CLIN SOW Description Unit of issue Est. Cost Est. Qty Total
0001 5b.1.1 Headstone receiving, preparation, and transportation EA $0.00 800 $0.00
5b.1.2 Headstone Installation and Setting, All First, Subequent (R2)
Interment and All Replacement Headstones
EA $0.00 800 $0.00
5b.1.3 Headstone Raise and Realign EA $0.00 500 $0.00
5b.2.1 Sunken Grave and Grounds Repair EA $0.00 150 $0.00
5b.2.2 Gravesite Floral/Decoration collection/removal (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
0006 5b.2.3 Mass Floral, Decorations, Trash and Debris Pick-up/Removal EA $0.00 20 $0.00 0007 5b.3.1 Pond Algae Treatment MO $0.00 9 $0.00
5b.3.2 Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)
JB $0.00 2 $0.00
0009 5b.4.1 Pump House Monitoring and Maintenance MO $0.00 12 $0.00
5b.4.2 Irrigation- Yearly Startup/Shut Down, & Monthly system check-
Includes Sprinkler adjustments as needed (Growing Season)
MO $0.00 10 $0.00
5b.4.2 Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6"
Breaks
EA $0.00 5 $0.00
0012 5b.4.2 Irrigation- Decoder Repair/Replace EA $0.00 5 $0.00 0013 5b.4.2 Irrigation- In-Valve Head Repair/Replace EA $0.00 5 $0.00
5b.4.2
Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present
EA $0.00 15 $0.00
0015 5b.4.2 Irrigation- Electric & Gate valve Repair/Replace EA $0.00 5 $0.00 0016 5b.4.2 Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly EA $0.00 5 $0.00
5b.4.2 Irrigation- Controller Repair/ Replace/ Program to current
Central(Rainbird)
EA $0.00 3 $0.00
0018 5b.4.3 Mowing and turf edging, (Tifway 419 Bermuda) WK $0.00 43 $0.00 0019 5b.4.4 Mowing non-turf areas WK $0.00 43 $0.00
5b.4.5 Headstone, Marker, Monument and Other Vertical Surface Trimming WK $0.00 25 $0.00
5b.4.6 Leaf, Trash and Debris Collection and Removal; (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
0022 5b.4.7 Extreme Weather Storm Damage and Debris Clean-up EV $0.00 3 $0.00 0023 5b.4.8 Sweeping/Blowing Off Roadways and Concrete Surfaces MO $0.00 12 $0.00 0024 5b.4.9 Maintenance of Benches, Concrete Pads, and Rocked Areas MO $0.00 12 $0.00 0025 5b.5.1 Maintenance of Plant Beds, Shrubs, and Bushes MO $0.00 6 $0.00
5b.5.2 Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)
JB $0.00 3 $0.00
5b.5.3 Mulching - Removal, Replenish and/or Install All Areas
Cemetery defined
JB $0.00 2 $0.00
0028 5b.6.1 Casket/Vault Gravesite Sod Installation EA $0.00 850 $0.00 0029 5b.6.2 Core Aerification (Aeration) - Approx 27 acres - September JB $0.00 1 $0.00
5b.6.3 Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds
JB $0.00 1 $0.00
5b.6.4 Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1
JB $0.00 5 $0.00
5b.6.5 Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))
JB $0.00 2 $0.00
5b.6.5 Weed Control: Post Emerge Herbicide Treatment/Application--
All Turf areas - Approx 27 acres (as needed or directed by COR)
JB $0.00 5 $0.00
5b.6.6 Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil test
JB $0.00 1 $0.00
5b.7.1 Insecticide( Mole Cricket, Stunt Mite control), Fungicide
Treatment/Application (as needed or directed by COR)
JB $0.00 5 $0.00
0036 5b.7.2 Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly MO $0.00 12 $0.00
5b.8.1
Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR
JB $0.00 2 $0.00
5b.8.2
Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR
JB $0.00 2 $0.00
5b.8.3
Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR
JB $0.00 2 $0.00
5b.8.4
Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR
JB $0.00 2 $0.00
5b.8.5
Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR
JB $0.00 2 $0.00
5b.8.6 Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)
JB $0.00 4 $0.00
5b.8.7
Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR
JB $0.00 2 $0.00
5b.8.8 Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning;
(quarterly (4 times per year), Nov., Feb., April, July)
JB $0.00 4 $0.00
0045 5b.9.1 Daily Committal Shelter Setup, Take Down, and Cleaning EA $0.00 375 $0.00 0046 5b.9.2 Weekend/Holiday Burial Support EA $0.00 11 $0.00 0047 5b.9.3 Ceremony Event Support to include set-up and take-down EV $0.00 3 $0.00
Alabama National Cemetery Grounds Maintenance Requirement Base Period
Base Year Total Estimate COST $0.00
10001 5b.1.1 Headstone receiving, preparation, and transportation EA $0.00 850 $0.00
10002 5b.1.2 Headstone Installation and Setting, All First, Subequent (R2)
Interment and All Replacement Headstones
EA $0.00 850 $0.00
10003 5b.1.3 Headstone Raise and Realign EA $0.00 500 $0.00 10004 5b.2.1 Sunken Grave and Grounds Repair EA $0.00 150 $0.00
10005 5b.2.2 Gravesite Floral/Decoration collection/removal (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
10006 5b.2.3 Mass Floral, Decorations, Trash and Debris Pick-up/Removal EA $0.00 20 $0.00 10007 5b.3.1 Pond Algae Treatment MO $0.00 9 $0.00
10008 5b.3.2 Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)
JB $0.00 2 $0.00
10009 5b.4.1 Pump House Monitoring and Maintenance MO $0.00 12 $0.00
10010 5b.4.2 Irrigation- Yearly Startup/Shut Down, & Monthly system check-
Includes Sprinkler adjustments as needed (Growing Season)
MO $0.00 10 $0.00
10011 5b.4.2 Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6"
Breaks
EA $0.00 5 $0.00
10012 5b.4.2 Irrigation- Decoder Repair/Replace EA $0.00 5 $0.00 10013 5b.4.2 Irrigation- In-Valve Head Repair/Replace EA $0.00 5 $0.00
10014 5b.4.2
Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present
EA $0.00 15 $0.00
10015 5b.4.2 Irrigation- Electric & Gate valve Repair/Replace EA $0.00 5 $0.00 10016 5b.4.2 Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly EA $0.00 5 $0.00
10017 5b.4.2 Irrigation- Controller Repair/ Replace/ Program to current
Central(Rainbird)
EA $0.00 3 $0.00
10018 5b.4.3 Mowing and turf edging, (Tifway 419 Bermuda) WK $0.00 43 $0.00 10019 5b.4.4 Mowing non-turf areas WK $0.00 43 $0.00
10020 5b.4.5 Headstone, Marker, Monument and Other Vertical Surface Trimming WK $0.00 25 $0.00
10021 5b.4.6 Leaf, Trash and Debris Collection and Removal; (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
10022 5b.4.7 Extreme Weather Storm Damage and Debris Clean-up EV $0.00 3 $0.00 10023 5b.4.8 Sweeping/Blowing Off Roadways and Concrete Surfaces MO $0.00 12 $0.00 10024 5b.4.9 Maintenance of Benches, Concrete Pads, and Rocked Areas MO $0.00 12 $0.00 10025 5b.5.1 Maintenance of Plant Beds, Shrubs, and Bushes MO $0.00 6 $0.00
10026 5b.5.2 Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)
JB $0.00 6 $0.00
10027 5b.5.3 Mulching - Removal, Replenish and/or Install All Areas
Cemetery defined
JB $0.00 2 $0.00
10028 5b.6.1 Casket/Vault Gravesite Sod Installation EA $0.00 900 $0.00 10029 5b.6.2 Core Aerification (Aeration) - Approx 27 acres - September JB $0.00 1 $0.00
10030 5b.6.3 Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds
JB $0.00 1 $0.00
10031 5b.6.4 Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1
JB $0.00 5 $0.00
10032 5b.6.5 Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))
JB $0.00 2 $0.00
10033 5b.6.5 Weed Control: Post Emerge Herbicide Treatment/Application--
All Turf areas - Approx 27 acres (as needed or directed by COR)
JB $0.00 5 $0.00
10034 5b.6.6 Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil test
JB $0.00 1 $0.00
10035 5b.7.1 Insecticide( Mole Cricket, Stunt Mite control), Fungicide
Treatment/Application (as needed or directed by COR)
JB $0.00 5 $0.00
10036 5b.7.2 Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly MO $0.00 12 $0.00
10037 5b.8.1
Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR
JB $0.00 2 $0.00
10038
5b.8.2
Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR
JB $0.00 2 $0.00
10039
5b.8.3
Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR
JB $0.00 2 $0.00
10040 5b.8.4
Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR
JB $0.00 2 $0.00
10041
5b.8.5
Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR
JB $0.00 2 $0.00
10042 5b.8.6 Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)
JB $0.00 4 $0.00
10043
5b.8.7
Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR
JB $0.00 2 $0.00
10044 5b.8.8 Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning;
(quarterly (4 times per year), Nov., Feb., April, July)
JB $0.00 4 $0.00
10045 5b.9.1 Daily Committal Shelter Setup, Take Down, and Cleaning EA $0.00 375 $0.00 10046 5b.9.2 Weekend/Holiday Burial Support EA $0.00 11 $0.00 10047 5b.9.3 Ceremony Event Support to include set-up and take-down EV $0.00 3 $0.00
Option Year 1 Total Estimate COST $0.00
Option 1 Period
20001 5b.1.1 Headstone receiving, preparation, and transportation EA $0.00 900 $0.00
20002 5b.1.2 Headstone Installation and Setting, All First, Subequent (R2)
Interment and All Replacement Headstones
EA $0.00 900 $0.00
20003 5b.1.3 Headstone Raise and Realign EA $0.00 500 $0.00 20004 5b.2.1 Sunken Grave and Grounds Repair EA $0.00 150 $0.00
20005 5b.2.2 Gravesite Floral/Decoration collection/removal (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
20006 5b.2.3 Mass Floral, Decorations, Trash and Debris Pick-up/Removal EA $0.00 20 $0.00 20007 5b.3.1 Pond Algae Treatment MO $0.00 9 $0.00
20008 5b.3.2 Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)
JB $0.00 2 $0.00
20009 5b.4.1 Pump House Monitoring and Maintenance MO $0.00 12 $0.00
20010 5b.4.2 Irrigation- Yearly Startup/Shut Down, & Monthly system check-
Includes Sprinkler adjustments as needed (Growing Season)
MO $0.00 10 $0.00
20011 5b.4.2 Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6"
Breaks
EA $0.00 5 $0.00
20012 5b.4.2 Irrigation- Decoder Repair/Replace EA $0.00 5 $0.00 20013 5b.4.2 Irrigation- In-Valve Head Repair/Replace EA $0.00 5 $0.00
20014 5b.4.2
Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present
EA $0.00 15 $0.00
20015 5b.4.2 Irrigation- Electric & Gate valve Repair/Replace EA $0.00 5 $0.00 20016 5b.4.2 Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly EA $0.00 5 $0.00
20017 5b.4.2 Irrigation- Controller Repair/ Replace/ Program to current
Central(Rainbird)
EA $0.00 3 $0.00
20018 5b.4.3 Mowing and turf edging, (Tifway 419 Bermuda) WK $0.00 43 $0.00 20019 5b.4.4 Mowing non-turf areas WK $0.00 43 $0.00
20020 5b.4.5 Headstone, Marker, Monument and Other Vertical Surface Trimming WK $0.00 25 $0.00
20021 5b.4.6 Leaf, Trash and Debris Collection and Removal; (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
20022 5b.4.7 Extreme Weather Storm Damage and Debris Clean-up EV $0.00 3 $0.00 20023 5b.4.8 Sweeping/Blowing Off Roadways and Concrete Surfaces MO $0.00 12 $0.00 20024 5b.4.9 Maintenance of Benches, Concrete Pads, and Rocked Areas MO $0.00 12 $0.00 20025 5b.5.1 Maintenance of Plant Beds, Shrubs, and Bushes MO $0.00 6 $0.00
20026 5b.5.2 Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)
JB $0.00 6 $0.00
20027 5b.5.3 Mulching - Removal, Replenish and/or Install All Areas
Cemetery defined
JB $0.00 2 $0.00
20028 5b.6.1 Casket/Vault Gravesite Sod Installation EA $0.00 950 $0.00 20029 5b.6.2 Core Aerification (Aeration) - Approx 27 acres - September JB $0.00 1 $0.00
20030 5b.6.3 Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds
JB $0.00 1 $0.00
20031 5b.6.4 Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1
JB $0.00 5 $0.00
20032 5b.6.5 Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))
JB $0.00 2 $0.00
20033 5b.6.5 Weed Control: Post Emerge Herbicide Treatment/Application--
All Turf areas - Approx 27 acres (as needed or directed by COR)
JB $0.00 5 $0.00
20034 5b.6.6 Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil test
JB $0.00 1 $0.00
20035 5b.7.1 Insecticide( Mole Cricket, Stunt Mite control), Fungicide
Treatment/Application (as needed or directed by COR)
JB $0.00 5 $0.00
20036 5b.7.2 Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly MO $0.00 12 $0.00
20037 5b.8.1
Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR
JB $0.00 2 $0.00
20038
5b.8.2
Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR
JB $0.00 2 $0.00
20039
5b.8.3
Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR
JB $0.00 2 $0.00
20040 5b.8.4
Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR
JB $0.00 2 $0.00
20041
5b.8.5
Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR
JB $0.00 2 $0.00
20042 5b.8.6 Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)
JB $0.00 4 $0.00
20043
5b.8.7
Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR
JB $0.00 2 $0.00
20044 5b.8.8 Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning;
(quarterly (4 times per year), Nov., Feb., April, July)
JB $0.00 4 $0.00
20045 5b.9.1 Daily Committal Shelter Setup, Take Down, and Cleaning EA $0.00 375 $0.00 20046 5b.9.2 Weekend/Holiday Burial Support EA $0.00 11 $0.00 20047 5b.9.3 Ceremony Event Support to include set-up and take-down EV $0.00 3 $0.00
Option 2 Period
Option Year 2 Total Estimate COST $0.00
30001 5b.1.1 Headstone receiving, preparation, and transportation EA $0.00 950 $0.00
30002 5b.1.2 Headstone Installation and Setting, All First, Subequent (R2)
Interment and All Replacement Headstones
EA $0.00 950 $0.00
30003 5b.1.3 Headstone Raise and Realign EA $0.00 500 $0.00 30004 5b.2.1 Sunken Grave and Grounds Repair EA $0.00 150 $0.00
30005 5b.2.2 Gravesite Floral/Decoration collection/removal (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
30006 5b.2.3 Mass Floral, Decorations, Trash and Debris Pick-up/Removal EA $0.00 20 $0.00 30007 5b.3.1 Pond Algae Treatment MO $0.00 9 $0.00
30008 5b.3.2 Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)
JB $0.00 2 $0.00
30009 5b.4.1 Pump House Monitoring and Maintenance MO $0.00 12 $0.00
30010 5b.4.2 Irrigation- Yearly Startup/Shut Down, & Monthly system check-
Includes Sprinkler adjustments as needed (Growing Season)
MO $0.00 10 $0.00
30011 5b.4.2 Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6"
Breaks
EA $0.00 5 $0.00
30012 5b.4.2 Irrigation- Decoder Repair/Replace EA $0.00 5 $0.00 30013 5b.4.2 Irrigation- In-Valve Head Repair/Replace EA $0.00 5 $0.00
30014 5b.4.2
Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present
EA $0.00 15 $0.00
30015 5b.4.2 Irrigation- Electric & Gate valve Repair/Replace EA $0.00 5 $0.00 30016 5b.4.2 Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly EA $0.00 5 $0.00
30017 5b.4.2 Irrigation- Controller Repair/ Replace/ Program to current
Central(Rainbird)
EA $0.00 3 $0.00
30018 5b.4.3 Mowing and turf edging, (Tifway 419 Bermuda) WK $0.00 43 $0.00 30019 5b.4.4 Mowing non-turf areas WK $0.00 43 $0.00
30020 5b.4.5 Headstone, Marker, Monument and Other Vertical Surface Trimming WK $0.00 25 $0.00
30021 5b.4.6 Leaf, Trash and Debris Collection and Removal; (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
30022 5b.4.7 Extreme Weather Storm Damage and Debris Clean-up EV $0.00 3 $0.00 30023 5b.4.8 Sweeping/Blowing Off Roadways and Concrete Surfaces MO $0.00 12 $0.00 30024 5b.4.9 Maintenance of Benches, Concrete Pads, and Rocked Areas MO $0.00 12 $0.00 30025 5b.5.1 Maintenance of Plant Beds, Shrubs, and Bushes MO $0.00 6 $0.00
30026 5b.5.2 Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)
JB $0.00 6 $0.00
30027 5b.5.3 Mulching - Removal, Replenish and/or Install All Areas
Cemetery defined
JB $0.00 2 $0.00
30028 5b.6.1 Casket/Vault Gravesite Sod Installation EA $0.00 1000 $0.00 30029 5b.6.2 Core Aerification (Aeration) - Approx 27 acres - September JB $0.00 1 $0.00
30030 5b.6.3 Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds
JB $0.00 1 $0.00
30031 5b.6.4 Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1
JB $0.00 5 $0.00
30032 5b.6.5 Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))
JB $0.00 2 $0.00
30033 5b.6.5 Weed Control: Post Emerge Herbicide Treatment/Application--
All Turf areas - Approx 27 acres (as needed or directed by COR)
JB $0.00 5 $0.00
30034 5b.6.6 Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil test
JB $0.00 1 $0.00
30035 5b.7.1 Insecticide( Mole Cricket, Stunt Mite control), Fungicide
Treatment/Application (as needed or directed by COR)
JB $0.00 5 $0.00
30036 5b.7.2 Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly MO $0.00 12 $0.00
30037 5b.8.1
Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR
JB $0.00 2 $0.00
30038
5b.8.2
Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR
JB $0.00 2 $0.00
30039
5b.8.3
Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR
JB $0.00 2 $0.00
30040 5b.8.4
Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR
JB $0.00 2 $0.00
30041
5b.8.5
Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR
JB $0.00 2 $0.00
30042 5b.8.6 Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)
JB $0.00 4 $0.00
30043
5b.8.7
Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR
JB $0.00 2 $0.00
30044 5b.8.8 Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning;
(quarterly (4 times per year), Nov., Feb., April, July)
JB $0.00 4 $0.00
30045 5b.9.1 Daily Committal Shelter Setup, Take Down, and Cleaning EA $0.00 375 $0.00 30046 5b.9.2 Weekend/Holiday Burial Support EA $0.00 11 $0.00 30047 5b.9.3 Ceremony Event Support to include set-up and take-down EV $0.00 3 $0.00
Option 3 Period
Option Year 3 Total Estimate COST $0.00
40001 5b.1.1 Headstone receiving, preparation, and transportation EA $0.00 1000 $0.00
40002 5b.1.2 Headstone Installation and Setting, All First, Subequent (R2)
Interment and All Replacement Headstones
EA $0.00 1000 $0.00
40003 5b.1.3 Headstone Raise and Realign EA $0.00 500 $0.00 40004 5b.2.1 Sunken Grave and Grounds Repair EA $0.00 150 $0.00
40005 5b.2.2 Gravesite Floral/Decoration collection/removal (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
40006 5b.2.3 Mass Floral, Decorations, Trash and Debris Pick-up/Removal EA $0.00 20 $0.00 40007 5b.3.1 Pond Algae Treatment MO $0.00 9 $0.00
40008 5b.3.2 Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)
JB $0.00 2 $0.00
40009 5b.4.1 Pump House Monitoring and Maintenance MO $0.00 12 $0.00
40010 5b.4.2 Irrigation- Yearly Startup/Shut Down, & Monthly system check-
Includes Sprinkler adjustments as needed (Growing Season)
MO $0.00 10 $0.00
40011 5b.4.2 Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6"
Breaks
EA $0.00 5 $0.00
40012 5b.4.2 Irrigation- Decoder Repair/Replace EA $0.00 5 $0.00 40013 5b.4.2 Irrigation- In-Valve Head Repair/Replace EA $0.00 5 $0.00
40014 5b.4.2
Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present
EA $0.00 15 $0.00
40015 5b.4.2 Irrigation- Electric & Gate valve Repair/Replace EA $0.00 5 $0.00 40016 5b.4.2 Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly EA $0.00 5 $0.00
40017 5b.4.2 Irrigation- Controller Repair/ Replace/ Program to current
Central(Rainbird)
EA $0.00 3 $0.00
40018 5b.4.3 Mowing and turf edging, (Tifway 419 Bermuda) WK $0.00 43 $0.00 40019 5b.4.4 Mowing non-turf areas WK $0.00 43 $0.00
40020 5b.4.5 Headstone, Marker, Monument and Other Vertical Surface Trimming WK $0.00 25 $0.00
40021 5b.4.6 Leaf, Trash and Debris Collection and Removal; (Daily occurrence -
Invoiced Monthly)
MO $0.00 12 $0.00
40022 5b.4.7 Extreme Weather Storm Damage and Debris Clean-up EV $0.00 3 $0.00 40023 5b.4.8 Sweeping/Blowing Off Roadways and Concrete Surfaces MO $0.00 12 $0.00 40024 5b.4.9 Maintenance of Benches, Concrete Pads, and Rocked Areas MO $0.00 12 $0.00 40025 5b.5.1 Maintenance of Plant Beds, Shrubs, and Bushes MO $0.00 6 $0.00
40026 5b.5.2 Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)
JB $0.00 6 $0.00
40027 5b.5.3 Mulching - Removal, Replenish and/or Install All Areas
Cemetery defined
JB $0.00 2 $0.00
40028 5b.6.1 Casket/Vault Gravesite Sod Installation EA $0.00 1050 $0.00 40029 5b.6.2 Core Aerification (Aeration) - Approx 27 acres - September JB $0.00 1 $0.00
40030 5b.6.3 Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds
JB $0.00 1 $0.00
40031 5b.6.4 Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1
JB $0.00 5 $0.00
40032 5b.6.5 Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))
JB $0.00 2 $0.00
40033 5b.6.5 Weed Control: Post Emerge Herbicide Treatment/Application--
All Turf areas - Approx 27 acres (as needed or directed by COR)
JB $0.00 5 $0.00
40034 5b.6.6 Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil test
JB $0.00 1 $0.00
40035 5b.7.1 Insecticide( Mole Cricket, Stunt Mite control), Fungicide
Treatment/Application (as needed or directed by COR)
JB $0.00 5 $0.00
40036 5b.7.2 Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly MO $0.00 12 $0.00
40037 5b.8.1
Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR
JB $0.00 2 $0.00
40038
5b.8.2
Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR
JB $0.00 2 $0.00
40039
5b.8.3
Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR
JB $0.00 2 $0.00
40040 5b.8.4
Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR
JB $0.00 2 $0.00
40041
5b.8.5
Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR
JB $0.00 2 $0.00
40042 5b.8.6 Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)
JB $0.00 4 $0.00
40043
5b.8.7
Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR
JB $0.00 2 $0.00
40044 5b.8.8 Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning;
(quarterly (4 times per year), Nov., Feb., April, July)
JB $0.00 4 $0.00
40045 5b.9.1 Daily Committal Shelter Setup, Take Down, and Cleaning EA $0.00 375 $0.00 40046 5b.9.2 Weekend/Holiday Burial Support EA $0.00 11 $0.00 40047 5b.9.3 Ceremony Event Support to include set-up and take-down EV $0.00 3 $0.00
Option Year 4 Total Estimate COST $0.00
Option 4 Period
BASE YEAR
OPTION YEAR # 1
OPTION YEAR # 2
OPTION YEAR # 3
OPTION YEAR # 4
TOTAL
Note:
Davis-Bacon Act WD # AL20230096 will be applied for CLINS 0002, 0003, 0004, 10002, 10003, 10004, 20002, 20003, 20004, 30002, 30003, 30004, 40002, 40003, and 40004.
Service Contract Act WD # 2015-4591 will be applied for all other CLINS.
File details come from the government source that posted it. Updated .