662-23-111 Drawings.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26126R0035
About this file
This document is a set of 100% Construction Documents (CD) for a federal construction project at the San Francisco VA Medical Center. The project, numbered 662-23-111, involves the repair and weatherization of Parking Structure 211 Elevator, located in San Francisco, California. The work includes repair of existing elevator components and creation of a sheltered lobby on the fourth floor of Building 211.
The design team comprises SPEES Design Build (Architect, Mechanical, and Electrical disciplines) located in Kent, Washington and Seattle, Washington; WSP (Structural Engineer) based in San Diego, California; and Northbay Elevator (Elevator consultant) in Santa Rosa, California. The project owner is the U.S. Department of Veterans Affairs. The construction documents, dated November 17, 2025, include 17 sheets covering general, architectural, structural, plumbing, and electrical scopes. Key architectural work includes demolition of existing elevator doors and components, installation of new stainless steel doors and frames, new aluminum storefront systems with glazing, new concrete curbs, and drainage modifications. Structural work involves installation of HSS steel posts and beams with connections to existing concrete walls, columns, and slabs, along with bollard installations. Electrical and mechanical work includes lighting modifications, conduit and wire routing, and storm water piping extensions with insulation. The documents were approved by the Department of Veterans Affairs on November 12, 2025, with approvals from Frederic Chung (Contracting Officer Representative), Charee Harris (Contracting Officer), and David Rovner (Contract Specialist).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126R0035 0003.docx | DOCX document | |
| RFI Responses Repair and Weatherize Parking 211 Structure Elevator 05062026.docx | DOCX document | |
| VA RFI response bck April 30th 2026.pdf | ||
| 36C26126R0035 0002.docx | DOCX document | |
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| Wage Determination CA20260018 01302026.pdf | ||
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.docx | DOCX document | |
| RFI Form - 36C26126R0035.docx | DOCX document | |
| Price Breakdown.xlsx | XLSX spreadsheet | |
| 662-23-111 Specifications.pdf | ||
| 36C26126R0035.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECT
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
DESIGN TEAM
ELEVATOR
NORTHBAY ELEVATOR
PHONE: (707) 583-3100
MECHANICAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
ELECTRICAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
3715 SANTA ROSA AVE
SANTA ROSA, CA 95407
STRUCTURAL
WSP
PHONE: (858) 500-4525
9177 SKY PARK COURT
SAN DIEGO, CA 92123
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
CONST TYPE:
CODE ANALYSIS PROJECT DESCRIPTION
REPAIR OF EXISTING ELEVATOR
COMPONENTS AND CREATION OF A
SHELTERED LOBBY ON THE FOURTH FLOOR.
APPLICABLE BUILDING & LEVEL
BUILDING 211, LEVEL 4
CALIFORNIA
SAN FRANCISCO
SAN FRANCISCO
GOV, VETERANS AFFAIRS
EXISTING (NOT ALTERED)
GENERAL NOTES
1. DO NOT SCALE DRAWINGS.
18 14
AREA OF WORK
EXISTING DRAIN
BUILDING 211
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of
Capital Projects
G-001
COVER SHEET
MK AJ
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
REPAIR AND WEATHERIZE PARKING STRUCTURE 211 ELEVATOR
SAN FRANCISCO VA MEDICAL CENTER, SAN FRANCISCO - CA
PROJECT #: 662-23-111
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 OF 17 G-001 COVER SHEET
ARCHITECTURAL
2 OF 17 A-001 ARCH SYMBOLS, ABBREVIATIONS, & GENERAL NOTES
3 OF 17 AD101 LEVEL 4 - ELEVATOR LOBBY - DEMOLITION PLAN
4 OF 17 AE101 LEVEL 4 - ELEVATOR LOBBY - ENLARGED PLAN
5 OF 17 AE420 EXTERIOR ELEVATIONS
6 OF 17 A-601 ELEVATOR SCOPE, DOOR SCHEDULE, TYPES & DETAILS
STRUCTURAL
7 OF 17 S-001 STRUCTURAL GENERAL NOTES
8 OF 17 S-002 ABBREVIATIONS AND SYMBOLS
9 OF 17 S-101 LEVEL 4 - STRUCTURAL PLAN AND ELEVATIONS
PLUMBING
10 OF 17 P-101 PLUMBING FLOOR PLANS
ELECTRICAL
11 OF 17 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
12 OF 17 E-002 ELECTRICAL LEGENDS
13 OF 17 E-101 ELECTRICAL FLOOR PLAN - LEVEL 1
14 OF 17 E-104 ELECTRICAL FLOOR PLAN - LEVEL 4
15 OF 17 E-501 ELECTRICA DETAILS
16 OF 17 E-601 ONE-LINE DIAGRAM
17 OF 17 E-701 ELECTRICAL SCHEDULES
PROJECT
NORTH
TRUE NORTH
(DASHED)
1" = 30'-0"
SITE PLAN
Revisions: Date:
11/12/2025
CD SET APPROVAL
DEPARTMENT OF VETERANS AFFAIRS
PROJECT #: 662-24-111
APPROVED BY:
FREDERIC CHUNG, CONTRACTING OFFICER REPRESENTATIVE DATE
APPROVED BY:
CHAREE HARRIS, CONTRACTING OFFICER DATE
APPROVED BY:
DAVID ROVNER, CONTRACT SPECIALIST DATE
101A
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION / LEVEL MARKER
KEY NOTE
ROOM TAG
(SF OPTIONAL)
CEILING HEIGHT TAG
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
TOILET
150 SF
A
01A
TRUE
NORTH
W1
PROJECT
NORTH
TRUE NORTH
(DASHED)
A01
D88
A5175SOAP DISH
ACT 2x2
9' - 0" AFF
F-1
R-1
SYMBOLS
A-101
A-101
A-101
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
(DEMO SHEET(S) ONLY)
ABOVE
BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
(DEMO SHEET(S) ONLY)
NEW DOOR
AREA SHOWN ON SHEET
OUT OF SCOPE
INACCESSIBLE DURING PHASE
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BOUNDRY
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BARRIER
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA DOOR
(ICRA SHEET(S) ONLY)
ADHESIVE WALK-OFF MATS
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA AIR PRESSURE
(ICRA SHEET(S) ONLY)
CONTRACTOR PATH OF TRAVEL
(ICRA SHEET(S) ONLY)
SMOKE COMPARTMENT PERIMETER
(FIRE LIFE SAFETY SHEET(S) ONLY)
SMOKE RATED WALL
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
(FIRE LIFE SAFETY SHEET(S) ONLY)
EMERGENCY EGRESS ROUTE
(FIRE LIFE SAFETY SHEET(S) ONLY)
SPRINKLER PER FIRE PROTECTION
DIFFUSER PER MECHANICAL
(SIZE & PROPORTION MAY VARY)
LIGHT FIXTURE PER ELECTRICAL
(SIZE & PROPORTION MAY VARY)
MATERIALS
EARTH
SAND
BATT INSULATION
RIGID INSULATION
CONCRETE
STEEL
PLYWOOD, FIRE RATED
GYPSUM BOARD, TYPE 'X'
GYPSUM BOARD, LEAD LINED
ACOUSTICAL CEILING TILE, 2' x 2'
ACOUSTICAL CEILING TILE, 2' x 4'
A-101
A-101
FEC
IN-04.02-01
ABBREVIATIONS
SYMBOLS
& AND
∠ ANGLE
@ AT
℄ CENTERLINE
° DEGREES
# NUMBER
A
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
A(C)T ACOUSTICAL (CEILING) TILE
ACM ASBESTOS CONTAINING MATERIAL
ACW ACOUSTICAL WALL
ADA AMERICANS W/ DISABILITIES ACT
ADJ ADJACENT
A/E ARCHITECT/ENGINEER
AF ACCESS FLOOR
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ASPH ASPHALT
A/V AUDIO / VIDEO
B
BARR BARRIER
BATH BATHROOM
BB BACKER BOARD
BLD(G) BUILDING
BLK(G) BLOCK(ING)
BLW BELOW
BM BEAM
BMT(U) BONE MARROW TRANSPLANT (UNIT)
BO BOTTOM OF
BOC BOTTOM OF CURB
BOS BOTTOM OF SLAB
BRC BRACE, BRACING
BRKT BRACKET
BRNG BEARING
BTM BOTTOM
BTWN BETWEEN
C
CAB CABINET
CC CONTRACTOR FURN, CONTRACTOR INST
CD CONSTRUCTION / CONTRACT DOCUMENTS
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMP COMPOSITION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER REPRESENTATIVE
CORR CORRIDOR
CS CONCRETE SEALER
CT CERAMIC TILE
CTR CENTER
CV CONTRACTOR FURNISHED, VA INSTALLED
D
DB DESIGN BUILD
DBL DOUBLE
DC DIRECT CURRENT
DD DESIGN DEVELOPMENT
DEMO DEMOLISH(ION)
DEPT DEPARTMENT
DG DESIGN GUIDE
DIA DIAMETER
DIM DIMENSION
DM DESIGN MANUAL
DWN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING(S)
E
E EAST
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATION OR ELEVATOR
ENG ENGINEER(ING)
EOC EDGE OF CURB
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
ETS EXPOSED TO STRUCTURE
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F
FA FIRE ALARM
FD FLOOR DRAIN
FE(C) FIRE EXTINGUISHER (CABINET)
FF FACTORY FINISH
FFB FINISH FLOOR BREAK
FIN FINISH(ED)
FLASH FLASHING
FLR FLOOR(ING)
FLRSNT FLORESCENT
FNDN FOUNDATION
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUDS
FP FIRE PROOF
FR FIRE RATED
FRM FRAME
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FURN FURNISHED
G
GA GAGE, GAUGE
GALV GALVANIZED
GE GENERAL ELECTRIC
G(W)B GYPSUM (WALL) BOARD
GC GENERAL CONTRACTOR
GL GRID LINE
GLB GLUE LAMINATED BEAM
GMU GLASS MASONRY UNIT
GOV(T) GOVERNMENT
GYP GYPSUM BOARD
H
HAC HOUSEKEEPING AIDES CLOSET
HDR HEADER
H(D)W(E) HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAM
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION & AIR CONDITIONING
I
ICRA INFECTIOUS CONTROL RISK ASSESSMENT
ID INSIDE DIAMETER OR DIM
ILSM INTERIM LIFE SAFETY MEASURES
INCL INCLUDE(D,ING)
INST INSTALL
INSUL INSULATION
INT INTERIOR
J
JT JOINT
K
KV KILOVOLT
L
LAM LAMINATE(D)
LAV LAVATORY
LCM LEAD CONTAINING MATERIAL(S)
LD LEAD
LT LIGHT
M
MAT MATERIAL(S)
MAX MAXIMUM
MDF MEDIUM-DENSITY FIBREBOARD
MECH MECHANIC(AL)
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODIFIED
MTL METAL
N
N NORTH
N(/)A NOT APPLICABLE
NEG NEGATIVE
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O.C. ON CENTER(S)
OPN(G) OPEN(ING)
OPP OPPOSITE
OPT OPTION(AL)
OVHD OVERHEAD
P
P PAINT
PCONC PRECAST CONCRETE
PCRA PRE-CONSTRUCTION RISK ASSESSMENT
PL PLATE
PLAM PLASTIC LAMINATE
PLY(WD) PLYWOOD
PNL PANEL
PR PAIR
PRFB PREFABRICATED
PS PLASTIC
PT PORCELAIN TILE
PTN(S) PARTITION(S)
PVMT PAVEMENT
Q
QTY QUANTITY
R
RAD RADIUS
RB RESILIENT BASE
RCP(S) REFLECTED CEILING PLAN(S)
REF REFERENCE
REINF REINFORCE(D,ING)
REP REPRESENTATIVE
REQ(S,(')D) REQUIRE(D,S,MENT(S))
RESIL RESILIENT
REV REVERSE
RF ROOF
RM ROOM
RMV REMOVE
RO ROUGH OPENING
S
S SOUTH
SCHED SCHEDULE
SCI(D) SPINAL CORD INJURY (& DISABILITY)
SD SCHEMATIC DESIGN
SDSF SOLID SURFACE
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHG SHINGLES
SHLD(G) SHEILD(ING)
SHT(G) SHEET (SHEATHING)
SIM SIMILAR
SM SEAM
SOW SCOPE OF WORK
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STDG STANDING
STF STAFF
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SURG SURGERY, SURGICAL
SUSP SUSPENDED
SV SHEET VINYL
SYS SYSTEM
T
TBD TO BE DETERMINED
TBL TABLE
TEMP TEMPORARY
T&G TONGUE AND GROOVE
THK THICK(NESS)
THRESH THRESHOLD
TOC TABLE OF CONTENTS
TOS TOP OF SLAB
TPH TOILET PAPER HOLDER
TRANS TRANSITION
TS TUBE STEEL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
V
VA VETERANS AFFAIRS
VAR VARIES
VB VAPOR BARRIER
VC VA FURNISHED, CONTRACTOR INSTALLED
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W
W WEST
W/ WITH
WD WOOD
WDW WINDOW
WGHT WEIGHT
W/O WITHOUT
WP WATERPROOF(ING)
WR WATER RESISTANT
WRK WORK
X
XRY X-RAY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of
Capital Projects
A-001
ARCH SYMBOLS, ABBREVIATIONS, &
GENERAL NOTES
MK AJ
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
Revisions: Date:
11/12/2025
FS
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
TO DEMOLISH
EXISTING TO REMAIN
1. REMOVE WALL MOUNTED ACCESSORIES REQUIRED TO
COMPLETE A CONSTRUCTION TASK. VERIFY WITH COR
BEFORE DISPOSAL.
2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF
ANY EXISTING EQUIPMENT.
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
14 15 16
A
A.5
STAIR ONE
DN
D1
D2
D3
D4
D5
D5
D6
D7 D7 D8
D9
D10
D11
D12
ELEV LOBBY
EQUIP
ELEV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of
Capital Projects
AD101
LEVEL 4 - ELEVATOR LOBBY - DEMOLITION
PLAN
MK AJ
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
D1 DEMOLISH EXISTING DOOR AND FRAME.
D2 DEMOLISH EXISTING ELEVATOR DOOR. EXISTING JAMB
TO REMAIN.
D3 REMOVE EXISTING BOLLARD. SALVAGE FOR
RELOCATION.
D4 DEMOLISH EXISTING ELEVATOR ON SCOPE OF WORK,
SEE SHEET A-601.
D5 EXISTING CMU WALLS, NO WORK.
D6 DRILL EXISTING CONCRETE WALL FOR DRAIN
PENETRATION.
D7 EXISTING CONCRETE WALLS, PREP FOR NEW
STOREFRONT SYSTEM.
D8 DEMO EXISTING RAILING AS NEEDED FOR NEW WORK.
MAXIMUM GAP BETWEEN GUARDRAIL AND GLAZING
NOT TO EXCEED 3.5".
D9 EXISTING STAIRWAY, NO WORK.
D10 EXISTING STROBE/PULL STATION TO REMAIN.
D11 DEMO EXISTING SHEET METAL COVER AS NEEDED FOR
NEW STOREFRONT.
D12 EXISTING BOLLARD TO REMAIN.
3/8" = 1'-0"
LEVEL 4 - ENLARGED ELEVATOR LOBBY - DEMOLITION PLAN
PROJECT
NORTH
TRUE NORTH
(DASHED)
FSK K
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
1. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS,
CENTERLINE OF OPENINGS, UNO.
2. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERSECTING WALL OR CENTERED ON THE
WALL, UNO.
3. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE
FULL SPACE INDICATED WITHOUT ENCROACHMENTS.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INSTALLING GYPSUM BOARD.
EXISTING DOOR TO REMAIN
NEW DOOR
EXISTING TO REMAIN
NEW
14 15 16
A
A.5
STAIR ONE
DN
AE420
AE420 5
F1
F2
F3
F4
F5
F6 F7
F8
EQUIP
401 ELEV
ELEV LOBBY
F4
AE4206
F9
5' - 6" 5' - 6"
F10
F4
F11
F11
SF-4
SF-3
SF-1
AE420
F12
SF-2
F4
14 15 16
A
A.5
ELEV
ELEV LOBBY
EQUIP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of
Capital Projects
AE101
LEVEL 4 - ELEVATOR LOBBY - ENLARGED
PLAN
MK AJ
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
PROJECT
NORTH
TRUE NORTH
(DASHED)
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
F1 INSTALL NEW STAINLESS STEEL DOOR AND FRAME
F2 SEE SHEET A-601 FOR SCOPE OF ELEVATOR WORK.
F3 INSTALL NEW ELEVATOR CAB DOOR.
F4 INSTALL NEW ALUMINUM STOREFRONT AND DOOR
WITH THRESHOLD SET IN SEALANT.
F5 CLEAR RUST FROM STAINLESS STEEL JAMBS, TYP AT
ALL FLOORS.
F6 CLEAN EXISTING CONCRETE DECK AT NEW ENCLOSED
AREA.
F7 COMBINE EXISTING DOWNSPOUT AND OVERFLOW AND
ROUTE THROUGH WALL TO NEW CONDUCTOR HEAD
AND DOWNSPOUT. CORE DRILL THROUGH CONCRETE.
F8 NEW CONDUCTOR HEAD AND DOWNSPOUT.
F9 INSTALL NEW LIGHT IMPACT BOLLARDS.
F10 EXISTING BOLLARDS TO REMAIN.
F11 EXISTING OPENING.
F12 NEW STRUCTURAL MEMBER, SEE STRUCTURAL.
3/8" = 1'-0"
LEVEL 4 - ELEVATOR LOBBY - ENLARGED PLAN
3/8" = 1'-0"
LEVEL 4 - ELEVATOR LOBBY - ENLARGED RCP
PROJECT
NORTH
TRUE NORTH
(DASHED)
1. INDICATED MOUNTING HEIGHTS COMPLY WITH
ARCHITECTURAL BARRIER ACT (ABA) ACCESSIBILITY
STANDARDS, 2004, INCLUDING VA SUPPLEMENT BARRIER
FREE DESIGN STANDARD (PG18-13), REV 2024.
2. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOWN
WITH HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
3. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. ENSURE ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
4. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH
FLOOR ELEVATION, UNO.
LEVEL 4
32' - 4"
14 15 16
ROOF
47' - 2 1/2"
OPEN
BEYOND
LOUVER PANELS
12 3
SF-2
EXISTING BOLLARD
TO BE REMAIN.
LEVEL 4
32' - 4"
A A.5
ROOF
47' - 2 1/2"
LOUVER PANELS
SF-1
36 1/4" 36 1/4"
LEVEL 4
32' - 4"
AA.5
ROOF
47' - 2 1/2"
STRUCTURAL MEMBER,
SEE STUCTURAL
DRAWINGS
SF-3
LEVEL 4
32' - 4"
14 15 16
ROOF
47' - 2 1/2"
OPEN
BEYOND
EXISTING BOLLARD
TO BE DEMOLISHED.
EXISTING BOLLARD
TO BE REMAIN.
LEVEL 4
32' - 4"
A A.5
ROOF
47' - 2 1/2"
OPEN
BEYOND
EXISTING BOLLARD
TO BE REMAIN.
LEVEL 4
32' - 4"
ROOF
47' - 2 1/2"
OPEN
BEYOND
SF-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of
Capital Projects
AE420
EXTERIOR ELEVATIONS
MK AJ
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
GENERAL NOTESKEY NOTES (THIS SHEET ONLY)#
1 NEW CONCRETE CURB.
2 NEW STAINLESS STEEL METAL CONDUCTOR HEAD AND
DOWNSPOUT.
3 NEW BOLLARD.
3/8" = 1'-0"
ELEVATOR LOBBY - SOUTH ELEVATION
3/8" = 1'-0"
ELEVATOR LOBBY - WEST ELEVATION
3/8" = 1'-0"
ELEVATOR LOBBY - EAST ELEVATION
3/8" = 1'-0"
ELEVATOR LOBBY - SOUTH ELEVATION - EXISTING CONDITIONS
3/8" = 1'-0"
ELEVATOR LOBBY - WEST ELEVATION - EXISTING CONDITIONS
3/8" = 1'-0"
ELEVATOR LOBBY - SOUTH INTERIOR ELEVATION
ELEVATOR SCOPE OF WORK
MACHINE ROOM DESCRIPTION ACTION REQUIRED COMMENTS
MACHINE TYPE/MFR. GEARLESS IMPERIAL RETAIN, PROVIDE NEW HOIST ROPES. CLEAN/INSPECT/SERVICE
SEISMIC CONTROL RING & STING PROVIDE NEW
GOVERNORS HW207 PROVIDE NEW NEW GOV ROPE
LIGHTING FLUORESCENT PROVIDE NEW
110V OUTLET GFCI YES PROVIDE NEW
HOISTWAY DESCRIPTION ACTION REQUIRED COMMENTS
DO MFR/MODEL WEATHER-RESISTANT GAL OPERATOR PROVIDE NEW
RESTRICTOR WEATHER-RESISTANT GAL OPERATOR PROVIDE NEW
CAR DOOR HANGERS WEATHER-RESISTANT GAL OPERATOR PROVIDE NEW
DOOR PROTECTION INFRARED PROVIDE NEW
HALL DOOR HANGERS WEATHER-RESISTANT GAL OPERATOR PROVIDE NEW
CLOSER TYPE SPIRATOR PROVIDE NEW SMARTORK
CAR GUIDES ELSCO ADJ. SPRINT ROLLER CLEAN/REMOVE RUST
CAR GUIDE RAILS ELSCO ADJ. SPRINT ROLLER CLEAN/REMOVE RUST
COUNTERWEIGHT RAILS
PIT DESCRIPTION ACTION REQUIRED COMMENTS
BUFFERS SPRING CLEAN/REPAINT
CAB ENCLOSURE DESCRIPTION ACTION REQUIRED COMMENTS
ENTRANCE FINISH #4 STAINLESS STEEL RECONDITION STAINLESS STEEL
FRONT RETURN #4 STAINLESS STEEL RECONDITION STAINLESS STEEL
DOORS #4 STAINLESS STEEL NEW STAINLESS STEEL DOORS 4TH FLOOR ONLY
TRANSOM #4 STAINLESS STEEL RECONDITION STAINLESS STEEL
WALL FINISH STAINLESS STEEL PANELS RECONDITION STAINLESS STEEL
SHELL STEEL PROVIDE NEW LID
CEILING STAINLESS STEEL PANELS CLEAN
ENTRANCES DESCRIPTION ACTION REQUIRED COMMENTS
FOURTH FLOOR DOORS STAINLESS REPLACE
FOURTH FLOOR FRAMES STAINLESS REFINISH
FOURTH FLOOR SILL ALUMINUM CLEAN
SIGNAL FIXTURES DESCRIPTION ACTION REQUIRED COMMENTS
HALL STATIONS/FINISH #4 STAINLESS STEEL PROVIDE NEW 4TH FLOOR ONLY
HALL PI LOCATION OVER ENTRANCE AT EACH FLOOR PROVIDE NEW DIGITAL PI/HL 4TH FLOOR ONLY
HOISTWAY ACCESS KEYED TOP AND BOTTOM PROVIDE NEW
GAUGE AS
SPECIFIED
RETURN ON FRAME WHERE
GYP FINISH IS REQ'D
/8
1 15/16"
VARIES
VARIES
THROAT OPENING = PARTITION
WIDTH + 1/8" MIN
1A 1B
*DOOR HEIGHTS AND WIDTHS PER SCHEDULE
1A
9" 9" 9" 9"
A-601
A-601
DOOR AS SCHEDULED
BACKER ROD AND
SEALANT BOTH SIDES
EXISTING CONCRETE WALL
SHIM AS REQUIRED
GROUT FILLED DOOR FRAME
EXISTING CONCRETE WALL
DOOR AS SCHEDULED
CONT SEALANT
NEW 6" HIGH CONCRETE CURB
WITH SLOPED EDGE
7"
BACKER ROD AND SEALAND
BOTH SIDES
ALUMINUM SPANDREL
EXISTING CONCRETE WALL
BACKER ROD AND SEALANT
BOTH SIDES
SHIM AS NEEDED
STOREFRONT GLAZING
EXISTING CONCRETE WALL
BACKER ROD AND SEALANT
BOTH SIDES
SHIM AS NEEDED
STOREFRONT GLAZING
LEVEL 4
32' - 4"
NEW STOREFRONT
DOOR
THRESHOLD
/4
EXISTING
CONCRETE FLOOR
80"
144"
/2
90 7/8"
/2
/2
/2
/2
/2
/2
2 1/2" 36 1/4" 2 1/2" 36 1/4" 2 1/2"
/2
/2
/2
/2
/2
/2
2 1/2"
34 1/2"
2 1/2"
12"
2 1/2"
36"
2 1/2"
12"
2 1/2"
34 1/2"
2 1/2"
/2
/2
/2
/8
/2
/2
/2
/2
/2
2 1/2" 40 7/16" 2 1/2" 40 7/16" 5"
G-1 G-1 G-1 G-1 G-1 G-1 G-1
G-1G-1
GLAZING TYPES
G-1: COATED SINGLE PANE
LV-1 LV-1 LV-4 LV-2 LV-3 LV-4
G-1
G-1
/2
/2
/2
/2
/8
/8
/2
/2
/2
/8
SF-1 SF-2 SF-3 SF-4
18 1/4"
5" 10 3/4" 2 1/2"
LV-2
G-1
A-601
TYP.
A-601
TYP.
A-601
TYP.
A-601
G-2: ALUMINUM SPANDREL
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2
G-2 G-2 G-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of
Capital Projects
A-601
ELEVATOR SCOPE, DOOR SCHEDULE, TYPES
& DETAILS
MK AJ
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
DOOR SCHEDULE
MARK ROOM # ROOM NAME
DOOR SIZE DOOR
TYPE
GLAZING
TYPE
HW
SET
MATERIAL FIRE
RATING
STC
RATING COMMENTSWIDTH HT THK DOOR FRAME
401 401 EQUIP 6' - 0" 6' - 8" 0' - 1 3/4" 1B - E8 SS SS - - 18" SQ. LOUVER IN DOOR
402 402 ELEV LOBBY 3' - 0" 7' - 0" 1A TEMPERED E4 GLASS HM - -
1. SEE SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE
FOR HW SETS.
GENERAL NOTES
3" = 1'-0"
STANDARD DOOR FRAME
1/4" = 1'-0"
DOOR TYPES
3" = 1'-0"
FRAMES @ EXISTING CONCRETE WALL
3" = 1'-0"
STOREFRONT SILL DETAIL
3" = 1'-0"
STOREFRONT JAMB DETAIL
3" = 1'-0"
STOREFRONT HEAD DETAIL
3" = 1'-0"
DOOR THRESHOLD @ STOREFRONT
1/2" = 1'-0"
STOREFRONT TYPES
LOUVER SCHEDULE
MARK WIDTH HEIGHT
LV-1 3' - 0 1/4" 2' - 7"
LV-2 1' - 0" 2' - 7"
LV-3 3' - 0" 2' - 7"
LV-4 2' - 10 1/2" 2' - 7"
SEE SPECIFICATION 08 71 00 FOR DOOR HARDWARE
WSP USA Inc.
Suite 550
Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
1201 Pacific Ave
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of Capital Projects
S-001
STRUCTURAL GENERAL NOTES
NRT JKM
100% CONSTRUCTION
DOCUMENTS (CD)
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
MATERIAL SPECIFIC STANDARDS ARE LISTED IN THE RESPECTIVE MATERIAL SECTION.
1. VA SEISMIC DESIGN REQUIREMENTS, H-18-8, NOVEMEBER 1ST 2024
2. 2024 INTERNATIONAL BUILDING CODE (IBC) WITH STATE AND LOCAL AMENDMENTS
CODES AND STANDARDS
REFERENCES:
ASCE 7-22 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
VA STRUCTURAL DESIGN MANUAL PG-18-10 OCTOBER 1ST 2022, REVISED JULY 1, 2023
DESIGN LOADS
WEIGHT OF STRUCTURAL ELEMENTS AND PERMANENT FIXED EQUIPMENT.
DEAD LOADS
SUPERIMPOSED DEAD LOADS
ROOF ROOFING MATERIALS 18
UNIFORM
LOAD (PSF)
CATEGORYLOCATION
LIVE AND ROOF LIVE LOADS
STAIRS & EXITS
ROOF
PARKING GARAGE
3000 (4.5"X4.5")
CONCENTRATED
LOAD (LBS)
OCCUPANCY OR USE UNIFORM
LOAD (PSF)
SNOW LOAD
SNOW LOAD IMPORTANCE FACTOR, Is
GROUND SNOW LOAD, Pg
SNOW LOAD ON FLAT ROOFS, Pf
EXPOSURE CATEGORY
SNOW LOAD EXPOSURE FACTOR, Ce
THERMAL FACTOR, Ct
1.2
6 PSF
20 PSF
D
1.0
1.0
VALUEDESIGN PARAMETER
WIND LOAD
BASIC WIND SPEED (3-SEC GUST), V
WIND EXPOSURE CATEGORY
KZT
ENCLOSURE CLASSIFICATION
INTERNAL PRESSURE COEFFICIENT
103 MPH
D
1.95
ENCLOSED
±0.18
VALUEDESIGN PARAMETER
REFER TO THE COMPONENTS AND CLADDING DIAGRAMS AT THE END OF THE GENERAL NOTES SECTION.
SEISMIC IMPORTANCE FACTOR, Ie
SITE LOCATION
SOIL SITE CLASS
MAPPED SPECTRAL ACCELERATION
DESIGN SPECTRAL ACCELERATION
SEISMIC DESIGN CATEGORY
1.5
37.782484° N -122.506754° E
C
2.12 0.82
1.48 0.078
F
VALUEDESIGN PARAMETER
SEISMIC LOAD
LATITUDE
LONGITUDE
SHORT PERIOD, Ss
1-SECOND PERIOD, S1
SHORT PERIOD, Sds 1-SECOND PERIOD, Sd1
1. CONFLICTS BETWEEN THE DRAWINGS AND SPECIFICATIONS MUST BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER AND STRUCTURAL ENGINEER OF RECORD (SER) IN WRITTEN FORM AND RESOLVED BEFORE PROCEEDING WITH AFFECTED WORK.
2. STRUCTURAL DRAWINGS REPRESENT THE COMPLETED STRUCTURE. THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND METHODS NECESSARY TO COMPLETE THE WORK, FOR JOB SITE SAFETY AND FOR COORDINATING WITH OTHER DISCIPLINES AS REQUIRED.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION PROCEDURE AND SEQUENCING TO ENSURE STABILITY OF THE STRUCTURE DURING CONSTRUCTION. PROVIDE SHORING, BRACING, AND FALSEWORK AS NEEDED TO PROTECT THE STRUCTURE THROUGHOUT CONSTRUCTION.
4. ERECTION AIDS FOR FACILITATING CONSTRUCTION NOT SHOWN IN THESE DRAWINGS MUST BE REMOVED AND ELEMENTS RESTORED TO ITS ORIGINAL
DESIGN INTENT SHOWN PER THESE DRAWINGS.
5. STRUCTURAL DRAWINGS SHOW GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE SPECIFIC CONDITIONS ARE NOT SHOWN, DETAILS OF
SIMILAR TYPE AND CHARACTER MAY BE USED BUT REQUIRE APPROVAL FROM THE SER.
6. TYPICAL DETAILS MAY NOT BE REFERENCED FROM THE PLANS BUT APPLY FOR THE CONDITIONS AS DESCRIBED BY THE DETAIL.
7. CONTRACTOR-INITIATED CHANGES REQUIRE APPROVAL FROM THE SER.
8. FOR A CONTRACTOR REQUESTED DESIGN REVISION, THE PROPOSED ALTERNATIVE MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL BY THE SER. THE SUBMITTAL MUST INCLUDE DRAWINGS, STRUCTURAL DETAILS AND RELATED CALCULATIONS, STAMPED AND SIGNED BY A PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE JURISDICTION OF THE PROJECT LOCATION. CALCULATIONS MUST DEMONSTRATE COMPLIANCE WITH THE CODES AND DESIGN REQUIREMENTS LISTED PER THESE DRAWINGS; AND THAT THE ALTERNATIVE DESIGN DOES NOT ADVERSELY
AFFECT THE STRUCTURE SHOWN IN THESE DRAWINGS.
9. CONTRACTOR MUST COORDINATE THESE DRAWINGS WITH THE DRAWINGS OF THE OTHER DISCIPLINES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION NOT SHOWN ON THE STRUCTURAL DRAWINGS. EXAMPLES INCLUDE EMBEDDED ANCHORS, SLEEVES AND INSERTS, MISCELLANEOUS ATTACHMENT DETAILS, FLOOR FINISHES, DOOR THRESHOLDS, SLOPES TO DRAINS, OPENINGS IN STRUCTURAL ELEMENTS, ETC.
10. VERIFY DIMENSIONS AND DETAILS PRIOR TO FABRICATION AND CONSTRUCTION. THIS INCLUDES COORDINATING THE SIZE AND LOCATION OF OPENINGS THROUGH STRUCTURAL ELEMENTS WITH THE RESPECTIVE SUBCONTRACTOR, AS WELL AS COORDINATING INSERTS AND ATTACHMENTS FOR USE BY
OTHER TRADES.
11. NO PIPES OR DUCTS MAY BE PLACED IN STRUCTURAL MEMBERS UNLESS DETAILED BY THE STRUCTURAL PLANS OR APPROVED BY THE SER.
12. DIMENSIONS MUST NOT BE SCALED FROM THE DRAWINGS.
13. PROVIDE SUBMITTALS AND (FABRICATION, AND ERECTION, ETC.) SHOP DRAWINGS FOR THE WORK SHOWN IN THESE DRAWINGS TO THE CONTRACTING OFFICE FOR APPROVAL FROM THE SER. WORK MUST NOT PROCEED WITHOUT REVIEW AND APPROVAL BY THE SER.
14. SHOP DRAWINGS MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. UNLESS NOTED
OTHERWISE, PROVIDE SHOP DRAWINGS FOR:
A. DEFORMED BAR REINFORCING LAYOUT FOR CONCRETE AND MASONRY.
B. STRUCTURAL AND MISCELLANEOUS STEEL.
a. INCLUDE LOCATIONS OF EXISTING REINF. WITH SUBMITTAL FOR PLATES WITH ANCHORS INTO EXISTING STRUCTURAL MEMBERS.
16. BY SUBMITTING FOR ENGINEER’S REVIEW, THE CONTRACTOR CONFIRMS THE ACCURACY OF THE SUBMITTALS FOR DIMENSIONS, QUANTITIES, ELEMENT SIZES, CONSTRUCTION MATERIALS, FIELD MEASUREMENTS AND THAT THE CONTENTS HAVE BEEN REVIEWED FOR MEANS, METHODS, AND OPERATIONS
OF CONSTRUCTION, AND FOR ITS ADHERENCE TO SAFETY PROTOCOLS AT THE SITE.
17. SHOP DRAWING REVIEW DOES NOT RELIEVE THE CONTRACTOR FROM HAVING SOLE RESPONSIBILITY FOR THE ACCURACY OF ELEMENT SIZES, DIMENSIONS AND DETAILS. SUCH REVIEW DOES NOT CONSTITUTE ACCEPTANCE BY THE ENGINEER OF THE CORRECTNESS OR ADEQUACY OF SUCH SUBMITTALS, NOR IS A WARRANTY THAT THE SUBMITTALS SATISFY THE REQUIREMENTS OF THE CONTRACT.
GENERAL CONDITIONS
1. REFERENCES:
A. ACI 301-20 SPECIFICATIONS FOR CONCRETE CONSTRUCTION
B. ACI 315R-18 DETAILS AND DETAILING CONCRETE CONSTRUCTION
C. ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
D. ACI 347-14 GUIDE TO FORMWORK FOR CONCRETE
1. CONCRETE WORK MUST CONFORM TO ACI 301. FORMWORK MUST CONFORM TO ACI 347.
2. MINIMUM CONCRETE PROPERTIES AT 28-DAYS PER THE FOLLOWING TABLE.
3. CONCRETE EXPOSED TO THE ENVIRONMENT MUST HAVE 6% +/- 1% AIR ENTRAINMENT BY VOLUME PER ASTM C260.
4. BEFORE CASTING THE SECOND SIDE OF A CONSTRUCTION JOINT, ROUGHEN SURFACE OF CONCRETE ELEMENTS AT CONSTRUCTION JOINTS TO A MINIMUM AMPLITUDE OF 1/4 INCH, UNLESS NOTED OTHERWISE. CLEAN AND APPLY BONDING AGENT TO THE HARDENED CONCRETE SURFACE RECEIVING FRESH
CONCRETE.
5. SECTIONS AND DETAILS MAY NOT SHOW ALL REQUIRED DEFORMED BAR REINFORCEMENT FOR CLARITY. ADDITIONAL REINFORCEMENT MAY BE DESCRIBED
IN PLANS, SCHEDULES, NOTES, OR OTHER DETAILS, AS APPLICABLE.
6. COORDINATE FLOOR FINISHES, SLAB SLOPES & DEPRESSIONS, FLOOR DRAINS, CURBS, CONCRETE PADS, AND OTHER CONCRETE FEATURES IDENTIFIED IN
THE CONTRACT DOCUMENTS.
7. THE STRUCTURAL DRAWINGS DO NOT NECESSARILY SHOW ALL ITEMS EMBEDDED IN THE CONCRETE. COORDINATE AND PROVIDED EMBEDDED ITEMS AS SHOWN IN THE CONTRACT DOCUMENTS AND AS REQUIRED BY THE EQUIPMENT MANUFACTURERS, AS NEEDED.
8. NON-STRUCTURAL STEEL MEMBERS EMBEDDED IN CONCRETE MUST BE HOT-DIP GALVANIZED OR PAINTED. DAMAGED COATINGS OF EMBEDDED ITEMS MUST
BE REPAIRED PRIOR TO CASTING CONCRETE.
9. PENETRATIONS THROUGH CONCRETE WALLS OR SLABS MUST CONFORM TO STANDARD DETAIL DRAWINGS.
10. PROVIDE 3/4" CHAMFER ON EXPOSED CONCRETE EDGES UNLESS NOTED OTHERWISE.
CAST IN PLACE CONCRETE
1. REFERENCES:
A. ACI 301-20 SPECIFICATIONS FOR CONCRETE CONSTRUCTION.
B. ACI SP-66-04 ACI DETAILING MANUAL.
C. ACI 315R-18 DETAILS AND DETAILING CONCRETE CONSTRUCTION.
D. AWS D1.4 2018 STRUCTURAL WELDING CODE – REINFORCING STEEL.
2. STEEL REINFORCEMENT MUST CONFORM TO:
3. PROVIDE BAR SUPPORTS AND SPACERS PER ACI 315 UNLESS NOTED OTHERWISE. DEFORMED BAR REINFORCEMENT AND INSERTS MUST BE SECURED IN- PLACE PRIOR TO PLACING CONCRETE. DO NOT PLACE REBAR MATS DIRECTLY AGAINST SOIL; REBAR MATS ADJACENT TO SOIL OR OVER MUD SLABS MUST BE
SUPPORTED BY CHAIRS, DO NOT LIFT INTO PLACE DURING POURING.
4. UNLESS INDICATED OTHERWISE, REINFORCEMENT BARS ARE CONTINUOUS AND MUST BE LAP SPLICED OR COUPLED WITH MECHANICAL CONNECTORS. LAP
LENGTH NOTES:
A. SEE DEVELOPMENT AND LAP SPLICE LENGTH SCHEDULES FOR REINFORCEMENT DETAILS.
B. LAP SPLICE LENGTH MUST BE USED FOR THE LARGER BAR SIZE WHEN BAR SIZE TRANSITIONS AT LAP.
C. OVERLAP WELDED WIRE LAYER REINFORCEMENT A LENGTH OF 1.5X WIRE DEVELOPMENT LENGTH OR ONE CROSSWIRE SPACING PLUS 2 INCHES, WHICHEVER IS LARGER.
D. MECHANICAL CONNECTORS MUST HAVE A MINIMUM CAPACITY OF 1.25 X YIELD STRENGTH OF THE BAR.
E. MECHANICAL CONNECTORS IN MEMBERS DESIGNATED AS PART OF THE SEISMIC-FORCE-RESISTING SYSTEM MUST HAVE A MINIMUM CAPACITY
EQUAL TO THE TENSILE STRENGTH OF THE BAR.
5. TYPE 1 MECHANICAL CONNECTORS MUST DEVELOP 125% OF THE YIELD STRENGTH (Fy) OF THE STRONGER OF THE TWO BAR BEING SPLICED. TYPE 2 MECHANICAL CONNECTORS MUST DEVELOP THE FULL TENSILE STRENGTH OF THE STRONGER OF THE TWO BARS BEING SPLICED. WHERE MECHANICAL CONNECTORS ARE USED IN LIEU OF LAP SPLICES, PROVIDE TYPE 2 MECHANICAL CONNECTORS EXCEPT WHERE TYPE 1 ARE PERMITTED AS INDICATED.
6. HEADED DEFORMED BARS (TERMINATORS) MUST BE INTEGRALLY FORMED OR THREADED DEVICES MEETING THE REQUIREMENTS OF ACI 318, SECTION 25.4.4.1.
7. UNLESS NOTED OTHERWISE ON THE DRAWINGS:
A. DEFORMED BAR COVER MUST CONFORM TO SPECIFIED CONCRETE COVER REQUIREMENTS OF ACI 318.
B. REINFORCEMENT MUST BE CONTINUOUS THROUGH CONSTRUCTION JOINTS.
C. APPROVAL FROM SER REQUIRED BEFORE WELDING NON-ASTM A706 Gr. 60 REINFORCEMENT .
D. APPROVAL FROM SER REQUIRED BEFORE FIELD BENDING REINFORCEMENT PARTIALLY EMBEDDED CONCRETE.
E. MATCH DOWELS TO THE LARGER OF MULTIPLE BAR SIZES.
8. DOWELS MUST BE SECURED WITH A RIGID TEMPLATE TO ENSURE SPLICE IS LOCATED INSIDE THE CONFINED REGION (REGION ENCLOSED BY SHEAR OR
HORIZONTAL REINFORCEMENT) OF CROSS-SECTION.
REINFORCING STEEL
CONDITION STANDARD AND GRADE MIN YIELD (KSI)
TYPICAL DEFORMED BAR ASTM A615 GR 60 OR
ASTM A706
LOCATION MIN 28-DAY
COMPRESSIVE
STRENGTH
(PSI)
FREEZING &
THAWING
CONCRETE CURB 4,000 S1
SULFATE WATER
CONTACT
ACI 318, CH. 19 EXPOSURE CATEGORIES
CORROSION
PROTECTION
F2 W1 C1
MAX
WATER/CEME
NT RATIO
0.45
CEMENT
TYPE
II
NOMINAL MAX
AGGREGATE
SIZE
1"
STRUCTURAL STEEL
WIDE FLANGES (W) AND TEES (WT)
CHANNELS (C & MC) AND ANGLES (L)
PLATE AND FLAT BAR STOCK (PL)
HSS
PIPE
OTHER STEEL
ASTM A992
ASTM A36
ASTM A36 GR 36
ASTM A500 GR C
ASTM A500 GR C
ASTM A53 GR B
ASTM A572
MIN YIELD
(KSI)
SHAPE
1. REFERENCES:
A. AISC 303-22 CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
B. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.
C. AISC 341-16 SEISMIC PROVISIONS FOR STEEL BUILDINGS.
D. AISC RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC) SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH-STRENGTH BOLTS 2014.
2. STRUCTURAL STEEL WORK MUST BE PERFORMED BY AISC CERTIFIED FABRICATORS & ERECTORS.
3. STEEL CONSTRUCTION AND DESIGN AS PART A DEFERRED DESIGN SUBMITTAL MUST CONFORM TO AISC 360 AND AISC 303.
4. USE STRUCTURAL STEEL SHAPES (AS APPLICABLE PER THE DRAWINGS), WITH CROSS-SECTIONS PER ASTM A6, PER THE FOLLOWING TABLE.
5. PROVIDE PROTECTIVE COATING AT STEEL EXPOSED TO THE ENVIRONMENT. UNO ALL STEEL TO BE HOT DIPPED GALVANIZED.
6. MACHINE COLUMN ENDS AT SPLICES TO PROVIDE A FLUSH BEARING CONTACT SURFACE, UNLESS NOTED OTHERWISE.
7. CAMBER MUST BE COLD FORMED PER AISC SPECIFICATIONS AND TOLERANCES.
8. USE HIGH STRENGTH (HS) BOLTS PER ASTM F3125, GRADES AS INDICATED IN THE FOLLOWING TABLE, UNLESS NOTED OTHERWISE.
9. SLIP-CRITICAL (SC) BOLTS MUST BE PER THE RCSC SPECIFICATION AND INSPECTED IN ACCORDANCE WITH THE IBC.
10. USE SNUG-TIGHT (ST) BOLTS PER THE RCSC WHEN SLIP-CRITICAL IS NOT IDENTIFIED IN THE DRAWINGS.
11. USE ASTM A449 BOLTS WITH ASTM F563 NUTS AND ASTM F436 HARDENED WASHERS FOR THROUGH BOLTING HSS SHAPES. BOLTS MUST BE SNUG TIGHT ONLY.
PROVIDE JAMB NUT TIGHTENED AGAINST STANDARD NUT TO FASTEN CONNECTOR.
12. DIRECT TENSION INDICATING (DTI) WASHERS, IF USED FOR HIGH STRENGTH BOLTS, MUST NOT BE TIGHTENED TO A FULLY CRUSHED CONDITION. DTI MUST HAVE THE MINIMUM ACCEPTABLE NUMBER OF TAPERED GAGE REJECTIONS BETWEEN LUGS. REJECTION OF GAGE AT EACH LUG LOCATION IS CAUSE FOR
REJECTION OF BOLT INSTALLATION.
13. CONTRACTOR MUST SUBMIT A BOLTING PROCEDURE PLAN TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL BY THE SER BEFORE BEGINNING
WORK.
14. BOLT HOLES CUT IN THE FIELD MUST BE DRILLED, NOT BURNED. BOLT HOLES CUT IN THE SHOP MAY BE DRILLED, WATER-JET OR LASER CUT; PLASMA CUTTING
HOLES NOT PERMITTED.
15. LOCATION OF EMBEDDED ELEMENTS MUST BE COORDINATED WITH CONTRACT DOCUMENTS.
16. STEEL COMPONENTS EMBEDDED IN CONCRETE OR MASONRY AT EXTERIOR LOCATIONS, EXPOSED TO EARTH, OR LOCATED IN UNCONDITIONED SPACE, MUST
BE HOT-DIPPED GALVANIZED PER ASTM A123.
17. AT INTERIOR CONDITIONS (NOT EXPOSED TO WEATHER) AND COMPONENTS EMBEDDED IN CONCRETE OR MASONRY MUST BE LEFT UNPAINTED.
18. ERECTION AIDS, WHICH ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, MUST BE REMOVED AND THE AFFECTED ELEMENTS RESTORED TO ORIGINAL DESIGN INTENT. ERECTION AIDS AND OTHER ATTACHMENTS ARE NOT PERMITTED IN PROTECTED SEISMIC ZONES OF ELEMENTS WITHOUT PRIOR APPROVAL
FROM THE SER.
19. NOTIFY CONTRACTING OFFICER OF ANY FABRICATION OR ERECTION ERRORS, OR DEVIATIONS. WRITTEN APPROVAL IS REQUIRED BEFORE FIELD
CORRECTIONS ARE MADE.
STANDARD &
GRADE (UNO)
RECTANGULAR OR SQUARE
ROUND
BOLT DIAMETER
BOLT ASTM F3125 GRADE
BOLT FINISH/COATING
HEAVY HEX NUT
HARDENED WASHER (CIRCULAR, BEVELED OR
CLIPPED, AS REQ'D)
DIRECT TENSION INDICATING WASHERS
BOLT DIAM. 1-1/2 IN AND SMALLER
BOLT DIAM. UP TO 2-1/2 INCHES
TENSION CONTROLLED BOLTS (USE
MANUFACTURER SUPPLIED NUTS AND WASHERS)
7/8 INCH DIAMETER, UNO
A325, TYPE 1 UNO
ASTM F2329 HDG
ASTM A563 TYPE DH
ASTM F436 TYPE 1
ASTM F959
ASTM F2437
F1852 , TYPE 1
TYPICAL HIGH STRENGTH
BOLTS
STANDARD, GRADE, AND
NOTES
STRUCTURAL WELDING
1. REFERENCES:
A. AWS D1.1-18 STRUCTURAL WELDING CODE – STEEL.
2. WELDING MUST BE DONE BY AWS CERTIFIED WELDERS AND PER AWS D1.1.
3. USE LOW HYDROGEN E70XX ELECTRODE WITH TENSILE STRENGTH PER AWS D1.1, UNLESS NOTED OTHERWISE.
4. WELDS THAT ARE PART OF THE SEISMIC FORCE-RESISTING SYSTEM MUST HAVE A MINIMUM CHARPY V-NOTCH TOUGHNESS OF 20 FOOT-POUNDS AT 0° F.
5. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN USED IN THE DRAWINGS. CONTRACTOR MUST COORDINATE THE USE OF SHOP AND FIELD WELDS AS
NECESSARY. REPAIR ANY DAMAGED GALVANIZED COATINGS PER ASTM A123
6. FILLET WELD SIZES SHOWN ON DRAWINGS INDICATE THE MINIMUM LEG SIZE REQUIRED AT THE JOINT. INCREASE WELD SIZE BY ROOT GAP DIMENSION IF A GAP EXISTS AT THE JOINT. IF THE INCLUDED ANGLE OF THE TWO CONNECTED PLATES EXCEEDS 90°, THE WELD MUST BE CONTOURED TO PROVIDE AN EFFECTIVE THROAT DIMENSION NO LESS THAN 72% OF WELD SIZE INDICATED. IF NOT SHOWN THE MINIMUM FILLET WELD SIZE AT INTERIOR LOCATIONS MUST BE NO LESS
THAN 3/16 INCHES, AND NO LESS THAN 1/4 INCHES AT EXTERIOR LOCATIONS.
7. PARTIAL JOINT PENETRATION (PJP) GROOVE WELDS SHOWN ON THE DRAWINGS REFER TO EFFECTIVE THROAT THICKNESS AND MUST BE SIZED ACCORDINGLY
FOR THE WELD PROCESS USED.
8. COMPLETE JOINT PENETRATION (CJP) MUST HAVE A BACKUP BAR WITH RUNOFF TABS TO ACHIEVE FULL DEPTH OVER FULL LENGTH OF WELD. BACKGOUGING THE ROOT IS REQUIRED. BACKUP BAR MUST BE REMOVED AND GROUND SMOOTH, UNLESS NOTED OTHERWISE.
9. ULTRASONICALLY TEST (UT) CJP WELDS UPON COMPLETION OF THE WELDED JOINT. PLATE THICKNESS OF 5/16-INCH OR LESS MAY USE MAGNETIC PARTICLE
INSPECTION (MPI) OR EDDIE CURRENT ARRAY (ECA) TESTING.
10. QUALIFICATIONS AND WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1 AND D1.8 MUST BE SUBMITTED TO THE ENGINEER FOR REVIEW BEFORE STARTING FABRICATION OR ERECTION. COPIES OF THE WPS MUST BE ON SITE AND AVAILABLE TO WELDERS AND THE SPECIAL INSPECTOR.
POST INSTALLED ANCHOR IN CONCRETE AND MASONRY
1. EXCEPT WHERE INDICATED ON THE DRAWINGS, POST-INSTALLED ANCHORS CONSIST OF THE FOLLOWING ANCHOR TYPES OR APPROVED EQUAL:
2. ANCHOR CAPACITY USED IN DESIGN MUST BE BASED ON THE TECHNICAL DATA PUBLISHED IN THE ICC APPROVAL REPORT. SUBSTITUTION REQUESTS MUST INCLUDE ICC ESR REPORT SHOWING COMPLIANCE WITH RELEVANT BUILDING CODE AND INSTALLATION CATEGORY AND BE APPROVED IN WRITING BY THE
CONTRACTING OFFICER FOR REVIEW AND APPROVAL BY THE SER PRIOR TO USE.
3. INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INCLUDED IN THE ANCHOR PACKAGING.
4. INSTALL ANCHORS IN ACCORDANCE WITH SPACING AND EDGE CLEARANCES INDICATED ON THE DRAWINGS.
5. EXISTING DEFORMED BAR REINFORCEMENT IN THE STRUCTURE MAY CONFLICT WITH SPECIFIC ANCHOR LOCATIONS. UNLESS NOTED OTHERWISE, THE CONTRACTOR MUST LOCATE THE POSITION OF THE EXISTING REINFORCING BARS AND AVOID CUTTING.
6. DRILLING, CORING, SAW-CUTTING, ETC. INTO CONCRETE SHALL MEET THE LATEST OSHA REGULATIONS FOR SILICA DUST EXPOSURE.
7. ALL ANCHORS SHALL BE HOT-DIPPED GALVANIZED, UNO.
CONCRETE
SOLID-GROUTED
MASONRY
SCREW
EXPANSION
ADHESIVE
UNDERCUT
SCREWS
EXPANSION
ADHESIVE
CONDITION TYPE
HILTI KWIK HUS-EZ SCREW ANCHORS PER ICC ESR-3027
SIMPSON TITEN HD SCREW ANCHOR PER ICC ESR-2713
DEWALT WEDGE-BOLT+ PER ICC ESR-2526
HILTI KWIK-BOLT TZ2 ANCHOR PER ICC ESR-4266
SIMPSON STRONG BOLT 2 ANCHOR PER ICC ESR-3037
DEWALT POWER-STUD+ SD1 ANCHOR PER ICC ESR-2818
HILTI HIT-HY 200 ADHESIVE ANCHOR SYSTEM PER ICC ESR-3187
SIMPSON SET-XP ADHESIVE ANCHOR SYSTEM PER ICC ESR-2508
DEWALT PE1000+ ADHESIVE ANCHOR SYSTEM PER ICC ESR-2583
HILTI HDA-P UNDERCUT ANCHOR PER ICC ESR-1546
SIMPSON TORQ-CUT SELF UNDERCUTTING ANCHOR PER ICC ESR-2705
DEWALT CCU+ UNDERCUT ANCHOR CARBON STEEL PER ICC ESR-4810
HILTI KWIK HUS-EZ SCREW ANCHORS PER ICC ESR-3056
SIMPSON TITEN HD SCREW ANCHOR PER ICC ESR-2713
DEWALT SCREW-BOLT+ PER ICC ESR-4042
HILTI KWIK-BOLT 3 ANCHOR PER ICC ESR-1385
SIMPSON STRONG BOLT 2 ANCHOR PER UES ER-240
DEWALT POWER-STUD+ SD1 ANCHOR PER ICC ESR-2966
HILTI HIT-HY 270 ADHESIVE SYSTEM PER ICC ESR-4143
SIMPSON SET-XP ADHESIVE SYSTEM PER IAPMO UES ER-265
DEWALT AC100+GOLD ADHESIVE SYSTEM PER ICC ESR-3200
(STEEL ANCHOR MUST BE ASTM F1554 GRADE 55 CONTINUOUSLY
THREADED ROD PER DRAWINGS)
ACCEPTABLE
ANCHORS
SPECIAL INSPECTION AND TESTING
1. SPECIAL INSPECTION AND TESTING MUST CONFORM TO SECTION 1704 OF THE INTERNATIONAL BUILDING CODE (IBC) AS AMENDED BY H-18-8.
2. ONE OR MORE QUALIFIED SPECIAL INSPECTION & TESTING AGENCIES MUST BE EMPLOYED TO PERFORM THE NECESSARY INSPECTION OF IBC SECTION 1705, AS APPLICABLE. QUALIFICATIONS FOR SPECIAL INSPECTION AND TESTING AGENCIES AND INSPECTORS MUST BE SUBMITTED TO THE CONTRACTING
OFFICER FOR REVIEW AND APPROVAL.
3. SPECIAL INSPECTOR QUALIFICATIONS MUST MEET THE REQUIREMENTS OF SPECIFICATION SECTION 01 45 35.
• FOR STATEMENT OF SPECIAL INSPECTION SEE PROJECT SPECIFICATIONS.
5. REPORTING ON SPECIAL INSPECTION AND TESTING MUST CONFORM TO IBC SECTION 1704.5 AND BE SUBMITTED TO THE CONTRACTING OFFICER WEEKLY , OR AS REQUIRED BY THE SPECIFICATIONS.
1. STRUCTURAL OBSERVATIONS MUST BE PERFORMED BY THE DESIGNATED REPRESENTATIVE BY THE GOVERNMENT, FOR THE FOLLOWING:
A. STRUCTURAL STEEL: BEAMS AND POST.
B. ANCHORAGE POST INSTALLED ANCHORS.
2. CONTRACTOR MUST NOTIFY CONTRACTING OFFICER 14 DAYS IN ADVANCE OF WHEN WORK IS EXPECTED TO COORDINATE THE DATE OF OBSERVATION.
3. STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY OF SPECIAL INSPECTION REQUIREMENTS.
STRUCTURAL OBSERVATIONS
INDICATES STEP FOOTING PER DETAIL
INDICATES STEP IN SLAB / DECK
INDICATES SLOPE IN SLAB / DECK
INDICATES APPROXIMATE SPOT ELEVATION
CENTERLINE
STRUCTURAL DRAWING SYMBOLS
S S
CL
SECTION OR ELEVATION CUT
SECTION, DETAIL, OR ELEVATION CALLOUT
DRAWING WHERE SECTION, DETAIL OR
ELEVATION IS SHOWN OR CALLED
FROM
TITLE
SCALE: X' = X'-XX"
PLAN
N XXXXX.XX
E XXXXX.XX
COORDINATES
GRID NO.XX
X x-xx
X x-xx
0.5%
SLOPE
WORK POINT
# PLAN REVISION
WP ##
ELEVATION OF COMPONENTS
T/XXXX
EL ##.#
x-xx
TITLE
SCALE: X' = X'-XX"
SECTION, DETAIL, OR ELEVATIONX
TRUE
NORTH
& AND
@ AT
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
AR ANCHOR RODS
ARCH ARCHITECT
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATFP ANTI-TERRORISM FORCE
PROTECTION
BAL BALANCE
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLW BELOW
BM BEAM
BOT BOTTOM
BRG BEARING
BTB BACK TO BACK
BTWN BETWEEN
CFS COLD-FORMED STEEL
CG CENTER OF GRAVITY
CIP CAST IN PLACE
CJ CONTROL JOINT
CJ CONSTRUCTION JOINT
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CTR CENTER
DBL DOUBLE
DEMO DEMOLISH
DET DETAIL
DIA OR Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIST DISTANCE
DL DEAD LOAD
DWG DRAWING
E EAST
EA EACH
EF EACH FACE
EL ELEVATION
ELEC ELECTRIC
EMBED EMBEDMENT
ENGR ENGINEER
EQ EQUAL
EQUIV EQUIVALENT
EW EACH WAY
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDTN FOUNDATION
FIN FINISH(ED)
FIN FLR FINISHED FLOOR
FLG FLANGE
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD, FACE OF STEEL
FRMG FRAMING
FS FAR SIDE
FT FOOT, FEET
FTG FOOTING
FV FIELD VERIFY
GA GAGE
GALV GALVANIZED
HDG HOT-DIP GALVANIZED
HORIZ HORIZONTAL
HS HIGH STRENGTH
HSA HEADED STUD ANCHOR
HT HEIGHT
ID INSIDE DIAMETER
IJ ISOLATION JOINT
IN INCH
INFO INFORMATION
INT INTERIOR
WSP USA Inc.
Suite 550
Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
1201 Pacific Ave
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of Capital Projects
S-002
ABRREVIATIONS AND SYMBOLS
NRT JKM
100% CONSTRUCTION
DOCUMENTS (CD)
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
JBE JOIST BEARING ELEVATION
JT JOINT
KSI KIPS PER SQUARE INCH
LBS POUNDS
LF LINEAR FEET
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGINTUDINAL
LSL LONG SLOTTED HOLE
LSLP LONG SLOTTED HOLE PARALLEL
LSLT LONG SLOTTED HOLE
TRANSVERSE
LT GA LIGHT GAGE
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTL METAL
# NUMBER
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
OWJ OPEN WEB JOIST
PAF POWDER ACTUATED FASTENERS
PCF POUNDS PER CUBIC FOOT
PEMB PRE-ENGINEERED METAL
BUILDING
PERP PERPENDICULAR
PH PHASE
PL PLATE
PLWD PLYWOOD
PNL PANEL
PREFAB PREFABRICATED
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POST TENSIONED
QTY QUANTITY
R RADIUS
REF REFERENCE
REINF REINFORCE, REINFORCEMENT
REQD REQUIRED
REV REVISION
RO ROUGH OPENING
S SOUTH
SC SLIP-CRITICAL
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPA SPACE, SPACING
SPEC SPECIFICATION
SQ SQUARE
SSL SHORT SLOTTED HOLE
SSLP SHORT SLOTTED HOLE PARALLEL
SSLT SHORT SLOTTED HOLE
TRANSVERSE
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SHEAR WALL
SYMM SYMMETRICAL
T&B TOP AND BOTTOM
TEMP TEMPORARY
THK THICK
THRU THROUGH
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TRANSV TRANSVERSE
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VOL VOLUME
W WEST
W/ WITH
W/O WITHOUT
WD WOOD
WP WORKING POINT
WT WEIGHT
WTS WELDED THREADED STUDS
WWR WELDED WIRE REINFORCEMENT
PROJECT
NORTH
TRUE NORTH
(DASHED)
A
A.5
161514
14 15 16
A
A.5
S-101C6
HSS4X4X3/16
E1
S-101
CONC CURB PER
TYP
/E1 S-101
TYP
EXIST 12" CMU WALL W/ #5 @ 16"
OC EF VERT & #6 @ 16" HORIZ
ROUGHEN TO 3/16"
AMPLITUDE AND APPLY CONC
BONDING AGENT. EPOXY
CONT #5 CURB HORZ REINF
INTO EXITING COLUMNS.
EMBED 3" DO NOT DAMAGE
EXISTING REINF., TYP
LVL 4
32' - 4"
ROOF
47' - 2 1/2"
AA.5
HSS4X4X3/16
H S
S X
X
/1
F3
S-101
EXIST W12x26
E7
S-101
S-101
E5
F5
S-101
LVL 4
32' - 4"
CONC CURB PER
ARCH DRAWINGS
#5 @ 24" OC MAX CENTER ON CURB. MAX 4" FROM
END OF CURB. EMBED. MAX 2" W/ EPOXY
ADHESIVE. DO NOT DRILL WITHIN 6" OF EXISTING
PD TENDONS
DO NOT DAMAGE EXIST CONC DECK REINF. OR PT
STEEL. LOCATE EXISTING PT STEEL AND NON PT
SLAB REINF PRIOR TO DRILLING W/ NON-
DESTRUCTIVE EXPLORATION.
ROUGHEN TO 3/16"
AMPLITUDE AND APPLY
CONC BONDING AGENT
EXIST 5" POST-TENSIONED CONC DECK
STOREFRONT PER ARCH
#5 CONT
6" M
A X
4" M
IN
6" MIN
EXIST POST-TENSIONED
CABLE WHERE LOCATED
NOTE:
LOCATION PT TENDONS PRIOR TO
FABRICATION OF STOREFRONT. CONTACT
COR IF DIMENSIONS CANNOT BE
MAINTAINED..
3" 3"
3" 3"
CL POST & CURB
CL POST & CURB1 1/2"
4"
1 1/2"
1/
2"
4" 1 1/
2"
CONC CURB
PER
STL PL1/2.
TOS FLUSH W/ TOP OF CURB
POST PER PLAN
(4) 1/2"Øx4" HSA
1/4
/E1 S-101
EXIST 12" CMU WALL.
LOCATE EXIST REINF PRIOR
TO DRILLING.
DO NOT DAMAGE EXIST REINF
CL POST & CURB
CL POST & CURB
STL PL1/2x6X6
POST PER PLAN
(2) 1/2"Ø GALV THREADED ROD T&B
W/ EPOXY & 4" EMBED. CTR ON PL
1/4
BEAM PER PLAN, TYP
NOTE:
LOCATION OF ANCHORS MAY BE SHIFTED UP TO 1" IN ANY
DIRECTION TO AVOID CONFLICT WITH EXISTING REINFORCEMENT.
MAINTAIN ANY MINIMUM AND MAXIMUM DIMENSIONS.
1/4
(2) 1/2"Ø GALV THREADED ROD W/
EPOXY & 4" EMBED. CTR ANCHORS
ON PLATE
MIN TYP
1 1/2"
EXIST #8 VERT FV
EXIST #4 TIES @ 4" OC FV
EXIST CONC COL.
LOCATE EXIST REINF PRIOR
TO DRILLING.
DO NOT DAMAGE EXIST REINF
BEAM PER ELEV, TYP
MAX
2"
NOTE:
LOCATION OF ANCHORS MAY BE SHIFTED UP TO 1" IN ANY
DIRECTION TO AVOID CONFLICT WITH EXISTING REINFORCEMENT.
MAINTAIN ANY MINIMUM AND MAXIMUM DIMENSIONS.
CL POST & BEAM
L6x4x1/2 LLV EA SIDE OF
POST W/ 3/4"Ø A307 BOLT
POST PER PLAN
1/4
3 SIDES
EXIST BEAM
G A
P 1"
E Q
E Q
VERT LSL CTRD ON L6
CENTER BOLT IN SLOT.
HAND TIGHT.
DAMAGE THREADS TO
PREVENT NUT LOOSENING
2"
5"
CL POST & BEAM
POST PER PLAN
1/4
BEAM PER ELEV
1/4
BASE PL PER BOLLARD MFR
3/8" SS WEDGE ANCHOR W/ 1 1/2" EMBED.
SEE NOTE
EXIST C5" POST
TENSIONED CONC SLAB
PRE-MANUFACTURED FLEXIBLE
BOLLARD
MAX CAPACITY OF BOLLARD
FLEXIBILITY AT BASE = 300 LB-FT
NOTE:
DO NOT TRILL WITHIN 6" OF EXISTING PT TENDONS. DO NOT
DAMAGE EXIST CONC DECK REINF. OR PT STEEL. LOCATE
EXISTING PT STEEL AND NON PT SLAB REINF PRIOR TO
DRILLING W/ NON-DESTRUCTIVE EXPLORATION.
WSP USA Inc.
Suite 550
Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
1201 Pacific Ave
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE: Office of Capital Projects
S-101
LEVEL 4 - STRUCTURAL PLAN, DETAILS, AND
ELEVATIONS
NRT JKM
100% CONSTRUCTION
DOCUMENTS (CD)
11/17/2025
662-23-111
SAN FRANCISCO VA MEDICAL CENTER - SAN
FRANCISCO, CA
REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATORSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PLAN NOTES:
1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES. THESE NOTES & DETAILS ON THIS
SHEET SHALL BE USED WHERE APPLICABLE, WHETHER SPECIFICALLY REFERENCED OR NOT.
2. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ANY DIMENSIONS, OPENINGS, AND
ELEVATIONS NOT SHOWN.
3. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR THE FOLLOWING:
A. DIMENSIONS NOT SHOWN.
B. OPENINGS NOT SHOWN.
C. FLOOR ELEVATIONS.
4. FOR TYPICAL OPENINGS EXACT LOCATION AND SIZE, SEE ARCHITECTURAL AND MECHANICAL
DRAWINGS.
5. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED PRIOR TO STEEL FABRICATION AND
ERECTION.
KEY PLAN
3/8" = 1'-0" C1
LEVEL 4 - STRUCTURAL PLAN
3/8" = 1'-0"
C6
STRUCTURAL FRAME ELEVATION
1" = 1'-0" E1
CONC CURB DETAIL
Revisions: Date:
1 1/2" = 1'-0" E3
POST BASE
1 1/2" = 1'-0" F3
BEAM TO EXIST WALL CONN
1 1/2" = 1'-0"
F5
BEAM TO EXIST CONC COL CONN
1 1/2" = 1'-0" E7
POST TO EXIST CONN
1 1/2" = 1'-0"
E5
TYP POST TO BEAM CONN
1 1/2" = 1'-0" F7
BOLLARD TO EXIST SLAB CONN
14 15 16
A
A.5
ELEV
ELEV LOBBY
EQUIP
2"ø SD
2"ø SD
14 15 16
A
A.5
ELEV LOBBY
ELEV
EQUIP
2"ø
2"ø SD
2"ø SD
P-101
WATER TO FLOW TO
EXISTING ROOF DECK
DRAIN.
REPLACE DRAIN GRATE.
DRAIN BODY IS
EXISTING TO REMAIN.
DRAIN IS EQUAL TO
ZURN Z533.
CONDUCTOR HEAD AND
DOWNSPOUT
SD
AREA SHOWN
PROJECT
NORTH
PIPING SYMBOLS
PIPING SYSTEMS
ADDITIONAL SYMBOLS
PL4
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
STORM WATERSD
DROP IN PIPE
WYE
DIRECTION OF PIPE PITCH (DOWN)
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
EXISTING PIPE TO BE REMOVEDX
CONCRETE WALL
STORM WATER PIPE
FOAM
SEALANT
CONDUCTOR HEAD
AND DOWNSPOUT.
SEE ARCHITECTURAL
DRAWINGS
CORE DRILL HOLE
THROUGH
CONCRETE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Capital Projects
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
11/10/2025 1:50:33 PM
Autodesk Docs://SDB VA CA SF B221 Elevator
662-23-111/VASF_B221
Elevator_ME_SDB.rvt
P-101
PLUMBING FLOOR PLANS
MGH/JW TG/JM/CY
100% CONSTRUCTION
DOCUMENTS
11/17/2025
662-23-111REPAIR AND WEATHERIZE
PARKING STRUCTURE 211
ELEVATOR
VA MEDICAL CENTER - SAN FRANCISCO, CA
1/4" = 1'-0"1
LEVEL 4 - PLUMBING DEMOLITION FLOOR PLAN
1/4" = 1'-0"2
LEVEL 4 - PLUMBING FLOOR PLAN
AREA OF WORK
PROJECT
NORTH
PROJECT
NORTH
KEY PLAN
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION
AND NEW WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER
TRADES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A. PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT
AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND
DEBRIS.
B. ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE
BUILDING DURING DEMOLITION.
C. PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D. PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT
COLLAPSE.
E. REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION
IMMEDIATELY AFTER THE DAMAGE OCCURS.
F. TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
3. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE.
DO NOT INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT
SCOPE WITHOUT FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE
TEMPORARY SERVICES AS REQUIRED.
KEYNOTES #
GENERAL NOTES
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT
BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA
STANDARDS, AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT
BETWEEN MANUFACTURER REQUIREMENTS, DRAWINGS, OR
SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL GOVERN.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH
OTHER TRADES.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND
VA COR PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. INSTALL ALL STORM WATER PIPING WITH A MINIMUM OF 1/4" PER LINEAR
FOOT (2%) SLOPE.
DEMO EXISTING ROOF STORM WATER AND OVERFLOW PIPING UP TO
ROOF DRAIN RISER CONNECTION.
CORE DRILL THROUGH EXISTING WALL. ROUTE STORM WATER PIPING TO
DRAIN INTO CONDUCTOR HEAD AND ASSOCIATED GUTTER. SEE
ARCHITECTURAL PLANS FOR FURTHER INFORMATION.
INSULATE STORM WATER PIPING IN ACCORDANCE WITH SPECIFICATION
SECTION 22 07 11.
NTS3
STORM WATER PIPE THROUGH CONCRETE WALL DETAIL
Revisions: Date:
11/12/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .