This document consists of construction drawings for the VA Medical Center Phase V project, specifically the Administration Building and Education Center Addition located in North Las Vegas, Nevada. The drawings were prepared by RTKL Associates Inc. (Architecture/Engineers) with multiple consulting firms including Slater Hanifan Group (Civil), J.W. Zunino Landscape Architecture, JBA Consulting Engineering (MEP), DegenKolb Engineering (Structural), Ninyo and Moore (Geotechnical), and LaSalle Engineering (Fire & Life Safety).
The construction documents include comprehensive architectural, structural, mechanical, electrical, and specialty system plans for Level 1 of the Education Center. Key drawing sheets include partial floor plans showing room layouts and designations, reflected ceiling plans with fixture locations, floor finish and detail specifications, foundation and framing plans, mechanical plans with HVAC routing, electrical lighting and power plans with circuit designations, telecom infrastructure plans, AV system ceiling plans, and security plans. The drawings specify various finishes including ceramic tile, VCT, terrazzo, and carpet in different areas, detail exterior wall panel systems with polymer-based phenolic panels and aluminum subframe assemblies, and show mechanical systems routing throughout the facility. All drawings are dated June 15, 2012, with document identification number 593CA2202, and indicate the building is fully sprinklered with comprehensive MEP and security system integration throughout the Education Center spaces.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARBLE THRESHOLD
1/
2" (M
A X)
CARPET REDUCER STRIP VCT REDUCER VCTTERRAZO REDUCER CARPETTERRAZO
CONC
CARPET REDUCER
MAX SLOPE
MARBLE THRESHOLD
1/ 4"
1/ 2'
(M A
X.
) REDUCER
CONCRETE
VCT METAL THRESHOLD
2"x2" CERAMIC TILE with
BULLNOSE (THINSET)
MOISTURE RESISTANT SHEATHING
ON METAL STUDS
PORTLAND CEMENT BOND COAT
TOP OF WAINSCOT
7' - 2" A.F.F.
MOISTURE RESISTANT SHEATHING
CERAMIC WALL TILE COVED
BASE (THINSET)
PORTLAND CEMENT BOND COAT
JOINT SEALER
CERAMIC FLOOR TILE (THINSET)
G
AP1/
4"
FOAM EXPANSION MATERIAL
SLOPE TO
DRAIN
FINISH FLOOR
SLOPED FILL
WATERPROOFING MEMBRANE
REINFORCED MORTAR BED
PORTLAND CEMENT BOND COAT
ONE TILE WIDTH
M
AX
1/
2"
FLOOR DRAIN
WEEP HOLES
CRUSHED STONE
WATERPROOFING
MEMBRANE CONTINUE
6" VERTICALLY UP WALL
SLOPED FILL
SLOPE TO
DRAIN
REINFORCED MORTAR
BED
MOISTURE RESISTANT
SHEATHING ON METAL
STUDS
2"x2" CERAMIC TILE
TYPICAL
PORTLAND CEMENT
BOND COAT
VINYL CORNER GUARD TO
BE 7'-0" HIGH MINIMUM
ABOVE FINISH FLOOR LINE
AND START AT 1" ABOVE
BASE.
ATTACH PER
MANUFACTURERS
REQUIREMENTS
METAL STUD
3" MINIMUM
POLYMER BASED SOLID
PHENOLIC EXTERIOR WALL
PANEL WITH ALUMINUM
SUBFRAME SYSTEM OVER
SHEET WATER/AIR BARRIER
J-CHANNEL
PANEL FASTENER
2" 3/
8" 2"
ALUMINUM SUBFRAME
SYSTEM
POLYMER BASED SOLID
PHENOLIC EXTERIOR WALL
PANEL WITH ALUMINUM
SUBFRAME SYSTEM OVER
SHEET WATER/AIR BARRIER
J-CHANNEL
2"
2"
PANEL FASTENER
ALUMINUM SUBFRAME
SYSTEM
POLYMER BASED SOLID
PHENOLIC EXTERIOR WALL
PANEL WITH ALUMINUM
SUBFRAME SYSTEM OVER
SHEET WATER/AIR BARRIER
J-CHANNEL
PANEL FASTENER
ALUMINUM SUBFRAME
SYSTEM
2" 3/8"
GLAZING - REFER TO
EXTERIOR ELEVATIONS
SEMI-RIGID MINERAL WOOL
INSULATION
4"
UNEXPOSED PANELS TO
RESIST MOISTURE, BLAST
IMPACT, WIND AND SEISMIC
FORCES
ALUMINUM CURTAINWALL
MOUNTING BRACKETS WITH
STAINLESS STEEL
FASTENERS - BY CW MANUF.
A.2
4.8
1"
STEEL COLUMN - REFER TO
STRUCTURAL DRAWINGS
FIRE PROOFING -
THICKNESS PER
SPECIFICATIONS
BACKWRAP WATER/AIR
BARRIER 4" MINIMUM
PROVIDE SEALANT AT WALL
AND MULLIONS AT
INTERSECTIONS - TYPICAL
1/8" ALUMINUM COVER
CAP/PANEL, ATTACH WITH
CONCEALED Z-CLIPS -
COLOR TO MATCH MULLION
PROVIDE SLOTTED
CONNECTION FOR VERT
AND LATERAL MOVEMENT
AE-6401
2' - 8" (V.I.F.) 4"
1/8" ALUMINUM COVER
CAP/PANEL, ATTACH WITH
CONCEALED Z-CLIPS -
COLOR TO MATCH MULLION
1/ 2"
1/
2"
REFER TO PLAN FOR WALL
CONSTRUCTION TYPES
3 SIDED 3" X 6" SOUND
BLOCKING FILLER SIMILAR
TO EMSEAL QUIETJOINT
CURTAIN WALL SYSTEM
J-BEAD TYP.
GRID
PROVIDE SEALANT AT WALL
AND MULLIONS AT
INTERSECTIONS - TYPICAL
ALIGN
ALIGN
VA
R
IE
S
6" 6"
SILL BELOW - WHERE
OCCURS
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
Department of Veterans Affairs
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
As indicated
AE-5610
June 15, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr.
Addition
Floor Finish and Misc Details 593CA2202
188 512Checker Author
6" = 1'-0"1 CARPET TO TILE
6" = 1'-0"2 CARPET TO VCT
6" = 1'-0"3 TERRAZO TO VCT
6" = 1'-0"4 TERRAZO TO CARPET
6" = 1'-0"5 CARPET TO CONCRETE
6" = 1'-0"6 VCT TO TILE
6" = 1'-0"7 VCT TO CONCRETE
6" = 1'-0"8 CONCRETE TO CONCRETE
6" = 1'-0"9 CERAMIC TILE WAINSCOT
6" = 1'-0"10 CERAMIC TILE BASE
6" = 1'-0"11 CERAMIC TILE FLOOR TO SHOWER
3" = 1'-0"12 CERAMIC TILE TO SHOWER DRAIN
12" = 1'-0"13 CORNER GUARD DETAIL
3" = 1'-0"14 TYPICAL PANEL REVEAL
6" = 1'-0"15 TYPICAL PANEL CORNER
3" = 1'-0"16 TYPICAL PANEL CORNER
1 1/2" = 1'-0"17 PLAN DETAIL AT EXTERIOR WINDOW
1 1 1
1 1
1 1/2" = 1'-0"18 EXTERIOR MULLION DETAIL 1
1 Addendum #01 08/15/2012
1 2 3 4 5 6
A
B
C
D
E
5.1
B.3
C.8
CS1
GB
GB
A.2
2.5
A.1
A.4
D.9
S-3102
S-3102
4.8
S-3102
S-3101
S-3101
F2
F6
F6
F6
F2
F6
F6 F2
F6 F2 F3
F6 F6
F1
F6 F6 F6
F2
F2
F6
F1
F6
F1
F6
F1
F1
F1
F1
F1 F1 F1
0"
0"
0"
6"
9'
- 1
0" 9'
- 8
2'
- 9
S-2102
S-2102
S-2102
S-2102
S-2101
(-1 '-0
(-1
'-0
SIM.
SIM.
TYP.
2' - 0"
2'
- 8
1/ 2"
2'
- 1
1/ 2"
2'
- 0
3'
- 2
1'
- 1
0 1 /2"
TYP.
2' - 0" F1 F5
SIM.
8' - 9"
4'
- 0
6'
- 3 1/
4" 2'
- 0
S-2102
S-5111
S-5111
D.3
A.9
4"
0"
S-5111
S-5111
S-5111
F1 F1
S-5214
S-4101
ABOVE
5.85.2
W
X1
W
X1
30' - 0" 14' - 2" 15' - 10" 30' - 0" 19' - 0" 11' - 0" 2' - 9" 27' - 3"
A.5
A.6
1.8 2.6
F5 F5
F5
S-5214
SIM.
S-5111
TYP.
KEY NOTES:
1 DEPRESSED S.O.G. S.A.D. AND 1/S-5103.
2 F5 FOLDING PARTITION COLUMN FOUNDATION.
SEE 9/S-5216 FOR COL. BASE PL.
3 BELOW GRADE PLUMBING, TYP.
SEE PLUMBING DRAWINGS
SHEET NOTES:
1. TOP OF SLAB = 0'-0" U.O.N.
2. TOP OF FND EL. = -1'-0" U.O.N.
3. TOP OF STEEL EL. = -0'-61/4"
4. FOUNDATIONS NOTE F# AND CF#
SEE 15/S-5102
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
Department of Veterans Affairs
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DISCLAIMER:
These electronic files are not contract documents. Significant differences may exist between these electronic files and corresponding hard copy contract documents due to addenda, change orders or other revisions, and problems related to electronic transmission or archiving. No representation is made regarding the accuracy or completeness of these electronic files. The final hard copy contract documents constitute our final work product.
Electronic files are provided for convenience only. They are not for construction. Delivery of electronic files shall not be deemed to be a sale. No warranty, express or implied, including the implied warranties of merchantability and fitness for a particular purpose, is made respecting these
These electronic files are not contract documents.Significant differencesmay exist between these electronic files andcorresponding hard copycontract documents due to addenda, change orders orother revisions, andproblems related to electronic transmission orarchiving. No representationis made regarding the accuracy or completeness ofthese electronic files.The final hard copy contract documents constituteour final work product.Electronic files are provided for convenience only.They are not forconstruction.Delivery of electronic files shall not be deemed tobe a sale. No warranty,express or implied, including the impliedwarranties of merchantability andfitness for a particular purpose, is made respectingthese electronic files.
As indicated
SF-1201B
June 15, 2012
New VA Medical Center Administration Building
PARTIAL FOUNDATION AND FRAMING PLAN -
LEVEL 01 - AREA B
593CA2202
RMG MAM
1/8" = 1'-0"
PARTIAL FOUNDATION AND
FRAMING PLAN - LEVEL 01 - AREA B
44 512
2 ADDENDUM #02 8/22/12
TT
M
MMM
M
M M
M
D
J
J
J
DM
DM
J
J
JJJJ
J
J
JJJJ
R
JJJJJJ
J
J
JJJJ
J
J J
J
J
R
J
J
J
J
JJJJ
J
J
J
J
J
J
J
J J J
J
R
M
J
J
J
J
J
R
J J
J J
J J
R
J R
J
J J
J J
R
J
J J
J R
J J J J J J J J J
J
JJJJJJJ J
J
R R
J
J
JJ
J J
J
J
J
J
J
DMDM
D
J
DM DM
D
SMD
M
M
MM
M M
A1
A1
A1
A1
A1
A1
A1
A1
A3 A3
A3
A3C1
C1
A3
A1
A3 A3
A3 A3
E
E
E
E
E
E
E E
F
F
F
E
E
E
F
F
F
E
E
E
E
D
B1
A1 A1
A1
A1
A1
A1
A2 B2
A3
A3 A3
A3
A1
A3
A1
A3
A1
A3 A3
A3
A1
A3
A1
A3
A1
A3 A3
A3
A3
A3
A1
B1
B1
B1
B1
B2 B1 B1 B1 B1 B1 B1
B2
B1
B1
B1
A1
A1
LRP1B LB1BS LB1B
HB
1A
LB1AS LB1A
T-
LB
1B T-
LB
1A
A1
B1
A1 A1
A1
2L 2L
2L
F
G1
G1
G1
K K
M M
FF
F F
BB BB
FF
A1
A1
A1
J J J J J J J
J
F F F F F F F
G1
F1
F1
F1 F1
F1 F1
F1
F1
F1
F1
F1 F1
F1 F1
F1
F1
TM
A3
F F
G3G3 G3G3 G3G3
G3
G3
G3 G3 G3 G3
FF
F
F
F
F
F
F
F
E
GG GG
GG GG
BBBB
M
2M
2M
LRP1B - 1
3 3 a b
2a 2b
2b2a
TM
TM
FF
M
TM
M
TM
B1
A1 A1
B1 A1 ab
F1
F1
F1
F1
F1F1
F1
F1
D
TM
3a 3b
3a 3b
2b
2b
2b2a
2a
2a
TM
a a ab b b b b b
LCPA - 1
LCPA - 2
LCPA - 3
LCPB - 3
LCPB - 1 LCPB - 2
LCPC - 1
LCPC - 2
LCPC - 3
LCPD - 1
LCPD - 2
LCPD - 3
4 4
LCPBLCPA
LCPD
LCPC
LRP1B - 3
LRP1B - 4
C1F
LRP1B - 5
LRP1B - 2
2a 2b
2b
2a
LRP1B - 21
LRP1B - 16
C2
C2
FF
C1F
F
C a b
F
F c a b
C1
C1G
EH1A - 3
F
FF
F
F
F
F
F
F
F
F
F
F
K2
K2
K2
K2K2
K2
K2 K2
K2
K2
K2
K2
K2K2
K2 K2
LRP1B - 6
LRP1B - 7
LCPB
LCPA
LCPD
LCPC
LRP1A-17 LRP1A-23 -
K2
GG
GG
GG
GG GG
GG
GG
GG
A A
B B
C C
D D
E E
A.1 A.1
D.9 D.9
MAIN LOBBY
1H121
OFFICE
1H137
OFFICE
1H136
OFFICE
1H135
OFFICE
1H131
OFFICE
1H130
STORAGE
1H129B
STORAGE
1H122A
CLASSROOM
1H123
STORAGE
1H123A
STORAGE
1H124A
STORAGE
1H125A
EDUCATION
1H133
OFFICE
1H110F
OFFICE
1H110E
OFFICE
1H112G
OFFICE
1H112F
OFFICE
1H112E
CLASSROOM
1H122
CLASSROOM
1H125
CLASSROOM
1H124
TELECOM
1H127
SIMULATION LAB
1H129A
COMPUTER TRAINING ROOM
1H141
STORAGE
1H140
ELECTRICAL
1H139
TRAINING ROOM
1H138
CORRIDOR
C1-108
CORRIDOR
C1-107
CORRIDOR
C1-106
SANDWICH SHOP
1H142
CLASSROOM
1H126
WELLNESS CENTER
1H111
HAC
1H145TOILET
1H146
MEN
1H147 WOMEN
1H144
VESTIBULE
1H143
VESTIBULE
1H120
WORKROOM
1H132
WORK AREA
1H134
A.2
A.5
B.3
C.8
4.8 5.1
5.1
STORAGE
1H129D
CONTROL ROOM
1H128A
SIMULATION ROOM
1H129C
ACCESS
1H128B
CORRIDOR
1H121A
1.8 2.6
A.4
A.6
2.5
2.51 2 3 4 5 6
A
B
C
D
E
5.1
B.3
C.8
A.2
2.5
A.1
A.4
D.9
4.8
D.3
A.9
5.85.2
A.5A.6
1.8 2.6
NOTES
REFER TO SHEET ESL-101 FOR
CIRCUIT CONTINUATION.
MASTER SWITCH FOR SIMULATION
LAB LIGHTING.
REFER TO SITE PLAN ESL-101 FOR
COURTYARD LIGHTING.
PROVIDE MINIMUM SIX ZONE
WALLBOX DIMMING SYSTEM. LCPA,
LCPB, LCPC & LCPD SHALL BE
INTERGRATED FOR SHARED
MULTI-PURPOSE CONTROL OF
PARTITIONED SPACE. PROVIDE
PARTITION SENSORS AND
PROGRAMMING AS NECESSARY TO
AUTOMATICALLY COMBINE PRESET
FUNCTIONS WHEN PARTITION IS
OPENED AND OPERATE
INDEPENDENTLY WHEN PARTITION
IS CLOSED.
RISER TO LEVEL ABOVE.5
PROVIDE RECESSED, IN-WALL LED
INCANDESCENT NIGHT LIGHT TO
MATCH SIXTH FLOOR PATIENT
ROOMS. (15W-T6 LAMP/120V) FIELD
VERIFY EXACT FIXTURE.
PROVIDE SURFACE WALL MOUNTED
FLUORESCENT PATIENT BED
FIXTURE TO MATCH EXISTING SIXTH
FLOOR PATIENT ROOMS (2)54W-T5,
28W-T5 & 9WPLS LAMPS/3500K/120V)
FIELD VERIFT EXACT FIXTURE.
PROVIDE RECESSED. LENSED
COMPACT FLUORESCENT
DOWNLIGHT TO MATCH EXISTING
SIXTH FLOOR PATIENT ROOMS.
(32W-PL/120V) FIELD VERIFY EXACT
FIXTURE.
PROVIDE FIXTURE AS SPECIFIED
EXCEPT 3'-0" AND WALL MOUNT
OVER DOOR.
LOW VOLTAGE OVER-RIDE LIGHTING
CONTROL STATION. PROVIDE
CONDUIT AND CONTROL WIRE TO
LIGHTING RELAY PANEL.
RISER DOWN WALL TO SLAB FOR
CONTINUATION TO COURTYARD.
PROVIDE VACANCY SENSOR
COMPATIBLE WITH SIX ZONE
WALLBOX DIMMING SYSTEM.
PROVIDE CONDUIT AND CONTROL
WIRE TO DIMMING SYSTEM
INDICATED.
ALL EXIT SIGNS AND EMERGENCY
RELAY COILS SHALL BE CONNECTED
TO AN UNSWITCHED, CONSTANT
HOT CONDUCTOR.
1.
NOTICE
PROVIDE QUANTITY OF
CONDUCTORS IN FIXTURE WHIPS AS
REQUIRED FOR DUAL BALLAST
FIXTURE.
2.
R UL 924 EMERGENCY TRANSFER
RELAY THIS SHEET U.N.O. REFER TO
DIAGRAM B ON SHEET E-411.
3.
PROVIDE DUAL BALLASTS PER
SPECIFICATIONS FOR FIXTURES
INDICATED WITH MULTI-LEVEL
SWITCHING.
4.
1/8" = 1'-0"1 Electrical - Lighting Plan - Level 1- Education Center
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
As indicated
EL-201B
June 15, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Electrical - Lighting Plan - Level 1 - Education Center
593CA2202
370 512RRJ GSL
1 ADDENDUM 1 08/15/12
REVISED ENTIRE SHEET
TT
J
J
J
J
J
J
J J
J J J J
J
J
J
J
J
J
J
J J
J
J J
JJ
J
J
J
EWC
T-
LB
1A
HB
1A LB1ALB1AS
LB1BLB1BSLRP1B
T-
LB
1B
V
V
V
V
V
V
V V
V V V V
V
V
E-401
TS
FC
1-3
V
WP+24"
+40"
C
C
WP
+24"
C
C
CC
C
C
C
C C
C C C C
C C
C
C
WP
+24"
WP+24"
LB1A -
1,3
LB1A - 5
LB1A - 7
LB1A - 9
LB1A - 11
13 17
LB1A - 13,15,17
LB1A - 32
LB1BS - 1
LB1BS - 3
LB1BS - 5
LB1BS - 2
LB1BS - 4
LB1BS - 6
LB1BS - 7
LB1BS - 9 LB1BS - 11
LB1BS - 8
LB1BS - 10 LB1BS - 12
LB1BS - 13
LB1BS - 15
LB1BS - 17
LB1BS - 19
LB1BS - 21
LB1BS - 23
LB1BS - 14
LB1BS - 16
LB1BS - 18
LB1BS - 20
LB1BS - 22
LB1BS - 24
LB1B - 1
LB1BS - 25
LB1AS - 3
LB1AS - 1
LB1AS - 5
LB1AS - 7 LB1AS - 9
LB1AS - 11
LB1AS - 13
LB1AS - 15
LB1AS - 17
LB1AS - 19
LB1AS - 21
LB1AS - 23
WP
+24"
WP
+24"
LB1BS - 26
EP-301B
LB1C
TV
TV
TS
FC
1-1
LB1A - 21
C
TV
LB1BS - 28
AVLB1BS - 29
TV
TV
C
LB1BS - 30
COPY LB1B - 5
E-402
N
CRAC
1-2
HB1A - 8,10,12
TV
LB1B - 3
V
V
V
V
V V
V
TV
TV
TV
TV
D D
D D D D
D
D
D
LB1BS - 27
6 6
LB1AS - 25
LB1AS - 4
LB1AS - 6
LB1AS - 8 LB1AS - 10
LB1AS - 12
LB1AS - 14
LB1AS - 16
LB1AS - 18
LB1AS - 20
LB1AS - 22
LB1AS - 24
LB1AS - 27
LB1AS - 29
LB1AS - 33
LB1AS - 35
LB1A - 28LB1BS - 32
LB1AS - 31
LB1A - 30
C
C C
EL1A - 14
#10
EL1A - 16
#10
TV
TV
LB1A - 2,4
LB1A - 14,16 LB1A - 18,20
Q
Q
Q
Q
Q Q
Q
Q
Q
Q
Q
Q
Q
Q Q
Q Q Q
Q Q
Q Q
Q Q
14 14 14
14 16161616
2222 4444
6 6 6 6
6 6 6 68 8 8 8
LB1A - 6,8
12 10 12 10 12 10 12 10
LB1A - 10,12
6 6 6
A A
B B
C C
D D
E E
A.1 A.1
D.9 D.9
MAIN LOBBY
1H121
OFFICE
1H137
OFFICE
1H136
OFFICE
1H135
OFFICE
1H131
OFFICE
1H130
STORAGE
1H129B
STORAGE
1H122A
CLASSROOM
1H123
STORAGE
1H123A
STORAGE
1H124A
STORAGE
1H125A
EDUCATION
1H133
A.2
A.5
B.3
C.8
4.8
CLASSROOM
1H122
CLASSROOM
1H125
CLASSROOM
1H124
TELECOM
1H127
SIMULATION LAB
1H129A
COMPUTER TRAINING ROOM
1H141
STORAGE
1H140
ELECTRICAL
1H139
TRAINING ROOM
1H138
CORRIDOR
C1-108
CORRIDOR
C1-107
CORRIDOR
C1-106
SANDWICH SHOP
1H142
CLASSROOM
1H126
HAC
1H145TOILET
1H146
MEN
1H147
WOMEN
1H144
VESTIBULE
1H143
VESTIBULE
1H120
WORKROOM
1H132
WORK AREA
1H134
STORAGE
1H129D
CONTROL ROOM
1H128A
SIMULATION ROOM
1H129C
ACCESS
1H128B
CORRIDOR
1H121A
1.8 2.6
A.4
A.6
2.5
2.51 2 3 4 5 6
A
B
C
D
E
5.1
B.3
C.8
A.2
2.5
A.1
A.4
D.9
4.8
D.3
A.9
5.85.2
A.5A.6
1.8 2.6
NOTES
NOT USED.1
120V CONNECTION TO ELECTRONIC
TRAP PRIMER. COORDINATE
ROUGH-IN WITH DIVISION 22.
NOT USED.3
COORDINATE RECEPTACLE
ROUGH-IN FOR CAMERA WITH A/V
DRAWINGS.
INSTALL DUPLEX RECEPTACLE IN AV
WALLBOX. REFER TO AV DRAWINGS
FOR WALLBOX REQUIREMENTS.
PROVIDE GRAY DUPLEX
RECEPTACLE WITH LABEL FOR HALF
SWITCHED SIDE OF DOUBLE
DUPLEX RECEPTACLE. REFER TO
PANEL SCHEDULE FOR SWITCHED
CIRCUIT DESIGNATION.
PROVIDE CONNECTION TO
PRE-WIRED HEADWALL.
COORDINATE CONNECTION WITH
ARCHITECTURAL ELEVATIONS AND
HEADWALL MANUFACTURER
REQUIREMENTS. INSTALL LABEL
"NOT Emergency Receptacle" APPLIED
TO FACEPLATE OF RED
EMERGENCY DESIGNATED
RECEPTACLES.
PROVIDE RED HOSPITAL GRADE
RECEPTACLE. INSTALL LABEL "NOT
Emergency Receptacle" APPLIED TO
RECEPTACLE FACEPLATE.
COORDINATE ROUGH-IN LOCATION
WITH DISPLAY BOARD SUPPORT
STRUCTURE.
COORDINATE RECEPTACLE NEMA
CONFIGURATION WITH FOOD
SERVICE AND ACTUAL EQUIPMENT
SUPPLIED.
120V CONNECTION TO ELECTRIC
DOOR OPERATOR. COORDINATE
WITH ARCHITECTURAL DOOR
SCHEDULE AND MANUFACTURER
CONNECTION REQUIREMENTS.
PROVIDE CONDUIT AND WIRE TO
PUSHBUTTON OPERATORS AS
REQUIRED. REFER TO
ARCHITECTURAL FOR LOCATIONS.
LB1B - 2,4
LB1B - 6
LB1B - 8
LB1B - 10
LB1B - 12
LB1B - 14
LB1B - 16
LB1B - 18,20
LB1B - 22,24
LB1B - 26
LB1B -
28,30,32
LB1B - 36
LB1B - 7
E11
E7
E11
E18
E18
E17
E5
E16 E14 E13
LB1B - 34
E15
E1
E19
E6 E4
E8
C C
SANDWICH SHOP
1H142
C
5.1
5.2
REFER TO FOOD SERVICE
DRAWINGS FOR EXACT ROUGH-IN
AND ADDITIONAL ELECTRICAL
REQUIREMENTS IN THE SANDWICH
SHOP.
1.
NOTICE
1/8" = 1'-0"1 Electrical - Power Plan - Level 01 - Education Center
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
As indicated
EP-301B
June 15, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Electrical - Power Plan - Level 1 - Education Center
593CA2202
380 512RRJ GSL
1/4" = 1'-0"2 Enlarged Sandwich Shop - Power
1 ADDENDUM 1 08/15/12
| Architectural Education Quad |
| RCP Education Quad |
| Floor Finishes Education Quad |
| MH Education Quad |
| MP Education Quad |
| Lighting Education Quad |
| Layout1 |
| Power Education Quad |
| Layout1 |
| Telecom Education Quad |
| AV Education Quad |
| Security Education Quad |
File details come from the government source that posted it. Updated .