570-22-219 Construction Drawings -.pdf
PDF 22 MB Posted
- Solicitation number
- 36C26125R0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0012 RFI_3.docx | DOCX document | |
| 36C26125R0012 0006.docx | DOCX document | |
| 36C26125R0012 0005.docx | DOCX document | |
| 36C26125R0012 RFI_2.docx | DOCX document | |
| 36C26125R0012 0004.docx | DOCX document | |
| SOW Consolidate Sterile Supply Rooms_Jan 22 .pdf | ||
| 36C26125R0012 0003.docx | DOCX document | |
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| 36C26125R0012 RFIs.docx | DOCX document | |
| 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS.docx | DOCX document | |
| 36C26125R0012 0002.docx | DOCX document | |
| Site Visit Log_01-08-2025.pdf | ||
| 36C26125R0012 0001.docx | DOCX document | |
| 570-22-219 Construction Specifications.pdf | ||
| Large Business Subcontracting Plan Template.docx | DOCX document | |
| Price Breakdown.xlsx | XLSX spreadsheet | |
| RFI Form - 36C26125R0012.docx | DOCX document | |
| Wage Determination CA20240018 Oct 18 2024.pdf | ||
| 36C26125R0012_1.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
VELTRE ENGINEERING
STRUCTURAL
SIMPSON GUMPERTZ & HEGER (SGH)
ELECTRICAL
MECHANICAL
1150 S. OLIVE STREET, SUITE 1600
LOS ANGELES, CA 90015
PHONE: (213) 271-2000
300 DESCHUTES WAY SW, SUITE 210
TUMWATER, WA 98501
PHONE: (360) 706-1257
PROJECT MGMT
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
PHONE: (619) 770-8552
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
PHONE: (619) 770-8552
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
PHONE: (619) 770-8552
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
SITE ZONING:
CONST TYPE:
OCCUPANCY:
CODE ANALYSIS
PROJECT DESCRIPTION
THIS PROJECT ENCOMPASSES THE
CONSOLIDATION OF THE SATELLITE STERILE
STORAGE ROOMS CONTAINING RMD LOCATED
THROUGHOUT THE HOSPITAL FRESNO VAMC.
THIS INCLUDES: THE UPGRADES TO THE HVAC
SYSTEMS SERVING THESE AREAS, THE
ADJUSTMENT AND REPLACEMENT OF
EXISTING EQUIPMENT, AND ARCHITECTURAL
RENOVATION TO BRING NEW AND EXISTING
SPACES UP TO THE VA STANDARD.
APPLICABLE BUILDING
BUILDING 1, OPC
APPLICABLE FLOOR
BUILDING 1: 2, 3, 4, 5, 6
OPC: 0,1, 2, 3
ICRA CLASS REQUIREMENTS
CONST TYPE:
CLINIC RISK:
CLASS REQS:
APPROX SQUARE FEET IN SCOPE
1,500 SF
TYPE C
HIGHEST
CLASS IV
CALIFORNIA
FRESNO
FRESNO
GOV, VETERANS AFFAIRS
1A B
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF, AND VERIFY WITH, VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
8. ALL PRODUCTS AND/ OR MANUFACTURES INDICATED ON DRAWINGS SHALL COMPLY WITH
SPECIFICATIONS AND/OR APPROVED IN WRITING BY ARCHITECT PRIOR TO ORDERING OR INSTALLING
OF MATERIAL.
APPLICABLE PUBLICATIONS
AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA
SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ).
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION
GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL). SEE ABOVE.
INTERNATIONAL BUILDING CODE (IBC) 2021.
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021.
NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER
IBC.
NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
NATIONAL ELECTRICAL CODE (NEC).
INTERNATIONAL PLUMBING CODE (IPC) 2021.
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS
(ASME) A 17.1.
ASME BOILER AND PRESSURE VESSEL CODE.
ASME CODE FOR PRESSURE PIPING.
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
ENERGY POLICY ACT OF 2005 (EPACT).
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR
PARTS 433,434 AND 435.
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATION
MANAGEMENT.
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS
SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2022.
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 - 2019.
VAMC APPROVED HARDWARE LOCKING STANDARDS.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).
AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).
FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND STANDARDS FOR
TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).
INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND
INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).
JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),
ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.
FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE
DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.
THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL
ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING
“ENVIRONMENTALLY RESPONSIBLE DESIGN”.
APPLICABLE VA STANDARDS
MASTER CONSTRUCTION SPECIFICATIONS (PG18-1)
DESIGN AND CONSTRUCTION PROCEDURES (PG18-3), TOPIC 1 - CODES, STANDARDS & EXECUTIVE ORDERS
SEPTEMBER 2013
EQUIPMENT GUIDE LISTS (PG18-5)
DESIGN MANUALS (PG18-10)
LOGISTICS SERVICE AND STERILE PROCESSING SERVICE DESIGN GUIDES (PG18-12)
ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT BARRIER
FREE DESIGN GUIDE (PG18-13)
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of
Construction and Facilities
Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e in c h s o n e fo o t o h e fo o t o n e a d a lf h e fo o t th q u a rt rs e fo o t o e fo o t th ig h th e fo o t o a rt e r i n e fo o t o e fo o t
Department of
Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
G-001
COVER SHEET
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK MC
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 01 of 46
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
FRESNO VAMC CONSOLIDATE STERILE SUPPLY ROOMS
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT #: 570-22-219
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
01 OF 46 G-001 COVER SHEET
02 OF 46 GS101 FACILITY SITE PLAN
03 OF 46 GS201 ICRA
04 OF 46 GS301 FIRE LIFE SAFETY
ARCHITECTURAL
05 OF 46 A-001 ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES
06 OF 46 A-101 B1 LEVEL 2 - PARTIAL PLAN - CENTER
07 OF 46 A-102 B1 LEVEL 3 - PARTIAL PLAN - WEST
08 OF 46 A-103 B1 LEVEL 4 - PARTIAL PLAN - WEST
09 OF 46 A-104 B1 LEVEL 4 - PARTIAL PLAN - CENTER
10 OF 46 A-105 B1 LEVEL 4 - PARTIAL PLAN - EAST
11 OF 46 A-106 B1 LEVEL 5 - PARTIAL PLAN - WEST
12 OF 46 A-107 B1 LEVEL 5 - PARTIAL PLAN - EAST
13 OF 46 A-108 B1 LEVEL 6 - PARTIAL PLAN - EAST
14 OF 46 A-109 OPC LEVEL 1 - OVERALL PLAN
15 OF 46 A-110 OPC LEVEL 2 - OVERALL PLAN
16 OF 46 A-111 OPC LEVEL 3 - OVERALL PLAN
17 OF 46 AE401 B1 LEVEL 3 - ENLARGED PLANS - 3A04D
18 OF 46 AE402 B1 LEVEL 4 - ENLARGED PLANS - 4A-5A1
19 OF 46 A-501 DETAILS
20 OF 46 A-601 SCHEDULES
MECHANICAL
21 OF 46 M-001 MECHANICAL COVER SHEET
22 OF 46 M-102 MECHANICAL B1 2ND FLOOR PLAN
23 OF 46 M-103 MECHANICAL B1 3RD FLOOR PLAN
24 OF 46 M-203 MECHANICAL B1 3RD FLOOR ROOM PLANS
25 OF 46 M-104 MECHANICAL B1 4TH FLOOR PLAN
26 OF 46 M-204 MECHANICAL B1 4TH FLOOR ROOM PLANS
27 OF 46 M-304 MECHANICAL B1 4TH FLOOR ROOM PLANS
28 OF 46 M-404 MECHANICAL B1 4TH FLOOR ROOM PLANS
29 OF 46 M-105 MECHANICAL B1 5TH FLOOR PLAN
30 OF 46 M-205 MECHANICAL B1 5TH FLOOR ROOM PLANS
31 OF 46 M-106 MECHANICAL B1 6TH FLOOR PLAN
32 OF 46 M-108 MECHANICAL OPC 1ST FLOOR PLAN
33 OF 46 M-109 MECHANICAL OPC 2ND FLOOR PLAN
34 OF 46 M-110 MECHANICAL OPC 3RD FLOOR PLAN
35 OF 46 M-401 MECHANICAL SCHEDULES
36 OF 46 M-501 MECHANICAL DETAILS
ELECTRICAL
37 OF 46 ES-001 ELECTRICAL SYMBOLS, GENERAL NOTES AND ABBREVIATIONS
38 OF 46 ES-401 B1 LEVEL 3 - ENLARGED PLANS - 3A04D
39 OF 46 ES-402 B1 LEVEL 4 - ENLARGED PLANS - 4A-5A1
FIRE PROTECTION
40 OF 46 FX001 COVER SHEET
41 OF 46 FX101 B1 LEVEL 3 - PARTIAL FIRE PROTECTION PLAN - WEST
42 OF 46 FX102 B1 LEVEL 4 - PARTIAL FIRE PROTECTION PLAN - WEST
43 OF 46 FX103 B1 LEVEL 4 - PARTIAL FIRE PROTECTION PLAN - EAST
44 OF 46 FX401 B1 LEVEL 3 - ENLARGED FIRE PROTECTION PLANS - 3A04D
45 OF 46 FX402 B1 LEVEL 4 - ENLARGED FIRE PROTECTION PLANS - 4A-5A1
46 OF 46 FX403 B1 LEVEL 4 - ENLARGED FIRE PROTECTION PLANS - 4A55 AND
5B17
Revisions: Date:
BUS
B U S
BUS
65 A B
74 A B
A B
MAIN
ENTRANCE
SIGN
V A
M O N U M E N T
S
IG
N
M O N U M E N T
S
IG
N
S P E E D
B U M P
S P E E D
B U M P
U T
IL
IT
Y
V A U L T
TANK
DIESEL
TANK
DIESEL
F R
E S
N O
S T
R E
E T
SOLAR PANELS
SOLAR PANELS
BBQ
MOTORCYCLES
YIELD
YIELD
B-1
MAIN
HOSPITAL
B-32
WAREHOUSE
B-19A
GENERATOR
SWITCHGEAR
B-19
MAIN
SWITCHGEAR
STAGING AREA
FUEL TANK #1 FUEL TANK #2
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
B-34
MENTAL
HEALTH
BLDG
B-3
ENGINEERING
T-5
ENGR. TRAILER
B-24
LIBERTY
BLDG
B-24
BREEZEWAY
B-24
AUDITORIUM
B-25
MENTAL
HEALTH
FREEDOM
BLDG
B-36
BARN
B-2
BOILER
PLANT
B-22
CHILLER
B-22A
CHILLER B-31
COMMUNITY
LIVING
CENTER
CLC
BUILDING
LOT C
MODULAR 2
OPC
OUTPATIENT
CLINIC
B-7
GASOLINE
PUMP AND
TANKS
B-8
STORAGE
SHEDS
B-4
PUMPHOUSE
B-17
LIQUID OXYGEN
STORAGE
CANOPY
PARKING LOT E
HARVARD AVENUE
PARKING LOT D
P A
R K
IN
G
L O
T C
PARKING LOT B
PARKING LOT A
W A
L K
O F
H O
N O
R
P A
R K
IN
G
L O
T H
O P
C
A N
C
IL
L A
R Y
P A
R K
IN
G
L O
T F
PARKING LOT G
B-5
PUMPHOUSE
B-27
MENTAL HEALTH
INDEPENDANCE BUILDING
N O
R T
H A
N G
U S
S T
R E
E T
CLINTON AVENUELAY DOWN AREA
CONFIRM WITH COR
TRUE
NORTH
VA CENTRAL CALIFORNIA
HEALTHCARE SYSTEM
AREA OF WORK / ISOLATED
CONSTRUCTION ZONE
CAMPUS BUILDINGS
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
GS101
FACILITY SITE PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK CH
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 02 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
1; OPC
BID Set
NOT TO SCALE
FACILITY SITE PLAN
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1. COORDINATE CONTRACTOR STAGING AREA WITH VA COR
AT THE PRE-CONSTRUCTION MEETING. THIS INCLUDES,
BUT IS NOT LIMITED TO, AREAS TO BE USED FOR
MATERIAL STORAGE, ACCESS FOR MATERIAL DELIVERIES
AND TRANSPORTATION ROUTES TO THE PROJECT AREA.
2. DO NOT STORE PRODUCTS, MATERIALS, TOOLS,
EQUIPMENT, VEHICLES, OR ANY OTHER NON-PERMITTED
ITEMS ON MEDICAL CENTER PROPERTY UNLESS GIVEN
PRIOR APPROVAL BY THE VA COR.
3. A LIMITED AMOUNT OF SUPPLIES MAY BE STORED IN THE
CONSTRUCTION AREA AS LONG AS SAFETY AND
CLEANLINESS ARE NOT COMPROMISED. VA COR HAS
AUTHORITY TO REQUEST RELOCATION OF ANY AND
ALL STORED ITEMS TO A DIFFERENT LOCATION.
4. VERIFY CONTRACTOR STAGING AREA AND MATERIAL /
PRODUCT DELIVERY LOCATION WITH VA COR, PRIOR TO
BRINGING OR DELIVERING ITEMS TO THE MEDICAL
CENTER.
NOT USED
65 A
74 A B
A B
S P E E D
B U M P
OUT OF SCOPE
INACCESSIBLE DURING PHASE
TEMPORARY ICRA BOUNDARY
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
TEMPORARY ICRA AIR PRESSURE
ADHESIVE WALK-OFF MATS
CONTRACTOR PATH OF TRAVEL
TEMPORARY EMERGENCY EGRESS ROUTE
HEPA EXHAUST FAN. DUCT TO EXTERIOR.
8 9 10
G
F
ICRA
CLASS IV
CHARTING
3A04C
GI LAB
SUITE
3A04
PROCEDURE
#1
3A04B
PROCEDURE
#2
3A04A
CORRIDOR
3A-2
CORRIDOR
3A-1
PRE-OP
3A04FTOILET
3A04E
CLEAN
SUPPLY
3A04D
10 11
G
F
E
D
ICRA
CLASS IV
EXAM
4A15
EXAM
4A16
EXAM
4A17
CORRIDOR
4A-5
EXAM
4A13
EXAM
4A12
EXAM
4A09
EXAM
4A10
EXAM
4A11
CORRIDOR
4A-4CORRIDOR
4A-1
GI
OFFICE
4A04
SOILED
UTILITY
4A05
COMP &
PENSION
4A06
TOILET
4A08
WOUND
CLINIC
4A07
TOILET
4B01C
TOILET
4B01B
STORAGE
4B01A
B-1
OPC
AREA SHOWN
TRUE
NORTH
TOILET
4A14
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
GS201
ICRA
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 03 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
3, 4
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
TRUE
NORTH
1. ICRA CLASS IV REQUIREMENTS MUST BE MET
THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.
2. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
4. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE
DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA
COR.
6. SHEET PLASTIC, MEETING REQUIREMENTS IN THE
INFECTION CONTROL SECTION OF SPECIFICATION 01 35
26 - SAFETY REQUIREMENTS, MAY BE USED AS A MEANS
OF DUST CONTROL WHILE CONSTRUCTING AND
DEMOLISHING TEMPORARY ICRA BARRIERS.
1 TEMPORARILY SEAL DOOR FOR CONSTRUCTION PHASE.
TEMP ICRA BARRIER FRAMED TO STRUCTURE ABOVE.
CONSTRUCT PER REQUIREMENTS IN THE INFECTION CONTROL
SECTION OF SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.
TEMP ICRA DOOR AND FRAME COMPLYING WITH
REQUIREMENTS IN THE INFECTION CONTROL SECTION OF
SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.
EXISTING WALL ACTING AS AN ICRA BOUNDARY. SEAL
OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.
WORK AREA ACCESS POINT WITH STICKY WALK OFF MATS.
ANTE ROOM. KEEP PRESSURE NEGATIVE IN ANTE ROOM.
CONSTRUCTION WORKERS SHALL TAKE PROTECTIVE
MEASURES IN ACCORDANCE WITH ICRA REQUIREMENTS FOR
PRECAUTION LEVEL IV. CONTRACTOR SHALL COORDINATE
WITH COR FOR ICRA REQ'S ON WORKERS' ACTIVITY.
REMOVE DOOR FROM HINGES TO ALLOW ACCESS TO ANTE
ROOM DURING CONSTRUCTION. REPLACE DOOR WHEN
CONSTRUCTION IN THIS AREA IS COMPLETE.
1/4" = 1'-0"
B1 LEVEL 3 - ICRA PLAN
1/4" = 1'-0"
B1 LEVEL 4 - ICRA PLAN - 4A-5A1
TRUE
NORTH
74 A B
A B
S P E E D
B U M P
OUT OF SCOPE
EMERGENCY EGRESS ROUTE
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
G
F
E
D
C
B
A
MAX ALLOWABLE 300'
PROVIDED 193' - 3"
M A
X A
L L O
W A
B L E
P R
O V
ID
E
D
B-1
OPC
AREA SHOWN
TRUE
NORTH
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
GS301
FIRE LIFE SAFETY
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK CH
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 04 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
3 & 4
1. BUILDING IS FULLY SPRINKLERED.
2. EXISTING FIRE RESISTIVE RATING OF BUILDING
UNALTERED.
3. EXISTING NFPA 101 OCCUPANCY TYPE UNALTERED.
4. LENGTH OF COMMON PATH OF EGRESS BEFORE TWO
PATHS ARE PROVIDED: LESS THAN 100' (FULLY
SPRINKLERED).
5. MAX TRAVEL DISTANCE TO EXITS SHALL NOT EXCEED
300' - 0".
1/16" = 1'-0"
B1 LEVEL 4 - FIRE LIFE SAFETY
LEGEND
GENERAL NOTES
KEY PLAN
TRUE
NORTH
101A
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION / LEVEL MARKER
KEY NOTE
ROOM TAG
(SF OPTIONAL)
CEILING HEIGHT TAG
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
TOILET
150 SF
A
01A
TRUE
NORTH
W1
PROJECT
NORTH
TRUE NORTH
(DASHED)
A01
D88
A5175SOAP DISH
IN-04.02-01
ACT 2x2
9' - 0" AFF
F-1
R-1
SYMBOLS
A-101
A-101
SIM
A-101
TYP
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
(DEMO SHEET(S) ONLY)
ABOVE
BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
(DEMO SHEET(S) ONLY)
NEW DOOR
AREA SHOWN ON SHEET
OUT OF SCOPE
INACCESSIBLE DURING PHASE
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BOUNDARY
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BARRIER
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA DOOR
(ICRA SHEET(S) ONLY)
ADHESIVE WALK-OFF MATS
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA AIR PRESSURE
(ICRA SHEET(S) ONLY)
CONTRACTOR PATH OF TRAVEL
(ICRA SHEET(S) ONLY)
SMOKE COMPARTMENT PERIMETER
(FIRE LIFE SAFETY SHEET(S) ONLY)
SMOKE RATED WALL
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
(FIRE LIFE SAFETY SHEET(S) ONLY)
EMERGENCY EGRESS PATHWAY
(FIRE LIFE SAFETY SHEET(S) ONLY)
SUPPLY GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
RETURN GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
LIGHTING PER ELECTRICAL
(SIZE & PROPORTIONS MAY VARY)
MATERIALS
EARTH
SAND
BATT INSULATION
RIGID INSULATION
CONCRETE
STEEL
PLYWOOD, FIRE RATED
GYPSUM BOARD, TYPE 'X'
GYPSUM BOARD, LEAD LINED
ACOUSTICAL CEILING TILE, 2' x 2'
ACOUSTICAL CEILING TILE, 2' x 4'
A-101
A-101
SIM
FEC
ABBREVIATIONS
SYMBOLS
& AND
∠ ANGLE
@ AT
℄ CENTERLINE
° DEGREES
# NUMBER
A
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
A(C)T ACOUSTICAL (CEILING) TILE
ACM ASBESTOS CONTAINING MATERIAL
ACW ACOUSTICAL WALL
ADA AMERICANS W/ DISABILITIES ACT
ADJ ADJACENT
A/E ARCHITECT/ENGINEER
AF ACCESS FLOOR
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ASPH ASPHALT
A/V AUDIO / VIDEO
B
BARR BARRIER
BATH BATHROOM
BB BACKER BOARD
BLD(G) BUILDING
BLK(G) BLOCK(ING)
BLW BELOW
BM BEAM
BMT(U) BONE MARROW TRANSPLANT (UNIT)
BO BOTTOM OF
BOC BOTTOM OF CURB
BOS BOTTOM OF SLAB
BRC BRACE, BRACING
BRKT BRACKET
BRNG BEARING
BTM BOTTOM
BTWN BETWEEN
C
CAB CABINET
CC CONTRACTOR FURN, CONTRACTOR INST
CD CONSTRUCTION / CONTRACT DOCUMENTS
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMP COMPOSITION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER REPRESENTATIVE
CORR CORRIDOR
CS CONCRETE SEALER
CT CERAMIC TILE
CTR CENTER
CV CONTRACTOR FURNISHED, VA INSTALLED
D
DB DESIGN BUILD
DBL DOUBLE
DC DIRECT CURRENT
DD DESIGN DEVELOPMENT
DEMO DEMOLISH(ION)
DEPT DEPARTMENT
DG DESIGN GUIDE
DIA DIAMETER
DIM DIMENSION
DM DESIGN MANUAL
DWN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING(S)
E
E EAST
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATION OR ELEVATOR
ENG ENGINEER(ING)
EOC EDGE OF CURB
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
ETS EXPOSED TO STRUCTURE
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F
FA FIRE ALARM
FD FLOOR DRAIN
FE(C) FIRE EXTINGUISHER (CABINET)
FF FACTORY FINISH
FFB FINISH FLOOR BREAK
FIN FINISH(ED)
FLASH FLASHING
FLR FLOOR(ING)
FLRSNT FLORESCENT
FNDN FOUNDATION
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUDS
FP FIRE PROOF
FR FIRE RATED
FRM FRAME
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FURN FURNISHED
G
GA GAGE, GAUGE
GALV GALVANIZED
GE GENERAL ELECTRIC
G(W)B GYPSUM (WALL) BOARD
GC GENERAL CONTRACTOR
GL GRID LINE
GLB GLUE LAMINATED BEAM
GMU GLASS MASONRY UNIT
GOV(T) GOVERNMENT
GYP GYPSUM BOARD
H
HAC HOUSEKEEPING AIDES CLOSET
HDR HEADER
H(D)W(E) HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAM
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION & AIR CONDITIONING
HW HARDWARE
I
ICRA INFECTIOUS CONTROL RISK ASSESSMENT
ID INSIDE DIAMETER OR DIM
ILSM INTERIM LIFE SAFETY MEASURES
INCL INCLUDE(D,ING)
INST INSTALL
INSUL INSULATION
INT INTERIOR
J
JT JOINT
K
KV KILOVOLT
L
LAM LAMINATE(D)
LAV LAVATORY
LCM LEAD CONTAINING MATERIAL(S)
LD LEAD
LT LIGHT
M
MAT MATERIAL(S)
MAX MAXIMUM
MDF MEDIUM-DENSITY FIBREBOARD
MECH MECHANIC(AL)
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODIFIED
MTL METAL
N
N NORTH
N(/)A NOT APPLICABLE
NEG NEGATIVE
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O.C. ON CENTER(S)
OPN(G) OPEN(ING)
OPP OPPOSITE
OPT OPTION(AL)
OVHD OVERHEAD
P
P PAINT
PCONC PRECAST CONCRETE
PCRA PRE-CONSTRUCTION RISK ASSESSMENT
PL PLATE
PLAM PLASTIC LAMINATE
PLY(WD) PLYWOOD
PNL PANEL
PR PAIR
PRFB PREFABRICATED
PS PLASTIC
PT PORCELAIN TILE
PTN(S) PARTITION(S)
PVMT PAVEMENT
Q
QTY QUANTITY
R
RAD RADIUS
RCP(S) REFLECTED CEILING PLAN(S)
REF REFERENCE
REINF REINFORCE(D,ING)
REP REPRESENTATIVE
REQ(S,(')D) REQUIRE(D,S,MENT(S))
RESIL RESILIENT
REV REVERSE
RF ROOF
RM ROOM
RMV REMOVE
RO ROUGH OPENING
S
S SOUTH
SCHED SCHEDULE
SCI(D) SPINAL CORD INJURY (& DISABILITY)
SD SCHEMATIC DESIGN
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHG SHINGLES
SHLD(G) SHEILD(ING)
SHT(G) SHEET (SHEATHING)
SIM SIMILAR
SM SEAM
SOW SCOPE OF WORK
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STDG STANDING
STF STAFF
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SURG SURGERY, SURGICAL
SUSP SUSPENDED
SV SHEET VINYL
SYS SYSTEM
T
TBD TO BE DETERMINED
TBL TABLE
TEMP TEMPORARY
T&G TONGUE AND GROOVE
THK THICK(NESS)
THRESH THRESHOLD
TOC TABLE OF CONTENTS
TOS TOP OF SLAB
TPH TOILET PAPER HOLDER
TRANS TRANSITION
TS TUBE STEEL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
V
VA VETERANS AFFAIRS
VAR VARIES
VB VAPOR BARRIER
VC VA FURNISHED, CONTRACTOR INSTALLED
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W
W WEST
W/ WITH
WD WOOD
WDW WINDOW
WGHT WEIGHT
W/O WITHOUT
WP WATERPROOF(ING)
WR WATER RESISTANT
WRK WORK
X
XRY X-RAY
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE COR.
2. ALL WORK DONE BY THE CONTRACTOR AND/OR SUB-
CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL
OF WORKMANSHIP.
3. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE.
4. DO NOT SCALE DRAWINGS.
5. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A
+/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD
TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM
DIMENSIONS INDICATED.
6. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE
FULL SPACE INDICATED WITHOUT ENCROACHMENTS.
7. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH
THE CONTRACT DOCUMENTS.
8. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH
FLOOR ELEVATION, UON.
GENERAL NOTES
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-001
ARCH SYMBOLS,
ABBREVIATIONS &
GENERAL NOTESSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 05 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
74 A B
A B
S P E E D
B U M P
8 9 10 11 12 13 14 15
G
F
E
D
HSKPG
2A12
VSO
OFFICE
2A20
CORRIDOR
2B1
IMAGING DEPT
STORAGE
2A11
MECH
2A17A
UNISEX
REST
2A14
IMAGING
SUITE
2A16
CONTROL
2A17
IMAGING
EQUIP
2A18A
PATIENT
CHANGING
TOILET
2A18C
BREAK
2A21
PHYSICAL
MED &
REHAB
OFFICE
2A18B
SPECIAL
PROCEDURES
PRE/POST
OP
2A13
ADMIN
ASSIST
2A16A
COMM
2A19
ULTRASOUND
#2
2A09B
ULTRASOUND
SUITE
2A09
TOILET
2A08
PREP
AREA
2A07
ELEC
2A07A
MRI
CONTROL
/ WORK
2A07B
MRI
SCANNER
2A07D
IMAGING
#4
2A05
CORRIDOR
2A-2 TOILET
2A09D
ULTRASOUND
#1
2A09C
TOILET
2A06
CORRIDOR
2A02
WAITING
PASSENGER
ELEVATOR
2P-1
PASSENGER
ELEVATOR
2P-2
CORRIDOR
2-A1
108 SF
CLEAN
SUPPLY
2A09A
C O
N T
R O
L
A
A
SPECIAL
PROCEDURES
OR
2A13B
MECH
2A13B.1
CHIEF
IMAGING
2A16B
OFFICE
2A16D
CONF
2A16C
OFFICE
2A16E
OFFICE
2A16F
OFFICE
2A16G
CT
SUITE
2A18MEDICATION
PREPARATION
2A15A
ELEVATOR
LOBBY
2A15B
BREAK
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-101
B1 LEVEL 2 - PARTIAL
PLAN - CENTER
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 06 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 2 - PARTIAL PLAN - CENTER
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
2 REFER TO COR FOR COORDINATION WITH OTHER
CONSTRUCTION PROJECTS IN THIS AREA.
74 A B
A B
S P E E D
B U M P
1 2 3 4 5 6 7 8 9 10 11
G
F
E
D
C
B
A
63 SF
CLEAN
SUPPLY
3A04D
AE401
RMD
ORIGIN
RMD
DESTIN-
ATION
RMD
ORIGIN
RMD
ORIGIN
OR #3
3B10M
SUB-STERILE
3B10L
OR #4
3B10K
AUTOCLAVE
3B10K.1
SCRUB
3B-4B
STAIR #3
3B11
EQUIP
STORAGE
3B10J
STERILE
SUPPLY
3B10I
ANESTH
SUPPLY
STORAGE
3B10G
LAUNDRY/
PHATHOLOGY
3B10H
E L
E C
B
J .1
OR #2
3B10D
SUB-STERILE
3B10C
OR #1
3B10A
TOILET
3B09E
HSKPG
3B09D
PRE-OP
3B09C MEN'S
REST
3B09B
SHOWER
TOILET
WOMEN'S
REST
3B09A
SHOWER
BREAK
3B09I
CHIEF
ANESTH
3B09H
ANESTH
OFFICE
3B09G
HEAD NURSE OR /
SDPU / PACU
3B09F
MED
STORAGE
3B06A
SURGY
STORAGE
3B06B
M E
D G
A S
B
A
.I
MECH
3B06
OFFICE
3B08
S T
O R
A G
E
B
A
S T
A
IR
B
CHIEF
SURGICAL
SVC
3B01A
SURGICAL
3B01
ADPAC
3B01C
PGM
MGR
3B01B
MECH
3A01A
WAITING
3A01
PURCHASING
3A02A
CORRIDOR
3B-1
SCRUB
3B-4A
SUPPLY
COMPUTER
3B10F
CORRIDOR
3B-4
ANESTH
WORK
3B10E
AUTOCLAVE
3B10B
D U
M B
W A
IT
E
R
S T
O R
A G
E
B
CORRIDOR
3B-2
SVC
ELEVATOR
3S-3
SVC
ELEVATOR
3S-4
PASSENGER
ELEVATOR
3P-1
PASSENGER
ELEVATOR
3P-2
CORRIDOR
3A-1
PROCEDURE
#1
3A04B
PROCEDURE
#2
3A04A
CORRIDOR
3A-2
CHARTING
3A04C
TOILET
3A04E
PRE-OP
3A04F
GI LAB
SUITE
3A04 PROCEDURE
#3
3A04G
GI LAB
CHECK-IN
3A05
CHIEF
SPS
3A02B
SPS /
INVENTORY
MGMT
3A02
TOILET
3A03
CHIEF
INV
MGMT
3A02C
BREAK
3A05A
CORRIDOR
3A-6
C O
R R
ID
O
R
B
-3 A
CORRIDOR
3B-3
RECEPTION
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-102
B1 LEVEL 3 - PARTIAL
PLAN - WEST
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 07 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 3 - PARTIAL PLAN - WEST
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
74 A B
A B
S P E E D
B U M P
1 2 3 4 5 6 7 8 9 10 11
G
F
E
D
C
B
A
AE402
RMD
ORIGIN
RMD
DESTIN-
ATION
RMD ORIGIN
RMD
DESTIN-
ATION
A -1
A -1
RMD DESTINATION
TOILET
4B46C
CONFERENCE
4B46D
EXAM
4B46E
EXAM
4B46F
EXAM
4B46G
EXAM
4B46H
OFFICE
4B46O
OFFICE
4B46Q
OFFICE
4B46P
OFFICE
4B46N
OFFICE
4B37
TOILET
4B46B.1
STAIR #3
4B46R
WOMEN'S
HEALTH
WAITING
4B46
MEETING
/ BREAK
4B46B
VISITOR'S
TOILET
4B46A
OFFICE
4B38
58 SF
CLEAN
SUPPLY
4B39
TOILET
4B40
HSKPG
4B44
EXAM
4B46I
EXAM
4B46J
OFFICE
4B46K
77 SF
CLEAN
SUPPLY
4B46L
INSTRUMENT TRAY
PROCED
4B46M
EXAM
4B36
EXAM
4B35
MECH
4B34
EXAM
4B41
COMM
4B42
EXAM
4B32
EXAM
4B31
TOILET
4B33
EXAM
4B27
OFFICE
4B30
HEALTH
NURSE
4B29
EXAM
4B28
CORRIDOR
4B-4
SOCIAL
WORK
OFFICE
4B16
EXAM
4B18
EXAM
4B20
MEDICINE
4B17
CORRIDOR
EXAM
4B19
TOILET
4B15 OFFICE
4B14
OFFICE
4B13
DUMBWAITER /
STORAGE
4B10
OFFICE
4B09
MECH
4B08
CONFERENCE
4B07
OFFICE
WORK
AREA
4B02
S T
A
IR
B
STAFF
LOUNGE
/ BREAK
4B01
EXAM
4B26
EXAM
4B25
EXAM
4B23
EXAM
4B22
EXAM
4B21
C O
R R
ID
O
R
B
-6
CORRIDOR
4B-6A
CORRIDOR
4B-5C
C O
R R
ID
O
R
B
-5 B
S T
O R
A G
E
B
M E
C H
A
H S
K P
G
B
CORRIDOR
4B-3
CORRIDOR
4B-2
CORRIDOR
4A-1
S T
O R
A G
E
B
A TOILET
4B01B
TOILET
4B01C
GI
OFFICE
4A04
COMP &
PENSION
4A06SOILED
UTILITY
4A05
DIETITIANS
4A02A
TOILET
4A02B TOILET
4A03
OFFICE
4A02F
OFFICE
4A02D
STORAGE
4A02C
CORRIDOR
4A-3
OFFICE
4A02E
OFFICE
4A02G
OFFICE
4A02H
EXAM
4A15
CORRIDOR
4A-5
TOILET
4A14
EXAM
4A13
EXAM
4A12
EXAM
4A11
EXAM
4A10
EXAM
4A09
TOILET
4A08
WOUND
CLINIC
4A07
EXAM
4A16
EXAM
4A17
C O
R R
ID
O
R
A
-5 A
C O
R R
ID
O
R
B
-1
59 SF
CLEAN
SUPPLY
4A-5A1
SEE NEXT SHEET
FOR LOCATION OF
RMD ORGIN
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-103
B1 LEVEL 4 - PARTIAL
PLAN - WEST
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 08 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 4 - PARTIAL PLAN - WEST
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
A B
74 A B
A B
S P E E D
B U M P
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
8 9 10 11 12 13 14 15
G
F
E
A -1
A -1
RMD ORIGIN
RMD DESTINATION
RMD
ORIGIN
CORRIDOR
4A-1
CORRIDOR
4A-4
GI
OFFICE
4A04
SOILED
UTILITY
4A05
DIETITIANS
4A02A
TOILET
4A02B TOILET
4A03
OFFICE
4A02F
OFFICE
4A02D
STORAGE
4A02C
CORRIDOR
4A-3
OFFICE
4A02E
OFFICE
4A02G
OFFICE
4A02H
EXAM
4A15
CORRIDOR
4A-5
TOILET
4A14
EXAM
4A13
EXAM
4A10
EXAM
4A09
TOILET
4A08
EXAM
4A17
EXAM
4A18 C
O R
R
ID
O R
A
-5 A
EXAM
4A21
EXAM
4A22
EXAM
4A23
EXAM
4A20
OFFICE
4A28
EXAM
4A27
SOILED
UTILITY
4A24
MEDICINE
4A29
TOILET
4A35
COMM
4A31
TOILET
4A32
EXAM
4A33
EXAM
4A26
EXAM
4A25
MECH
4A19
C O
R R
ID
O
R
A
-5 B
CORRIDOR
4A-5C
C O
R R
ID
O
R
A
-5 D
C O
R R
ID
O
R
A
-5 E
EXAM
4A34
59 SF
CLEAN
SUPPLY
4A-5A1
SEE NEXT SHEET
FOR LOCATION OF
RMD ORGIN
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-104
B1 LEVEL 4 - PARTIAL
PLAN - CENTER
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 09 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1/8" = 1'-0"
B1 LEVEL 4 - PARTIAL PLAN - CENTER
74 A B
A B
S P E E D
B U M P
PANELS
SOLAR
PANELS
SOLAR
11 12 13 14 15 16 17 18
G
F
E
D
A -1
A -1
RMD DESTINATION
RMD ORIGIN
RMD ORIGIN
RMD ORIGIN
RMD ORIGIN
RMD ORIGIN
RMD
ORIGIN
CORRIDOR
4A-4
CORRIDOR
4A-5
EXAM
4A10
EXAM
4A09
TOILET
4A08
WOUND
CLINIC
4A07
EXAM
4A17
EXAM
4A18
EXAM
4A21
EXAM
4A22
EXAM
4A23
EXAM
4A20
OFFICE
4A28
EXAM
4A27
SOILED
UTILITY
4A24
MEDICINE
4A29
TOILET
4A35
COMM
4A31
TOILET
4A32
EXAM
4A33
EXAM
4A26
EXAM
4A25
MECH
4A19
C O
R R
ID
O
R
A
-5 B
CORRIDOR
4A-5C
C O
R R
ID
O
R
A
-5 D
C O
R R
ID
O
R
A
-5 E
C O
R R
ID
O
R
A
-5 F
C O
R R
ID
O
R
A
-5 G
EXAM
4A34
EXAM
4A39
EXAM
4A40
EXAM
4A41
EXAM
4A42
EXAM
4A37
EXAM
4A38
OFFICE
4A36
TOILET
4A60
OFFICE
4A59
CORRIDOR
4A-6
EXAM
4A57
EXAM
4A56
STAIR #1
4A58
24 SF
CLEAN
SUPPLY
4A55
EXAM
4A54
EXAM
4A52
EXAM
4A51
EXAM
4A53
EXAM
4A43
72 SF
CLEAN
SUPPLY
4A45
HSKPG
4A47
BIO-HAZARD
4A48
EXAM
4A50
EXAM
4A49
EXAM
4A44
EXAM
4A46
SEE PRVIOUS SHEET
FOR LOCATION OF
RMD DESTINATION
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-105
B1 LEVEL 4 - PARTIAL
PLAN - EAST
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 10 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 4 - PARTIAL PLAN - EAST
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
74 A B
A B
S P E E D
B U M P
1 2 3 4 5 6 7 8 9 10 11
G
F
E
D
C
B
A
A -1
A -1
R E
S P
IR
A
T O
R Y
C A
R E
B
PULMONARY
FUNCTION
5B02
QUIET
5B03
STAIR
#2
5B04
RESPIRATORY
CARE
ADMIN
5B10
D U
M B
W A
IT
E
R
S T
O R
A G
E
B
TR
5B12
PATIENT
5B13
PATIENT
5B14
CHARTING
5B15
TOILET
5B16
413 SF
CLEAN
SUPPLY
5B17
STORAGE
EKG
MACHINE
5B18
PATIENT
5B19
PATIENT
5B20
PATIENT
5B21
PATIENT
5B22
PATIENT
5B23
PATIENT
5B24
STAIR
#3
5B25
CHARTING
5B30
STORAGE
5B31
CLEAN
LINEN
5B32
PATIENT
5B33
PATIENT
5B34
PATIENT
5B35
PATIENT
5B36
PATIENT
5B37
PATIENT
5B38
RESPIRARTORY
SUPPLIES
5B39
TELE /
ICU
NURSE
MANAGER
5B40
MENS
REST
5B41A
EYEWASH
5B42
TOILET
5B43
HAC
5B44
STORAGE
5B45
WOMEN'S
REST
5B41B
OFFICE
5B10A
TOILET
5B13A
TOILET
5B14AA
N
T E
B
.1
A N
T E
B
.1
COMM
5B46
MEDICATION
5B47
SOILED
UTILITY
5B48
TOILET
5B03B
STORAGE
5B03A
STORAGE
5B02A
WAITING
5A01
TOILET
5A02
LINEN
CHUTE
5A03
HAC
5A04
D U
M B
W A
IT
E
R
S T
O R
A G
E
A
PATIENT
5A32
MED /
SURG
HEAD
NURSE
5A33
INPATIENT
SOCIAL
WORKER
5A34
PATIENT
5A35
PATIENT
5A36
PATIENT
5A37
SOILED
UTILITY
5A38
SOILED
UTILITY
5A39
BATH
5A36A
BATH
5A37A
BATH
5A35A
CORRIDOR
5A-1A
CORRIDOR
5A-3A
CORRIDOR
5B-3
C O
R R
ID
O
R
B
-3 B
NURSE
STATION
5B-3C
NURSE
STATION
5B-3D
CORRIDOR
5B-3
C O
R R
ID
O
R
B
-1
ELEVATOR
LOBBY
5A-1
BREAK
5B41
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-106
B1 LEVEL 5 - PARTIAL
PLAN - WEST
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 11 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 5 - PARTIAL PLAN - WEST
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
74 A B
A B
S P E E D
B U M P
PANELS
SOLAR
PANELS
SOLAR
11 12 13 14 15 16 17 18
G
F
E
D
C
A -1
A -1
PATIENT
5A06
PATIENT
5A07
PATIENT
5A08
PATIENT
5A09
PATIENT
5A10
PATIENT
5A11
PATIENT
5A12
PATIENT
5A13
STAFF
LOCKER
5A14
STAIR #1
5A15
PATIENT
5A20
198 SF
CLEAN
SUPPLY
5A21
CONFERENCE
5A22
PATIENT
5A23
PATIENT
5A24
PATIENT
5A25
PATIENT
5A26
95 SF
CLEAN
SUPPLY
5A27
ISOLATION
5A28
ANTE
5A29
ISOLATION
5A30
CORRIDOR
5A-1B
STORAGE
5A46
PATIENT
5A31
PATIENT
5A32
CHARTING
5A40
MEDS
5A41
TR
5A42
TOILET
5A43
TOILET
5A44
85 SF
CLEAN
SUPPLY
5A45
BATH
5A31.1
BATH
5A26A
CORRIDOR
5A-1
CORRIDOR
5A-1
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-107
B1 LEVEL 5 - PARTIAL
PLAN - EAST
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 12 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 5 - PARTIAL PLAN - EAST
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
74 A B
A B
S P E E D
B U M P
PANELS
SOLAR
PANELS
SOLAR
11 12 13 14 15 16 17 18
G
F
E
D
ONE
BED
6A04
BATH
6A05
ONE
BED
6A06
ONE
BED
6A07
BATH
6A08
ONE
BED
6A09
ONE
BED
6A10
ONE
BED
6A12
BATH
6A11
ACCESSIBLE
ONE
BED
6A13
BATH
6A14
ACCESSIBLE
ONE
BED
6A15
SUPERVISING
NURSE
6A16
PATIENT
INTERVIEW
6A17
STAIR #1
6A18
GROUP
THERAPY
6A20
DAY
6A22
RECREATIONAL
THERAPY
6A23
EXAM
6A24
STORAGE
6A25
LAUNDRY
6A26
PSYCH
6A27
ANTE
6A28
64 SF
CLEAN
SUPPLY
6A29
NURSE
STATION
6A30
PSYCHIATRY
RESIDENTS
6A27E
ONE
BED
6A31
BATH
6A32
ONE
BED
6A33
ONE
BED
6A34
BATH
6A35
ONE
BED
6A36
MEDICINE
6A39
CLEAN
LINEN
6A40
TOILET
6B30A
BREAK
6B30B
STORAGE
6A27A
HAC
6A27B
TOILET
6A27C
CHIEF
INPATIENT
PSYCHIATRY
6A27D
PSYCHIATRIST
6A27F
SOCIAL
WORKER
6A27G
REC
THERAPY
6A27H
STORAGE
6A27H.1
CORRIDOR
6A-3
CORRIDOR
6A-4
CORRIDOR
6A-3B
CORRIDOR
6A-3C
CORRIDOR
6A-3A
NOURISH
6A30C
TOILET
6A28A
SECLUSION
6A28B
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-108
B1 LEVEL 6 - PARTIAL
PLAN - EAST
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 13 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/8" = 1'-0"
B1 LEVEL 6 - PARTIAL PLAN - EAST
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
74 A B
A B
S P E E D
B U M P
PANELS
SOLAR
PANELS
SOLAR
OA
OA6
OB
OB1
OC
OD
OE
OF
OG
O1 O2 O3 O4 O5 O5A O6
EXAM
1C66
EXAM
1C68
TOILET
1C67 EXAM
1C69
EXAM
1C72
EXAM
1C74
EXAM
1C75
EXAM
1C76
RESIDENT
OFFICE
1C02
CLINICAL
PHARMACIST
1C01
DIETICIAN/MOVE
COORDINATOR
1C03
BREAK
1C05
CORRIDOR
1C-1
52 SF
CLEAN
SUPPLY
1C06
STAIR #4
1C07
EXAM
1C13
EXAM
1C14
TOILET
1C15
MENTAL
HEALTH
INT
1C16
TOILET
1C17
EXAM
1C18
EXAM
1C21
EXAM
1C22
EXAM
1C23
EXAM
1C24
EXAM
1C28
EXAM
1C29
EXAM
1C32
EXAM
1C34
EXAM
1C35
EXAM
1C36
EXAM
1C37
EXAM
1C38
STAIR
#5
1C39
EXAM
1C42
EXAM
1C43
ELEC
CLOSET
1C44
COMM
1C45
TOILET
1C27
EXAM
1C30
EXAM
1C31
EXAM
1C33
CORRIDOR
1C-2
EXAM
1C25
EXAM
1C26
TELERETINAL
1C20
SOCIAL
WORK
1C19
OFFICE /
EXAM
1C12
EXAM
1C46
CLINICAL
PHARMACIST
1C47
PC
CLINICAL
MANAGER
1C56
EXAM
1C57
CHARTING
1C48
WOMEN'S
REST
1C55
MEN'S
REST
1C49
EXAM
1C79
TOILET
1C78
TELE
HEALTH
1C73
EXAM
1C71
EXAM
1C70
EXAM
1C59
EXAM
1C60
EXAM
1C63
EXAM
1C54
70 SF
MEDICAL
STORAGE
1C53
EXAM
1C52
EXAM
1C61
EXAM
1C62
EXAM
1C64
EXAM
1C65
NURSE
MANAGER
1C04C
NURSE
MANAGER
1C04B
INTERVIEW
1C04A
EXAM
1C77
CORRIDOR
C1-2G
PC
ADMIN
SUPPORT
1C58
HSKPG
1C51
SOILED
LINEN
1C50
CORRIDOR
C1-2D
CORRIDOR
1C-2C
CORRIDOR
1C-2B
ELEVATOR
1S-6
ELEVATOR
1S-5
WAITING
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-109
OPC LEVEL 1 - OVERALL
PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK MC
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 14 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
OPC
BID Set
TRUE
NORTH
1/8" = 1'-0"
OPC LEVEL 1 - FLOOR PLAN
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
74 A B
A B
S P E E D
B U M P
PANELS
SOLAR
PANELS
SOLAR
OA
OA6
OB
OB1
OC
OD
OE
OF
OG
O1 O2 O3 O4 O5 O5A O6
NEURO
DIAGNOSTICS
2C01
KORRECT
OPTICAL
2C02
TOILET
2C03
TOILET
2C05
HEMA /
ONC
EXAM
2C06A
HEMA /
ONC
EXAM
2C06C
EXAM
2C06E
HEMA /
ONC
STAFF
OFFICE
2C06G
CONFERENCE
2C06I
INFUSION
CLINIC
2C06K
CORRIDOR
2C-5
59 SF
CLEAN
SUPPLY
2C06J
PALLATIVE
EXAM
2C06H
HEMA /
ONC
FELLOWS
EXAM
2C06F
CE
2C06D
HEMA /
ONC
CO-ORDR
OFFICE
2C06B
NURSING
IN-TAKE
2C06
HEMA /
ONC
NURSES
OFFICE
2C04
HEMA /
ONC
PHARM
2C07
TOILET
2C09
HSKPG
2C10
STAIR
#4
2C11
VISUAL
IMPAITRMENT
SVC
2C12
HELEN
WONG
MD
2C13
EYE
EXAM
PHOTO
LAB
2C14
CHIEF
EYE
CLINIC
2C15A
EYE
CLINIC
CHECKING
2C15
TRIAGE /
TECH
2C15B
EYE
CLINIC 1
2C15C
EYE
CLINIC 2
2C15F
EYE
CLINIC 3
2C15G
EYE
CLINIC 4
2C15H
HVF
2C15I
EYE
CHARTING
2C15K
TOILET
2C15J
EYE
CLINIC 6
2C15L
EYE
CLINIC 7
2C15M
EYE
CLINIC 8
2C15N
EYE
CLINIC
2C15P
STAIR #5
2C15Q
STORAGE
2C15R
CORRIDOR
2C-2
EYE
CLINIC
2C15S
EYE
CLINIC
2C15T
TOILET
2C06K.1
DIRECTOR
CARD
IMAGING
OFFICE
2C08K
CARD
ATT
EXAM
2C08I
OFFICE
RN /
BSM
2C08F
ELECTROCARDIOGRAM
EXAM
2C08D TOILET
2C08B
COPIER
FRIDGE
2C08A
CHIEF
CARDIOLOGY
2C08P
TREADMILL
2C08O
CORRIDOR
2C-3
ECHO
2CO8N
STORAGE
2C08Q
TOILET
2C08R
CARD
OFFICE
2C08S
COMM
2C15D
ELEC
2C15E
CARDIOLOGY
EXAM
2C08W
CARDIOLOGY
EXAM
2C08Y
EYE
CLINIC 9
2C15O
CARD
OFFICE
2C08L
CARD
FELLOWS
CONFERENCE
2C08J
ECHO
FELLOWS
OFFICE
2C08H
CHIEF
DIRECTORS
OFFICE
2C08G
CHIEF
NURSE
OFFICE
2C08E
ECHO
2C08C
CARDIOLOGY
EXAM
2C08T
CARDIOLOGY
EXAM
2C08U
CARDIOLOGY
EXAM
2C08V
CARDIOLOGY
EXAM
2C08X
CARDIOLOGY
EXAM
2C08Z
RECEPTION
2C08M
WAITING
CORRIDOR
2C-1
ELEVATOR
2S-6
ELEVATOR
2S-5
COPY
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-110
OPC LEVEL 2 - OVERALL
PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 15 of 53
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
OPC
BID Set
1/8" = 1'-0"
OPC LEVEL 2 - FLOOR PLAN
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
Revisions: Date:
VHAFREMurphB Text Box
2. REFER TO PART B FOR WORK IN CLEAN SUPPLY ROOM 2C15R.
VHAFREMurphB Rectangle
VHAFREMurphB Text Box
VHAFREMurphB Ellipse
74 A B
A B
S P E E D
B U M P
PANELS
SOLAR
PANELS
SOLAR
OA
OA6
OB
OB1
OC
OD
OE
OF
OG
O1 O2 O3 O4 O5 O5A O6
CORRIDOR
3C-1
PRE-OP
3C17A
TOILET
3C17B
TOILET
3C17C
60 SF
CLEAN
SUPPLY
3C17D
BREAK
3C17E
TREATMENT
#3
3C17F
TREATMENT
#2
3C17G
TREATMENT
#1
3C17H
TOILET
3C17I
POST
ANESTHESIA
RECOVERY
3C17J
ON-CALL
3C17K
SOILED
UTILITY
3C17L
STORAGE
3C17M
RECOVERY
CHECK-IN
3C17
OFFICE
3C-18
HSKPG
3C16
STAIR #5
DENTAL
CHECK-IN
3C10
STORAGE
3C10E
CHIEF
OF
DENTAL
3C10F
IMAGING
3C10G
TREATMENT
3C10H
TREATMENT
3C10I
TREATMENT
3C10J
TREATMENT
3C10K
OPERATORY 1
3C10L
HYGIENE
3C10M
TOILET
3C10N
OPERATORY 2
3C10O
OPERATORY 3
3C10P
OPERATORY 4
3C10Q
182 SF
STORAGE
3C10R
DENTAL
LAB
3C10S
ORAL
SURGERY
3C10T
INSTRUMENT
& PREP
3C10U
TREATMENT
3C10V
CONFERENCE
3C10A
HYGIENE
EXAM
3C10B
HYGIENE
EXAM
3C10C
ADMIN
OFFICE
3C10D
AUDIOLOGY
SUPV
OFFICE
3C01
WOMEN'S
REST
3C02
HSKPG
3C03
MENS
REST
3C04 OFFICE
3C05
OBSERVATION
SAME
DAY
PROCEDURE
RECOVERY
CORRIDOR
3C-6
SUITE #3
3C11B
AUDIOLOGY
SUITE
3C11
CONTROL
SO-337C
SUITE #2
SO-337B
CALIBRATION
3C11A
CONTROL
SO-337E
SUITE #1
SO-337D
AUDIOLOGY
CHECK
IN
3C12
COMM
3C13
COMM
3C14
ELEC
3C15
90 SF
CLEAN SUPPLY
3C10W
CORRIDOR
3C-3
C O
R R
ID
O
R
C
-4
CORRIDOR
3C-5
SOILED
UTILITY
3C17J.1
STORAGE
3C17J.2
BATH
3C17K.1
STAIR
#4
3C07
NURSING
MOTHER
RM/COPIER
3C06
CORRIDOR
3C-4
TOILET
3C17J.3
CORRIDOR
3C-5A
CORRIDOR
3C-2
CORRIDOR
3C-3A C
O R
R
ID
O R
C
-3 B
ELEVATOR
3S-6
ELEVATOR
3S-5
WAITING
ELEVATOR
LOBBY
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
1. MINIMIZE DISTRUPTION ON SURROUNDING HOSPITAL AS
MUCH AS POSSIBLE.
MECHANICAL WORK ONLY IN THIS ROOM. REFER TO
MECHANICAL DOCUMENTS.
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
A-111
OPC LEVEL 3 - OVERALL
PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 MK AB
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 16 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
OPC
BID Set
1/8" = 1'-0"
OPC LEVEL 3 - FLOOR PLAN
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
74 A B
A B
S P E E D
B U M P
8 9
G
F
63 SF
CLEAN
SUPPLY
3A04D
(R) EXISTING RMD CABINETS, TYP
E0948 EQUIPMENT CART
M4255(R) IV STAND
IN-04.02-01
01b 01b
3A04D
4 01b
PROCEDURE #1
3A04B
PROCEDURE #2
3A04A
CHARTING
3A04C
TOILET
3A04E
8 9
G
F
63 SF
CLEAN
SUPPLY
3A04D
PROCEDURE #1
3A04B
PROCEDURE #2
3A04A
GI LAB SUITE
3A04
CHARTING
3A04C
TOILET
3A04E
8 9
G
F
63 SF
CLEAN
SUPPLY
3A04D
GYP - 1 HR FR
8' - 0" AFF
PROCEDURE #1
3A04B
PROCEDURE #2
3A04A
GI LAB SUITE
3A04
CHARTING
3A04C
TOILET
3A04E
8 9
G
F
63 SF
CLEAN
SUPPLY
3A04D
PROCEDURE #1
3A04B
PROCEDURE #2
3A04A
GI LAB SUITE
3A04
CHARTING
3A04C
TOILET
3A04E
B-1
OPC
AREA SHOWN
TRUE
NORTH
OUT OF SCOPE
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
TO DEMOLISH
EXISTING TO REMAIN
Building No.
Drawing Number
Project Number
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM
08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th h e fo o t o e fo o t o n e a h e fo o t th a rt e fo o t o e fo o t th h e fo o t o a rt e r i n e fo o t o e fo o t
Department of Veteran Affairs
35% SD
65% DD
08/23/2022
11/23/2022
Project Phase
FULLY SPRINKLERED
95% DD 09/22/2023
100% CD 01/08/2024
AE401
B1 LEVEL 3 - ENLARGED
PLANS - 3A04D
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
PROJECT DIRECTOR
03/20/2024 AB MK
FRESNO VAMC CONSOLIDATE
STERILE SUPPLY ROOMS
Dwg. 17 of 47
570-22-219
2615 E CLINTON AVE, FRESNO, CA 93703
BID Set
1/4" = 1'-0"
B1 LEVEL 3 - ENLARGED PLAN - 3A04D
1/4" = 1'-0"
B1 LEVEL 3 - DEMO PLAN - 3A04D
1/4" = 1'-0"
B1 LEVEL 3 - CEILING PLAN - 3A04D
1/4" = 1'-0"
B1 LEVEL 3 - DEMO CEILING PLAN - 3A04D
1. RMD TO GO IN RENOVATED CLEAN SUPPLY
A. X4 SCOPE CABINETS (36"W X 18"D X 80"H)
a. EGD SCOPE CABINET
b. ERCP SCOPE CABINET
c. ADULT SCOPE CABINET
d. PEDIATRIC SCOPE CABINET
B. X3 IV POLE, ON WHEELS
C. X38 DIALATORS
a. CURRENTLY IN DRAWER (31"W X 24"D X 11"H)
b. RELOCATE TO EQUIPMENT CART
D. X1 BRONCHOSCOPE
a. CURRENTLY IN DRAWER (31"W X 24"D X 11"H
b. RELOCATE TO EQUIPMENT CART
E. X2 MANOMETER
a. CURRENTLY ON COUNTER
b. RELOCATE TO…
This is the start of the file's text. The full file is on GovTribe.