Attachment Updated Door Shedules 05-21-2026.pdf
PDF 277 KB Posted
- Attached to
- Z2DA--Solicitation No. 36C26126R0041 Project 593-26-103, Renovate Education Building Training Hub
- Solicitation number
- 36C26126R0041
About this file
This document comprises architectural construction documents, specifically door schedules and floor plans for a multi-level education center facility. The drawings include detailed door specifications for Level 1, Basement Level, and Penthouse Roof levels, prepared by RTKL Associates Inc. (architect/engineer) in conjunction with multiple consulting firms including structural, MEP, civil, landscape, geotechnical, and fire & life safety specialists.
The door schedules specify over 150 individual doors across the facility with detailed parameters including door number, location (from/to rooms), width, height, thickness, door type, frame material, and finish specifications. Door types include wood flush doors (solid core and fire-rated), hollow metal doors (standard and fire-rated), aluminum-framed glass doors, and sliding glass doors with various configurations. Frame details reference specific architectural drawing details (AE series references) for construction guidance. The Level 1 education area includes classrooms, training rooms, simulation labs, offices, corridors, storage areas, and common spaces such as main lobby, sandwich shop, and restroom facilities. The Basement Level contains mechanical, electrical, and emergency electrical rooms with associated service corridors. The Penthouse Roof level houses mechanical penthouse spaces. The documents include elevation details (Types A through N) showing door configurations with glass panels, sidelites, and hardware specifications. Revisions were issued via Addendum #01 (08/15/2012), Addendum #02 (08/22/2012), and Amendment #06 (09/27/2012), with final approval dated June 25, 2012.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TT
ALIGN
A A
B B
C C
D D
E E
AE-2101
C
A.1 A.1
D.9 D.9
AE-2101
B
AE-2103
D
A1
AE
-1
1A
AE-2101
A
AE-2101
D
CLASSROOM
1H123
515 SF / 400 SF
MAIN LOBBY
1H121
1536 SF / 200 SF
OFFICE
1H137
70 SF / 100 SF
OFFICE
1H136
83 SF / 100 SF
OFFICE
1H135
76 SF / 100 SF
OFFICE
1H131
116 SF / 120 SF
OFFICE
1H130
105 SF / 100 SF
STORAGE
1H129B
92 SF / 100 SF
ST
O R
AG
E
1H
2A
S
F
S F
ST
O
R
AG
E 1H
3A
S
F
S F
ST
O
R
AG
E 1H
4A
S
F
S F
ST
O
R
AG
E 1H
5A
S
F
S F
EDUCATION
1H133
2094 SF /
CLASSROOM
1H122
515 SF / 400 SF
CLASSROOM
1H125
510 SF / 400 SF
CLASSROOM
1H124
511 SF / 400 SF
TELECOM
1H127
SIMULATION LAB
1H129A
223 SF / 800 SF
COMPUTER TRAINING ROOM
1H141
534 SF / 400 SF
STORAGE
1H140
100 SF / 100 SF
ELECTRICAL
1H139
TRAINING ROOM
1H138
393 SF / 550 SF
C O
R R
ID
O
R C
1-
SF
CORRIDOR
C1-107
489 SF /
C O
R R
ID
O
R C
1-
SF
SANDWICH SHOP
1H142
757 SF /
CLASSROOM
1H126
528 SF / 600 SF
3.
122A.1
125A.1
123A.1
124A.1
138.2
0.
0.
6.
129.1
129.3
3.
125A.2
123A.2122A.2
147 144
2.
0.
0.
HAC
1H145
33 SF /TOILET
1H146
63 SF /MEN
1H147
352 SF /
WOMEN
1H144
357 SF /
VESTIBULE
1H143
147 SF /
VESTIBULE
1H120
WORKROOM
1H132
95 SF / 150 SF
WORK AREA
1H134
109 SF / 150 SF
AE-3111
AE-3111
AE-3111
AE-3111
AE-3111
AE-3111
AE-3111
A1
AE
-1
1A
AE-4503
2'
9"
2'
9"
AE-4102
B
AE-4101
C
AE-4101
B
AE-4503
AE-4510
A.2
A.5
B.3
C.8
4.8 5.1
5.1
6'
8'
1"
3'
0" 6'
2"
9"
0"
22' - 8" 7' - 4" 8" 5' - 2" 16' - 2" 8' - 0" 8' - 0" 16' - 2" 5' - 2" 8" 7' - 0" 23' - 0"
9" 6' - 3" 8' - 0" 5' - 2" 9' - 10"
7'
3" 8'
6"
7'
4"
2'
6"
8' - 3" 6' - 7" 9"
9' - 3" 5' - 2"
5'
0"
AE-4101
D
STORAGE
1H129D
130 SF / 100 SF
128.1
CONTROL ROOM
1H128A
163 SF /
AE-4111
F
SHADE CANOPY ABOVE
SHADE CANOPY ABOVE
EMERGENCY EXIT ONLY
4' - 0"
SIMULATION ROOM
1H129C
220 SF /
ACCESS
1H128B
14 SF /
141.1
141.2
129.2
128.2
AE-5505
3' - 0"
3' - 0"
AE-4104
B
124A.2
AE-4104
C
AE-4104
A
AE-3113
2.
L
W
X
Y
BB CC
Z
AA
D
S
EPL
R
IA
IC
ID
AE-2101
F
AE-2101
E
AE-5504
AE-5504
AE-5504
T
AE-3113
5.2
5.2
5.8
5.8
D.3
2' - 3"
CORRIDOR
1H121A
387 SF /
1.8 2.6
A.4
A.6
2.5
2.5
FEC
FEC
FEC
2' - 8 1/2" 19' - 3" 5' - 3 1/2"
05d
05d
05d
CG CG
WALK-OFF
MAT
TYPICAL
AE-3111
AE-3113
AE-3113
AE-3113
UU
AE-5610
AE-6401
AE-5508
AE-5508
VV
AE-5506
WALL FIRE RATING LEGEND
1 HOUR RATED PARTITION
2 HOUR RATED PARTITION
ACOUSTICALLY RATED PARTITION
PROVIDE ACCESS CONTROL AT ELEVATOR P1 AND P2 TO PREVENT PUBLIC ACCESS TO
BASEMENT AND PENTHOUSE.
PROVIDE SECURITY CAMERAS LOCATED AS INDICATED IN SECURITY PLANS.
PROVIDE ACCESS CONTROL AS INDICATED IN SECURITY PLANS.
PROVIDE POWER AND DATA TO ACCOMMODATE PORTABLE ENTRY SCREENING
EQUIPMENT.
PROVIDE POWER AND DATA TO SUPPORT SECURITY MONITORING STATION.
PHYSICAL SECURITY NOTES
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
Department of Veterans Affairs
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
As indicated
AE-1201B
June 15, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr.
Addition
Floor Plan - Level 1 - Area B - Education Center 593CA2202
103 512RE MP
1/8" = 1'-0"B1 PARTIAL FLOOR PLAN - LEVEL 1 - EDUCATION CENTER
B A
C
1 ALL DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF CMU, FACE OF CONCRETE OR
GRID LINES - TYPICAL UNLESS NOTED OTHERWISE
2 DIMENSIONS MARKED AS "CLEAR" DICTATES THE CLEAR DIMENSION FROM FINISH TO FINISH
3 REFER TO ENLARGED PLANS FOR DIMENSIONS WHERE CALLED FOR
4 COMPLETELY FILL VOIDS AROUND WALL AND FLOOR PENETRATIONS WITH SOUND
ATTENUATION BLANKETS AND FIRE STOPPING TO AVOID SOUND TRANSFER AND REDUCTION
OF FIRE RATING
5 CONTRACTOR SHALL COORDINATE ALL TRADES AND WORK INCLUDING BUT NOT LIMITED TO
MECHANICAL PIPING AND DUCTWORK, SPRINKLER PIPING, ELECTRICAL CONDUIT,
STRUCTURAL SUPPORT, SPEAKERS AND ROOF DRAINS
6 ALL DOORS TO BE INSTALLED 6" FROM HINGE SIDE OF WALL - TYPICAL UNLESS NOTED OR
DIMENSIONED OTHERWISE
7 FIRE RATED AND ACOUSTICALLY RATED WALL ASSEBLIES SHALL NOT BE INTERRUPTED BY
LESSER RATED OR NON-RATED WALLS - CONTRACTOR TO MAINTAIN CONTINUITY OF HIGHER
RATED FIRE AND ACOUSTICAL WALL AND CEILING ASSEMBLIES
8 INTERIOR WALLS RECEIVING CERAMIC TILE SHALL CONFORM TO THE TILE COUNCIL OF
NORTH AMERICA (TCNA) HANDBOOK
9 REFER TO ELECTRICAL DRAWINGS FOR ALL POWER, LIGHTING AND ELECTRICAL EQUIPMENT
LOCATIONS AND REQUIREMENTS
10 ALUMINUM SURFACES IN CONTACT WITH DISSIMILAR METALS OR WITH INCOMPATIBLE
MATERIALS SUCH AS CONRETE, MASONRY AND PLASTER SHALL BE PAINTED ON CONTACT
SURFACES WITH A PROTECTIVE COATING OF ALKALI-RESISTANT BITUMINOUS PAINT BEFORE
INSTALLATION OR ISOLATED IN A MANNER APPROVED BY THE VA WITH NONABSORPTIVE
TAPE OR GASKETS
11 REFER TO INTERIOR ELEVATIONS FOR ALL TOILET ACCESSORIES AND FINISHES
12 REFER TO LOW VOLTAGE DRAWINGS FOR ALL COMMUNICATION EQUIPMENT LOCATIONS AND
REQUIREMENTS
13 REFER TO MECHANICAL DRAWINGS FOR ALL HEATING VENTILATION AND AIR CONDITIONING
EQUIPMENT LOCATIONS AND REQUIREMENTS
14 REFER TO PLUMBING DRAWINGS FOR ALL DRAINAGE, PLUMBING VENTILATION, SEWAGE
PIPING AND EQUIPMENT LOCATIONS AND REQUIREMENTS
15 THIS BUILDING SHALL BE FULLY SPRINKLERED
16 WHERE FIRE RATED PARTITIONS INTERSECT WITH LESSER RATED PARTITION OR NON-RATED
PARTITIONS, THE HIGHER RATED PARTITION IS TO CONTINUE THROUGH THE INTERSECTION
TO MAINTAIN THE HIGHER RATING
17 PROVIDE GYPSUM BOARD CONTROL JOINTS AS INDICATED IN THE SPECIFICATIONS
18 FEC = FIRE EXTINGUISHER CABINET - REFER TO DETAIL 1 ON SHEET AE-5611
19 CG = CORNER GUARD - REFER TO DETAIL 13 ON SHEET AE-5610
20 REFER TO SLAB PLAN SHEET AE-1211A THROUGH AE-1213 FOR FLOOR SLAB AND SLAB
OPENING LAYOUTS AND DIMENSIONAL INFORMATION
GRAPHIC SCALE
4' 8' 16' 32'0
GENERAL NOTES - FLOOR PLAN
TYPE
MARK
WALL TYPE
(SHEET
GI-0301) DESCRIPTION
01 7A0 18" THICK CONCRETE WALL (REFER TO STRUCTURAL FOR
ADDITIONAL INFORMATION)
02 7A0 24" THICK CONCRETE WALL (REFER TO STRUCTURAL FOR
ADDITIONAL INFORMATION)
03 7B0 8" THICK CONCRETE WALL (REFER TO STRUCTURAL FOR
ADDITIONAL INFORMATION)
04 1A0 5/8" GYPSUM BOARD AT EACH SIDE OF 3 5/8" METAL STUDS
AT 16" ON CENTER (FULL HEIGHT)
05d 1A0 5/8" GYPSUM BOARD AT EACH SIDE OF 3 5/8" METAL STUDS
AT 16" ON CENTER - FILL STUD CAVATIES WITH FIBERGLASS
BATT INSULATION (FULL HEIGHT) (ACOUSTIC) STC-40
06d 1A0 3 5/8" METAL STUDS AT 16" ON CENTER WITH 5/8" GYPSUM
BOARD ON 7/8" FURRING CHANNELS (HORIZONTAL AT 24" ON
CENTER) WITH KINETICS ISOMAX CLIPS OR EQUAL AT ONE
SIDE AND 5/8" GYPSUM BOARD AT ONE SIDE - FILL STUD
CAVATIES WITH FIBERGLASS BATT INSULATION (FULL
HEIGHT) (ACOUSTIC) STC-52
07d 1A0 5/8" GYPSUM BOARD AT EACH SIDE OF 3 5/8" METAL STUDS
AT 16" ON CENTER - FILL STUD CAVATIES WITH FIBERGLASS
BATT INSULATION (FULL HEIGHT) (ACOUSTIC) STC-40
08 1A0 5/8" GYPSUM BOARD AT EACH SIDE OF 6" METAL STUDS AT
16" ON CENTER (ABOVE CEILING)
09d 1A0 5/8" GYPSUM BOARD AT EACH SIDE OF 6" METAL STUDS AT
16" ON CENTER - FILL STUD CAVATIES WITH FIBERGLASS
BATT INSULATION (FULL HEIGHT) (ACOUSTIC) STC-40
10 1A1 5/8" GYPSUM BARD AT EACH SIDE OF 3 5/8" METAL SUTDS AT
16" ON CENTER (1-HOUR RATED) (FULL HEIGHT)
11bd 1A1 2 LAYERS OF 5/8" GYPSUM BOARD AT EACH SIDE OF 3 5/8"
METAL STUDS AT 16" ON CENTER - FILL STUD CAVATIES WITH
FIBERGLASS BATT INSULATION (1-HOUR RATED) (FULL
HEIGHT) (ACOUSTIC) STC-45
12b 1A1 5/8" GYSPUM BOARD AT EACH SIDE OF 6" METAL STUDS AT
16" ON CENTER (1-HOUR RATED) (FULL HEIGHT)
13bd 1A1 5/8" GYSPUM BOARD AT EACH SIDE OF 6" METAL STUDS AT
16" ON CENTER - FILL STUD CAVATIES WITH FIBERGLASS
BATT INSULATION (1-HOUR RATED) (FULL HEIGHT)
(ACOUSTIC) STC-40
14c 1A2 2 LAYERS 5/8" GYPSUM BOARD AT EACH SIDE OF 3 5/8" METAL
STUDS AT 16" ON CENTER (2-HOUR RATED) (FULL HEIGHT)
15c 1A2 2 LAYERS 5/8" GYPSUM BOARD AT EACH SIDE OF 6" METAL
STUDS AT 16" ON CENTER (2-HOUR RATED) (FULL HEIGHT)
16 1B0 5/8" GYPSUM BOARD AT EACH SIDE OF 3 5/8" METAL STUDS
AT 16" ON CENTER (ABOVE CEILING)
17 1B0 3 5/8" METAL STUDS AT 16" ON CENTER WITH 3 LAYERS 5/8"
GYPSUM BOARD AT ONE SIDE AND 1 LAYER 5/8" GYPSUM
BOARD AT ONE SIDE (ABOVE CEILING)
18 1B0 5/8" GYPSUM BOARD AT EACH SIDE OF 6" METAL STUDS AT
16" ON CENTER (FULL HEIGHT)
19 1B0 5/8" GYSPUM BOARD AT EACH SIDE OF 8" METAL STUDS AT
16" ON CENTER (FULL HEIGHT)
20 3A0 5/8" GYPSUM BOARD ON 2 1/2" METAL STUDS AT 16" ON
CENTER (FULL HEIGHT)
21 3A0 5/8" GYPSUM BOARD ON 3 5/8" METAL STUDS AT 16" ON
CENTER (ABOVE CEILING)
22 3A0 5/8" GYPSUM BOARD ON 6" METAL STUDS AT 16" ON CENTER
(ABOVE CEILING)
23 3A0 5/8" GYPSUM BOARD ON 6" METAL STUDS AT 16" ON CENTER -
FILL STUD CAVATIES WITH FIBERGLASS BATT INSULATION
(FULL HEIGHT)
24 3B0 5/8" GYPSUM BOARD ON 1 5/8" METAL STUDS AT 16" ON
CENTER (ABOVE CEILING)
25 3B0 5/8" GYPSUM BOARD ON 2 1/2" METAL STUDS AT 16" ON
CENTER (ABOVE CEILING)
26 3B0 5/8" GYPSUM BOARD ON 3 5/8" METAL STUDS AT 16" ON
CENTER (FULL HEIGHT)
27 3B0 5/8" GYPSUM BOARD ON 6" METAL STUDS AT 16" ON CENTER
(ABOVE CEILING)
28b 2A1 SHAFT WALL WITH 5/8" GYPSUM BOARD AT ONE SIDE AND 1
LAYER 1" SHAFT LINER AT ONE SIDE (1-HOUR RATED) (FULL
HEIGHT)
29c 2A2 SHAFT WALL WITH 2 LAYERS 5/8" GYPSUM BOARD AT ONE
SIDE AND 1 LAYER 1" SHAFT LINER AT ONE SIDE (2-HOUR
RATED) (FULL HEIGHT)
PARTITION SCHEDULE
3 3
1 Addendum #01 08/15/2012
VHALASKentoW Highlight 125A.2
VHALASKentoW Highlight 125A.1
VHALASKentoW Highlight 122A.2
VHALASKentoW Highlight 122A.1
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight 123A.1
VHALASKentoW Highlight 123A.2
VHALASKentoW Highlight 124A.2
VHALASKentoW Highlight 124A.1
VHALASKentoW Highlight
VHALASKentoW Highlight
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
Department of Veterans Affairs
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
AE-6102
June 15, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr.
Addition
Door Schedule 593CA2202
191 512Checker Author
DOOR SCHEDULE - LEVEL 1
D O
O R
N U
M
BE
R
FROM ROOM TO ROOM SIZE DOOR FRAME DETAILS RATINGS
H
AR
D W
AR
E
SE
T
C O
M M
EN
TS
R
EV
IS
ED
IN
D
EL
TA
(S
N U
M
BE
R
N
AM
E
N U
M
BE
R
N
AM
E
W
ID
TH
H
EI
G H
T
TH
IC
KN
ES
S
EL
EV
AT
IO
N
TY
PE
D
ES
C R
IP
TI
O N
FI
N
IS
H
TY
PE
D
ES
C R
IP
TI
O N
FI
N
IS
H
H
EA
D
JA
M
B
JA
M
B
TH
R
ES
H
O
LD
FI
R
E
ST
C
A
D J
W
AL
L
101.1 1H101 LOBBY C1-109 CONNECTOR 8' - 0" 8' - 0" 1 3/4" L SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 6/AE6301 7/AE6301 7/AE6301 12/AE6301 HW-E10B SIM TO VA SDO 201 3
101.2 1H117 OPEN OFFICE 1H101 LOBBY 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3E 3
101.3 1H110B RECEPTION 1H101 LOBBY 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3E 102 1H102 ELEVATOR LOBBY C1-102 CORRIDOR 8' - 0" 7' - 0" 1 3/4" D WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-8 3
102.3 C1-102 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-SH-4 SIM TO VA SDO 228 3
102.4 C1-102 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-6
102.5 C1-103 CORRIDOR C1-102 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-6 3 103 C1-104 CORRIDOR 1H103 TELECOM 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 45 MIN HW-4G 104 C1-101 CORRIDOR C1-102 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-6 105 C1-104 CORRIDOR 1H105 MEN 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-1 106 C1-104 CORRIDOR 1H106 WOMEN 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-1 3 107 C1-101 CORRIDOR 1H107 ELECTRICAL 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 45 MIN STC-45 HW-4G 3 108 C1-101 CORRIDOR 1H108 HAC 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-4G 109 1H109 TOILET C1-105 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 6/AE6301 6/AE6301 PER OTHERS STC-40 HW-4U
109.1 S3 STAIR 3 C1-109 CONNECTOR 5' - 2 3/4" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) Wood - Wall HMI HOLLOW METAL N/A 3/AE4622 1/AE4622 2/AE4622 SEE SHEET AE-5610 HW-5X CONCEALED DOOR WITH PIVOT HINGE 3
110.1 1H110 OPEN OFFICE C1-104 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3
110.2 C1-104 CORRIDOR 1H121A CORRIDOR 5' - 4" 7' - 0" 1 3/4" D WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 1 HR HW-SH-9 3 110A 1H110B RECEPTION 1H110A CONFERENCE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 110C 1H110B RECEPTION 1H110C WORKROOM 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3 110D 1H110 OPEN OFFICE 1H110D OFFICE 12' - 10" 8' - 0" 1 3/4" K SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 110E 1H110 OPEN OFFICE 1H110E OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 110F 1H110 OPEN OFFICE 1H110F OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 111 1H111 WELLNESS CENTER 1H121A CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH3 3
111A 1H111 WELLNESS CENTER 1H111A MEN 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-1 3 111B 1H111 WELLNESS CENTER 1H111B WOMEN 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-1 112 1H112 OPEN OFFICE C1-101 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3
112A 1H112 OPEN OFFICE 1H112A MAILROOM 3' - 4" 8' - 0" 1 3/4" H SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3 112B 1H112 OPEN OFFICE 1H112B WORKROOM 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3 112D 1H112C RECEPTION 1H112D OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 112E 1H112 OPEN OFFICE 1H112E OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 112F 1H112 OPEN OFFICE 1H112F OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 112G 1H112 OPEN OFFICE 1H112G OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A
113A.1 1H113A VESTIBULE 6' - 0" 7' - 4 3/4" 1 3/4" L SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 5/AE6301 5/AE6302 5/AE6302 12/AE6301 HW-E10A SIM TO VA SDO 103 113A.2 1H113A VESTIBULE 1H113B LOBBY 6' - 0" 7' - 4 3/4" 1 3/4" L SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 5/AE6301 5/AE6302 5/AE6302 12/AE6301 HW-E10B SIM TO VA SDO 201 113B.2 1H112C RECEPTION 1H113B LOBBY 3' - 0" 7' - 0" 1 3/4" C WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN STC-40 HW-SH-3 114A C1-102 CORRIDOR 1H114A RECEPTION 3' - 0" 7' - 0" 1 3/4" C WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN STC-40 HW-SH-3 3 114B 1H114A RECEPTION 1H114B OFFICE 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3 114C 1H114 OPEN OFFICE 1H114C OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 114D 1H114D OFFICE 1H114 OPEN OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 114E 1H114E OFFICE 1H114 OPEN OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 114F 1H114G RECEPTION 1H114F OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 114G 1H114G RECEPTION 1H113B LOBBY 3' - 0" 7' - 0" 1 3/4" C WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN STC-40 HW-SH-3 114H 1H114H OFFICE 1H114G RECEPTION 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3 114J 1H114A RECEPTION 1H114J OFFICE 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 115B 1H115B OFFICE 1H116F HALL 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 115C 1H116 OPEN OFFICE 1H115C OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 115D 1H115 OPEN OFFICE 1H115D OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 115F 1H115E HALL 1H115F OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 115G 1H115E HALL 1H115G OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 115H 1H115 OPEN OFFICE 1H115H OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 115J 1H115 OPEN OFFICE 1H115J OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A
116A.1 1H116B HALL 1H116A WORK / FILE ROOM 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3 116A.2 1H116F HALL 1H116A WORK / FILE ROOM 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3 116B C1-104 CORRIDOR 1H116B HALL 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3 116C 1H116 OPEN OFFICE 1H116C OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 116D 1H116 OPEN OFFICE 1H116D OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 116E 1H116 OPEN OFFICE 1H116E OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 116F 1H116F HALL C1-102 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN STC-40 HW-SH-3 117A 1H117 OPEN OFFICE 1H117A OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117B 1H117 OPEN OFFICE 1H117B OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117C 1H117E HALL 1H117C OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117D 1H117E HALL 1H117D OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117F 1H117 OPEN OFFICE 1H117F OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117G 1H117G OFFICE 1H116B HALL 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117H 1H117 OPEN OFFICE 1H117H OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117J C1-104 CORRIDOR 1H117J INTERVIEW 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 117K 1H117 OPEN OFFICE 1H117K OFFICE 9' - 8" 8' - 0" 1 3/4" J SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117L 1H117L INTERVIEW C1-104 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 117M 1H117 OPEN OFFICE 1H117M OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 117N C1-104 CORRIDOR 1H117N INTERVIEW 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E
120.1 1H120 VESTIBULE 6' - 0" 7' - 0" 2" L SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 1/AE6302 2/AE6302 2/AE6302 12/AE6301 HW-E10A SIM TO VA SDO 103 3
120.2 1H120 VESTIBULE 1H121 MAIN LOBBY 6' - 0" 7' - 0" 2" L SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 1/AE6302 2/AE6302 2/AE6302 12/AE6301 HW-E10B SIM TO VA SDO 201 3 121 1H121A CORRIDOR 6' - 0" 7' - 4 3/4" 1 3/4" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 6/AE6301 7/AE6301 7/AE6301 12/AE6301 HW-E9 3 122 1H122 CLASSROOM 1H121 MAIN LOBBY 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 3
122A.1 1H122A STORAGE 1H122 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3 122A.2 1H122A STORAGE 1H122 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3
123 1H123 CLASSROOM 1H121 MAIN LOBBY 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 3 123A.1 1H123A STORAGE 1H123 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3 123A.2 1H123A STORAGE 1H123 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3
124 1H124 CLASSROOM C1-107 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 3 124A.1 1H124A STORAGE 1H124 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3 124A.2 1H124A STORAGE 1H124 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3
125 1H125 CLASSROOM C1-107 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 125A.1 1H125A STORAGE 1H125 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3 125A.2 1H125A STORAGE 1H125 CLASSROOM 5' - 4" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3
126 1H126 CLASSROOM C1-108 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 3
126.2 1H129B STORAGE 1H126 CLASSROOM 3' - 6" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 STC-52 HW-SH-3 SIM TO VA SDO 217 3 127 1H127 TELECOM C1-108 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 STC-52 HW-4G SIM TO VA SDO 217 3
128.1 C1-108 CORRIDOR 1H128A CONTROL ROOM 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-SH-3 SIM TO VA SDO 217
128.2 1H128B ACCESS C1-108 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 STC-52 HW-5D
129.1 C1-108 CORRIDOR 1H129A SIMULATION LAB 4' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 STC-52 HW-SH-3 3
129.2 C1-108 CORRIDOR 1H129C SIMULATION ROOM 4' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 STC-52 HW-SH-3
129.3 1H129D STORAGE C1-108 CORRIDOR 3' - 6" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 STC-52 HW-SH-3 3 130 1H133 EDUCATION 1H130 OFFICE 3' - 4" 8' - 0" 1 3/4" H SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3 131 1H133 EDUCATION 1H131 OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3 132 1H133 EDUCATION 1H132 WORKROOM 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3
133.1 1H133 EDUCATION C1-107 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3
133.2 1H133 EDUCATION C1-107 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-SH-3 135 1H133 EDUCATION 1H135 OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3 136 1H133 EDUCATION 1H136 OFFICE 6' - 6" 8' - 0" 1 3/4" I SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3 137 1H134 WORK AREA 1H137 OFFICE 3' - 4" 8' - 0" 1 3/4" H SAF SLIDING ALUMINUM-FRAMED GLASS AL ALUMINUM 10/AE6302 11/AE6301 11/AE6301 7/AE-6302 STC-40 HW-9A 3
138.2 1H138 TRAINING ROOM C1-106 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 3 139 1H139 ELECTRICAL C1-106 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-4G 3
140.1 1H140 STORAGE 1H141 COMPUTER TRAINING ROOM 6' - 0" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-11 3
140.2 1H140 STORAGE 1H138 TRAINING ROOM 6' - 0" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-11 3
141.1 1H141 COMPUTER TRAINING ROOM C1-106 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-3E 3
141.2 1H141 COMPUTER TRAINING ROOM C1-106 CORRIDOR 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-52 HW-SH-3
142.1 1H142 SANDWICH SHOP 6' - 0" 7' - 4 3/4" 2" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 6/AE6301 7/AE6301 7/AE6301 12/AE6301 HW-E9 3
142.2 1H121A CORRIDOR 1H142 SANDWICH SHOP 6' - 0" 8' - 0" 1 3/4" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 6/AE6301 7/AE6301 7/AE6301 12/AE6301 HW-12J SIM TO VA SDO 207 3 144 1H143 VESTIBULE 1H144 WOMEN 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-1 3 145 1H145 HAC 1H143 VESTIBULE 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-5D 3 146 1H143 VESTIBULE 1H146 TOILET 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 6/AE6301 6/AE6301 PER OTHERS HW-4U 147 1H143 VESTIBULE 1H147 MEN 3' - 0" 7' - 0" 1 3/4" A WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-1
148.1 1H148 VESTIBULE 6' - 0" 7' - 0" 2" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 1/AE6302 2/AE6302 2/AE6302 12/AE6301 HW-8D EXISTING RELOCATED VESTIBULE DOOR -
SDO 103
148.2 C1-109 CONNECTOR 1H148 VESTIBULE 6' - 0" 7' - 0" 2" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 1/AE6302 2/AE6302 2/AE6302 12/AE6301 HW-8D EXISTING RELOCATED VESTIBULE DOOR -
SDO 201
149.1 1H149 VESTIBULE 6' - 0" 7' - 0" 2" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 1/AE6302 2/AE6302 2/AE6302 12/AE6301 HW-8D SIM TO VA SDO 103 3
149.2 C1-109 CONNECTOR 1H149 VESTIBULE 6' - 0" 7' - 0" 2" G AFE ALUMINUM-FRAMED ENTRANCE AL ALUMINUM 1/AE6302 2/AE6302 2/AE6302 12/AE6301 HW-8D SIM TO VA SDO 201
209.6 1H115 OPEN OFFICE 1H115A OFFICE 3' - 0" 7' - 0" 1 3/4" C WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 STC-40 HW-3E 3 304 S2 STAIR 2 C1-105 CORRIDOR 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-6 3
ENTIRE SHEET MODIFIED
1 Addendum #01 08/15/2012 2 Amendment #06 09/27/2012
S1 STAIR 1
S1 STAIR 1
- EXTERIOR
- EXTERIOR
- EXTERIOR
- EXTERIOR
- EXTERIOR
- EXTERIOR
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Highlight
VHALASKentoW Rectangle
VHALASKentoW Highlight 3' - 6"
SLIDER
SLIDER
SLIDERSLIDER
SLIDER SLIDER SLIDER SLIDER
WIDTH AS SCHEDULED
WIDTH AS SCHEDULED
WIDTH AS SCHEDULED
HOLLOW METAL
DOOR AND FRAME
HOLLOW METAL
DOOR AND FRAME
ALUMINUM FRAMED
DOOR WITH GLAZING
SLIDING DOOR WITH
GLASS PANEL
SLIDING DOOR WITH GLASS
PANEL AND SIDELITE
SLIDING DOOR WITH GLASS
PANEL AND SIDELITES
SLIDING DOOR WITH GLASS
PANEL AND SIDELITES
SLIDING 4 PANEL DOOR - DOORS
TO BE BREAK AWAY
WIDTH AS SCHEDULEDWIDTH AS SCHEDULED
SINGLE VISION
DOOR AND FRAME
DOUBLE VISION
DOOR AND FRAME
WIDTH AS SCHEDULED
SINGLE WOOD FLUSH
DOOR AND FRAME
DOUBLE FLUSH
DOOR AND FRAME
A B C D E F G H I J
K L
WIDTH AS SCHEDULED WIDTH AS SCHEDULED
H
IE
G H
T
AS
S C
H
ED
U
LE
D
WIDTH AS SCHEDULED WIDTH AS SCHEDULED
WIDTH AS SCHEDULED
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
H
IE
G H
T
AS
S C
H
ED
U
LE
D
3'
6" 2'
1"
4" 9"
3'
6" 2'
1"
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG) (ALG)
(ALG) (ALG)
(ALG)
(ALG)(ALG)(ALG)
7'
0"
12' - 0"
3' - 1" 3' - 1"
(ALG) (ALG)
(ALG)(ALG)
SLIDING DOOR WITH GLASS
PANEL AND SIDELITES
M
H
EI
G H
T
AS
S C
H
ED
U
LE
D
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
(ALG)
WIDTH AS SCHEDULED
EQ EQ EQ EQ EQ
WIDTH AS SCHEDULED
SLIDING CLOSET DOOR
N
H
IE
G H
T
AS
S C
H
ED
U
LE
D
FIXED
EQ EQ EQ EQ EQ EQ
3' - 4" EQ EQ 3' - 4"
3' - 4"EQ EQ EQ 3' - 4" EQ EQ
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office of Construction and Facilities
Management
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
Department of Veterans Affairs
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1/4" = 1'-0"
AE-6101
June 15, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr.
Addition
Door Type and Schedule 593CA2202
190 512Author
D O
O R
N U
M
BE
R
FROM ROOM TO ROOM SIZE DOOR FRAME DETAILS RATINGS
H
AR
D W
AR
E
SE
T
C O
M M
EN
TS
R
EV
IS
ED
IN
D
EL
TA
(S
N U
M
BE
R
N
AM
E
N U
M
BE
R
N
AM
E
W
ID
TH
H
EI
G H
T
TH
IC
KN
ES
S
EL
EV
AT
IO
N S
TY
PE
D
ES
C R
IP
TI
O N
FI
N
IS
H
TY
PE
D
ES
C R
IP
TI
O N
FI
N
IS
H
H
EA
D
JA
M
B
JA
M
B
TH
R
ES
H
O
LD
FI
R
E
ST
C
A
D J
W
AL
L
001 - EXISTING ELEVATOR LOBBY 6' - 0" 8' - 0" 1 3/4" D HMR HOLLOW METAL (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 60 MIN HW-12 2,3
001.1 CB-002 CORRIDOR S1 STAIR 1 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-6 2
002.1 BH002 MECHANICAL BH005 SERVICE WELL 8' - 0" 8' - 0" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 3/AE6301 3/AE6301 3/AE6301 13/AE6301 HW-E9B SIM TO VA SDO 112
002.2 CB-002 CORRIDOR BH002 MECHANICAL 8' - 0" 7' - 0" 1 3/4" F HMR HOLLOW METAL (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 1 HR STC-45 HW-SH-9 SIM TO VA SDO 228 2
003.1 BH003 ELECTRICAL BH005 SERVICE WELL 8' - 0" 8' - 0" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 3/AE6301 3/AE6301 3/AE6301 13/AE6301 HW-E9B SIM TO VA SDO 112
003.2 BH003 ELECTRICAL CB-002 CORRIDOR 6' - 0" 7' - 0" 1 3/4" B HMR HOLLOW METAL (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 1 HR STC-45 HW-SH-9 SIM TO VA SDO 228 2
004.1 BH004 EMERGENCY ELECTRICAL BH005 SERVICE WELL 8' - 0" 8' - 0" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 3/AE6301 3/AE6301 3/AE6301 13/AE6301 HW-E9B SIM TO VA SDO 112
004.2 BH003 ELECTRICAL BH004 EMERGENCY ELECTRICAL 3' - 0" 7' - 0" 1 3/4" A HMR HOLLOW METAL (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 1 HR HW-6G 2
DOOR SCHEDULE - BASEMENT LEVEL
DOOR SCHEDULE - PENTHOUSE ROOF
D O
O R
N U
M
BE
R
FROM ROOM TO ROOM SIZE DOOR FRAME DETAILS RATINGS
H
AR
D W
AR
E
SE
T
C O
M M
EN
TS
R
EV
IS
ED
IN
D
EL
TA
(S
N U
M
BE
R
N
AM
E
N U
M
BE
R
N
AM
E
W
ID
TH
H
EI
G H
T
TH
IC
KN
ES
S
EL
EV
AT
IO
N
TY
PE
D
ES
C R
IP
TI
O N
FI
N
IS
H
TY
PE
D
ES
C R
IP
TI
O N
FI
N
IS
H
H
EA
D
JA
M
B
JA
M
B
TH
R
ES
H
O
LD
FI
R
E
ST
C
A
D J
W
AL
L
401.1 MH401 VESTIBULE MH402 MECHANICAL 6' - 0" 7' - 0" 1 3/4" B WDSC WOOD FLUSH (SOLID CORE) HMI HOLLOW METAL 1/AE6301 1/AE6301 1/AE6301 SEE SHEET AE-5610 HW-8 MAG HOLD OPENS 2
401.2 MH402 MECHANICAL MH401A CONTROL ROOM 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 60 MIN HW-5J 1,2
403.1 MH403 VESTIBULE 6' - 0" 7' - 0" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 10/AE6301 11/AE6301 11/AE6301 14/AE6301 HW-E6 DOOR POSITION SWITCH 2
403.2 MH402 MECHANICAL MH403 VESTIBULE 6' - 0" 7' - 0" 1 3/4" F HMR HOLLOW METAL (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-11C 2
403.3 MH403 VESTIBULE 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-SH-4 SIM TO VA SDO 228 2
404.1 MH404 VESTIBULE 6' - 0" 7' - 0" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 10/AE6301 11/AE6301 11/AE6301 14/AE6301 HW-E6 DOOR POSITION SWITCH 2
404.2 MH404 VESTIBULE MH402 MECHANICAL 6' - 0" 7' - 0" 1 3/4" F HMR HOLLOW METAL (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-11C 2
404.3 MH404 VESTIBULE 3' - 0" 7' - 0" 1 3/4" A WDR WOOD FLUSH (FIRE RATED) HMI HOLLOW METAL 2/AE6301 2/AE6301 2/AE6301 15/AE6301 90 MIN HW-SH-4 SIM TO VA SDO 228 2
DOOR SCHEDULE - ELEVATIONS
1 ALL DOORS ALONG RATED CORRIDORS SHALL MEET THE MINIMUM REQUIREMENTS OF 2000
IBC SECTION 714.2.3 - ALL DOORS ALONG A 1 HOUR RATED CORRIDORS SHALL HAVE A
MINIMUM FIRE PROTECTION OF 20 MINUTES UNLESS NOTED OTHERWISE - DOOR OPENINGS
ALONG A FIRE RATED CORRIDORS SHALL BE PROTECTED BY TIGHT-FITTING SMOKE AND
DRAFT CONTROL ASSEMBLY - DOORS SHALL MAINTAIN A SELF CLOSING DEVICE PER IBC
SECTION 714.2.7 FIRE DOORS SHALL MEET THE REQUIREMENTS FOR A SMOKE AND DRAFT
CONTROL DOOR ASSEMBLY OF THE DOOR ASSEMBLY
2 ALL DOORS SHALL BE PROVIDED WITH A LEVEL FLOOR OR LANDING - ALL THRESHOLD
PROVIDED SHALL HAVE A MAXIMUM OF 12" ABOVE THE FLOOR OR LANDING PER CODE
3 ALL EXTERIOR DOORS SHALL BE WEATHERSTRIPPED
4 ALL HARDWARE SHALL COMPLY WITH "ADA" SECTIONS AND SHALL BE MADE OF THE SAME
MATERIAL AND HAVE THE SAME FINISH AS SELECTED BY THE ARCHITECT - REFER TO
SPECIFICATIONS FOR HARDWARE INFORMATION
5 EXCEPT FOR SLIDING DOORS THE LOWER 12" OF ALL DOORS SHALL COMPLY WITH CODE
AND SHALL BE SMOOTH AND UNINTERRUPTED TO ALLOW THE DOOR TO BE OPENED BY A
WHEELCHAIR FOOT REST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION
6 LABELING REQUIREMENTS OF RATED DOORS SHALL BE LABELED SHOWING THE NAME OF
THE MANUFACTURER, THE NAME OF THE THIRD PARTY INSPECTION AGENCY, THE FIRE
PROTECTION RATING AND, WHERE REQUIRED FOR FIRE DOORS IN EXIT ENCLOSURES BY
SECTION 714.2.4 - THE MAXIMUM TRANSMITTED TEMPERATURE END POINT, SMOKE AND
DRAFT CONTROL DOORS COMPLYING WITH UL 1784 SHALL BE LABELED AS A SMOKE AND
DRAFT CONTROL DOOR - LABELS SHALL BE APPROVED AND PERMANENTLY AFFIXED - THE
LABEL SHALL BE APPLIED AT THE FACTORY WHERE FABRICATION AND ASSEMBLY ARE
PERFORMED
7 OPENING SIZE IS EQUAL TO NET OPENING - ROUGH OPENING IS EQUAL TO OPENING SIZE
AND FRAME DIMENSION
8 THE DETAILS AS INDICATED ON DRAWINGS REFLECT DESIGN INTENT ONLY - ATTACHMENTS
AND SEALANT DETAILS ARE SCHEMATIC AND TOGETHER WITH SPECIFICATIONS AND
PROFILES SHOWN ARE INTENDED TO ESTABLISH THE PERFORMANCE REQUIREMENTS AND
MATERIAL QUALITIES REQUIRED - DETAILS NOT SHOWN SHALL BE SIMILAR IN CHARACTER TO
THOSE DETAILED - WHERE SPECIFIC DIMENSION, DETAIL OR INTENT CANNOT BE
DETERMINED, OR ARE NOT CLEARLY DEFINED, THE ARCHITECTS CLARIFICATION SHALL BE
REQUESTED BEFORE PROCEEDING WITH THAT PORTION OF THE WORK. THE CONTRACTOR
SHALL DEVELOP A FINAL DETAILS TO ACCOMMODATE THE FABRICATION (SHOP DRAWINGS),
ERECTION AND INSTALLATION OF THE WORK IN ACCORDANCE WITH THE DESIGN INTENT
SHOWN
9 THE DOOR NUMBER IN THE SCHEDULE CORRESPONDS WITH THE NUMBER OF THE ROOM OF
WHICH THE DOOR IS LOCATED - PLUS THE LETTER SUFFIX INDICATED ON THE PLAN FOR
THAT DOOR - REFER ALSO TO THE FLOOR PLAN AND THE INTERIOR AND EXTERIOR
ELEVATIONS
10 THE MAXIMUM EFFORT TO OPERATE DOORS APPLIED AT RIGHT ANGLES TO HINGED DOORS
OR AT THE CENTER PLANE SLIDING DOORS SHALL COMPLY WITH THE LATEST CODE
REQUIREMENTS
11 UNLESS NOTED OTHERWISE THE DOOR OPENING IN RATED WALLS SHALL BE PROTECTED BY
A TIGHT FITTING SMOKE AND DRAFT CONTROL ASSEMBLY HAVING A FIRE PROTECTION
RATING OF NOT LESS THAN (20) MINUTES - THE LABELED ASSEMBLY SHALL BE SELF CLOSING
OR AUTOMATIC CLOSING ACTUATION OF A SMOKE DETECTOR AND SHALL BE PROVIDED WITH
A CONTINUOUS GASKET ALONG THE STOP AT THE DOOR JAMB AND HEAD
12 ALL GLAZING WITHIN OR ADJACENT TO DOOR PANELS ARE TO BE (ALG) ACOUSTICAL
LAMINATED GLAZING UNLESS WITHIN FIRE RATED PARTITIONS.
GENERAL NOTES - DOORS
ENTIRE SHEET MODIFIED
1 Addendum #01 08/15/2012 2 Addendum #02 08/22/2012 3 Amendment #06 09/27/2012
EXTERIOR
STAIR 1
EXTERIOR
STAIR 2
S1
S2
150.1 2H220 MECHANICAL PENTHOUSE 6' - 0" 7' - 10" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 10/AE6301 11/AE6301 11/AE6301 14/AE6301 HW-E9 2
150.2 2H220 MECHANICAL PENTHOUSE 6' - 0" 7' - 10" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 10/AE6301 11/AE6301 11/AE6301 14/AE6301 HW-E9 2
501 3' - 0" 7' - 0" 1 3/4" F HMI HOLLOM METAL (INSULATED) HMI HOLLOW METAL 10/AE6301 11/AE6301 11/AE6301 14/AE6301 HW-E6 LOCATED AT ELEVATOR PENTHOUSE 2
CB-001 CORRIDOR3
VHALASKentoW Rectangle
File details come from the government source that posted it. Updated .