This is a price breakdown template spreadsheet for solicitation #36C26125R0012 for the Consolidate Sterile Supply Rooms project (#570-22-219) at the Department of Veterans Affairs. The template requires bidders to provide detailed cost breakdowns across multiple construction divisions including material, equipment, and labor costs for each category. Key divisions include general requirements, existing conditions, wood/plastics/composites, thermal/moisture protection, openings (including ICU sliding glass doors), finishes, specialties, fire suppression, plumbing, HVAC, electrical, communications, and electronic safety systems. The template also requires pricing for bonds, insurance, overhead, and profit to determine the total project cost.
The breakdown follows CSI MasterFormat divisions and appears to be for a comprehensive medical facility renovation project focused on sterile supply rooms, with significant mechanical, electrical, and plumbing work along with architectural modifications. Notable specialized items include static dissipative sealer, resinous specialty glazed coating systems, and seismic restraint requirements for non-structural components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0012 RFI_3.docx | DOCX document | |
| 36C26125R0012 0006.docx | DOCX document | |
| 36C26125R0012 0005.docx | DOCX document | |
| 36C26125R0012 RFI_2.docx | DOCX document | |
| 36C26125R0012 0004.docx | DOCX document | |
| SOW Consolidate Sterile Supply Rooms_Jan 22 .pdf | ||
| 36C26125R0012 0003.docx | DOCX document | |
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| 36C26125R0012 RFIs.docx | DOCX document | |
| 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS.docx | DOCX document | |
| 36C26125R0012 0002.docx | DOCX document | |
| Site Visit Log_01-08-2025.pdf | ||
| 36C26125R0012 0001.docx | DOCX document | |
| 570-22-219 Construction Specifications.pdf | ||
| Large Business Subcontracting Plan Template.docx | DOCX document | |
| 570-22-219 Construction Drawings -.pdf | ||
| RFI Form - 36C26125R0012.docx | DOCX document | |
| Wage Determination CA20240018 Oct 18 2024.pdf | ||
| 36C26125R0012_1.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A - Price Breakdown 36C26125R0012 - Project # 570-22-219 Consolidate Sterile Supply Rooms Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total
| Project Manager/QC |
| Superintendent/Safety |
| Mobilization |
| Division 01 - General Requirements |
| Project Schedules |
| Shop Drawings, Product Data, and Samples |
| Safety Requirements |
| Reference Standards |
| Quality Control |
| Construction Waste Management |
| General Commissioning Requirements |
| Division 02 - Existing Conditions |
| Demolition |
| Division 06- Wood, Plastics and Composites |
| Rough Carpentry |
| Division 07- Thermal and Moisture Protection |
| Firestopping |
| Joint Sealants |
| Division 08- Openings |
| Hollow Metal Doors and Frames |
| Interior Wood Doors |
| Integrated Door Assemblies |
| Access Doors and Frames |
| ICU Sliding Glass Doors |
| Door Hardware |
| Division 09- Finishes |
| Subsurface Preparation for Floor Finishes |
| Schedule for Finishes |
| Non-Structural Metal Framing |
| Gypsum Board |
| Ceramic/Porcelain Tiling |
| Acoustical Ceilings |
| Resilient Base and Accessories |
| Resilient Tile Flooring |
| Static Dissipative Sealer for Concrete Substrates |
| Painting |
| Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W-1, RES-W2) |
| Division 10- Specialties |
| Signage |
| Wall and Door Protection |
| Division 13- Special Construction |
| Seismic Restraint Requirements for Non-Strutural Components |
| Division 21- Fire Supression |
| Wet-Pipe Sprinkler Systems |
| Division 22- Plumbing |
| Common Work Reesults for Plumbing |
| Plumbing Insulations |
| Division 23- Heating, Ventilating, and Air Conditioning (HVAC) |
| Common Work Results for HVAC |
| Noise and Vibration Control for HVAC Piping and Equipment |
| Testing, Adjusting, and Balancing for HVAC |
| HVAC and Boiler Plant Insulation |
| Commissioning of HVAC Systems |
| Direct-Digital Control System for HVAC |
| Hydronic Piping |
| HVAC Ducts and Casing |
| Air Terminal Units |
| Air Outlets and Inlets |
| Division 26- Electrical |
| Requirements for Electrical Installations |
| Low-Voltage Electrical Power Conductors and Cables |
| Grounding and Bonding for Electrical Systems |
| Raceway and Boxes for Electrical Systems |
| Commissioning of Electrical Systems |
| Wiring Devices |
| Interior Lighting |
| Division 27- Communications |
| Control, Communication and Signal Wiring |
| Division 28- Electronic Safety and Security |
| Commissioning of Electronic Safety and Security Systems |
| Fire Detectiona and Alarm |
| Bonds |
| Insurance |
| Home Office Overhead |
| Profit |
SUB-TOTAL
PROJECT GRAND TOTAL