Price Breakdown.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z2DZ--Project 662-23-111 | Repair and Weatherize Parking Structure 211 Elevator
Solicitation number
36C26126R0035
Issued by

About this file

This is a price breakdown attachment for a federal construction solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 for Project 662-23-111, which involves repair and weatherization work on Parking Structure 211 Elevator (Solicitation Number 36C26126R0035).

The price breakdown template is organized by construction divisions and cost categories, including material, equipment, and labor line items. Key work scopes encompassed in the estimate include: General Requirements (project management, scheduling, safety, quality control, and waste management); Existing Conditions (demolition); Concrete work; Metals (structural steel and fabrications); Thermal and Moisture Protection (flashing and sealants); Openings (doors, frames, entrances, hardware, glazing); Finishes and Painting; Conveying Equipment (traction elevator modernization); Plumbing (including drainage systems); and Electrical Systems (power distribution, lighting, wiring devices, and commissioning). The template also includes line items for bonds, insurance, home office overhead, and profit, with subtotal and grand total rows for the complete project cost. This attachment serves as the standardized pricing format required for contractor proposals in response to the solicitation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A - Price Breakdown

36C26126R0035 - Project # 662-23-111 Repair and Weatherize Parking Structure 211 Elevator Attachment A - PRICE BREAKDOWN
DescriptionMaterialEquipmentLaborTotal
Project Manager/QC
Superintendent/Safety
Mobilization
Division 01 - General Requirements
Project Schedules
Shop Drawings, Product Data, and Samples
Safety Requirements for Major Projects
Reference Standards
Quality Control
Testing Laboratory Services
Special Inspections
Temporary Envirenmental Controls
Construction Waste Management
Sustainable Construction Requirements
Division 02 - Existing Conditions
Demolition
Division 03- Concrete
(Short-Form) Cast-in-Place Concrete
Division 05- Metals
Structural Steel Framing
Metal Fabrications
Division 07- Thermal and Moisture Protection
Flashing and Sheet Metal
Joint Sealants
Division 08- Openings
Hollow Metal Doors and Frames
Aluminum-Framed Entrances and Storefronts
Door Hardware
Glazing
Louvers and Vents
Division 09- Finishes
Schedule for Finishes
Painting
Division 14- Conveying Equipment
Traction Elevator- Modernization
Division 22- Plumbing
Common Work Reesults for Plumbing
Plumbing Insulations
Facility Storm Drainage
Division 26- Electrical
Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway and Boxes for Electrical Systems
Overcurrent Protective Device coordination Study
Commissioning of Electrical Systems
Wiring Devices
Interior Lighting
Exterior Lighting
Bonds
Insurance
Home Office Overhead
Profit

SUB-TOTAL

PROJECT GRAND TOTAL

File details come from the government source that posted it. Updated .