Price Schedule - 36C78623Q50041.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
S208 - Grounds Maintenance Services for Alabama National Cemetery
Solicitation number
36C78623Q50041
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GM W_O $

Alabama National Cemetery Grounds Maintenance Requirement
BASE YEAR
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
00015b.1.1Headstone receiving, preparation, and transportationEA$0.00800$0.00
00025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00800$0.00See guidance at bottom of page
00035b.1.3Headstone Raise and RealignEA$0.00500$0.00See guidance at bottom of page
00045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00See guidance at bottom of page
00055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
00065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
00075b.3.1Pond Algae TreatmentMO$0.009$0.00
00085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
00095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
00105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
00115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
00125b.4.2Irrigation- Decoder Repair/ReplaceEA$0.005$0.00
00135b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
00145b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
00155b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
00165b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
00175b.4.2Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird)EA$0.003$0.00
00185b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
00195b.4.4Mowing non-turf areasWK$0.0043$0.00
00205b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
00215b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
00225b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
00235b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
00245b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
00255b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
00265b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.003$0.00
00275b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
00285b.6.1Casket/Vault Gravesite Sod InstallationEA$0.00850$0.00
00295b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
00305b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
00315b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
00325b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
00335b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
00345b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
00355b.7.1Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
00365b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
00375b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
00385b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
00395b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
00405b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
00415b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
00425b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
00435b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
00445b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
00455b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
00465b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
00475b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00

Base Year Total Estimate COST $0.00

OPTION YEAR 1
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
100015b.1.1Headstone receiving, preparation, and transportationEA$0.00850$0.00
100025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00850$0.00See guidance at bottom of page
100035b.1.3Headstone Raise and RealignEA$0.00500$0.00See guidance at bottom of page
100045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00See guidance at bottom of page
100055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
100065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
100075b.3.1Pond Algae TreatmentMO$0.009$0.00
100085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
100095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
100105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
100115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
100125b.4.2Irrigation- Decoder Repair/ReplaceEA$0.005$0.00
100135b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
100145b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
100155b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
100165b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
100175b.4.2Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird)EA$0.003$0.00
100185b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
100195b.4.4Mowing non-turf areasWK$0.0043$0.00
100205b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
100215b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
100225b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
100235b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
100245b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
100255b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
100265b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
100275b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
100285b.6.1Casket/Vault Gravesite Sod InstallationEA$0.00900$0.00
100295b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
100305b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
100315b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
100325b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
100335b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
100345b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
100355b.7.1Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
100365b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
100375b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
100385b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
100395b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
100405b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
100415b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
100425b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
100435b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
100445b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
100455b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
100465b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
100475b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00

Option Year 1 Total Estimate COST $0.00

OPTION YEAR 2
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
200015b.1.1Headstone receiving, preparation, and transportationEA$0.00900$0.00
200025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00900$0.00See guidance at bottom of page
200035b.1.3Headstone Raise and RealignEA$0.00500$0.00See guidance at bottom of page
200045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00See guidance at bottom of page
200055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
200065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
200075b.3.1Pond Algae TreatmentMO$0.009$0.00
200085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
200095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
200105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
200115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
200125b.4.2Irrigation- Decoder Repair/ReplaceEA$0.005$0.00
200135b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
200145b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
200155b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
200165b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
200175b.4.2Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird)EA$0.003$0.00
200185b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
200195b.4.4Mowing non-turf areasWK$0.0043$0.00
200205b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
200215b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
200225b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
200235b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
200245b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
200255b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
200265b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
200275b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
200285b.6.1Casket/Vault Gravesite Sod InstallationEA$0.00950$0.00
200295b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
200305b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
200315b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
200325b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
200335b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
200345b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
200355b.7.1Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
200365b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
200375b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
200385b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
200395b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
200405b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
200415b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
200425b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
200435b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
200445b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
200455b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
200465b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
200475b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00

Option Year 2 Total Estimate COST $0.00

OPTION YEAR 3
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
300015b.1.1Headstone receiving, preparation, and transportationEA$0.00950$0.00
300025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00950$0.00See guidance at bottom of page
300035b.1.3Headstone Raise and RealignEA$0.00500$0.00See guidance at bottom of page
300045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00See guidance at bottom of page
300055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
300065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
300075b.3.1Pond Algae TreatmentMO$0.009$0.00
300085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
300095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
300105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
300115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
300125b.4.2Irrigation- Decoder Repair/ReplaceEA$0.005$0.00
300135b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
300145b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
300155b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
300165b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
300175b.4.2Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird)EA$0.003$0.00
300185b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
300195b.4.4Mowing non-turf areasWK$0.0043$0.00
300205b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
300215b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
300225b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
300235b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
300245b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
300255b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
300265b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
300275b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
300285b.6.1Casket/Vault Gravesite Sod InstallationEA$0.001000$0.00
300295b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
300305b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
300315b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
300325b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
300335b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
300345b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
300355b.7.1Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
300365b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
300375b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
300385b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
300395b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
300405b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
300415b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
300425b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
300435b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
300445b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
300455b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
300465b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
300475b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00

Option Year 3 Total Estimate COST $0.00

OPTION YEAR 4
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
400015b.1.1Headstone receiving, preparation, and transportationEA$0.001000$0.00
400025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.001000$0.00See guidance at bottom of page
400035b.1.3Headstone Raise and RealignEA$0.00500$0.00See guidance at bottom of page
400045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00See guidance at bottom of page
400055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
400065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
400075b.3.1Pond Algae TreatmentMO$0.009$0.00
400085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
400095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
400105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
400115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
400125b.4.2Irrigation- Decoder Repair/ReplaceEA$0.005$0.00
400135b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
400145b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
400155b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
400165b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
400175b.4.2Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird)EA$0.003$0.00
400185b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
400195b.4.4Mowing non-turf areasWK$0.0043$0.00
400205b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
400215b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
400225b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
400235b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
400245b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
400255b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
400265b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
400275b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
400285b.6.1Casket/Vault Gravesite Sod InstallationEA$0.001050$0.00
400295b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
400305b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
400315b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
400325b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
400335b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
400345b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
400355b.7.1Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
400365b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
400375b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
400385b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
400395b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
400405b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
400415b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
400425b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
400435b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
400445b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
400455b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
400465b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
400475b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00

Option Year 4 Total Estimate COST $0.00

BASE YEAR$0.00
OPTION YEAR # 1$0.00
OPTION YEAR # 2$0.00
OPTION YEAR # 3$0.00
OPTION YEAR # 4$0.00
TOTAL$0.00
Note:
Davis-Bacon Act WD # AL20230096 will be applied for CLINS 0002, 0003, 0004, 10002, 10003, 10004, 20002, 20003, 20004, 30002, 30003, 30004, 40002, 40003, and 40004.
Service Contract Act WD # 2015-4591 will be applied for all other CLINS.

File details come from the government source that posted it. Updated .