626-18-202 Upgrade Surgical Suir Handling Units Bid drawings 7.pdf

PDF 1 MB Posted

Attached to
Y1DZ--Project# 626-18-202 - Upgrade Surgical Suite Air Handling Units
Solicitation number
36C24920R0049
Issued by

About this file

This document contains bid drawings for the Upgrade Surgical Suite Air Handler Units project at the Nashville VA Medical Center. The project involves removing lead shielding from designated work areas in the basement and properly disposing of the material. Strict protocols must be followed to contain lead dust and maintain negative air pressure within containment areas. Personal protective equipment, decontamination chambers, and regulated power within work areas are required. The related federal contract opportunity is solicitation number 36C24920R0049 for project number 626-18-202 to upgrade the surgical suite air handler units at the Nashville VAMC. Bids are due on or before the specified date.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREAWAY

STRETCHER

ALCOVE

CB-24A

CLOSET

C-07D

CLOSET

C-07C

MALE

TOILET

C-08D

FEMALE

TOILET

C-08B

FEMALE

STAFF

TOILET

G-51

FEMALE

STAFF

TOILET

G-55

CLOSET

G-46

CLOSET

G-08A

CLOSET

ELECTRICAL

A-22A

FROZEN

SECTION

G-18

B-A118

CORRIDOR

CB-23

CORRIDOR

CB-4

AREAWAY

CORRIDOR

CB-9C

CORRIDOR

CB-3

SCRUB UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

FAN RM - 4

B-B105

MECH RM

AHU-26

FAN RM 11

STORAGE

ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC

POS RM

C-07V

EMERGENCY

GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

CORRIDOR

CB-16E

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

DECONTAMINATION RM

B-02

CORRIDOR

CB-7

CORRIDOR

CB-8

SCRUB

CB-3B

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

STAIR

NO 2

OFFICE

A-04B

BLOOD BANK

A-14

OFFICE

A-14A

PATH CHIEF

A-09

HEMA SUPER

A-17C

FEMALE

TOILET

A-10

FEMALE

TOILET

A-11

A-17B

MALE

TOILET

A-12

MALE

TOILET

A-13

SOILED

UTILITY

G-56A

RECOVERY

STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL

CLOSET

SIGNAL

G-49B

CLEAN

LINEN

G-56D

SIGNAL

G-49A

RECOVERY

CLEAN

UTILITY

G-56E

RECOVERY

NURSE

STATION

RECOVERY

ISOLATION

BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY

ISOLATION

BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

STAIR

NO 10

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

GAS STORAGE

NURSE

MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

ELEVATOR

P-8

TISSUE TYP

A-20

FLOW CYTO

A-20A

IMMUN LAB

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST EQUIP

STOR

SCRUB-UP

ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

CORRIDOR

CB-2

CHIEF

G-08

OFFICE

G-11

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE TOILET

& SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

STAIR

NO 1

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN

LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB UP

ALCOVE

G-29

SCRUB-UP

ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER &

SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING RM

GENERAL

G-27

SUB STERILE

G-26A

OPERATING RM

GENERAL

G-26

GENERAL

OPERATING RM

G-25

SUB

STERILE

G-21A

OPERATING RM

GENERAL

G-21

OPERATING RM

GENERAL

G-19

SCRUB

SUB

STERILE

G-19A

REC & OR

HEAD NURSES

G-01

ELECTRICAL

CLOSET

G-22

PHONE/SGNL RM

EXT RAD

CNTROLRM

G-20A

STORAGE

G-20B

INSTRUMENT

& STERILE

G-20C

CYSTOSCOPY RM

G-20

HOLDING

G-17

OFFICE

G-02A

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

OFFICE

G-02B

CONTROL

G-03

DRESSING

& HOLDING

G-15

SEC

G-16

OFFICE

G-04

TOILET

G-15A

TOILET

G-15B

OFFICE

G-07

SEC

G-13

CONFERENCE RM

G-14

HAC

G-12

NUCLEAR

CARDIOLOGY

A-25Q

HAZ.

45 KVA

45 & 30 KVA

45 KVA 45 KVA

KVA

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER

ALCOVE

WC

ALCOVE

STRETCHER

ALCOVE

WC

ALCOVE

MULTI-PURPOSE

B-G127S

TLT

B-B101G

ALCOVE

B-G127V

C L E

A N S

U P P L Y

B

G R

PV CV LAB #1

B-B101I

EPS CV LAB #2

B-G127J

CONTROL #1

B-B101J

CV LAB #3 (BID

ITEM 5)

B-B101O

CONTROL #2 (BID

ITEM 5)

B-B101Q

CORRIDOR

B-G127F

VIEW

B-G127O

CV EQUIP #2

B-B101N

SOILED UTIL

B-B101E

PREP/HOLDING

B-G127T

H.A.C

B-B101H

CRASH CART

ALCOVE

B-B101R

TLT

1-G127W

CV EQUIP #3

B-B101P

ALCOVE

B-G127W

ALCOVE

B-G127X

CHANGE

B-G127Y

COR.

B-G127Z

CLEAN LINEN

B-G127AA

ALCOVE

B-G127BB

C V E

Q U

IP

B -B

N www.skellyloy.com

412-828-1412

PITTSBURGH, PA 15238

3280 WILLIAM PITT WAY

SKELLY AND LOY, INC.

626-18-202

Project Number

Building Number

Drawing Number

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Architect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

AE Works Ltd.

209 Sandusky Street

Pittsburgh, PA 15212

PH: 412.287.7333

www.ae-works.com

AE Works Project Number - 18028

AE WORKS

# Revisions Date

LEAD NOTES

NOT TO SCALE

LEGEND

KEY PLAN

NORTH

PROJECT

DRAWING AREA SHOWN

CONTAINMENT AREA

PROJECT AREA

LEAD SHIELDING

LEAD SHIELDING ABATEMENT

LEAD-01

LEAD-01

LEAD CONTAINING MATERIALS

CONSTRUCTION/DEMOLITION WASTE.

CONSIDERED BE SHALL SHIELDING LEAD THE COVERING WALLS WASTE.

LEAD AS OF DISPOSED BE SHALL SHIELDING LEAD THE C.

REMOVAL OF THE EQUIPMENT FROM THE WORK AREA.

FOR SHEETING PLASTIC RETARDANT FLAME SIX-MIL OF LAYER A WITH

EQUIPMENT THE SEAL THEN SHALL CONTRACTOR THE COMPLETE. IS

EQUIPMENT THE OF USE THE ONCE EQUIPMENT REMOVAL ALL WET-WIPE

AND VACUUM HEPA THOROUGHLY SHALL CONTRACTOR THE B.

AIR PRESSURE IN THE WORK AREA.

NEGATIVE APPROPRIATE THE RE-ESTABLISH TO REPAIRS NECESSARY

THE MAKE AND WORK STOP SHALL CONTRACTOR THE COLUMN, WATER

OF INCHES -0.02” BELOW FALLS AREA WORK THE WITHIN PRESSURE

AIR NEGATIVE THE TIME ANY AT IF EQUIPMENT. SAW SHROUDED

THE OF USE THE DURING TIMES ALL AT MAINTAINED BE SHALL

AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.

CONTROLS/WORK PRACTICES WHEN REMOVING LEAD SHIELDING:

ENGINEERING FOLLOWING THE USE SHALL CONTRACTOR THE

DISPOSED OF AS CONSTRUCTION/DEMOLITION WASTE.

AND CONTAINING NON-LEAD CONSIDERED BE SHALL SHIELDING LEAD

THE COVERING WALLS ETC. HAMMER, BAR, PRY I.E. METHODS; MANUAL

USING AREA WORK THE IN PRESENT SHIELDING LEAD THE REMOVE

SHALL CONTRACTOR THE - METHOD REMOVAL SHIELDING LEAD 2.

SECTION 3.1 OF THE SPECIFICATIONS.

BY REQUIRED AS SHEETING PLASTIC OF LAYERS 2 WITH SURFACES

WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE

THE WORK AREA’S NEGATIVE AIR PRESSURE.

MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETERS DIGITAL (2)

TWO MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED MANOMETERS

DIGITAL OF USE THE THROUGH CONTRACTOR THE BY MONITORED

CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE AIR NEGATIVE

AREA. WORK THE INSIDE HOUR PER CHANGES AIR FOUR LEAST

AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED HEPA THESE

BUILDING. THE OF EXTERIOR THE TO EXHAUSTED AND HANDLERS

AIR FILTERED HEPA USING AREA WORK THE IN CREATED BE SHALL

PRESSURE AIR NEGATIVE REMOVAL. DURING TIMES ALL AT PROVIDED

BE SHALL LOCATION, PERIMETER AREA WORK ANY AT MEASURED

AS COLUMN, WATER OF INCHES -0.02 LEAST AT OF PRESSURE

AIR NEGATIVE A CONTAINMENT. PRESSURE NEGATIVE A WITHIN

CONDUCTED BE SHALL WORK REMOVAL SHIELDING LEAD ALL

THE WORK AREA.

FROM MATERIAL SHIELDING LEAD ALL OF REMOVAL THE PERFORMING

WHEN DUST OF RELEASE THE CONTROL TO VACUUM FILTERED

HEPA AND METHODS WET MANUAL USE SHALL CONTRACTOR THE

AREA, WHERE INDICATED ON THE DRAWING.

WORK DESIGNATED THE FROM SHIELDING LEAD ALL OF DISPOSE AND

REMOVE SHALL CONTRACTOR THE - REMOVAL SHIELDING 1. LEAD

PROJECT PHASING.

AND SETUP AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS

CONTROL DUST APPLICABLE REFERENCE SHALL CONTRACTOR THE 11.

1926.500-503.

CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO

ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET

(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED

WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.

(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926

AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE

CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS

APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.

PROJECT IN THIS WORK AREA.

RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK THE MAKE

AND SHIELDING LEAD SPECIFIED REMOVE TO IS WORK ABATEMENT THE

OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED

OR CONTAINING LEAD ANY OF DISPOSAL THE INCLUDES ALSO WORK

THE DUST. LEAD AIRBORNE WITH CONTACT FROM AREAS ADJACENT

AND ENVIRONMENT THE WORKERS, PROTECT TO MATERIAL SHIELDING

LEAD OF CONTROL AND HANDLING THE INCLUDES WORK THE 8.

CONSTRUCTION/DEMOLITION WASTE.

NON-LEAD AS TREATED BE SHALL WALLS REMOVED. BE TO SHIELDING

LEAD ACCESS TO WALLS ALL REMOVE SHALL CONTRACTOR THE 7.

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE

A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN

SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT FULL FOR 6.

THE DESIGNATED VA REPRESENTATIVE.

WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION

THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN

LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.

BE TO IS WORK WHERE FLOOR THE ON LOCATED PANEL DISTRIBUTION

POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS

GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR

THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS

WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR

OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.

PLASTIC SHEETING TO PROTECT THEM FROM DUST AND WATER.

WITH THEM COVER SHALL AND SYSTEM FIRE MAIN THE FROM ISOLATED

AREA WORK THE IN DETECTORS SMOKE ANY HAVE TO ARRANGE

SHALL CONTRACTOR THE PROJECT. THE THROUGHOUT FUNCTIONAL

REMAIN SHALL HEADS SPRINKLER HEADS. SPRINKLER COVER NOT

SHALL SHEETING PLASTIC THE SHEETING. PLASTIC 6-MIL RETARDANT

FLAME OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK

THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.

SHIELDING MATERIAL.

LEAD THE OF ABATEMENT THE CONDUCT TO NEEDED AS CHAMBER

DECONTAMINATION THE RELOCATE TO REQUIRED BE MAY CONTRACTOR

THEREFORE, REQUIRED. IS AREA WORK THE WITHIN CHAMBERS

DECONTAMINATION THE OF PLACEMENT SPECIFICATIONS. THE OF 3.1

SECTION WITH ACCORDANCE IN CHAMBERS DECONTAMINATION WASTE

AND PERSONNEL DESIGN AND CONSTRUCT SHALL CONTRACTOR THE

- LOCATION ENCLOSURE DECONTAMINATION PERSONAL/WASTE 3.

Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/25/2019 2:33:51 PM

1310 24th Avenue South, Nashville, TN 37212

RCM

Project Title

Location

Issue Date Checked Drawn

Phase

Sprinkler Status

Phase

100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR

HANDLER UNITS

FULLY SPRINKLERED

01/28/2020 BSR

BASEMENT - LEAD SHIELDING ABATEMENT

VHATVHSANTIM1

Line

VHATVHSANTIM1

Line

VHATVHSANTIM1

Typewritten Text Deleted Per Addendum

File details come from the government source that posted it. Updated .