This is a Question and Answer (Q&A) document for solicitation 36C26125R0012, a Department of Veterans Affairs project to consolidate sterile supply rooms (Project Number 570-22-219). The document addresses a single technical question regarding pressure monitors shown in detail 8 on Sheet M-501. The question concerns connecting new pressure monitors to a Bacnet MS/TP trunk in areas where only older Johnson Controls N2 Protocol systems exist.

The VA's response clarifies that the project's intent is to connect new pressure monitoring devices to the existing building automation system for monitoring and alarming at the central plant. The VA recommends contractors first attempt to connect to existing systems and install additional devices and trunks as needed. If space limitations exist due to other projects, new supervisory controller(s) can be installed in coordination with the VA Contracting Officer's Representative (COR).

View the file

Other files

File Type Posted
36C26125R0012 RFI_3.docx DOCX document
36C26125R0012 0006.docx DOCX document
36C26125R0012 0005.docx DOCX document
36C26125R0012 0004.docx DOCX document
SOW Consolidate Sterile Supply Rooms_Jan 22 .pdf PDF
36C26125R0012 0003.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
36C26125R0012 RFIs.docx DOCX document
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS.docx DOCX document
36C26125R0012 0002.docx DOCX document
Site Visit Log_01-08-2025.pdf PDF
36C26125R0012 0001.docx DOCX document
570-22-219 Construction Specifications.pdf PDF
Large Business Subcontracting Plan Template.docx DOCX document
570-22-219 Construction Drawings -.pdf PDF
Price Breakdown.xlsx XLSX spreadsheet
RFI Form - 36C26125R0012.docx DOCX document
Wage Determination CA20240018 Oct 18 2024.pdf PDF
36C26125R0012_1.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26125R0012 | Consolidate Sterile Supply Rooms | Project Number 570-22-219 Request for Information (RFIs)

1. Referencing detail 8 on Sheet M-501, the new pressure monitors are shown to be connected to a Bacnet MS/TP trunk. Most of the areas where the pressure monitors are being installed do not have an existing MS/TP communication trunk installed nearby, instead, the facility is populated with the older Johnson Controls N2 Protocol connected to existing supervisory controllers than cannot communicate simultaneously to the N2 protocol and the Bacnet MS/TP protocol. In order to communicate to the new pressure monitors, a new supervisory controller(s) would need to be installed along with a new MS/TP communication trunk to all of the devices. Is this the intent for this project? The intent of this project is to connect the new pressure monitoring devices to the existing building automation system for monitoring and alarming at the central plant. The devices can be connected to the existing control system as needed to allow for that monitoring and alarming. We would recommend the contractor first connect to existing and install additional devices and trunks as required. If there is not enough available space on the existing system due to the spaces being utilized by other projects then a new supervisory controller(s) can be installed in coordination with VA COR.