570-22-219 Construction Drawings -.pdf

PDF 22 MB Posted

Attached to
Z2DA--570-22-219 Consolidate Sterile Supply Rooms
Solicitation number
36C26125R0012
Issued by

View the file

Other files

File Type Posted
36C26125R0012 RFI_3.docx DOCX document
36C26125R0012 0006.docx DOCX document
36C26125R0012 0005.docx DOCX document
36C26125R0012 RFI_2.docx DOCX document
36C26125R0012 0004.docx DOCX document
SOW Consolidate Sterile Supply Rooms_Jan 22 .pdf PDF
36C26125R0012 0003.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
36C26125R0012 RFIs.docx DOCX document
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS.docx DOCX document
36C26125R0012 0002.docx DOCX document
Site Visit Log_01-08-2025.pdf PDF
36C26125R0012 0001.docx DOCX document
570-22-219 Construction Specifications.pdf PDF
Large Business Subcontracting Plan Template.docx DOCX document
Price Breakdown.xlsx XLSX spreadsheet
RFI Form - 36C26125R0012.docx DOCX document
Wage Determination CA20240018 Oct 18 2024.pdf PDF
36C26125R0012_1.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECTION

VELTRE ENGINEERING

STRUCTURAL

SIMPSON GUMPERTZ & HEGER (SGH)

ELECTRICAL

MECHANICAL

1150 S. OLIVE STREET, SUITE 1600

LOS ANGELES, CA 90015

PHONE: (213) 271-2000

300 DESCHUTES WAY SW, SUITE 210

TUMWATER, WA 98501

PHONE: (360) 706-1257

PROJECT MGMT

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

PHONE: (619) 770-8552

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

PHONE: (619) 770-8552

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

PHONE: (619) 770-8552

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

SITE ZONING:

CONST TYPE:

OCCUPANCY:

CODE ANALYSIS

PROJECT DESCRIPTION

THIS PROJECT ENCOMPASSES THE

CONSOLIDATION OF THE SATELLITE STERILE

STORAGE ROOMS CONTAINING RMD LOCATED

THROUGHOUT THE HOSPITAL FRESNO VAMC.

THIS INCLUDES: THE UPGRADES TO THE HVAC

SYSTEMS SERVING THESE AREAS, THE

ADJUSTMENT AND REPLACEMENT OF

EXISTING EQUIPMENT, AND ARCHITECTURAL

RENOVATION TO BRING NEW AND EXISTING

SPACES UP TO THE VA STANDARD.

APPLICABLE BUILDING

BUILDING 1, OPC

APPLICABLE FLOOR

BUILDING 1: 2, 3, 4, 5, 6

OPC: 0,1, 2, 3

ICRA CLASS REQUIREMENTS

CONST TYPE:

CLINIC RISK:

CLASS REQS:

APPROX SQUARE FEET IN SCOPE

1,500 SF

TYPE C

HIGHEST

CLASS IV

CALIFORNIA

FRESNO

FRESNO

GOV, VETERANS AFFAIRS

1A B

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF, AND VERIFY WITH, VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

8. ALL PRODUCTS AND/ OR MANUFACTURES INDICATED ON DRAWINGS SHALL COMPLY WITH

SPECIFICATIONS AND/OR APPROVED IN WRITING BY ARCHITECT PRIOR TO ORDERING OR INSTALLING

OF MATERIAL.

APPLICABLE PUBLICATIONS

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA

SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION

GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL). SEE ABOVE.

INTERNATIONAL BUILDING CODE (IBC) 2021.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER

IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC) 2021.

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS

(ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE.

ASME CODE FOR PRESSURE PIPING.

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).

ENERGY POLICY ACT OF 2005 (EPACT).

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR

PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATION

MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS

SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2022.

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 - 2019.

VAMC APPROVED HARDWARE LOCKING STANDARDS.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND STANDARDS FOR

TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”.

APPLICABLE VA STANDARDS

MASTER CONSTRUCTION SPECIFICATIONS (PG18-1)

DESIGN AND CONSTRUCTION PROCEDURES (PG18-3), TOPIC 1 - CODES, STANDARDS & EXECUTIVE ORDERS

SEPTEMBER 2013

EQUIPMENT GUIDE LISTS (PG18-5)

DESIGN MANUALS (PG18-10)

LOGISTICS SERVICE AND STERILE PROCESSING SERVICE DESIGN GUIDES (PG18-12)

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT BARRIER

FREE DESIGN GUIDE (PG18-13)

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of

Construction and Facilities

Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e in c h s o n e fo o t o h e fo o t o n e a d a lf h e fo o t th q u a rt rs e fo o t o e fo o t th ig h th e fo o t o a rt e r i n e fo o t o e fo o t

Department of

Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

G-001

COVER SHEET

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK MC

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 01 of 46

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

FRESNO VAMC CONSOLIDATE STERILE SUPPLY ROOMS

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT #: 570-22-219

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

01 OF 46 G-001 COVER SHEET

02 OF 46 GS101 FACILITY SITE PLAN

03 OF 46 GS201 ICRA

04 OF 46 GS301 FIRE LIFE SAFETY

ARCHITECTURAL

05 OF 46 A-001 ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES

06 OF 46 A-101 B1 LEVEL 2 - PARTIAL PLAN - CENTER

07 OF 46 A-102 B1 LEVEL 3 - PARTIAL PLAN - WEST

08 OF 46 A-103 B1 LEVEL 4 - PARTIAL PLAN - WEST

09 OF 46 A-104 B1 LEVEL 4 - PARTIAL PLAN - CENTER

10 OF 46 A-105 B1 LEVEL 4 - PARTIAL PLAN - EAST

11 OF 46 A-106 B1 LEVEL 5 - PARTIAL PLAN - WEST

12 OF 46 A-107 B1 LEVEL 5 - PARTIAL PLAN - EAST

13 OF 46 A-108 B1 LEVEL 6 - PARTIAL PLAN - EAST

14 OF 46 A-109 OPC LEVEL 1 - OVERALL PLAN

15 OF 46 A-110 OPC LEVEL 2 - OVERALL PLAN

16 OF 46 A-111 OPC LEVEL 3 - OVERALL PLAN

17 OF 46 AE401 B1 LEVEL 3 - ENLARGED PLANS - 3A04D

18 OF 46 AE402 B1 LEVEL 4 - ENLARGED PLANS - 4A-5A1

19 OF 46 A-501 DETAILS

20 OF 46 A-601 SCHEDULES

MECHANICAL

21 OF 46 M-001 MECHANICAL COVER SHEET

22 OF 46 M-102 MECHANICAL B1 2ND FLOOR PLAN

23 OF 46 M-103 MECHANICAL B1 3RD FLOOR PLAN

24 OF 46 M-203 MECHANICAL B1 3RD FLOOR ROOM PLANS

25 OF 46 M-104 MECHANICAL B1 4TH FLOOR PLAN

26 OF 46 M-204 MECHANICAL B1 4TH FLOOR ROOM PLANS

27 OF 46 M-304 MECHANICAL B1 4TH FLOOR ROOM PLANS

28 OF 46 M-404 MECHANICAL B1 4TH FLOOR ROOM PLANS

29 OF 46 M-105 MECHANICAL B1 5TH FLOOR PLAN

30 OF 46 M-205 MECHANICAL B1 5TH FLOOR ROOM PLANS

31 OF 46 M-106 MECHANICAL B1 6TH FLOOR PLAN

32 OF 46 M-108 MECHANICAL OPC 1ST FLOOR PLAN

33 OF 46 M-109 MECHANICAL OPC 2ND FLOOR PLAN

34 OF 46 M-110 MECHANICAL OPC 3RD FLOOR PLAN

35 OF 46 M-401 MECHANICAL SCHEDULES

36 OF 46 M-501 MECHANICAL DETAILS

ELECTRICAL

37 OF 46 ES-001 ELECTRICAL SYMBOLS, GENERAL NOTES AND ABBREVIATIONS

38 OF 46 ES-401 B1 LEVEL 3 - ENLARGED PLANS - 3A04D

39 OF 46 ES-402 B1 LEVEL 4 - ENLARGED PLANS - 4A-5A1

FIRE PROTECTION

40 OF 46 FX001 COVER SHEET

41 OF 46 FX101 B1 LEVEL 3 - PARTIAL FIRE PROTECTION PLAN - WEST

42 OF 46 FX102 B1 LEVEL 4 - PARTIAL FIRE PROTECTION PLAN - WEST

43 OF 46 FX103 B1 LEVEL 4 - PARTIAL FIRE PROTECTION PLAN - EAST

44 OF 46 FX401 B1 LEVEL 3 - ENLARGED FIRE PROTECTION PLANS - 3A04D

45 OF 46 FX402 B1 LEVEL 4 - ENLARGED FIRE PROTECTION PLANS - 4A-5A1

46 OF 46 FX403 B1 LEVEL 4 - ENLARGED FIRE PROTECTION PLANS - 4A55 AND

5B17

Revisions: Date:

BUS

B U S

BUS

65 A B

74 A B

A B

MAIN

ENTRANCE

SIGN

V A

M O N U M E N T

S

IG

N

M O N U M E N T

S

IG

N

S P E E D

B U M P

S P E E D

B U M P

U T

IL

IT

Y

V A U L T

TANK

DIESEL

TANK

DIESEL

F R

E S

N O

S T

R E

E T

SOLAR PANELS

SOLAR PANELS

BBQ

MOTORCYCLES

YIELD

YIELD

B-1

MAIN

HOSPITAL

B-32

WAREHOUSE

B-19A

GENERATOR

SWITCHGEAR

B-19

MAIN

SWITCHGEAR

STAGING AREA

FUEL TANK #1 FUEL TANK #2

G E

N E

R A

T O

R

G E

N E

R A

T O

R

G E

N E

R A

T O

R

G E

N E

R A

T O

R

G E

N E

R A

T O

R

B-34

MENTAL

HEALTH

BLDG

B-3

ENGINEERING

T-5

ENGR. TRAILER

B-24

LIBERTY

BLDG

B-24

BREEZEWAY

B-24

AUDITORIUM

B-25

MENTAL

HEALTH

FREEDOM

BLDG

B-36

BARN

B-2

BOILER

PLANT

B-22

CHILLER

B-22A

CHILLER B-31

COMMUNITY

LIVING

CENTER

CLC

BUILDING

LOT C

MODULAR 2

OPC

OUTPATIENT

CLINIC

B-7

GASOLINE

PUMP AND

TANKS

B-8

STORAGE

SHEDS

B-4

PUMPHOUSE

B-17

LIQUID OXYGEN

STORAGE

CANOPY

PARKING LOT E

HARVARD AVENUE

PARKING LOT D

P A

R K

IN

G

L O

T C

PARKING LOT B

PARKING LOT A

W A

L K

O F

H O

N O

R

P A

R K

IN

G

L O

T H

O P

C

A N

C

IL

L A

R Y

P A

R K

IN

G

L O

T F

PARKING LOT G

B-5

PUMPHOUSE

B-27

MENTAL HEALTH

INDEPENDANCE BUILDING

N O

R T

H A

N G

U S

S T

R E

E T

CLINTON AVENUELAY DOWN AREA

CONFIRM WITH COR

TRUE

NORTH

VA CENTRAL CALIFORNIA

HEALTHCARE SYSTEM

AREA OF WORK / ISOLATED

CONSTRUCTION ZONE

CAMPUS BUILDINGS

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

GS101

FACILITY SITE PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK CH

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 02 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

1; OPC

BID Set

NOT TO SCALE

FACILITY SITE PLAN

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. COORDINATE CONTRACTOR STAGING AREA WITH VA COR

AT THE PRE-CONSTRUCTION MEETING. THIS INCLUDES,

BUT IS NOT LIMITED TO, AREAS TO BE USED FOR

MATERIAL STORAGE, ACCESS FOR MATERIAL DELIVERIES

AND TRANSPORTATION ROUTES TO THE PROJECT AREA.

2. DO NOT STORE PRODUCTS, MATERIALS, TOOLS,

EQUIPMENT, VEHICLES, OR ANY OTHER NON-PERMITTED

ITEMS ON MEDICAL CENTER PROPERTY UNLESS GIVEN

PRIOR APPROVAL BY THE VA COR.

3. A LIMITED AMOUNT OF SUPPLIES MAY BE STORED IN THE

CONSTRUCTION AREA AS LONG AS SAFETY AND

CLEANLINESS ARE NOT COMPROMISED. VA COR HAS

AUTHORITY TO REQUEST RELOCATION OF ANY AND

ALL STORED ITEMS TO A DIFFERENT LOCATION.

4. VERIFY CONTRACTOR STAGING AREA AND MATERIAL /

PRODUCT DELIVERY LOCATION WITH VA COR, PRIOR TO

BRINGING OR DELIVERING ITEMS TO THE MEDICAL

CENTER.

NOT USED

65 A

74 A B

A B

S P E E D

B U M P

OUT OF SCOPE

INACCESSIBLE DURING PHASE

TEMPORARY ICRA BOUNDARY

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

TEMPORARY ICRA AIR PRESSURE

ADHESIVE WALK-OFF MATS

CONTRACTOR PATH OF TRAVEL

TEMPORARY EMERGENCY EGRESS ROUTE

HEPA EXHAUST FAN. DUCT TO EXTERIOR.

8 9 10

G

F

ICRA

CLASS IV

CHARTING

3A04C

GI LAB

SUITE

3A04

PROCEDURE

#1

3A04B

PROCEDURE

#2

3A04A

CORRIDOR

3A-2

CORRIDOR

3A-1

PRE-OP

3A04FTOILET

3A04E

CLEAN

SUPPLY

3A04D

10 11

G

F

E

D

ICRA

CLASS IV

EXAM

4A15

EXAM

4A16

EXAM

4A17

CORRIDOR

4A-5

EXAM

4A13

EXAM

4A12

EXAM

4A09

EXAM

4A10

EXAM

4A11

CORRIDOR

4A-4CORRIDOR

4A-1

GI

OFFICE

4A04

SOILED

UTILITY

4A05

COMP &

PENSION

4A06

TOILET

4A08

WOUND

CLINIC

4A07

TOILET

4B01C

TOILET

4B01B

STORAGE

4B01A

B-1

OPC

AREA SHOWN

TRUE

NORTH

TOILET

4A14

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

GS201

ICRA

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 03 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

3, 4

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

TRUE

NORTH

1. ICRA CLASS IV REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. SHEET PLASTIC, MEETING REQUIREMENTS IN THE

INFECTION CONTROL SECTION OF SPECIFICATION 01 35

26 - SAFETY REQUIREMENTS, MAY BE USED AS A MEANS

OF DUST CONTROL WHILE CONSTRUCTING AND

DEMOLISHING TEMPORARY ICRA BARRIERS.

1 TEMPORARILY SEAL DOOR FOR CONSTRUCTION PHASE.

TEMP ICRA BARRIER FRAMED TO STRUCTURE ABOVE.

CONSTRUCT PER REQUIREMENTS IN THE INFECTION CONTROL

SECTION OF SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

TEMP ICRA DOOR AND FRAME COMPLYING WITH

REQUIREMENTS IN THE INFECTION CONTROL SECTION OF

SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

EXISTING WALL ACTING AS AN ICRA BOUNDARY. SEAL

OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.

WORK AREA ACCESS POINT WITH STICKY WALK OFF MATS.

ANTE ROOM. KEEP PRESSURE NEGATIVE IN ANTE ROOM.

CONSTRUCTION WORKERS SHALL TAKE PROTECTIVE

MEASURES IN ACCORDANCE WITH ICRA REQUIREMENTS FOR

PRECAUTION LEVEL IV. CONTRACTOR SHALL COORDINATE

WITH COR FOR ICRA REQ'S ON WORKERS' ACTIVITY.

REMOVE DOOR FROM HINGES TO ALLOW ACCESS TO ANTE

ROOM DURING CONSTRUCTION. REPLACE DOOR WHEN

CONSTRUCTION IN THIS AREA IS COMPLETE.

1/4" = 1'-0"

B1 LEVEL 3 - ICRA PLAN

1/4" = 1'-0"

B1 LEVEL 4 - ICRA PLAN - 4A-5A1

TRUE

NORTH

74 A B

A B

S P E E D

B U M P

OUT OF SCOPE

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

G

F

E

D

C

B

A

MAX ALLOWABLE 300'

PROVIDED 193' - 3"

M A

X A

L L O

W A

B L E

P R

O V

ID

E

D

B-1

OPC

AREA SHOWN

TRUE

NORTH

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

GS301

FIRE LIFE SAFETY

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK CH

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 04 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

3 & 4

1. BUILDING IS FULLY SPRINKLERED.

2. EXISTING FIRE RESISTIVE RATING OF BUILDING

UNALTERED.

3. EXISTING NFPA 101 OCCUPANCY TYPE UNALTERED.

4. LENGTH OF COMMON PATH OF EGRESS BEFORE TWO

PATHS ARE PROVIDED: LESS THAN 100' (FULLY

SPRINKLERED).

5. MAX TRAVEL DISTANCE TO EXITS SHALL NOT EXCEED

300' - 0".

1/16" = 1'-0"

B1 LEVEL 4 - FIRE LIFE SAFETY

LEGEND

GENERAL NOTES

KEY PLAN

TRUE

NORTH

101A

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION / LEVEL MARKER

KEY NOTE

ROOM TAG

(SF OPTIONAL)

CEILING HEIGHT TAG

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

TOILET

150 SF

A

01A

TRUE

NORTH

W1

PROJECT

NORTH

TRUE NORTH

(DASHED)

A01

D88

A5175SOAP DISH

IN-04.02-01

ACT 2x2

9' - 0" AFF

F-1

R-1

SYMBOLS

A-101

A-101

SIM

A-101

TYP

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

(DEMO SHEET(S) ONLY)

ABOVE

BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

(DEMO SHEET(S) ONLY)

NEW DOOR

AREA SHOWN ON SHEET

OUT OF SCOPE

INACCESSIBLE DURING PHASE

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA BOUNDARY

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA BARRIER

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA DOOR

(ICRA SHEET(S) ONLY)

ADHESIVE WALK-OFF MATS

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA AIR PRESSURE

(ICRA SHEET(S) ONLY)

CONTRACTOR PATH OF TRAVEL

(ICRA SHEET(S) ONLY)

SMOKE COMPARTMENT PERIMETER

(FIRE LIFE SAFETY SHEET(S) ONLY)

SMOKE RATED WALL

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINET

(FIRE LIFE SAFETY SHEET(S) ONLY)

EMERGENCY EGRESS PATHWAY

(FIRE LIFE SAFETY SHEET(S) ONLY)

SUPPLY GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

RETURN GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

LIGHTING PER ELECTRICAL

(SIZE & PROPORTIONS MAY VARY)

MATERIALS

EARTH

SAND

BATT INSULATION

RIGID INSULATION

CONCRETE

STEEL

PLYWOOD, FIRE RATED

GYPSUM BOARD, TYPE 'X'

GYPSUM BOARD, LEAD LINED

ACOUSTICAL CEILING TILE, 2' x 2'

ACOUSTICAL CEILING TILE, 2' x 4'

A-101

A-101

SIM

FEC

ABBREVIATIONS

SYMBOLS

& AND

∠ ANGLE

@ AT

℄ CENTERLINE

° DEGREES

# NUMBER

A

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT

A(C)T ACOUSTICAL (CEILING) TILE

ACM ASBESTOS CONTAINING MATERIAL

ACW ACOUSTICAL WALL

ADA AMERICANS W/ DISABILITIES ACT

ADJ ADJACENT

A/E ARCHITECT/ENGINEER

AF ACCESS FLOOR

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATELY

ARCH ARCHITECT(URAL)

ASPH ASPHALT

A/V AUDIO / VIDEO

B

BARR BARRIER

BATH BATHROOM

BB BACKER BOARD

BLD(G) BUILDING

BLK(G) BLOCK(ING)

BLW BELOW

BM BEAM

BMT(U) BONE MARROW TRANSPLANT (UNIT)

BO BOTTOM OF

BOC BOTTOM OF CURB

BOS BOTTOM OF SLAB

BRC BRACE, BRACING

BRKT BRACKET

BRNG BEARING

BTM BOTTOM

BTWN BETWEEN

C

CAB CABINET

CC CONTRACTOR FURN, CONTRACTOR INST

CD CONSTRUCTION / CONTRACT DOCUMENTS

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR(ANCE)

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMP COMPOSITION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER REPRESENTATIVE

CORR CORRIDOR

CS CONCRETE SEALER

CT CERAMIC TILE

CTR CENTER

CV CONTRACTOR FURNISHED, VA INSTALLED

D

DB DESIGN BUILD

DBL DOUBLE

DC DIRECT CURRENT

DD DESIGN DEVELOPMENT

DEMO DEMOLISH(ION)

DEPT DEPARTMENT

DG DESIGN GUIDE

DIA DIAMETER

DIM DIMENSION

DM DESIGN MANUAL

DWN DOWN

DR DOOR

DTL DETAIL

DWG DRAWING(S)

E

E EAST

EA EACH

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

ELEV ELEVATION OR ELEVATOR

ENG ENGINEER(ING)

EOC EDGE OF CURB

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

ETS EXPOSED TO STRUCTURE

EX(IST) EXISTING

EXP EXPANSION

EXT EXTERIOR

F

FA FIRE ALARM

FD FLOOR DRAIN

FE(C) FIRE EXTINGUISHER (CABINET)

FF FACTORY FINISH

FFB FINISH FLOOR BREAK

FIN FINISH(ED)

FLASH FLASHING

FLR FLOOR(ING)

FLRSNT FLORESCENT

FNDN FOUNDATION

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOS FACE OF STUDS

FP FIRE PROOF

FR FIRE RATED

FRM FRAME

FT FOOT, FEET

FTG FOOTING

FUR FURRING

FURN FURNISHED

G

GA GAGE, GAUGE

GALV GALVANIZED

GE GENERAL ELECTRIC

G(W)B GYPSUM (WALL) BOARD

GC GENERAL CONTRACTOR

GL GRID LINE

GLB GLUE LAMINATED BEAM

GMU GLASS MASONRY UNIT

GOV(T) GOVERNMENT

GYP GYPSUM BOARD

H

HAC HOUSEKEEPING AIDES CLOSET

HDR HEADER

H(D)W(E) HARDWARE

HM HOLLOW METAL

HORZ HORIZONTAL

HPDL HIGH PRESSURE DECORATIVE LAM

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATION & AIR CONDITIONING

HW HARDWARE

I

ICRA INFECTIOUS CONTROL RISK ASSESSMENT

ID INSIDE DIAMETER OR DIM

ILSM INTERIM LIFE SAFETY MEASURES

INCL INCLUDE(D,ING)

INST INSTALL

INSUL INSULATION

INT INTERIOR

J

JT JOINT

K

KV KILOVOLT

L

LAM LAMINATE(D)

LAV LAVATORY

LCM LEAD CONTAINING MATERIAL(S)

LD LEAD

LT LIGHT

M

MAT MATERIAL(S)

MAX MAXIMUM

MDF MEDIUM-DENSITY FIBREBOARD

MECH MECHANIC(AL)

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFR MANUFACTURE(R)

MIN MINIMUM

MISC MISCELLANEOUS

MOD MODIFIED

MTL METAL

N

N NORTH

N(/)A NOT APPLICABLE

NEG NEGATIVE

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O.C. ON CENTER(S)

OPN(G) OPEN(ING)

OPP OPPOSITE

OPT OPTION(AL)

OVHD OVERHEAD

P

P PAINT

PCONC PRECAST CONCRETE

PCRA PRE-CONSTRUCTION RISK ASSESSMENT

PL PLATE

PLAM PLASTIC LAMINATE

PLY(WD) PLYWOOD

PNL PANEL

PR PAIR

PRFB PREFABRICATED

PS PLASTIC

PT PORCELAIN TILE

PTN(S) PARTITION(S)

PVMT PAVEMENT

Q

QTY QUANTITY

R

RAD RADIUS

RCP(S) REFLECTED CEILING PLAN(S)

REF REFERENCE

REINF REINFORCE(D,ING)

REP REPRESENTATIVE

REQ(S,(')D) REQUIRE(D,S,MENT(S))

RESIL RESILIENT

REV REVERSE

RF ROOF

RM ROOM

RMV REMOVE

RO ROUGH OPENING

S

S SOUTH

SCHED SCHEDULE

SCI(D) SPINAL CORD INJURY (& DISABILITY)

SD SCHEMATIC DESIGN

SECT SECTION

SF SQUARE FEET

SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHG SHINGLES

SHLD(G) SHEILD(ING)

SHT(G) SHEET (SHEATHING)

SIM SIMILAR

SM SEAM

SOW SCOPE OF WORK

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

ST STAIN

STDG STANDING

STF STAFF

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SURG SURGERY, SURGICAL

SUSP SUSPENDED

SV SHEET VINYL

SYS SYSTEM

T

TBD TO BE DETERMINED

TBL TABLE

TEMP TEMPORARY

T&G TONGUE AND GROOVE

THK THICK(NESS)

THRESH THRESHOLD

TOC TABLE OF CONTENTS

TOS TOP OF SLAB

TPH TOILET PAPER HOLDER

TRANS TRANSITION

TS TUBE STEEL

TYP TYPICAL

U

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

V

VA VETERANS AFFAIRS

VAR VARIES

VB VAPOR BARRIER

VC VA FURNISHED, CONTRACTOR INSTALLED

VERT VERTICAL

VIF VERIFY IN FIELD

VV VA FURNISHED, VA INSTALLED

W

W WEST

W/ WITH

WD WOOD

WDW WINDOW

WGHT WEIGHT

W/O WITHOUT

WP WATERPROOF(ING)

WR WATER RESISTANT

WRK WORK

X

XRY X-RAY

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE

ATTENTION OF THE COR.

2. ALL WORK DONE BY THE CONTRACTOR AND/OR SUB-

CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL

OF WORKMANSHIP.

3. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE.

4. DO NOT SCALE DRAWINGS.

5. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A

+/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD

TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM

DIMENSIONS INDICATED.

6. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE

FULL SPACE INDICATED WITHOUT ENCROACHMENTS.

7. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH

THE CONTRACT DOCUMENTS.

8. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH

FLOOR ELEVATION, UON.

GENERAL NOTES

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-001

ARCH SYMBOLS,

ABBREVIATIONS &

GENERAL NOTESSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 05 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

74 A B

A B

S P E E D

B U M P

8 9 10 11 12 13 14 15

G

F

E

D

HSKPG

2A12

VSO

OFFICE

2A20

CORRIDOR

2B1

IMAGING DEPT

STORAGE

2A11

MECH

2A17A

UNISEX

REST

2A14

IMAGING

SUITE

2A16

CONTROL

2A17

IMAGING

EQUIP

2A18A

PATIENT

CHANGING

TOILET

2A18C

BREAK

2A21

PHYSICAL

MED &

REHAB

OFFICE

2A18B

SPECIAL

PROCEDURES

PRE/POST

OP

2A13

ADMIN

ASSIST

2A16A

COMM

2A19

ULTRASOUND

#2

2A09B

ULTRASOUND

SUITE

2A09

TOILET

2A08

PREP

AREA

2A07

ELEC

2A07A

MRI

CONTROL

/ WORK

2A07B

MRI

SCANNER

2A07D

IMAGING

#4

2A05

CORRIDOR

2A-2 TOILET

2A09D

ULTRASOUND

#1

2A09C

TOILET

2A06

CORRIDOR

2A02

WAITING

PASSENGER

ELEVATOR

2P-1

PASSENGER

ELEVATOR

2P-2

CORRIDOR

2-A1

108 SF

CLEAN

SUPPLY

2A09A

C O

N T

R O

L

A

A

SPECIAL

PROCEDURES

OR

2A13B

MECH

2A13B.1

CHIEF

IMAGING

2A16B

OFFICE

2A16D

CONF

2A16C

OFFICE

2A16E

OFFICE

2A16F

OFFICE

2A16G

CT

SUITE

2A18MEDICATION

PREPARATION

2A15A

ELEVATOR

LOBBY

2A15B

BREAK

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-101

B1 LEVEL 2 - PARTIAL

PLAN - CENTER

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 06 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 2 - PARTIAL PLAN - CENTER

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

2 REFER TO COR FOR COORDINATION WITH OTHER

CONSTRUCTION PROJECTS IN THIS AREA.

74 A B

A B

S P E E D

B U M P

1 2 3 4 5 6 7 8 9 10 11

G

F

E

D

C

B

A

63 SF

CLEAN

SUPPLY

3A04D

AE401

RMD

ORIGIN

RMD

DESTIN-

ATION

RMD

ORIGIN

RMD

ORIGIN

OR #3

3B10M

SUB-STERILE

3B10L

OR #4

3B10K

AUTOCLAVE

3B10K.1

SCRUB

3B-4B

STAIR #3

3B11

EQUIP

STORAGE

3B10J

STERILE

SUPPLY

3B10I

ANESTH

SUPPLY

STORAGE

3B10G

LAUNDRY/

PHATHOLOGY

3B10H

E L

E C

B

J .1

OR #2

3B10D

SUB-STERILE

3B10C

OR #1

3B10A

TOILET

3B09E

HSKPG

3B09D

PRE-OP

3B09C MEN'S

REST

3B09B

SHOWER

TOILET

WOMEN'S

REST

3B09A

SHOWER

BREAK

3B09I

CHIEF

ANESTH

3B09H

ANESTH

OFFICE

3B09G

HEAD NURSE OR /

SDPU / PACU

3B09F

MED

STORAGE

3B06A

SURGY

STORAGE

3B06B

M E

D G

A S

B

A

.I

MECH

3B06

OFFICE

3B08

S T

O R

A G

E

B

A

S T

A

IR

B

CHIEF

SURGICAL

SVC

3B01A

SURGICAL

3B01

ADPAC

3B01C

PGM

MGR

3B01B

MECH

3A01A

WAITING

3A01

PURCHASING

3A02A

CORRIDOR

3B-1

SCRUB

3B-4A

SUPPLY

COMPUTER

3B10F

CORRIDOR

3B-4

ANESTH

WORK

3B10E

AUTOCLAVE

3B10B

D U

M B

W A

IT

E

R

S T

O R

A G

E

B

CORRIDOR

3B-2

SVC

ELEVATOR

3S-3

SVC

ELEVATOR

3S-4

PASSENGER

ELEVATOR

3P-1

PASSENGER

ELEVATOR

3P-2

CORRIDOR

3A-1

PROCEDURE

#1

3A04B

PROCEDURE

#2

3A04A

CORRIDOR

3A-2

CHARTING

3A04C

TOILET

3A04E

PRE-OP

3A04F

GI LAB

SUITE

3A04 PROCEDURE

#3

3A04G

GI LAB

CHECK-IN

3A05

CHIEF

SPS

3A02B

SPS /

INVENTORY

MGMT

3A02

TOILET

3A03

CHIEF

INV

MGMT

3A02C

BREAK

3A05A

CORRIDOR

3A-6

C O

R R

ID

O

R

B

-3 A

CORRIDOR

3B-3

RECEPTION

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-102

B1 LEVEL 3 - PARTIAL

PLAN - WEST

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 07 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 3 - PARTIAL PLAN - WEST

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

74 A B

A B

S P E E D

B U M P

1 2 3 4 5 6 7 8 9 10 11

G

F

E

D

C

B

A

AE402

RMD

ORIGIN

RMD

DESTIN-

ATION

RMD ORIGIN

RMD

DESTIN-

ATION

A -1

A -1

RMD DESTINATION

TOILET

4B46C

CONFERENCE

4B46D

EXAM

4B46E

EXAM

4B46F

EXAM

4B46G

EXAM

4B46H

OFFICE

4B46O

OFFICE

4B46Q

OFFICE

4B46P

OFFICE

4B46N

OFFICE

4B37

TOILET

4B46B.1

STAIR #3

4B46R

WOMEN'S

HEALTH

WAITING

4B46

MEETING

/ BREAK

4B46B

VISITOR'S

TOILET

4B46A

OFFICE

4B38

58 SF

CLEAN

SUPPLY

4B39

TOILET

4B40

HSKPG

4B44

EXAM

4B46I

EXAM

4B46J

OFFICE

4B46K

77 SF

CLEAN

SUPPLY

4B46L

INSTRUMENT TRAY

PROCED

4B46M

EXAM

4B36

EXAM

4B35

MECH

4B34

EXAM

4B41

COMM

4B42

EXAM

4B32

EXAM

4B31

TOILET

4B33

EXAM

4B27

OFFICE

4B30

HEALTH

NURSE

4B29

EXAM

4B28

CORRIDOR

4B-4

SOCIAL

WORK

OFFICE

4B16

EXAM

4B18

EXAM

4B20

MEDICINE

4B17

CORRIDOR

EXAM

4B19

TOILET

4B15 OFFICE

4B14

OFFICE

4B13

DUMBWAITER /

STORAGE

4B10

OFFICE

4B09

MECH

4B08

CONFERENCE

4B07

OFFICE

WORK

AREA

4B02

S T

A

IR

B

STAFF

LOUNGE

/ BREAK

4B01

EXAM

4B26

EXAM

4B25

EXAM

4B23

EXAM

4B22

EXAM

4B21

C O

R R

ID

O

R

B

-6

CORRIDOR

4B-6A

CORRIDOR

4B-5C

C O

R R

ID

O

R

B

-5 B

S T

O R

A G

E

B

M E

C H

A

H S

K P

G

B

CORRIDOR

4B-3

CORRIDOR

4B-2

CORRIDOR

4A-1

S T

O R

A G

E

B

A TOILET

4B01B

TOILET

4B01C

GI

OFFICE

4A04

COMP &

PENSION

4A06SOILED

UTILITY

4A05

DIETITIANS

4A02A

TOILET

4A02B TOILET

4A03

OFFICE

4A02F

OFFICE

4A02D

STORAGE

4A02C

CORRIDOR

4A-3

OFFICE

4A02E

OFFICE

4A02G

OFFICE

4A02H

EXAM

4A15

CORRIDOR

4A-5

TOILET

4A14

EXAM

4A13

EXAM

4A12

EXAM

4A11

EXAM

4A10

EXAM

4A09

TOILET

4A08

WOUND

CLINIC

4A07

EXAM

4A16

EXAM

4A17

C O

R R

ID

O

R

A

-5 A

C O

R R

ID

O

R

B

-1

59 SF

CLEAN

SUPPLY

4A-5A1

SEE NEXT SHEET

FOR LOCATION OF

RMD ORGIN

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-103

B1 LEVEL 4 - PARTIAL

PLAN - WEST

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 08 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 4 - PARTIAL PLAN - WEST

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

A B

74 A B

A B

S P E E D

B U M P

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

8 9 10 11 12 13 14 15

G

F

E

A -1

A -1

RMD ORIGIN

RMD DESTINATION

RMD

ORIGIN

CORRIDOR

4A-1

CORRIDOR

4A-4

GI

OFFICE

4A04

SOILED

UTILITY

4A05

DIETITIANS

4A02A

TOILET

4A02B TOILET

4A03

OFFICE

4A02F

OFFICE

4A02D

STORAGE

4A02C

CORRIDOR

4A-3

OFFICE

4A02E

OFFICE

4A02G

OFFICE

4A02H

EXAM

4A15

CORRIDOR

4A-5

TOILET

4A14

EXAM

4A13

EXAM

4A10

EXAM

4A09

TOILET

4A08

EXAM

4A17

EXAM

4A18 C

O R

R

ID

O R

A

-5 A

EXAM

4A21

EXAM

4A22

EXAM

4A23

EXAM

4A20

OFFICE

4A28

EXAM

4A27

SOILED

UTILITY

4A24

MEDICINE

4A29

TOILET

4A35

COMM

4A31

TOILET

4A32

EXAM

4A33

EXAM

4A26

EXAM

4A25

MECH

4A19

C O

R R

ID

O

R

A

-5 B

CORRIDOR

4A-5C

C O

R R

ID

O

R

A

-5 D

C O

R R

ID

O

R

A

-5 E

EXAM

4A34

59 SF

CLEAN

SUPPLY

4A-5A1

SEE NEXT SHEET

FOR LOCATION OF

RMD ORGIN

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-104

B1 LEVEL 4 - PARTIAL

PLAN - CENTER

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 09 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1/8" = 1'-0"

B1 LEVEL 4 - PARTIAL PLAN - CENTER

74 A B

A B

S P E E D

B U M P

PANELS

SOLAR

PANELS

SOLAR

11 12 13 14 15 16 17 18

G

F

E

D

A -1

A -1

RMD DESTINATION

RMD ORIGIN

RMD ORIGIN

RMD ORIGIN

RMD ORIGIN

RMD ORIGIN

RMD

ORIGIN

CORRIDOR

4A-4

CORRIDOR

4A-5

EXAM

4A10

EXAM

4A09

TOILET

4A08

WOUND

CLINIC

4A07

EXAM

4A17

EXAM

4A18

EXAM

4A21

EXAM

4A22

EXAM

4A23

EXAM

4A20

OFFICE

4A28

EXAM

4A27

SOILED

UTILITY

4A24

MEDICINE

4A29

TOILET

4A35

COMM

4A31

TOILET

4A32

EXAM

4A33

EXAM

4A26

EXAM

4A25

MECH

4A19

C O

R R

ID

O

R

A

-5 B

CORRIDOR

4A-5C

C O

R R

ID

O

R

A

-5 D

C O

R R

ID

O

R

A

-5 E

C O

R R

ID

O

R

A

-5 F

C O

R R

ID

O

R

A

-5 G

EXAM

4A34

EXAM

4A39

EXAM

4A40

EXAM

4A41

EXAM

4A42

EXAM

4A37

EXAM

4A38

OFFICE

4A36

TOILET

4A60

OFFICE

4A59

CORRIDOR

4A-6

EXAM

4A57

EXAM

4A56

STAIR #1

4A58

24 SF

CLEAN

SUPPLY

4A55

EXAM

4A54

EXAM

4A52

EXAM

4A51

EXAM

4A53

EXAM

4A43

72 SF

CLEAN

SUPPLY

4A45

HSKPG

4A47

BIO-HAZARD

4A48

EXAM

4A50

EXAM

4A49

EXAM

4A44

EXAM

4A46

SEE PRVIOUS SHEET

FOR LOCATION OF

RMD DESTINATION

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-105

B1 LEVEL 4 - PARTIAL

PLAN - EAST

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 10 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 4 - PARTIAL PLAN - EAST

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

74 A B

A B

S P E E D

B U M P

1 2 3 4 5 6 7 8 9 10 11

G

F

E

D

C

B

A

A -1

A -1

R E

S P

IR

A

T O

R Y

C A

R E

B

PULMONARY

FUNCTION

5B02

QUIET

5B03

STAIR

#2

5B04

RESPIRATORY

CARE

ADMIN

5B10

D U

M B

W A

IT

E

R

S T

O R

A G

E

B

TR

5B12

PATIENT

5B13

PATIENT

5B14

CHARTING

5B15

TOILET

5B16

413 SF

CLEAN

SUPPLY

5B17

STORAGE

EKG

MACHINE

5B18

PATIENT

5B19

PATIENT

5B20

PATIENT

5B21

PATIENT

5B22

PATIENT

5B23

PATIENT

5B24

STAIR

#3

5B25

CHARTING

5B30

STORAGE

5B31

CLEAN

LINEN

5B32

PATIENT

5B33

PATIENT

5B34

PATIENT

5B35

PATIENT

5B36

PATIENT

5B37

PATIENT

5B38

RESPIRARTORY

SUPPLIES

5B39

TELE /

ICU

NURSE

MANAGER

5B40

MENS

REST

5B41A

EYEWASH

5B42

TOILET

5B43

HAC

5B44

STORAGE

5B45

WOMEN'S

REST

5B41B

OFFICE

5B10A

TOILET

5B13A

TOILET

5B14AA

N

T E

B

.1

A N

T E

B

.1

COMM

5B46

MEDICATION

5B47

SOILED

UTILITY

5B48

TOILET

5B03B

STORAGE

5B03A

STORAGE

5B02A

WAITING

5A01

TOILET

5A02

LINEN

CHUTE

5A03

HAC

5A04

D U

M B

W A

IT

E

R

S T

O R

A G

E

A

PATIENT

5A32

MED /

SURG

HEAD

NURSE

5A33

INPATIENT

SOCIAL

WORKER

5A34

PATIENT

5A35

PATIENT

5A36

PATIENT

5A37

SOILED

UTILITY

5A38

SOILED

UTILITY

5A39

BATH

5A36A

BATH

5A37A

BATH

5A35A

CORRIDOR

5A-1A

CORRIDOR

5A-3A

CORRIDOR

5B-3

C O

R R

ID

O

R

B

-3 B

NURSE

STATION

5B-3C

NURSE

STATION

5B-3D

CORRIDOR

5B-3

C O

R R

ID

O

R

B

-1

ELEVATOR

LOBBY

5A-1

BREAK

5B41

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-106

B1 LEVEL 5 - PARTIAL

PLAN - WEST

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 11 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 5 - PARTIAL PLAN - WEST

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

74 A B

A B

S P E E D

B U M P

PANELS

SOLAR

PANELS

SOLAR

11 12 13 14 15 16 17 18

G

F

E

D

C

A -1

A -1

PATIENT

5A06

PATIENT

5A07

PATIENT

5A08

PATIENT

5A09

PATIENT

5A10

PATIENT

5A11

PATIENT

5A12

PATIENT

5A13

STAFF

LOCKER

5A14

STAIR #1

5A15

PATIENT

5A20

198 SF

CLEAN

SUPPLY

5A21

CONFERENCE

5A22

PATIENT

5A23

PATIENT

5A24

PATIENT

5A25

PATIENT

5A26

95 SF

CLEAN

SUPPLY

5A27

ISOLATION

5A28

ANTE

5A29

ISOLATION

5A30

CORRIDOR

5A-1B

STORAGE

5A46

PATIENT

5A31

PATIENT

5A32

CHARTING

5A40

MEDS

5A41

TR

5A42

TOILET

5A43

TOILET

5A44

85 SF

CLEAN

SUPPLY

5A45

BATH

5A31.1

BATH

5A26A

CORRIDOR

5A-1

CORRIDOR

5A-1

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-107

B1 LEVEL 5 - PARTIAL

PLAN - EAST

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 12 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 5 - PARTIAL PLAN - EAST

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

74 A B

A B

S P E E D

B U M P

PANELS

SOLAR

PANELS

SOLAR

11 12 13 14 15 16 17 18

G

F

E

D

ONE

BED

6A04

BATH

6A05

ONE

BED

6A06

ONE

BED

6A07

BATH

6A08

ONE

BED

6A09

ONE

BED

6A10

ONE

BED

6A12

BATH

6A11

ACCESSIBLE

ONE

BED

6A13

BATH

6A14

ACCESSIBLE

ONE

BED

6A15

SUPERVISING

NURSE

6A16

PATIENT

INTERVIEW

6A17

STAIR #1

6A18

GROUP

THERAPY

6A20

DAY

6A22

RECREATIONAL

THERAPY

6A23

EXAM

6A24

STORAGE

6A25

LAUNDRY

6A26

PSYCH

6A27

ANTE

6A28

64 SF

CLEAN

SUPPLY

6A29

NURSE

STATION

6A30

PSYCHIATRY

RESIDENTS

6A27E

ONE

BED

6A31

BATH

6A32

ONE

BED

6A33

ONE

BED

6A34

BATH

6A35

ONE

BED

6A36

MEDICINE

6A39

CLEAN

LINEN

6A40

TOILET

6B30A

BREAK

6B30B

STORAGE

6A27A

HAC

6A27B

TOILET

6A27C

CHIEF

INPATIENT

PSYCHIATRY

6A27D

PSYCHIATRIST

6A27F

SOCIAL

WORKER

6A27G

REC

THERAPY

6A27H

STORAGE

6A27H.1

CORRIDOR

6A-3

CORRIDOR

6A-4

CORRIDOR

6A-3B

CORRIDOR

6A-3C

CORRIDOR

6A-3A

NOURISH

6A30C

TOILET

6A28A

SECLUSION

6A28B

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-108

B1 LEVEL 6 - PARTIAL

PLAN - EAST

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 13 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/8" = 1'-0"

B1 LEVEL 6 - PARTIAL PLAN - EAST

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

74 A B

A B

S P E E D

B U M P

PANELS

SOLAR

PANELS

SOLAR

OA

OA6

OB

OB1

OC

OD

OE

OF

OG

O1 O2 O3 O4 O5 O5A O6

EXAM

1C66

EXAM

1C68

TOILET

1C67 EXAM

1C69

EXAM

1C72

EXAM

1C74

EXAM

1C75

EXAM

1C76

RESIDENT

OFFICE

1C02

CLINICAL

PHARMACIST

1C01

DIETICIAN/MOVE

COORDINATOR

1C03

BREAK

1C05

CORRIDOR

1C-1

52 SF

CLEAN

SUPPLY

1C06

STAIR #4

1C07

EXAM

1C13

EXAM

1C14

TOILET

1C15

MENTAL

HEALTH

INT

1C16

TOILET

1C17

EXAM

1C18

EXAM

1C21

EXAM

1C22

EXAM

1C23

EXAM

1C24

EXAM

1C28

EXAM

1C29

EXAM

1C32

EXAM

1C34

EXAM

1C35

EXAM

1C36

EXAM

1C37

EXAM

1C38

STAIR

#5

1C39

EXAM

1C42

EXAM

1C43

ELEC

CLOSET

1C44

COMM

1C45

TOILET

1C27

EXAM

1C30

EXAM

1C31

EXAM

1C33

CORRIDOR

1C-2

EXAM

1C25

EXAM

1C26

TELERETINAL

1C20

SOCIAL

WORK

1C19

OFFICE /

EXAM

1C12

EXAM

1C46

CLINICAL

PHARMACIST

1C47

PC

CLINICAL

MANAGER

1C56

EXAM

1C57

CHARTING

1C48

WOMEN'S

REST

1C55

MEN'S

REST

1C49

EXAM

1C79

TOILET

1C78

TELE

HEALTH

1C73

EXAM

1C71

EXAM

1C70

EXAM

1C59

EXAM

1C60

EXAM

1C63

EXAM

1C54

70 SF

MEDICAL

STORAGE

1C53

EXAM

1C52

EXAM

1C61

EXAM

1C62

EXAM

1C64

EXAM

1C65

NURSE

MANAGER

1C04C

NURSE

MANAGER

1C04B

INTERVIEW

1C04A

EXAM

1C77

CORRIDOR

C1-2G

PC

ADMIN

SUPPORT

1C58

HSKPG

1C51

SOILED

LINEN

1C50

CORRIDOR

C1-2D

CORRIDOR

1C-2C

CORRIDOR

1C-2B

ELEVATOR

1S-6

ELEVATOR

1S-5

WAITING

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-109

OPC LEVEL 1 - OVERALL

PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK MC

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 14 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

OPC

BID Set

TRUE

NORTH

1/8" = 1'-0"

OPC LEVEL 1 - FLOOR PLAN

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

74 A B

A B

S P E E D

B U M P

PANELS

SOLAR

PANELS

SOLAR

OA

OA6

OB

OB1

OC

OD

OE

OF

OG

O1 O2 O3 O4 O5 O5A O6

NEURO

DIAGNOSTICS

2C01

KORRECT

OPTICAL

2C02

TOILET

2C03

TOILET

2C05

HEMA /

ONC

EXAM

2C06A

HEMA /

ONC

EXAM

2C06C

EXAM

2C06E

HEMA /

ONC

STAFF

OFFICE

2C06G

CONFERENCE

2C06I

INFUSION

CLINIC

2C06K

CORRIDOR

2C-5

59 SF

CLEAN

SUPPLY

2C06J

PALLATIVE

EXAM

2C06H

HEMA /

ONC

FELLOWS

EXAM

2C06F

CE

2C06D

HEMA /

ONC

CO-ORDR

OFFICE

2C06B

NURSING

IN-TAKE

2C06

HEMA /

ONC

NURSES

OFFICE

2C04

HEMA /

ONC

PHARM

2C07

TOILET

2C09

HSKPG

2C10

STAIR

#4

2C11

VISUAL

IMPAITRMENT

SVC

2C12

HELEN

WONG

MD

2C13

EYE

EXAM

PHOTO

LAB

2C14

CHIEF

EYE

CLINIC

2C15A

EYE

CLINIC

CHECKING

2C15

TRIAGE /

TECH

2C15B

EYE

CLINIC 1

2C15C

EYE

CLINIC 2

2C15F

EYE

CLINIC 3

2C15G

EYE

CLINIC 4

2C15H

HVF

2C15I

EYE

CHARTING

2C15K

TOILET

2C15J

EYE

CLINIC 6

2C15L

EYE

CLINIC 7

2C15M

EYE

CLINIC 8

2C15N

EYE

CLINIC

2C15P

STAIR #5

2C15Q

STORAGE

2C15R

CORRIDOR

2C-2

EYE

CLINIC

2C15S

EYE

CLINIC

2C15T

TOILET

2C06K.1

DIRECTOR

CARD

IMAGING

OFFICE

2C08K

CARD

ATT

EXAM

2C08I

OFFICE

RN /

BSM

2C08F

ELECTROCARDIOGRAM

EXAM

2C08D TOILET

2C08B

COPIER

FRIDGE

2C08A

CHIEF

CARDIOLOGY

2C08P

TREADMILL

2C08O

CORRIDOR

2C-3

ECHO

2CO8N

STORAGE

2C08Q

TOILET

2C08R

CARD

OFFICE

2C08S

COMM

2C15D

ELEC

2C15E

CARDIOLOGY

EXAM

2C08W

CARDIOLOGY

EXAM

2C08Y

EYE

CLINIC 9

2C15O

CARD

OFFICE

2C08L

CARD

FELLOWS

CONFERENCE

2C08J

ECHO

FELLOWS

OFFICE

2C08H

CHIEF

DIRECTORS

OFFICE

2C08G

CHIEF

NURSE

OFFICE

2C08E

ECHO

2C08C

CARDIOLOGY

EXAM

2C08T

CARDIOLOGY

EXAM

2C08U

CARDIOLOGY

EXAM

2C08V

CARDIOLOGY

EXAM

2C08X

CARDIOLOGY

EXAM

2C08Z

RECEPTION

2C08M

WAITING

CORRIDOR

2C-1

ELEVATOR

2S-6

ELEVATOR

2S-5

COPY

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-110

OPC LEVEL 2 - OVERALL

PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 15 of 53

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

OPC

BID Set

1/8" = 1'-0"

OPC LEVEL 2 - FLOOR PLAN

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

VHAFREMurphB Text Box

2. REFER TO PART B FOR WORK IN CLEAN SUPPLY ROOM 2C15R.

VHAFREMurphB Rectangle

VHAFREMurphB Text Box

VHAFREMurphB Ellipse

74 A B

A B

S P E E D

B U M P

PANELS

SOLAR

PANELS

SOLAR

OA

OA6

OB

OB1

OC

OD

OE

OF

OG

O1 O2 O3 O4 O5 O5A O6

CORRIDOR

3C-1

PRE-OP

3C17A

TOILET

3C17B

TOILET

3C17C

60 SF

CLEAN

SUPPLY

3C17D

BREAK

3C17E

TREATMENT

#3

3C17F

TREATMENT

#2

3C17G

TREATMENT

#1

3C17H

TOILET

3C17I

POST

ANESTHESIA

RECOVERY

3C17J

ON-CALL

3C17K

SOILED

UTILITY

3C17L

STORAGE

3C17M

RECOVERY

CHECK-IN

3C17

OFFICE

3C-18

HSKPG

3C16

STAIR #5

DENTAL

CHECK-IN

3C10

STORAGE

3C10E

CHIEF

OF

DENTAL

3C10F

IMAGING

3C10G

TREATMENT

3C10H

TREATMENT

3C10I

TREATMENT

3C10J

TREATMENT

3C10K

OPERATORY 1

3C10L

HYGIENE

3C10M

TOILET

3C10N

OPERATORY 2

3C10O

OPERATORY 3

3C10P

OPERATORY 4

3C10Q

182 SF

STORAGE

3C10R

DENTAL

LAB

3C10S

ORAL

SURGERY

3C10T

INSTRUMENT

& PREP

3C10U

TREATMENT

3C10V

CONFERENCE

3C10A

HYGIENE

EXAM

3C10B

HYGIENE

EXAM

3C10C

ADMIN

OFFICE

3C10D

AUDIOLOGY

SUPV

OFFICE

3C01

WOMEN'S

REST

3C02

HSKPG

3C03

MENS

REST

3C04 OFFICE

3C05

OBSERVATION

SAME

DAY

PROCEDURE

RECOVERY

CORRIDOR

3C-6

SUITE #3

3C11B

AUDIOLOGY

SUITE

3C11

CONTROL

SO-337C

SUITE #2

SO-337B

CALIBRATION

3C11A

CONTROL

SO-337E

SUITE #1

SO-337D

AUDIOLOGY

CHECK

IN

3C12

COMM

3C13

COMM

3C14

ELEC

3C15

90 SF

CLEAN SUPPLY

3C10W

CORRIDOR

3C-3

C O

R R

ID

O

R

C

-4

CORRIDOR

3C-5

SOILED

UTILITY

3C17J.1

STORAGE

3C17J.2

BATH

3C17K.1

STAIR

#4

3C07

NURSING

MOTHER

RM/COPIER

3C06

CORRIDOR

3C-4

TOILET

3C17J.3

CORRIDOR

3C-5A

CORRIDOR

3C-2

CORRIDOR

3C-3A C

O R

R

ID

O R

C

-3 B

ELEVATOR

3S-6

ELEVATOR

3S-5

WAITING

ELEVATOR

LOBBY

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS

MUCH AS POSSIBLE.

MECHANICAL WORK ONLY IN THIS ROOM. REFER TO

MECHANICAL DOCUMENTS.

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

A-111

OPC LEVEL 3 - OVERALL

PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 MK AB

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 16 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

OPC

BID Set

1/8" = 1'-0"

OPC LEVEL 3 - FLOOR PLAN

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

74 A B

A B

S P E E D

B U M P

8 9

G

F

63 SF

CLEAN

SUPPLY

3A04D

(R) EXISTING RMD CABINETS, TYP

E0948 EQUIPMENT CART

M4255(R) IV STAND

IN-04.02-01

01b 01b

3A04D

4 01b

PROCEDURE #1

3A04B

PROCEDURE #2

3A04A

CHARTING

3A04C

TOILET

3A04E

8 9

G

F

63 SF

CLEAN

SUPPLY

3A04D

PROCEDURE #1

3A04B

PROCEDURE #2

3A04A

GI LAB SUITE

3A04

CHARTING

3A04C

TOILET

3A04E

8 9

G

F

63 SF

CLEAN

SUPPLY

3A04D

GYP - 1 HR FR

8' - 0" AFF

PROCEDURE #1

3A04B

PROCEDURE #2

3A04A

GI LAB SUITE

3A04

CHARTING

3A04C

TOILET

3A04E

8 9

G

F

63 SF

CLEAN

SUPPLY

3A04D

PROCEDURE #1

3A04B

PROCEDURE #2

3A04A

GI LAB SUITE

3A04

CHARTING

3A04C

TOILET

3A04E

B-1

OPC

AREA SHOWN

TRUE

NORTH

OUT OF SCOPE

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

TO DEMOLISH

EXISTING TO REMAIN

Building No.

Drawing Number

Project Number

Location

Date Checked Drawn

Drawing Title

Approved:

VA FORM

08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t

Department of Veteran Affairs

35% SD

65% DD

08/23/2022

11/23/2022

Project Phase

FULLY SPRINKLERED

95% DD 09/22/2023

100% CD 01/08/2024

AE401

B1 LEVEL 3 - ENLARGED

PLANS - 3A04D

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA

PROJECT DIRECTOR

03/20/2024 AB MK

FRESNO VAMC CONSOLIDATE

STERILE SUPPLY ROOMS

Dwg. 17 of 47

570-22-219

2615 E CLINTON AVE, FRESNO, CA 93703

BID Set

1/4" = 1'-0"

B1 LEVEL 3 - ENLARGED PLAN - 3A04D

1/4" = 1'-0"

B1 LEVEL 3 - DEMO PLAN - 3A04D

1/4" = 1'-0"

B1 LEVEL 3 - CEILING PLAN - 3A04D

1/4" = 1'-0"

B1 LEVEL 3 - DEMO CEILING PLAN - 3A04D

1. RMD TO GO IN RENOVATED CLEAN SUPPLY

A. X4 SCOPE CABINETS (36"W X 18"D X 80"H)

a. EGD SCOPE CABINET

b. ERCP SCOPE CABINET

c. ADULT SCOPE CABINET

d. PEDIATRIC SCOPE CABINET

B. X3 IV POLE, ON WHEELS

C. X38 DIALATORS

a. CURRENTLY IN DRAWER (31"W X 24"D X 11"H)

b. RELOCATE TO EQUIPMENT CART

D. X1 BRONCHOSCOPE

a. CURRENTLY IN DRAWER (31"W X 24"D X 11"H

b. RELOCATE TO EQUIPMENT CART

E. X2 MANOMETER

a. CURRENTLY ON COUNTER

b. RELOCATE TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .