626-18-202 Upgrade Surgical Suir Handling Units Bid drawings 6.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24920R0049
About this file
This document package includes bid drawings and specifications for an asbestos abatement project at the Nashville VA Medical Center. The project involves removing asbestos-containing materials including pipe insulation, mastic, and floor tile located in surgical suite areas where renovations to upgrade air handler units are planned. Negative air containment and abatement procedures will be implemented according to Tennessee environmental regulations and OSHA standards. Bidders should reference the drawings and specifications to identify the work areas and sequencing for the planned asbestos abatement activities.
The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs for project number 626-18-202 to upgrade the surgical suite air handling units at the Nashville VAMC. Asbestos removal is required prior to and during the renovation work specified in the solicitation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREAWAY
STRETCHER
ALCOVE
CB-24A
C-07DC-07C
MALE
TOILET
C-08D
FEMALE
TOILET
C-08B
FEMALE
STAFF
TOILET
G-51
FEMALE
STAFF
TOILET
G-55
CLOSET
G-46
CLOSET
G-08A
CLOSET
ELECTRICAL
A-22A
FROZEN
SECTION
G-18
B-A118
CORRIDOR
CB-23
CORRIDOR
CB-4
AREAWAY
CORRIDOR
CB-9C
CORRIDOR
CB-3
SCRUB UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
FAN RM - 4
B-B105
MECH RM
AHU-26
FAN RM 11
STORAGE
ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC
POS RM
C-07V
EMERGENCY
GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-16E
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
DECONTAMINATION RM
B-02
CORRIDOR
CB-7
CORRIDOR
CB-8
SCRUB
CB-3B
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
STAIR
NO 2
OFFICE
A-04B
BLOOD BANK
A-14
A-14A
PATH CHIEF
A-09
HEMA SUPER
A-17C
FEMALE
TOILET
A-10
FEMALE
TOILET
A-11
A-17B
MALE
TOILET
A-12
MALE
TOILET
A-13
SOILED
UTILITY
G-56A
RECOVERY
STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL
CLOSET
SIGNAL
G-49B
CLEAN
LINEN
G-56D
SIGNAL
G-49A
RECOVERY
CLEAN
UTILITY
G-56E
RECOVERY
NURSE
STATION
RECOVERY
ISOLATION
BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY
ISOLATION
BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
STAIR
NO 10
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
GAS STORAGE
NURSE
MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
ELEVATOR
P-8
TISSUE TYP
A-20
FLOW CYTO
A-20A
IMMUN LAB
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST EQUIP
STOR
SCRUB-UP
ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
CORRIDOR
CB-2
CHIEF
G-08
OFFICE
G-11
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE TOILET
& SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
STAIR
NO 1
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN
LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB UP
ALCOVE
G-29
SCRUB-UP
ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER &
SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING RM
GENERAL
G-27
SUB STERILE
G-26A
OPERATING RM
GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING RM
GENERAL
G-21
OPERATING RM
GENERAL
G-19
SCRUB
SUB
STERILE
G-19A
REC & OR
HEAD NURSES
G-01
ELECTRICAL
CLOSET
G-22
PHONE/SGNL RM
EXT RAD
CNTROLRM
G-20A
STORAGE
G-20B
INSTRUMENT
& STERILE
G-20C
CYSTOSCOPY RM
G-20
HOLDING
G-17
OFFICE
G-02A
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
OFFICE
G-02B
CONTROL
G-03
DRESSING
& HOLDING
G-15
SEC
G-16
OFFICE
G-04
TOILET
G-15A
TOILET
G-15B
OFFICE
G-07
SEC
G-13
CONFERENCE RM
G-14
HAC
G-12
NUCLEAR
CARDIOLOGY
A-25Q
HAZ.
45 KVA
45 & 30 KVA
45 KVA 45 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER
ALCOVE
WC
ALCOVE
STRETCHER
ALCOVE
WC
ALCOVE
MULTI-PURPOSE
B-G127S
TLT
B-B101G
ALCOVE
B-G127V
C L E
A N S
U P P L Y
B
G R
PV CV LAB #1
B-B101I
EPS CV LAB #2
B-G127J
CONTROL #1
B-B101J
CV LAB #3 (BID
ITEM 5)
B-B101O
CONTROL #2 (BID
ITEM 5)
B-B101Q
CORRIDOR
B-G127F
VIEW
B-G127O
CV EQUIP #2
B-B101N
SOILED UTIL
B-B101E
PREP/HOLDING
B-G127T
H.A.C
B-B101H
CRASH CART
ALCOVE
B-B101R
TLT
1-G127W
CV EQUIP #3
B-B101P
ALCOVE
B-G127W
ALCOVE
B-G127X
CHANGE
B-G127Y
COR.
B-G127Z
CLEAN LINEN
B-G127AA
ALCOVE
B-G127BB
C V E
Q U
IP
B -B
N
/5 /2
:3
:4
A
M
1310 24th Avenue South, Nashville, TN 37212
626-18-202
# Revisions Date
ASB-01
RCM NDB
www.skellyloy.com
412-828-1412
PITTSBURGH, PA 15238
3280 WILLIAM PITT WAY
SKELLY AND LOY, INC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
209 Sandusky Street
Pittsburgh, PA 15212
PH: 412.287.7333
www.ae-works.com
AE Works Project Number - 18028
AE WORKS
ASBESTOS CONTAINING MATERIALS
ACM NOTES
ASB-01
ASBESTOS ABATEMENT
NOT TO SCALE
LEGEND
KEY PLAN
NORTH
PROJECT
DRAWING AREA SHOWN
REQUIRED.
IS AREA WORK THE WITHIN CHAMBERS DECONTAMINATION THE OF
PLACEMENT SPECIFICATIONS. THE OF 1.9 SECTION WITH ACCORDANCE
IN CHAMBERS DECONTAMINATION WASTE AND PERSONNEL
SEPARATE DESIGN AND CONSTRUCT SHALL CONTRACTOR THE
- LOCATION ENCLOSURE DECONTAMINATION PERSONNEL/WASTE 3.
ASBESTOS WASTE.
NON-FRIABLE AS OF DISPOSED BE SHALL PIPE CEMENT AND MASTIC,
AND TILE FLOOR ASBESTOS-CONTAINING ACCUMULATED THE B.
APPROPRIATE NEGATIVE AIR PRESSURE IN THE WORK AREA.
THE RE-ESTABLISH TO REPAIRS NECESSARY THE MAKE AND WORK
STOP SHALL CONTRACTOR THE COLUMN, WATER OF INCHES -0.02”
BELOW FALLS AREA WORK THE WITHIN PRESSURE AIR NEGATIVE THE
TIME ANY AT IF REMOVAL. DURING TIMES ALL AT MAINTAINED BE SHALL
AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.
PRESENT IN THE WORK AREAS USING MANUAL WET METHODS.
MATERIALS ASBESTOS-CONTAINING ALL REMOVE SHALL CONTRACTOR
THE - REMOVAL PIPE ASBESTOS CEMENT MASTIC, AND TILE FLOOR 2.
TO PROCEED PRIOR TO THE START OF ABATEMENT.
APPROVAL RECEIVE AND VA THE NOTIFY SHALL CONTRACTOR THE
REGULATIONS AND THE SPECIFICATIONS.
ALL WITH ACCORDANCE IN PPE PROPER USE SHALL AND CERTIFIED,
AND TRAINED PROPERLY BE SHALL WORKERS ABATEMENT ALL
BUILDING MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
THE WITH COORDINATED BE SHALL SHUTDOWN REQUIRED SERVICE.
IN REMAIN SHALL SYSTEMS PROTECTION AND DETECTION FIRE
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
SHALL WORK AREA. WORK EACH IN EQUIPMENT/DEVICES ELECTRIFIED
AND EQUIPMENT HVAC ALL OF SHUTDOWN FOR CONTRACTOR
TRADE AND VA THE WITH COORDINATE SHALL CONTRACTOR THE
ACCORDANCE WITH THE SPECIFICATIONS.
IN MONITORING AIR PROVIDE SHALL CONTRACTOR THE
BY SECTIONS 3.1 AND 3.2 OF THE SPECIFICATIONS.
REQUIRED AS SHEETING POLYETHYLENE OF LAYERS 2 WITH SURFACES
WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE
AREA’S NEGATIVE AIR PRESSURE.
WORK THE MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETER
DIGITAL A MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED
MANOMETERS DIGITAL OF USE THE THROUGH CONTRACTOR THE BY
MONITORED CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE
AIR NEGATIVE AREAS. WORK THE INSIDE HOUR PER CHANGES AIR (4)
FOUR LEAST AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED
HEPA THESE BUILDING. THE OF EXTERIOR THE TO EXHAUSTED
HANDLERS AIR FILTERED HEPA USING AREA WORK THE IN CREATED
BE SHALL PRESSURE AIR NEGATIVE REMOVAL. ASBESTOS DURING
TIMES ALL AT PROVIDED BE SHALL LOCATION, PERIMETER AREA WORK
ANY AT MEASURED AS COLUMN, WATER OF INCHES -0.02 LEAST AT
OF PRESSURE AIR NEGATIVE A CONTAINMENTS. PRESSURE NEGATIVE
WITHIN CONDUCTED BE SHALL WORK REMOVAL ASBESTOS ALL
THE WORK AREA.
FROM MATERIALS NON-ASBESTOS AND ASBESTOS ALL OF REMOVAL THE
PERFORMING WHEN DUST OF RELEASE THE CONTROL TO CLEANERS
VACUUM AND HANDLERS AIR FILTERED HEPA AND METHODS WET
USE SHALL CONTRACTOR THE PIPE. ASBESTOS CEMENT AND MASTIC
AND TILE FLOOR ACM ACCESS TO AREAS WORK ASBESTOS DESIGNATED
THE WITHIN FROM CREATED MATERIALS CONTAINING NON-ASBESTOS
ALL OF DISPOSE AND REMOVE SHALL CONTRACTOR THE
SURGICAL SUITE RENOVATIONS, WHERE INDICATED ON THE DRAWINGS.
THE BY IMPACTED BE WILL THAT AREAS WORK FROM PIPE ASBESTOS
CEMENT AND MASTIC AND TILE FLOOR CONTAINING ASBESTOS
OF DISPOSE AND REMOVE SHALL CONTRACTOR THE 1200. CHAPTER
CONSERVATION ENVIRONMENTAL OF DEPARTMENT TENNESSEE WITH
ACCORDANCE STRICT IN DONE BE SHALL WORK ASBESTOS ALL 1.
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
ASBESTOS APPROVED PER ABATEMENT WITH PROCEED 4.
PROVIDE NEGATIVE AIR EXHAUST.3.
UNITS.
LOAD-OUT WASTE AND DECONTAMINATION CONSTRUCT 2.
ESTABLISH REGULATED ABATEMENT WORK AREA.1.
WORK SEQUENCE FOR ABATEMENT
SETUP AND PROJECT PHASING.
AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS CONTROL
DUST APPLICABLE THE REFERENCE SHALL CONTRACTOR THE 11.
1926.500-503.
CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO
ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET
(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED
WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 10.
(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926
AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE
CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS
APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 9.
TO PROCEED IN THE PROJECT WORK AREA.
PROJECT RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK
THE MAKE AND ACM SPECIFIED REMOVE TO IS WORK ABATEMENT THE
OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED
OR CONTAINING ASBESTOS ANY OF DISPOSAL THE INCLUDES
ALSO WORK THE FIBERS. ASBESTOS AIRBORNE WITH CONTACT
FROM ENVIRONMENT THE AND WORKERS PROTECT TO MATERIALS
CONTAINING ASBESTOS OF CONTROL AND HANDLING PROPER
THE INCLUDES COVERED WORK THE CONTAINMENT; UNDER WHILE 8.
REMOVED.
BE TO PIPE ASBESTOS CEMENT AND MASTIC AND TILE FLOOR ACM
ACCESS TO ETC. PARTITIONS, WALLS, CONTAINING NON-ASBESTOS ALL
REMOVE SHALL CONTRACTOR THE CONTAINMENT, UNDER WHILE 7.
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE
A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN
SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT IN 6.
THE DESIGNATED VA REPRESENTATIVE.
WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION
THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN
LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.
BE TO IS WORK WHERE FLOOR THE ON LOCATED PANELS DISTRIBUTION
POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS
GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR
THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS
WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR
OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.
SHEETING TO PROTECT THEM FROM DUST AND WATER CONTAMINATION.
PLASTIC WITH DETECTORS SMOKE THE COVER SHALL AND SYSTEM FIRE
MAIN THE FROM ISOLATED AREA WORK THE IN DETECTORS SMOKE ANY
HAVE TO ARRANGE SHALL CONTRACTOR THE SHEETING. PLASTIC 6-MIL
RETARDANT FIRE OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK
THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.
CONTAINMENT AREA
PROJECT AREA
ASBESTOS-CONTAINING TRANSITE PIPE
BLACK MASTIC UNDER NON-ACM FLOOR TILE
Nashville VAMC Asbestos and Lead Abatement REV.dgn Layout1 10/23/2019 4:35:07 PM
Phase
100% BID DOCUMENTS UPGRADE SURGICAL SUITE AIR
HANDLER UNITS
FULLY SPRINKLERED
01/28/2020
BASEMENT - ASBESTOS ABATEMENT
VHATVHSANTIM1
Polygon
VHATVHSANTIM1
Callout ASBESTOS FLOORING ABATEMENT AND REPLACEMENT NOT IN CONTRACT Specification Section 02 82 13.19 Asbestos Floor Tile and Mastic Abatement shall be deleted
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Cross-Out
VHATVHSANTIM1
Polygon
VHATVHSANTIM1
Callout Deleted References to Floor Tile and Mastic
File details come from the government source that posted it. Updated .