP #2
B-B101N
SOILED UTIL
B-B101E
PREP/HOLDING
B-G127T
H.A.C
B-B101H
CRASH CART
ALCOVE
B-B101R
TLT
1-G127W
CV EQUIP #3
B-B101P
ALCOVE
B-G127W
ALCOVE
B-G127X
CHANGE
B-G127Y
COR.
B-G127Z
CLEAN LINEN
B-G127AA
ALCOVE
B-G127BB
C V E
Q U
IP
B -B
N www.skellyloy.com
412-828-1412
PITTSBURGH, PA 15238
3280 WILLIAM PITT WAY
SKELLY AND LOY, INC.
626-18-202
Project Number
Building Number
Drawing Number
Drawing Title
Approved:
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Architect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
AE Works Ltd.
209 Sandusky Street
Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
# Revisions Date
LEAD NOTES
NOT TO SCALE
LEGEND
KEY PLAN
NORTH
PROJECT
DRAWING AREA SHOWN
CONTAINMENT AREA
PROJECT AREA
LEAD SHIELDING
LEAD SHIELDING ABATEMENT
LEAD-01
LEAD-01
LEAD CONTAINING MATERIALS
CONSTRUCTION/DEMOLITION WASTE.
CONSIDERED BE SHALL SHIELDING LEAD THE COVERING WALLS WASTE.
LEAD AS OF DISPOSED BE SHALL SHIELDING LEAD THE C.
REMOVAL OF THE EQUIPMENT FROM THE WORK AREA.
FOR SHEETING PLASTIC RETARDANT FLAME SIX-MIL OF LAYER A WITH
EQUIPMENT THE SEAL THEN SHALL CONTRACTOR THE COMPLETE. IS
EQUIPMENT THE OF USE THE ONCE EQUIPMENT REMOVAL ALL WET-WIPE
AND VACUUM HEPA THOROUGHLY SHALL CONTRACTOR THE B.
AIR PRESSURE IN THE WORK AREA.
NEGATIVE APPROPRIATE THE RE-ESTABLISH TO REPAIRS NECESSARY
THE MAKE AND WORK STOP SHALL CONTRACTOR THE COLUMN, WATER
OF INCHES -0.02” BELOW FALLS AREA WORK THE WITHIN PRESSURE
AIR NEGATIVE THE TIME ANY AT IF EQUIPMENT. SAW SHROUDED
THE OF USE THE DURING TIMES ALL AT MAINTAINED BE SHALL
AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.
CONTROLS/WORK PRACTICES WHEN REMOVING LEAD SHIELDING:
ENGINEERING FOLLOWING THE USE SHALL CONTRACTOR THE
DISPOSED OF AS CONSTRUCTION/DEMOLITION WASTE.
AND CONTAINING NON-LEAD CONSIDERED BE SHALL SHIELDING LEAD
THE COVERING WALLS ETC. HAMMER, BAR, PRY I.E. METHODS; MANUAL
USING AREA WORK THE IN PRESENT SHIELDING LEAD THE REMOVE
SHALL CONTRACTOR THE - METHOD REMOVAL SHIELDING LEAD 2.
SECTION 3.1 OF THE SPECIFICATIONS.
BY REQUIRED AS SHEETING PLASTIC OF LAYERS 2 WITH SURFACES
WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE
THE WORK AREA’S NEGATIVE AIR PRESSURE.
MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETERS DIGITAL (2)
TWO MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED MANOMETERS
DIGITAL OF USE THE THROUGH CONTRACTOR THE BY MONITORED
CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE AIR NEGATIVE
AREA. WORK THE INSIDE HOUR PER CHANGES AIR FOUR LEAST
AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED HEPA THESE
BUILDING. THE OF EXTERIOR THE TO EXHAUSTED AND HANDLERS
AIR FILTERED HEPA USING AREA WORK THE IN CREATED BE SHALL
PRESSURE AIR NEGATIVE REMOVAL. DURING TIMES ALL AT PROVIDED
BE SHALL LOCATION, PERIMETER AREA WORK ANY AT MEASURED
AS COLUMN, WATER OF INCHES -0.02 LEAST AT OF PRESSURE
AIR NEGATIVE A CONTAINMENT. PRESSURE NEGATIVE A WITHIN
CONDUCTED BE SHALL WORK REMOVAL SHIELDING LEAD ALL
THE WORK AREA.
FROM MATERIAL SHIELDING LEAD ALL OF REMOVAL THE PERFORMING
WHEN DUST OF RELEASE THE CONTROL TO VACUUM FILTERED
HEPA AND METHODS WET MANUAL USE SHALL CONTRACTOR THE
AREA, WHERE INDICATED ON THE DRAWING.
WORK DESIGNATED THE FROM SHIELDING LEAD ALL OF DISPOSE AND
REMOVE SHALL CONTRACTOR THE - REMOVAL SHIELDING 1. LEAD
PROJECT PHASING.
AND SETUP AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS
CONTROL DUST APPLICABLE REFERENCE SHALL CONTRACTOR THE 11.
1926.500-503.
CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO
ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET
(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED
WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.
(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926
AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE
CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS
APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.
PROJECT IN THIS WORK AREA.
RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK THE MAKE
AND SHIELDING LEAD SPECIFIED REMOVE TO IS WORK ABATEMENT THE
OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED
OR CONTAINING LEAD ANY OF DISPOSAL THE INCLUDES ALSO WORK
THE DUST. LEAD AIRBORNE WITH CONTACT FROM AREAS ADJACENT
AND ENVIRONMENT THE WORKERS, PROTECT TO MATERIAL SHIELDING
LEAD OF CONTROL AND HANDLING THE INCLUDES WORK THE 8.
CONSTRUCTION/DEMOLITION WASTE.
NON-LEAD AS TREATED BE SHALL WALLS REMOVED. BE TO SHIELDING
LEAD ACCESS TO WALLS ALL REMOVE SHALL CONTRACTOR THE 7.
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE
A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN
SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT FULL FOR 6.
THE DESIGNATED VA REPRESENTATIVE.
WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION
THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN
LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.
BE TO IS WORK WHERE FLOOR THE ON LOCATED PANEL DISTRIBUTION
POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS
GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR
THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS
WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR
OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.
PLASTIC SHEETING TO PROTECT THEM FROM DUST AND WATER.
WITH THEM COVER SHALL AND SYSTEM FIRE MAIN THE FROM ISOLATED
AREA WORK THE IN DETECTORS SMOKE ANY HAVE TO ARRANGE
SHALL CONTRACTOR THE PROJECT. THE THROUGHOUT FUNCTIONAL
REMAIN SHALL HEADS SPRINKLER HEADS. SPRINKLER COVER NOT
SHALL SHEETING PLASTIC THE SHEETING. PLASTIC 6-MIL RETARDANT
FLAME OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK
THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.
SHIELDING MATERIAL.
LEAD THE OF ABATEMENT THE CONDUCT TO NEEDED AS CHAMBER
DECONTAMINATION THE RELOCATE TO REQUIRED BE MAY CONTRACTOR
THEREFORE, REQUIRED. IS AREA WORK THE WITHIN CHAMBERS
DECONTAMINATION THE OF PLACEMENT SPECIFICATIONS. THE OF 3.1
SECTION WITH ACCORDANCE IN CHAMBERS DECONTAMINATION WASTE
AND PERSONNEL DESIGN AND CONSTRUCT SHALL CONTRACTOR THE
- LOCATION ENCLOSURE DECONTAMINATION PERSONAL/WASTE 3.
Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/25/2019 2:33:51 PM
1310 24th Avenue South, Nashville, TN 37212
RCM
Project Title
Location
Issue Date Checked Drawn
Phase
Sprinkler Status
Phase
100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
FULLY SPRINKLERED
01/28/2020 BSR
BASEMENT - LEAD SHIELDING ABATEMENT
VHATVHSANTIM1
Line
VHATVHSANTIM1
Line
VHATVHSANTIM1
Typewritten Text Deleted Per Addendum
File details come from the government source that posted it. Updated .