About this file

This is a pricing template/breakdown sheet for a construction project to renovate an education building training hub (Project #593-26-103) at VA Southern Nevada Healthcare. The spreadsheet is designed to capture detailed cost estimates organized by the 50 CSI (Construction Specifications Institute) divisions, including labor and material costs for each line item. The template includes overhead markup (10%), profit margin (10%), insurance and taxes (7%), and bond costs (3%), with a grand total calculation field currently showing $0.00 as no values have been populated.

The cost breakdown structure covers 34 construction divisions relevant to the renovation scope, including existing conditions demolition, concrete, masonry, metals, doors and windows, finishes, electrical, HVAC, plumbing, and exterior improvements. Specific line items identified in the template address demolition of existing walls, doors, folding doors, acoustic ceilings, flooring, and electrical/data outlets; installation of new steel structures for an automatic wall system, interior doors, automatic dividing walls, metal stud framing with gypsum board, carpet tile, painting, ceiling finishes, and electrical/data installations. The template is a blank form awaiting contractor cost input and is intended to support the firm-fixed-price proposal submission for this SDVOSB set-aside construction solicitation with a 120-calendar-day performance period.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Breakdown

Project Title: Renovate Education Building Training Hub
Project # 593-26-103
Prepared Date:
Prepared By:

Division Total: $0.00 Basis of Estimate Methodology

Data Sources

Overhead:10%$0.00
Subtotal:$0.00
Profit:10%$0.00
Subtotal:$0.00
Insurance and Taxes:7%$0.00
Bond3%$0.00
Subtotal:$0.00
Grand Total:$0.00
Division Totals
Division 01 - General Requirements$0.00
Division 02 - Existing Conditions$0.00
Division 03 - Concrete$0.00
Division 04 - Masonry$0.00
Division 05 - Metals$0.00
Division 06 - Wood and Plastic$0.00
Division 07 - Therm/Moisture Prot.$0.00
Division 08 - Doors and Windows$0.00
Division 09 - Finishes$0.00
Division 10 - Specialties$0.00
Division 11 - Equipment$0.00
Division 12 - Furnishings$0.00
Division 13 - Special Construction$0.00
Division 14 - Conveying Equipment$0.00
Division 21 - Fire Suppression$0.00
Division 22 - Plumbing$0.00
Division 23 - HVAC$0.00
Division 25 - Integrated Automation$0.00
Division 26 - Electrical$0.00
Division 27 - Communications$0.00
Division 28 - Elect. Safety/Security$0.00
Division 31 - Earthwork$0.00
Division 32 - Exterior Improvements$0.00
Division 33 - Utilities$0.00
Division 34 - Transportation$0.00
Division 48 - Electrical Power Gen.$0.00
Division 01 - General RequirementsLaborMaterial
General Superintendent$0.000$0.00
Quality Control Personnel$0.00$0.00
Project Manager$0.00$0.00
Scheduling, critical path, monthly update$0.00$0.00
Mobilization, small-equipment$0.00$0.00
ICRA Temp barrier$0.00$0.00
Scissor Lift$0.00$0.00
Dumbster rental$0.00$0.00
$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 02 - Existing ConditionsLaborMaterial
Demo and Dispose of existing wallsHRS$0.00$0.00
Demo and Dispose of Existing DoorsHRS$0.00$0.00
Demo and Dispose of existing folding foorHRS$0.00$0.00
Demo and Dispose of folding door structural steelHRS$0.00$0.00
Demo and Dispose of Acoustic CeilingHRS$0.00$0.00
Demo and Dispose of gypsum Soffit as necessaryHRS$0.00$0.00
Demo and Dispose of flooringHRS$0.00$0.00
Demo and Dispose of electrical & Data outletsHRS$0.00$0.00
Demo and Dispose of existing light fixturesHRS$0.00$0.00
Demo and Dispose of existing TVs, projectors, screens etcHRS$0.00$0.00
Dispoal of All materialsHRS$0.00$0.00
GPR ScanningHRS$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 03 - ConcreteLaborMaterial
0$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 04 - MasonryLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 05 - MetalsLaborMaterial
New steel Strucure for Automatic Wall, including PE Stamped DrawingsHRS$0.00LF$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 06 - Wood and PlasticLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00

Division 07 - Therm /Moisture Prot. Labor Material

Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 08 - Doors and WindowsLaborMaterial
Interior Doors, inc. frame and hardware$0.00$0.00
New Automatic dividing wall, Continuously Hinged partition systems, aluminum rames, acoustical$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 09 - FinishesLaborMaterial
New walls, metal stud framing, gypsum board, finish two sides, 16'' OC, 5/8'' interior$0.00$0.00
New folding wall gypsum Soffit, framing, gypsum board and finishes$0.00$0.00
Carpet tile, floor finish$0.00$0.00
Painting$0.00$0.00
Ceiling Finishes, acoustic ceiling tile and grid$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 10 - SpecialtiesLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 11 - EquipmentLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 12 - FurnishingsLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 13 - Special ConstructionLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 14 - Conveying EquipmentLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 21 - Fire SuppressionLaborMaterial
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00

Division 22 - Plumbing Labor Material

Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00

Division 23 - HVAC Labor Material

Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
LaborMaterial
Division 25 - Integrated Automation0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 26 - ElectricalLaborMaterial
Install new power and data outlets$0.00$0.00
Install new branch and data circuit wiring$0.00$0.00
Lighting and Branch wiring, including controls$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
Division 27 - CommunicationsLaborMaterial
Install new power and data outlets$0.00$0.00
Install new branch and data circuit wiring$0.00$0.00
Lighting and Branch wiring, including controls$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00

Division 28 - Elect. Safety/Security Labor Material

Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
LaborMaterial
Division 31 - Earthwork0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
LaborMaterial
Division 32 - Exterior Improvements0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
LaborMaterial
Division 33 - Utilities0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
LaborMaterial
Division 34 - Transportation0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00
LaborMaterial
Division 48 - Electrical Power Gen.0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
0$0.00$0.000$0.00$0.00
Labor Sum:$0.00Material Sum:$0.00
Division Total:$0.00