Price Schedule - 36C78623Q50041.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 36C78623Q50041
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GM W_O $
| Alabama National Cemetery Grounds Maintenance Requirement | ||||||||
| BASE YEAR | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 0001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 800 | $0.00 | ||
| 0002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 800 | $0.00 | See guidance at bottom of page | |
| 0003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | See guidance at bottom of page | |
| 0004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | See guidance at bottom of page | |
| 0005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 0006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 0007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 0008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 0009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 0010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 0011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 0012 | 5b.4.2 | Irrigation- Decoder Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 0013 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 0014 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 0015 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 0016 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 0017 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird) | EA | $0.00 | 3 | $0.00 | ||
| 0018 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 0019 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 0020 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 0021 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 0022 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 0023 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 0024 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 0025 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 0026 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 3 | $0.00 | ||
| 0027 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 0028 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 850 | $0.00 | ||
| 0029 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 0030 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 0031 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 0032 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 0033 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 0034 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 0035 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 0036 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 0037 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0038 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 0039 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0040 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 0041 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0042 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 0043 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0044 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 0045 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 0046 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 0047 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 |
Base Year Total Estimate COST $0.00
| OPTION YEAR 1 | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 10001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 850 | $0.00 | ||
| 10002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 850 | $0.00 | See guidance at bottom of page | |
| 10003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | See guidance at bottom of page | |
| 10004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | See guidance at bottom of page | |
| 10005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 10006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 10007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 10008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 10009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 10010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 10011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 10012 | 5b.4.2 | Irrigation- Decoder Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 10013 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 10014 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 10015 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 10016 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 10017 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird) | EA | $0.00 | 3 | $0.00 | ||
| 10018 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 10019 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 10020 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 10021 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 10022 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 10023 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 10024 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 10025 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 10026 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 10027 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 10028 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 900 | $0.00 | ||
| 10029 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 10030 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 10031 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 10032 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 10033 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 10034 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 10035 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 10036 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 10037 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10038 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 10039 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10040 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 10041 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10042 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 10043 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10044 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 10045 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 10046 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 10047 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 |
Option Year 1 Total Estimate COST $0.00
| OPTION YEAR 2 | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 20001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 900 | $0.00 | ||
| 20002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 900 | $0.00 | See guidance at bottom of page | |
| 20003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | See guidance at bottom of page | |
| 20004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | See guidance at bottom of page | |
| 20005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 20006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 20007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 20008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 20009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 20010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 20011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 20012 | 5b.4.2 | Irrigation- Decoder Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 20013 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 20014 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 20015 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 20016 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 20017 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird) | EA | $0.00 | 3 | $0.00 | ||
| 20018 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 20019 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 20020 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 20021 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 20022 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 20023 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 20024 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 20025 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 20026 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 20027 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 20028 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 950 | $0.00 | ||
| 20029 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 20030 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 20031 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 20032 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 20033 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 20034 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 20035 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 20036 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 20037 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20038 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 20039 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20040 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 20041 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20042 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 20043 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20044 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 20045 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 20046 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 20047 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 |
Option Year 2 Total Estimate COST $0.00
| OPTION YEAR 3 | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 30001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 950 | $0.00 | ||
| 30002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 950 | $0.00 | See guidance at bottom of page | |
| 30003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | See guidance at bottom of page | |
| 30004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | See guidance at bottom of page | |
| 30005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 30006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 30007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 30008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 30009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 30010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 30011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 30012 | 5b.4.2 | Irrigation- Decoder Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 30013 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 30014 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 30015 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 30016 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 30017 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird) | EA | $0.00 | 3 | $0.00 | ||
| 30018 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 30019 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 30020 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 30021 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 30022 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 30023 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 30024 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 30025 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 30026 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 30027 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 30028 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 1000 | $0.00 | ||
| 30029 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 30030 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 30031 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 30032 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 30033 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 30034 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 30035 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 30036 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 30037 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 30038 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 30039 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 30040 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 30041 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 30042 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 30043 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 30044 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 30045 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 30046 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 30047 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 |
Option Year 3 Total Estimate COST $0.00
| OPTION YEAR 4 | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 40001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 1000 | $0.00 | ||
| 40002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 1000 | $0.00 | See guidance at bottom of page | |
| 40003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | See guidance at bottom of page | |
| 40004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | See guidance at bottom of page | |
| 40005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 40006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 40007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 40008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 40009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 40010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 40011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 40012 | 5b.4.2 | Irrigation- Decoder Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 40013 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 40014 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 40015 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 40016 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 40017 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Central(Rainbird) | EA | $0.00 | 3 | $0.00 | ||
| 40018 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 40019 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 40020 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 40021 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 40022 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 40023 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 40024 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 40025 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 40026 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 40027 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 40028 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 1050 | $0.00 | ||
| 40029 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 40030 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 40031 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 40032 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 40033 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 40034 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 40035 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 40036 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 40037 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 40038 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 40039 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 40040 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 40041 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 40042 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 40043 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 40044 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 40045 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 40046 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 40047 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 |
Option Year 4 Total Estimate COST $0.00
| BASE YEAR | $0.00 |
| OPTION YEAR # 1 | $0.00 |
| OPTION YEAR # 2 | $0.00 |
| OPTION YEAR # 3 | $0.00 |
| OPTION YEAR # 4 | $0.00 |
| TOTAL | $0.00 |
| Note: |
| Davis-Bacon Act WD # AL20230096 will be applied for CLINS 0002, 0003, 0004, 10002, 10003, 10004, 20002, 20003, 20004, 30002, 30003, 30004, 40002, 40003, and 40004. |
| Service Contract Act WD # 2015-4591 will be applied for all other CLINS. |
File details come from the government source that posted it. Updated .